30

Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin
Page 2: Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin

Standardized Freestanding Hybrid Riser Systems for Deepwater FPSOs

John Bob-ManuelSenior Engineer2H Offshore Engineering Ltd1st November 2011

Learn more at www.2hoffshore.com

Page 3: Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin

Freestanding Hybrid Risers

2H overview

Why is there a need for them?

Configurations

Current examples

Alternatives

Learn more at www.2hoffshore.com

Page 4: Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin

2H Overview

Riser and conductor systems specialists

Houston, Rio, London, Aberdeen, Kuala Lumpur, and Perth

170+ high quality engineers

Unique combination:Complex analysisEquipment detail design

Part of Acteon Group

Learn more at www.2hoffshore.com

Page 5: Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin

18 specialist subsea Companies

£310m Turnover

51% owned byFirst Reserve Corporation

Linking Subsea Services

Acteon Group

Learn more at www.2hoffshore.com

Page 6: Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin

Deepwater Riser Design Challenges

Long unsupported lengthsHigh pressuresDesign life of 20-30 yearsEnvironmental loading

CurrentWave

FPSOVessel motionsVessel offsetsPayload limitationsRiser-FPSO interfaces

High extreme stressesHigh fatigue damage rates

Vessel Offset

Wind

Current

Waves

Learn more at www.2hoffshore.com

Page 7: Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin

Deep Water Riser Design Options: Flexible Risers

Compliant responseNot fatigue sensitiveInstallation friendlyLimitations

Water depthPressureDiameterTemperature

ExpensiveReliability? Free-Hanging Lazy Wave

Learn more at www.2hoffshore.com

Page 8: Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin

Deep Water Riser Design Options: Steel Catenary Riser (SCR)

6-30” diameter1,000 – 10,000ft water(8,000ft installed)Sensitive to vessel and environment

Extreme loadsFatigue motionsVIV

Payload impact on host facilityComplex vessel interface

Flex jointStress joint

Heave optimised vessels (Spar, TLP)

Learn more at www.2hoffshore.com

Page 9: Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin

Freestanding Hybrid Riser

Learn more at www.2hoffshore.com

Page 10: Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin

Free Standing Riser Configuration

Learn more at www.2hoffshore.com

Page 11: Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin

Single Line and Bundle FSHRs

Learn more at www.2hoffshore.com

Page 12: Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin

Buoyancy Tank

Maintain riser verticalitySteel plate structureFlat or hemispherical endsPressure balanced designCompartmentalised

Design up to:40m tall6m diameter~700Te upthrust

Limited by:Fabrication siteHandling / Installation restrictions

Learn more at www.2hoffshore.com

Page 13: Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin

Upper Assembly - Conventional

Tubular frame structure

Loading interface between:Top of riser pipeBuoyancy tankFlexible jumper

May require:Articulation connectionFlexible jumper pull-inIntervention entry point

Design up to:23m tall55Te

Learn more at www.2hoffshore.com

Page 14: Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin

Upper Assembly - Alternatives

Learn more at www.2hoffshore.com

Page 15: Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin

Lower Assembly

Tubular frame structure

Loading interface between:Bottom of riser pipeFoundationRigid base jumper

May require:Articulation connectionStress jointRiser base gas lift

Design up to:5m – 20m tall10 - 30Te

Learn more at www.2hoffshore.com

Page 16: Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin

Rigid Base JumperSteel pipe / induction bends

Accommodate relative movement between riser and flowlinePipeline expansionRiser motions

Critical fatigue mechanismsRiser motions (drift / riser VIV)Jumper VIV Thermal cyclingSlugging

Learn more at www.2hoffshore.com

Page 17: Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin

Rigid Base JumperSteel pipe / induction bends

Accommodate relative movement between riser and flowlinePipeline expansionRiser motions

Critical fatigue mechanismsRiser motions (drift / riser VIV)Jumper VIV Thermal cyclingSlugging

Learn more at www.2hoffshore.com

Page 18: Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin

Freestanding Riser EvaluationAdvantages

Decoupled from vessel motionsNot sensitive to environmental loadingExcellent fatigue performanceLow vessel payloadPre-installableFlow assurance flexibility

Large insulation thicknessesPipe-in-PipeCRA lined pipe

Local content PilesBuoyancy Can

Opportunity for design standardisation

DisadvantagesLarge spatial requirementClearance issuesIncreased design complexityHigh CAPEX compared to SCRInstallation challenges

Large componentsOverall lift weight/height

Learn more at www.2hoffshore.com

Page 19: Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin

Benefits of Standardising Freestanding Hybrid Risers

Differentiate on ability to install pipe efficiently, NOT ability to:

Develop riser conceptsConduct detail design of products/components

Allows Operator to drive technical solution

Risk & responsibility fairly distributed:Operator - Global system performanceContractors - Component design & installation

System engineered once

Increased market competition

Wider application of ‘available’ installation vessels

Learn more at www.2hoffshore.com

Page 20: Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin

Freestanding Risers to Date

Type Field Status Owner/Field Operator

Yr. Installed Region

Water Depth Vessel

(ft) (m)

Green Canyon 29/Garden Banks 388

De-commissionedPlacid Oil Company/Ensearch

1988/1994 GoM 1,529/2,096 466/639 Semi-Sub

Girassol Operating Total Elf 2001 Angola 4,430 1,350 Spread Moored FPSO

Rosa Operating Total Elf 2007 Angola 4,430 1,350 Spread Moored FPSO

BP Greater Plutonio Operating BP 2007 Angola 4,300 1,311 Spread Moored FPSO

Kizomba A/B Operating Exxon 2003/2005 Angola 3,330 to 4,200

1,006 to 1,280

Spread Moored FPSO

*Block 31 NE Fabrication BP 2010 Angola 6,890 2,100 Turret Moored FPSO

Roncador P-52 Operating Petrobras 2007 Campos Basin 5,906 1,800

Semi-SubFPU

*Cascade/Chinook Detailed Design/Execute Petrobras 2011 GoM 8,531 2,600 Turret

Moored FPSO

*To be installed

Bun

dle

Sing

le L

ine

Learn more at www.2hoffshore.com

Page 21: Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin

Kizomba A & B - Exxon

First field to use SLORKizomba A – 5 risers

1 x Water Injection 2 x Water Injection 2 x Gas Injection

Kizomba B - 5 risersCOR - riser base gas lift2 x Production PIP 1 x Test PIP2 x Water Injection

Kizomba Satellites – Two additional CORs (2011 installation)

Learn more at www.2hoffshore.com

Page 22: Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin

Kizomba A

Learn more at www.2hoffshore.com

Page 23: Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin

Girassol Riser Tower

Learn more at www.2hoffshore.com

Page 24: Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin

BP Block 18 Riser Bundle

Learn more at www.2hoffshore.com

Page 25: Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin

Other Developments

Petrobras Cascade & ChinookFirst FPSO in GoM2600m water depthDisconnectable turret required for hurricane event5 single line freestanding risers Freestanding Riser is ‘enabling technology’

BP Block 31 PSVMDeepest SLHRs in WoA2000m water depth9 SLHRsExternal bow mounted turreted FPSO

Learn more at www.2hoffshore.com

Page 26: Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin

Alternatives/Developments

Freestanding RisersReduced cost - top assembly optimisationGrouped arrangement

SCRWeight optimisedLazy Wave – Shell BC10Buoyancy supported

Learn more at www.2hoffshore.com

Page 27: Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin

BSR – Riser Supporting Buoy

Concept developed in the 90’s by DeepStar for 1000m.

Being evaluated by Petrobras for Guara and Iara

Learn more at www.2hoffshore.com

Page 28: Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin

BSR is a hybrid concept that takes advantage of the best features of SCRs and flexibles.

SCRs: Less expensive thanflexibles. Suitable for use in ultra-deep waters with largediameter sizes.

Flexible jumpers have excellentfatigue behavior.

BSR – Riser Supporting Buoy

Learn more at www.2hoffshore.com

Page 29: Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin

FPSO Interfaces

Key interfacesFlexible end terminations and bend restrictors

Key parameters affecting designTurret vs spread mooredPosition of riser hangoffSpace for riser end terminationsMaximum hang off weightVessel motionsHeading analysisMooring analysis

Interface mechanism with FPSO contractor needs establishing early on!

Learn more at www.2hoffshore.com

Page 30: Standardized Freestanding Hybrid Riser Systems for Deepwater …€¦ · BP. 2010; Angola. 6,890; 2,100. Turret Moored FPSO; Roncador P-52. Operating; Petrobras. 2007; Campos Basin

Thank you for your time.

Questions….

Further information:

2H Offshore Engineering Limitedwww.2hoffshore.com

+44 1483 774900

Learn more at www.2hoffshore.com