  • Republic of the PhilippinesDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

    OFFICE OF THE SECRETARY1. 7 MAY201i' Manila

    t9?7. /,3 A t#lAJ"'"dlt'" _ / P_U;1"

    DEPARTMENT ORDER ))))96NO. _

    Series of 201~ ll't'.II./~

    SUBJECT: Standardized Pay Items of Works forCivil Works Construction forInfrastructure Projects.

    To ensure uniformity in the application/adoption of the Pay Items of Work involved in thepreparation of the Design Plans and Quantities, Programs of Works (POW) and ApprovedBudget for the Contract (ABC) for Infrastructure Projects nationwide, a Standard Pay ItemList is hereby prescribed (Annex "A") for various work pay items based on the DPWHStandard Specifications for Highways, Bridges and Airports (Volume II) and Buildings &Flood Control (Volume III), to include pay items subscript based on differentdimensions/sizes, classifications, types and unit of measures for an item. This Standard PayItem List incorporates some pay items not yet included in the Blue Book but are deemednecessary in the actual project implementation.

    Henceforth, all implementing offices of the Department are hereby directed to adopt strictlythe Standardized Pay Items of Work in the preparation of the Design Plans and Quantities,Programs of Works (POW) and Approved Budget for the Contract (ABC) for all infrastructureprojects for CY 2016 Program wherein said Standard Pay Items are the basis in the projectmonitoring under the Project Contract Management Application (PCMA), with the followingconsiderations:

    a. For projects already bid out/awarded/contracted, change of pay itemsnumber/description/unit of measure to conform with the standard pay items shall beeffected with the approval of the Head of Implementing Office (10);

    b. For projects with already approved Plans, POW & ABC, change of pay itemsnumber/description/unit of measure to conform with the standard pay items shall beeffected with the approval of the Head of Implementing Office, prior to the bidding;

    c. For items of work not yet included in the Standard Pay Item List, the Head of 10shall seek first the approval of the Bureau of Research and Standards (BRS), prior toits adoption.

    This Order take,s effect immediately.

    Department of Public Works and HighwaysOffice of the Secretary

    III 11111 11111111111111111111111111111WIN6W01930

    5.2 WROj AMD

  • Department of Public Works and Highways

    STANDARDIZED PAY ITEMS OF WORKFOR CONSTRUCTION OF

    INFRASTRUCTURE PROJECTS(Department Order No. 96, Series of 2016)

    May 2016

  • BLUE BOOKVOL. II

    .JL

  • PART A - FACILITIES FOR THE ENGINEERPay Item Suffix

    Description I Valid Values I Unit Of Measure(Number) (Subscri I Thickness/Sizes Class I others IA.l.l Offices and Laboratorv for the Enaineer

    A.1.! (!) Construction of Combined Field Office, Laboratory and Living Quarters Lump SumBuildino for the Enoineer

    A.1.! (2) Construction of Combined Field Office and Laboratory Building for the Lump SumEnoineerA.1.! 3 Construction of Field Office for the Enoineer Lump SumA.1.! 4 Construction of Field Laboratorv for the Enoineer Lump SumA.1.! 5 Construction of Livina Ouarters for the Enaineer Lump Sum

    A.1.! (6) Provision of Combined Field Office, Laboratory and Living Quarters Building Monthfor the Enoineer (Rental Basis)

    A.1.! (7) Provision of Combined Field Office and Laboratory Building for the Engineer MonthRental Basis)A.1.! (S Provison of Field Office for the Enqineer (Rental Basis) MonthA.1.! (9 Provison of Laboratorv for the Enoineer (Rental Basis) Month

    A.1.!f!O Provison of Livina Ouarters for the Enaineer (Rental Basis) Month

    A.1.! (11) Provision of FurnituresfFixtures, Equipment & Appliances for the Field Office Lump Sumfor the Enoineer

    A.1.! (!2) Provision of FurnituresfFixtures, Equipment & Appliances for Laboratory Lump SumBuildino for the Enoineer

    A.1.! (13) Provision of FurnituresfFixtures & Appliances for the Living Quarters for the Lump SumEnoineer

    A.1.! (14) Provision of Laboratory Testing Equipment, Apparatus and Publications for the Lump SumEnaineer

    A.1.! (!5) Operation & Maintenance of Temporary Field Office, Laboratory and Living MonthIOuarters Buildina for the EnoineerA.1.! !6 Ooeration & Maintenance of Field Office for the Enaineer MonthA.1.! !7 Ooeration & Maintenance of Laboratorv Buildina for the Enoineer MonthA.1.! !8 Ooeration & Maintenance of Livina Ouarters for the Enaineer Month

    A.l.2 Vehicles for the EnaineerA.1.iCIT Provision of 4x4 Pick UO Tvoe Service Vehicle for the Enaineer Each

    A.1.2 (2) Provision of 4x4 Pick Up Type Service Vehicle for the Engineer on Bare Rental MonthBasisA.1.2 (3) Provision of 4x2 Pick UO Type Service Vehicle for the Enoineer Each

    A.1.2 (4) Provision of 4x2 Pick Up Type Service Vehicle for the Engineer on Bare Rental MonthBasis

    A.1.2 (5) Operation and Maintenance of 4x4 Pick Up Type Service Vehicle for the MonthEnaineer

    A.1.2 (6) Operation and Maintenance of 4x2 Pick Up Type Service Vehicle for the MonthEnaineerA.1.2 (7) Provision of 4x4 Van Tvoe Service Vehicle (12-seater) EachA.1.irs) Provision of 4x4 Van Tvoe Service Vehicle on Rental Basis (!2 Seater) Month

    A.1.2 (9) Operation and Maintenance of 4x4 Van Type Service Vehicle (!2-seater) Month

    Page 1 VOL II

  • A.1.3 Assistance to the EngineerA.1.3 (1) Provision of Field Office Staff for the Assistance to the Enaineer MonthA.1.3 (2) Provision of Survev Eauioment for the Assistance to the Enaineer Lump SumA.1.3 (3) Provision of Survev Personnel for the Assistance to the Enaineer MonthA.1.3 (4) Provision of Laboratorv Personnel for the Assistance to the Enaineer Month

    A.1.4 PhotographsA.1.4 (1) IProvision of Proaress Photoaraohs T I Month

    A.1.5 Communication FacilityA.1.5 (1) IProvision of Communication Facilitv for the Enaineer I I EachA.1.5 (2) IOoeration and Maintenance of Communication Facilitv for the Enaineer I Each

    PART B - OTHER GENERAL REQUIREMENTS

    Pay Item Suffix Description Valid Values Unit Of Measure(Number) (Subscri Thickness/Sizes Class OthersB.1 Offices. Shoos Stores and Workmens Accomodation for Contractor Lumo sumB.2 Medical Room and First Aid Facilities Lumo sumB.3

    B.4 (1) Construction survev and stakina KilometerB.4 2 SloDe. reference. and c1earina and arubbina stakes KilometerB.4 3 Centerline reestablishment KilometerB.4 4 Culvert survev and stakina EachB.4 5) Bridae survev and stakina Lumo sumB.4 6 Retainina wall survev and stakina Lump sumB.4 7 Grade finishina stakes KilometerB.4 8 Permanent monuments and markers EachB.4 9 Miscellaneous survey and stakina Hour

    B.4 ( 10) Miscellaneous survev and stakina Lumo sumB.5 Proiect Billboard / SiQnboard EachB.6 Installation of ODA Recoanition Plate Lumo sumB.7 Occupational Safetv and Health Proaram MonthB.8 Traffic Manaaement MonthB.9 Mobilization / Demobilization Lump sum

    B.10 Davworks PSB.11 Provisional Sum PSB.12 Removal and Relocation of Utilities Lumo sumB.13 Additional Geotechnical Investiaation Lumo sumB.14 Environmental ManaQement and Monitorina Month

    B.15 (1) Detour/Access Road Lumo sumB.15 (2) Detour/Access Road Linear Meter

    B.16 Recoanition Plate/Proiect Marker EachB.17 Temporary DiverSion ot waterway Lumo Sum

    B.18(1) Craneway - Lump SumB.18(2) ~raneway Linear Meter

    Page 2 VOL II

  • PART C - EARTHWORKITEM 100 - CLEARING AND GRUBBINGPay Item Suffix Description Valid Values Unit Of Measure(Numberl (Subscri Thickness/Sizes Class Others

    100 1 ClearinQ and GrubbinQ Hectare100 2 Clearina and GrubbinQ Lumo Sum100 3 a Individual Removal of Trees 150-300 mm dia. Small Each100 3 b Individual Removal of Trees 301-500 mm dia. Small Each100 3 c Individual Removal of Trees 501-750 mm dia. Small Each100 3 d Individual Removal of Trees 751-900 mm dia. Small Each100 4 Individual Removal of Trees above 900mm dia. Large Each

    ITEM 101- REMOVAL OF STRUCTURES AND OBSTRUCTIONSPay Item Suffix Description Valid Values Unit Of Measure(Number) (Subscri Thickness/Sizes Class Others

    101 1 Removal of Structures and Obstruction Lumo Sum101 2 Removal of Actual Structures Obstruction Each101 3 a1 Removal of Actual Structures Obstruction 0.15 m thick PCCP Reinforced Sauare Meter101 3 a2 Removal of Actual Structures Obstruction 0.20 m thick PCCP Reinforced Sauare Meter101 3 a3 Removal of Actual Structures Obstruction 0.23 m thick PCCP Reinforced ;ouare Meter101 3 a4 Removal of Actual Structures Obstruction 0.25 m thick PCCP Reinforced iauare Meter101 3 a5 Removal of Actual Structures Obstruction 0.28 m thick PCCP Reinforced iauare Meter101 3 a6 Removal of Actual Structures Obstruction 0.30 m thick PCCP Reinforced Sauare Meter101 3 a7 Removal of Actual Structures Obstruction 0.33 m thick PCCP Reinforced Square Meter101 3 a8 Removal of Actual Structures Obstruction 0.35 m thick PCCP Reinforced Sauare Meter101 3 b1 Removal of Actual Structures Obstruction 0.15 m thick PCCP Unreinforced Square Meter101 3 b2 Removal of Actual Structures Obstruction 0.20 m thick PCCP Unreinforced Sauare Meter101 3 b3 Removal of Actual Structures Obstruction 0.23 m thick PCCP Unreinforced Sauare Meter101 3 b4 Removal of Actual Structures Obstruction 0.25 m thick PCCP Unreinforced ' quare Meter101 3 b5 Removal of Actual Structures Obstruction 0.28 m thick PCCP Unreinforced quare Meter101 3 b6 Removal of Actual Structures Obstruction 0.30 m thick PCCP Unrei nforced iauare Meter101 3 b7 Removal of Actual Structures Obstruction 0.33 m thick PCCP Unreinforced iauare Meter101 3 b8 Removal of Actual Structures Obstruction 0.35 m thick PCCP Unreinforced ;ouare Meter101 3 c1 Removal of Actual Structures Obstruction 0.05 m thick ACP Square Meter101 3 c2 Removal of Actual Structures Obstruction 0.10 m thick ACP Square Meter101 3. d Removal of Actual Structur