5
Standardized Baselines (SB): Perspective of a project developer Christian Dannecker Director of Forestry South Pole Carbon Asset Management Ltd. LACF, 29 September 2011

Standardized Baselines (SB): Perspective of a project developer

Embed Size (px)

DESCRIPTION

Standardized Baselines (SB): Perspective of a project developer. Christian Dannecker Director of Forestry South Pole Carbon Asset Management Ltd. LACF, 29 September 2011. World Bank Mandate. How can SBs help promoting CDM benefits to underrepresented areas and technologies? - PowerPoint PPT Presentation

Citation preview

Page 1: Standardized Baselines (SB): Perspective of a project developer

Standardized Baselines (SB):Perspective of a project developer

Christian DanneckerDirector of ForestrySouth Pole Carbon Asset Management Ltd.

LACF, 29 September 2011

Page 2: Standardized Baselines (SB): Perspective of a project developer

2

World Bank Mandate

• How can SBs help promoting CDM benefits to underrepresented areas and technologies?

• Selected case studies to standardize existing CDM methodologies:1. Cook stoves2. Solar Home Systems3. Low Emission Vehicles / city wide transport GHG monitoring

• Steps:1. Analyse methodologies existing in the sectors (CDM, VCS, CAR, etc)2. Develop checklists for registration (e.g. positive lists)3. Propose prototypes for standardized monitoring4. Test-run them5. Propose how SB can include provisions to include E- policy rules

Outcomes due mid November

Page 3: Standardized Baselines (SB): Perspective of a project developer

3

Cheaper access to cleaner water with less emissions

Water purification POA under validation, first CPA in Uganda, now requesting LOAs from Colombia, Honduras, Peru, Argentina, Haiti, El Salvador

Page 4: Standardized Baselines (SB): Perspective of a project developer

4

International water purification PoA

• SBs to be key component of POAs, turned out differently

• SSC-WG meth / EB decisions provided two „pull“ factors into use of this “SB-PoA”:

– Automatic additionality proof for micro projects (appliance below 600 tCO2e OR location in LDC), therefore reduced auditor liability for POAs as subjectivity is removed

– Standardized baselines (default water consumption 5.5 L/d; suppressed demand)

EU ETS provided „push“ factor out of „normal“ CDM projects

– Sunset clause of 2012 leaving no other choice than strict standardization

SBs allow to register more POAs, and allow growing them quicker as each additional CPA becomes cheaper to add

(yet comes a little late to allow for more EU ETS eligible POAs pre-12)

Page 5: Standardized Baselines (SB): Perspective of a project developer

5

South Pole Carbon Asset Management Ltd.

Christian Dannecker

[email protected]

Contact: