February 10, 2016 STARS P STARS P STARS P STARS PROGRAM ROGRAM ROGRAM ROGRAM OVERVIEW VERVIEW VERVIEW VERVIEW Integrating Transportation Planning, Project Development, and Project Programming PRESENTATION RESENTATION RESENTATION RESENTATION OUTLINE UTLINE UTLINE UTLINE What is the STARS Program? How can STARS Help You? Example STARS Project Next steps 2 Strategically Targeted and Affordable Roadway Solutions

STARS P ROGRAM OOOOVERVIEWSTARS B RIDGINGRIDGINGTHE THE GGGGAPAAPPAP Planning linked to operations/ITS, safety and design Designers engaged early in the planning process …

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: STARS P ROGRAM OOOOVERVIEWSTARS B RIDGINGRIDGINGTHE THE GGGGAPAAPPAP Planning linked to operations/ITS, safety and design Designers engaged early in the planning process …

February 10, 2016

STARS PSTARS PSTARS PSTARS PROGRAMROGRAMROGRAMROGRAM

OOOOVERVIEWVERVIEWVERVIEWVERVIEW

Integrating Transportation Planning, Project

Development, and Project Programming

PPPPRESENTATIONRESENTATIONRESENTATIONRESENTATION OOOOUTLINEUTLINEUTLINEUTLINE

� What is the STARS Program?

� How can STARS Help You?

� Example STARS Project

� Next steps

2

Strategically Targeted and Affordable

Roadway Solutions

Page 2: STARS P ROGRAM OOOOVERVIEWSTARS B RIDGINGRIDGINGTHE THE GGGGAPAAPPAP Planning linked to operations/ITS, safety and design Designers engaged early in the planning process …

SSSSUMMARYUMMARYUMMARYUMMARY

� Data

� Corridors

� Studies/Design

� Applications

� Six-Year Program

3

����

����

�RSTP/ CMAQ

Revenue Sharing

HB2

HSIP

TAP

WWWWHATHATHATHAT ISISISIS THETHETHETHE STARS STARS STARS STARS PROGRAMPROGRAMPROGRAMPROGRAM????

Program to develop solutions to reduce crashes and congestion bottlenecks using a data-driven approach

Crash hotspots

Speed data

AADT data

4

Overall goal of STARS is to develop solutions that Overall goal of STARS is to develop solutions that can be programmed in the VDOT

Six-Year Improvement Program (SYIP)

Use this information together

to identify corridors with

safety and congestion

challenges

Page 3: STARS P ROGRAM OOOOVERVIEWSTARS B RIDGINGRIDGINGTHE THE GGGGAPAAPPAP Planning linked to operations/ITS, safety and design Designers engaged early in the planning process …

STARS BSTARS BSTARS BSTARS BRIDGINGRIDGINGRIDGINGRIDGING THETHETHETHE GGGGAPAPAPAP

� Planning linked to operations/ITS, safety and design

� Designers engaged early in the planning process

� Project risks identified

� Readiness improved for project implementation

5

Estimates ����

Schedules ����

Miscellaneous Data

WWWWHATHATHATHAT DDDDATAATAATAATA ISISISIS AAAAVAILABLEVAILABLEVAILABLEVAILABLE????

6

INRIX (TTI, BTI, and PTI)

Avg. Annual Daily Traffic

VDOT SYIP Projects

Previous STARS Projects

Safety

Volume-Capacity Ratio

Page 4: STARS P ROGRAM OOOOVERVIEWSTARS B RIDGINGRIDGINGTHE THE GGGGAPAAPPAP Planning linked to operations/ITS, safety and design Designers engaged early in the planning process …

STARS PSTARS PSTARS PSTARS PROJECTROJECTROJECTROJECT DDDDEVELOPMENTEVELOPMENTEVELOPMENTEVELOPMENT CCCCORRIDORORRIDORORRIDORORRIDOR CCCCRITERIARITERIARITERIARITERIA

7

Source(s)

Supporting details needed

Percentiles

Percentiles

What type of study conducted

Description of problems/concerns

In State Highway Plan

NEPA Study

Approximate number of crashes

Percentiles

Percentiles

Yes/No

Yes/No

Yes/No

Yes/No

Yes/No

Measure

Yes/No

Yes/No

Urban/Rural

Yes/No

Yes/No

Yes/No

Yes/No

Rank

Rank

Local / MPO Support

Funding Identified

Planning Time Index

Buffer Time Index

PSI Rating - Intersection

Planning

Designations

Corridor Length

Located on CoSS

Indicator

Corridor Location

Future Improvements IdentifiedIn Long Range Transportation Plan

Criteria

0.5 - 10 miles

SYIP Project

Safety

Operations

District

Coordination

Category

Yes/No

Economic Development Impact

Historic Crash Pattern

PSI Rating - Segment

V/C Ratio

Travel Time Index

Corridor Already Studied

District Identified Problems

District Administration Support

Source(s)

Supporting details needed

Percentiles

Percentiles

What type of study conducted

Description of problems/concerns

In State Highway Plan

NEPA Study

Approximate number of crashes

Percentiles

Percentiles

Yes/No

Yes/No

Yes/No

Yes/No

Yes/No

Measure

Yes/No

Yes/No

Urban/Rural

Yes/No

Yes/No

Yes/No

Yes/No

Rank

Rank

Local / MPO Support

Funding Identified

Planning Time Index

Buffer Time Index

PSI Rating - Intersection

Planning

Designations

Corridor Length

Located on CoSS

Indicator

Corridor Location

Future Improvements IdentifiedIn Long Range Transportation Plan

Criteria

0.5 - 10 miles

SYIP Project

Safety

Operations

District

Coordination

Category

Yes/No

Economic Development Impact

Historic Crash Pattern

PSI Rating - Segment

V/C Ratio

Travel Time Index

Corridor Already Studied

District Identified Problems

District Administration Support

WWWWHYHYHYHY ISISISIS STARS ISTARS ISTARS ISTARS IMPORTANTMPORTANTMPORTANTMPORTANT TOTOTOTO YYYYOUOUOUOU????

� Prepares a source of current data

� Develops solutions that can be funded in the SYIP

• HB2, HSIP, CMAQ, RSTP, Revenue Sharing

� Improves accuracy of cost estimates and schedules

8

Page 5: STARS P ROGRAM OOOOVERVIEWSTARS B RIDGINGRIDGINGTHE THE GGGGAPAAPPAP Planning linked to operations/ITS, safety and design Designers engaged early in the planning process …

RRRREVIEWEVIEWEVIEWEVIEW PPPPOTENTIALOTENTIALOTENTIALOTENTIAL PPPPROJECTROJECTROJECTROJECT CCCCORRIDORSORRIDORSORRIDORSORRIDORS

8

TTTTHEHEHEHE STARS TSTARS TSTARS TSTARS TEAMEAMEAMEAM

10

VDOT Districts and Residencies

� Coordinate with localities, MPOs, and PDCs

� Submit STARS applications

� Lead STARS projects

� Coordinate with consultant team

VDOT Central Office

� Provides program oversight, data analysis, and application review

Consultants

� Provide project support

Page 6: STARS P ROGRAM OOOOVERVIEWSTARS B RIDGINGRIDGINGTHE THE GGGGAPAAPPAP Planning linked to operations/ITS, safety and design Designers engaged early in the planning process …

STARS PSTARS PSTARS PSTARS PROJECTSROJECTSROJECTSROJECTS

11

LLLLYNCHBURGYNCHBURGYNCHBURGYNCHBURG EEEEXPRESSWAYXPRESSWAYXPRESSWAYXPRESSWAY (US 29 B(US 29 B(US 29 B(US 29 BUSUSUSUS))))

� 4.5 miles of limited access highway

� 10 interchanges / 41 ramps / 23 intersections

� Built in phases between 1950s and 1970s

� City of Lynchburg

� Liberty University

� Traffic analysistools used

• CORSIM

• Synchro

Page 7: STARS P ROGRAM OOOOVERVIEWSTARS B RIDGINGRIDGINGTHE THE GGGGAPAAPPAP Planning linked to operations/ITS, safety and design Designers engaged early in the planning process …

STARS PSTARS PSTARS PSTARS PROJECTROJECTROJECTROJECT SSSSUMMARIESUMMARIESUMMARIESUMMARIES

13

STARS PSTARS PSTARS PSTARS PROJECTROJECTROJECTROJECT DDDDEVELOPMENTEVELOPMENTEVELOPMENTEVELOPMENT CCCCYCLEYCLEYCLEYCLE

13

Page 8: STARS P ROGRAM OOOOVERVIEWSTARS B RIDGINGRIDGINGTHE THE GGGGAPAAPPAP Planning linked to operations/ITS, safety and design Designers engaged early in the planning process …

NNNNEXTEXTEXTEXT SSSSTEPSTEPSTEPSTEPS

� STARS 2016 annual study cycle

� Coordinate with VDOT District Planner

� Contact Samuel W. Hayes, PE

Transportation and Mobility Planning Division

(804) 586-2718 – office

(804) 896-3762 – mobile

[email protected]

15

QQQQUESTIONSUESTIONSUESTIONSUESTIONS????

16http://www.virginiadot.org/projects/stars_ii.asp