26
Standard Drafting Team Rosters March 2014 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 | www.nerc.com

Standard Drafting Team Rosters · Project 2014-03 Revisions to TOP/IRO Standards Standard Drafting Team ..... 25 1 NERC Standard Drafting Team Rosters – March 2014 . Standard Drafting

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Standard Drafting Team Rosters · Project 2014-03 Revisions to TOP/IRO Standards Standard Drafting Team ..... 25 1 NERC Standard Drafting Team Rosters – March 2014 . Standard Drafting

Standard Drafting Team Rosters

March 2014

3353 Peachtree Road NE Suite 600, North Tower

Atlanta, GA 30326 404-446-2560 | www.nerc.com

Page 2: Standard Drafting Team Rosters · Project 2014-03 Revisions to TOP/IRO Standards Standard Drafting Team ..... 25 1 NERC Standard Drafting Team Rosters – March 2014 . Standard Drafting

Table of Contents

Project 2007-02 Operating Personnel Communications Protocols Standard Drafting Team ........ 2

Project 2007-06 System Protection Coordination Standard Drafting Team .................................. 3

Project 2007-11 Disturbance Monitoring Standard Drafting Team ............................................... 4

Project 2007-17.3 Phase 3 of Protection System Maintenance and Testing: Sudden Pressure Relays Standard Drafting Team ...................................................................................................... 5

Project 2008-02 Undervoltage Load Shedding Standard Drafting Team ....................................... 6

Project 2009-03 Emergency Operations Standard Drafting Team ................................................. 7

Project 2010-01 Training (PER) Standard Drafting Team ............................................................... 8

Project 2010-02 Connecting New Facilities to the Grid FAC Five-Year Review Team .................... 9

Project 2010-03 Modeling Data (MOD B) Standard Drafting Team ............................................. 10

Project 2010-04 Demand Data (MOD C) Standard Drafting Team ............................................... 11

Project 2010-05-1 Phase 1 of Protection Systems: Misoperations Standard Drafting Team ...... 12

Project 2010-05.2 Phase 2 of Protection Systems: Special Protection Systems Standard Drafting Team ............................................................................................................................................. 13

Project 2010-13.2 Phase 2 of Relay Loadability: Generation Standard Drafting Team................ 14

Project 2010-13.3 Phase 3 of Relay Loadability: Stable Power Swings Standard Drafting Team 15

Project 2010-14.1 Phase 1 of Balancing Authority Reliability-based Controls: Reserves Standard Drafting Team ............................................................................................................................... 16

Project 2010-14.2 Balancing Authority Reliability-based Controls, Phase 2 Standard Drafting Team ............................................................................................................................................. 17

Project 2010-17 Definition of Bulk Electric System Standard Drafting Team .............................. 18

Project 2012-09 IRO Five-Year Review Team ............................................................................... 19

Project 2012-13 Nuclear Plant Interface Coordination Standard Drafting Team ......................... 20

Project 2013-03 Geomagnetic Disturbance Mitigation Standard Drafting Team ........................ 21

Project 2013-04 Voltage and Reactive Control (VAR) Standard Drafting Team ........................... 22

Project 2014-01 Standards Applicability for Dispersed Generation Resources Standard Drafting Team ............................................................................................................................................. 23

Project 2014-02 CIP Version 5 Revisions Standard Drafting Team ............................................... 24

Project 2014-03 Revisions to TOP/IRO Standards Standard Drafting Team ................................ 25

1 NERC Standard Drafting Team Rosters – March 2014

Page 3: Standard Drafting Team Rosters · Project 2014-03 Revisions to TOP/IRO Standards Standard Drafting Team ..... 25 1 NERC Standard Drafting Team Rosters – March 2014 . Standard Drafting

Standard Drafting Team Rosters

Project 2007-02 Operating Personnel Communications Protocols

Standard Drafting Team

Chair Lloyd S. Snyder – Manager, Transmission Operations

Georgia Systems Operations Corporation

Member Glen Boyle – Engineer/Instructor PJM Interconnection, LLC

Mike Brost – Vice President, Electric Systems

JEA

Michael Cassiadoro – Director of Reliability Coordination

WECC

Tom Irvine – Manager, Grid Operations

Hydro One Networks, Inc.

Robert C. Rhodes, Jr. – Manager, Reliability Standards

SPP

Stephen Solis – Planning and Operating Standards Compliance

Electric Reliability Council of Texas, Inc.

John Stephens – Director, Power System Control

City Utilities of Springfield

Fred Waites – Team Leader, Training Southern Company

NERC Staff Stephen Eldridge – Standards Developer

North American Electric Reliability Corporation

William Edwards – Counsel North American Electric Reliability Corporation

Marisa Hecht – Supporting Standards Developer

North American Electric Reliability Corporation

Howard Gugel – Director of Standards Development

North American Electric Reliability Corporation

Larry J. Kezele – Manager of Operations

North American Electric Reliability Corporation

NERC Standard Drafting Team Rosters – March 2014 2

Page 4: Standard Drafting Team Rosters · Project 2014-03 Revisions to TOP/IRO Standards Standard Drafting Team ..... 25 1 NERC Standard Drafting Team Rosters – March 2014 . Standard Drafting

Project 2007-06 System Protection Coordination

Standard Drafting Team

Chair Philip Winston Georgia Power Company

Vice Chair Bill Middaugh Tri-State G & T Association, Inc.

Member Forrest Brock Western Farmers Electric Cooperative

David Cirka National Grid

Samuel Francis Oncor Electric Delivery

Jeffrey Iler American Electric Power

William Waudby Consumers Energy

Kevin Wempe Kansas City Power & Light Co.

NERC Staff Al McMeekin – Standards Developer North American Electric Reliability Corporation

3 NERC Standard Drafting Team Rosters – March 2014

Page 5: Standard Drafting Team Rosters · Project 2014-03 Revisions to TOP/IRO Standards Standard Drafting Team ..... 25 1 NERC Standard Drafting Team Rosters – March 2014 . Standard Drafting

Project 2007-11 Disturbance Monitoring Standard Drafting Team

Chair Lee Pedowicz NPCC

Member Frank Ashrafi Southern California Edison

Alan D. Baker Florida Power & Light

Daniel J. Hansen NRG

Tim Kucey PSEG Fossil LLC

Jack Soehren ITC Holdings

Vladimir Stanisic AESI Inc.

Ryan Quint Bonneville Power Administration

NERC Staff Stephen Crutchfield – Standards Developer

North American Electric Reliability Corporation

NERC Standard Drafting Team Rosters – March 2014 4

Page 6: Standard Drafting Team Rosters · Project 2014-03 Revisions to TOP/IRO Standards Standard Drafting Team ..... 25 1 NERC Standard Drafting Team Rosters – March 2014 . Standard Drafting

Project 2007-17.3 Phase 3 of Protection System Maintenance and Testing: Sudden Pressure Relays

Standard Drafting Team

Chair Charles W. Rogers Consumers Energy

Member John Anderson Xcel Energy, Inc.

Merle Ashton Tri-State G&T Association, Inc.

Forrest D. Brock Western Farmers Electric Cooperative

Aaron Feathers Pacific Gas and Electric Company

Samuel Francis Oncor Electric Delivery

Ervin David Harper NRG Texas Maintenance Services

James M. Kinney FirstEnergy Corporation

Mark Lukas Commonwealth Edison Co.

Kristina Marriott ENOSERV

Michael Palusso Southern California Edison

John E. Schechter American Electric Power

William D. Shultz Southern Company Generation

Eric Udren Quanta Technology, LLC

Scott Vaughan Roseville Electric

Mathew J. Westrich American Transmission Co.

Philip B. Winston Southern Company

NERC Staff Jordan Mallory – Standards Developer Specialist

North American Electric Reliability Corporation

Al McMeekin – Standards Developer North American Electric Reliability Corporation

Phil Tatro – Technical Advisor North American Electric Reliability Corporation

5 NERC Standard Drafting Team Rosters – March 2014

Page 7: Standard Drafting Team Rosters · Project 2014-03 Revisions to TOP/IRO Standards Standard Drafting Team ..... 25 1 NERC Standard Drafting Team Rosters – March 2014 . Standard Drafting

Project 2008-02 Undervoltage Load Shedding

Standard Drafting Team

Chair Greg Vassallo Bonneville Power Administration

Member José Conto ERCOT

Bill Harm PJM

Sharma Kolluri Entergy

Charles-Eric Langlois Hydro-Quebec TransEnergie

Manish Patel Southern Company

Fabio Rodriguez Duke Energy

Hari Singh Xcel Energy

Matthew Tackett MISO

NERC Staff Erika Chanzes – Standards Developer North American Electric Reliability Corporation

Phil Tatro – Technical Advisor North American Electric Reliability Corporation

NERC Standard Drafting Team Rosters – March 2014 6

Page 8: Standard Drafting Team Rosters · Project 2014-03 Revisions to TOP/IRO Standards Standard Drafting Team ..... 25 1 NERC Standard Drafting Team Rosters – March 2014 . Standard Drafting

Project 2009-03 Emergency Operations

Standard Drafting Team

Chair David McRee Duke Energy

Vice Chair Robert Staton Xcel Energy

Member Will Behnke Alliant Energy

Richard Cobb Midcontinent ISO, Inc.

Jen Fiegel Oncor Electric Delivery

Hal Haugom Madison Gas and Electric

Steve Lesiuta Ontario Power Corporation Inc.

Connie Lowe Dominion Resource Services, Inc.

Greg Le Grave Wisconsin Public Service Corp.

Brad Young LG&E/KU

NERC Staff Laura Anderson North American Electric Reliability Corporation

Steve Crutchfield North American Electric Reliability Corporation

Ed Dobrowolski North American Electric Reliability Corporation

Laura Hussey North American Electric Reliability Corporation

7 NERC Standard Drafting Team Rosters – March 2014

Page 9: Standard Drafting Team Rosters · Project 2014-03 Revisions to TOP/IRO Standards Standard Drafting Team ..... 25 1 NERC Standard Drafting Team Rosters – March 2014 . Standard Drafting

Project 2010-01 Training (PER)

Standard Drafting Team

Chair Patti Metro NRECA

Vice Chair Lauri Jones PG&E

Member Charles Abell Ameren

Sam Austin Tennessee Valley Authority

Jim Bowles ERCOT

Jeff Gooding Florida Power & Light Co.

Mark Grear Constellation

Venona Greaff OXY

John M. Rymer MISO

Stanley Winbush American Electric Power

NERC Staff Jordan Mallory – Standards Developer Specialist

North American Electric Reliability Corporation

NERC Standard Drafting Team Rosters – March 2014 8

Page 10: Standard Drafting Team Rosters · Project 2014-03 Revisions to TOP/IRO Standards Standard Drafting Team ..... 25 1 NERC Standard Drafting Team Rosters – March 2014 . Standard Drafting

Project 2010-02 Connecting New Facilities to the Grid

FAC Five-Year Review Team

Chair John Beck Con Edison

Vice Chair Michael Steckelberg Great River Energy

Member Brian Dale Georgia Power Company

Ruth Kloecker ITC Holdings

Stewart Rake Luminant Generation Company LLC

Ganesh Velummylum Northern Indiana Public Service Co.

NERC Staff Mallory Huggins – Lead Standards Developer

North American Electric Reliability Corporation

Sean Cavote – Supporting Standards Developer

North American Electric Reliability Corporation

Ed Dobrowolski – Supporting Standards Developer

North American Electric Reliability Corporation

Laura Hussey – Director of Standards Development

North American Electric Reliability Corporation

9 NERC Standard Drafting Team Rosters – March 2014

Page 11: Standard Drafting Team Rosters · Project 2014-03 Revisions to TOP/IRO Standards Standard Drafting Team ..... 25 1 NERC Standard Drafting Team Rosters – March 2014 . Standard Drafting

Project 2010-03 Modeling Data (MOD B) Standard Drafting Team

Chair Bobby Jones Southern Company Services

Vice Chair Reené Miranda Xcel Energy, Inc.

Member Durgesh Manjure MISO

Kent Bolton WECC

Jeff Gindling Duke Energy

Wayne Haidle Basin Electric Power Cooperative

James Teixeira ERCOT

Catherine Wesley PJM Interconnection

NERC Staff Steven Noess – Associate Director of Standards Development

North American Electric Reliability Corporation

NERC Standard Drafting Team Rosters – March 2014 10

Page 12: Standard Drafting Team Rosters · Project 2014-03 Revisions to TOP/IRO Standards Standard Drafting Team ..... 25 1 NERC Standard Drafting Team Rosters – March 2014 . Standard Drafting

Project 2010-04 Demand Data (MOD C)

Standard Drafting Team

Chair Mark Kuras PJM

Vice Chair Josh Collins MISO

Member Paul Kure ReliabilityFirst Corporation

Brian Glover Great River Energy

Robert Emmert CAISO

Barbara Doland SERC

Andrey Oks NPCC

NERC Staff Darrel Richardson – Standards Developer

North American Electric Reliability Corporation

11 NERC Standard Drafting Team Rosters – March 2014

Page 13: Standard Drafting Team Rosters · Project 2014-03 Revisions to TOP/IRO Standards Standard Drafting Team ..... 25 1 NERC Standard Drafting Team Rosters – March 2014 . Standard Drafting

Project 2010-05-1 Phase 1 of Protection Systems: Misoperations

Standard Drafting Team

Chair Mark J. Kuras PJM Interconnection, LLC

Member Martin Bauer, P.E. U.S. Bureau of Reclamation

Paul DiFilippo HydroOne Networks, Inc.

Mark Gutzmann Xcel Energy, Inc.

Ted Kramer Duke Energy

Bill Middaugh Tri-State G & T Association, Inc.

John W. Miller Georgia Transmission Corporation

Steve Paglow American Electric Power

Richard A. Purdy, PE Dominion Virginia Power

Tim Seeber ComEd/Exelon

Patrick Sorrells Sacramento Municipal Utility District

NERC Staff Scott Barfield-McGinnis – Standards Developer

North American Electric Reliability Corporation

NERC Standard Drafting Team Rosters – March 2014 12

Page 14: Standard Drafting Team Rosters · Project 2014-03 Revisions to TOP/IRO Standards Standard Drafting Team ..... 25 1 NERC Standard Drafting Team Rosters – March 2014 . Standard Drafting

Project 2010-05.2 Phase 2 of Protection Systems: Special Protection Systems

Standard Drafting Team

Chair Gene Henneberg NV Energy / Mid-American

Vice Chair Bobby Jones Southern Company

Member Amos Ang Southern California Edison

John Ciufo Hydro One Inc

Alan Engelmann ComEd / Exelon

Davis Erwin Pacific Gas and Electric

Sharma Kolluri Entergy

Charles-Eric Langlois Hydro-Quebec TransEnergie

Robert J. O' Keefe American Electric Power

Hari Singh Xcel Energy

NERC Staff Al McMeekin – Standards Developer North American Electric Reliability Corporation

Erika Chanzes – Standards Developer North American Electric Reliability Corporation

Phil Tatro – Technical Advisor North American Electric Reliability Corporation

Bill Edwards – Counsel North American Electric Reliability Corporation

13 NERC Standard Drafting Team Rosters – March 2014

Page 15: Standard Drafting Team Rosters · Project 2014-03 Revisions to TOP/IRO Standards Standard Drafting Team ..... 25 1 NERC Standard Drafting Team Rosters – March 2014 . Standard Drafting

Project 2010-13.2 Phase 2 of Relay Loadability: Generation

Standard Drafting Team

Chair Charles W. Rogers Consumers Energy

Member Jeff Billo ERCOT

S. Bryan Burch, P.E. Southern Company

Steven Hataway Florida Power & Light Co.

Jonathan E Hayes Southwest Power Pool, Inc.

Mike Jensen Pacific Gas and Electric Company

Sudhir Thakur, P.E. Exelon Nuclear

Joe T. Uchiyama U.S. Bureau of Reclamation

Benson Vuong Salt River Project

David Youngblood Luminant Energy

NERC Staff Scott Barfield-McGinnis – Standards Developer

North American Electric Reliability Corporation

NERC Standard Drafting Team Rosters – March 2014 14

Page 16: Standard Drafting Team Rosters · Project 2014-03 Revisions to TOP/IRO Standards Standard Drafting Team ..... 25 1 NERC Standard Drafting Team Rosters – March 2014 . Standard Drafting

Project 2010-13.3 Phase 3 of Relay Loadability: Stable Power Swings

Standard Drafting Team

Chair Bill Middaugh, P.E. Tri-State Generation & Transmission Association

Vice-Chair Kevin W. Jones Xcel Energy

Member David Barber, P.E. FirstEnergy

Steven Black Southern Company Services

Ding Lin Manitoba Hydro

Slobodan Pajic General Electric Energy Consulting

Fabio Rodriquez Duke Energy - Florida

John Schmall Electric Reliability Council of Texas (ERCOT)

Matthew H. Tackett, P.E. Midcontinent Independent System Operator (MISO)

NERC Staff Scott Barfield-McGinnis – Standards Developer

North American Electric Reliability Corporation

Phil Tatro – Technical Advisor North American Electric Reliability Corporation

15 NERC Standard Drafting Team Rosters – March 2014

Page 17: Standard Drafting Team Rosters · Project 2014-03 Revisions to TOP/IRO Standards Standard Drafting Team ..... 25 1 NERC Standard Drafting Team Rosters – March 2014 . Standard Drafting

Project 2010-14.1 Phase 1 of Balancing Authority Reliability-based Controls: Reserves

Standard Drafting Team

Chair Glenn Stephens Santee Cooper

Vice Chair Thomas W. Siegrist Brickfield Burchette Ritts and Stone, PC

Member Gerald D. Beckerle Ameren Services

Howard F. Illian Energy Mark, Inc.

David F. Lemmons Xcel Energy, Inc.

Clyde Loutan California ISO

David McRee Duke Energy Carolina

H. Steven Myers Electric Reliability Council of Texas, Inc.

LeRoy Patterson Patterson Consulting

Michael Potishnak Representing NPCC

Mark Prosperi-Porta British Columbia Transmission Corporation

Jerry Rust Northwest Power Pool

Stephen Swan Midwest ISO, Inc.

Thomas Washburn Florida Municipal Power Pool

NERC Staff Darrel Richardson – Standards Developer

North American Electric Reliability Corporation

NERC Standard Drafting Team Rosters – March 2014 16

Page 18: Standard Drafting Team Rosters · Project 2014-03 Revisions to TOP/IRO Standards Standard Drafting Team ..... 25 1 NERC Standard Drafting Team Rosters – March 2014 . Standard Drafting

Project 2010-14.2 Balancing Authority Reliability-based Controls, Phase 2

Standard Drafting Team

Chair Doug Hils Duke Energy

Vice Chair Thomas W. Siegrist Brickfield Burchette Ritts and Stone, PC

Member Scott Brooks Manitoba Hydro

Ron Carlsen Southern Company

Howard F. Illian Energy Mark, Inc.

Mike Potishnak Representing NPCC

Jerry Rust Northwest Power Pool

Robert Staton Xcel Energy

Glenn Stephens Santee Cooper

Stephen Swan Midwest ISO, Inc.

Mark Trumble Omaha Public Power District

NERC Staff Sean Cavote – Lead Standards Developer

North American Electric Reliability Corporation

Laura Anderson – Supporting Standards Developer

North American Electric Reliability Corporation

Stephen Crutchfield – Supporting Standards Developer

North American Electric Reliability Corporation

Mallory Huggins – Supporting Standards Developer

North American Electric Reliability Corporation

Laura Hussey – Director of Standards Development

North American Electric Reliability Corporation

17 NERC Standard Drafting Team Rosters – March 2014

Page 19: Standard Drafting Team Rosters · Project 2014-03 Revisions to TOP/IRO Standards Standard Drafting Team ..... 25 1 NERC Standard Drafting Team Rosters – March 2014 . Standard Drafting

Project 2010-17 Definition of Bulk Electric System

Standard Drafting Team

Chair Peter Heidrich – Manager of Reliability Standards

Florida Reliability Coordinating Council

Vice Chair Barry R. Lawson – Associate Director, Power Delivery & Reliability

National Rural Electric Cooperative Association

Member Jennifer Dering – Manager Operations Planning, Transmission

New York Power Authority

Brian Evans-Mongeon – President and CPO

Utility Services, Inc.

Philip A. Fedora – Assistant Vice President, Reliability Services

NPCC

Ajay Garg – Manager, Policy and Approvals Hydro One Networks, Inc.

John Hughes – Vice President, Technical Affairs

Electricity Consumers Resource Council (ELCON)

Jeff Mitchell – Director, Engineering RFC

Rich Salgo – Director, Electric System Operations NV Energy

Jason Snodgrass – Regulatory Compliance Manager Georgia Transmission Corporation

Jennifer T. Sterling, P.E. – Director, Transmission Strategy and Compliance

Exelon

Jonathan Sykes – Manager, System Protection Pacific Gas & Electric

NERC Staff Edward J. Dobrowolski – Standards Developer

North American Electric Reliability Corporation

Stacey Tyrewala – Counsel North American Electric Reliability Corporation

NERC Standard Drafting Team Rosters – March 2014 18

Page 20: Standard Drafting Team Rosters · Project 2014-03 Revisions to TOP/IRO Standards Standard Drafting Team ..... 25 1 NERC Standard Drafting Team Rosters – March 2014 . Standard Drafting

Project 2012-09 IRO Five-Year Review Team

Chair Robert C. Rhodes, Jr. Southwest Power Pool

Vice Chair David Souder PJM Interconnection, LLC

Member Anthony Jankowski We Energies

John Mulhern Con Edison

Ed Rudder TVA

Kevin Sherd Midwest ISO

(Milton) Dave Thoms WECC

Scott Watts Duke Energy Carolinas

NERC Staff Steve Crutchfield North American Electric Reliability Corporation

Laura Anderson North American Electric Reliability Corporation

Laura Hussey – Director of Standards Development

North American Electric Reliability Corporation

19 NERC Standard Drafting Team Rosters – March 2014

Page 21: Standard Drafting Team Rosters · Project 2014-03 Revisions to TOP/IRO Standards Standard Drafting Team ..... 25 1 NERC Standard Drafting Team Rosters – March 2014 . Standard Drafting

Project 2012-13 Nuclear Plant Interface Coordination

Standard Drafting Team

Chair John Gyrath Exelon Generation LLC (Nucler)

Vice Chair George Attarian Duke Energy

Member Mukund “Mookie” Chander Entergy Services Inc.

Kevin Donnelly Consolidated Edison of NY

Pete Jenkins Luminant Generation Company LLC

David Schweizer PJM Interconnection

Jerry Whooley PJM Interconnection

NERC Staff Stephen Eldridge – Standards Developer

North American Electric Reliability Corporation

Laura Hussey – Director of Standards Development

North American Electric Reliability Corporation

NERC Standard Drafting Team Rosters – March 2014 20

Page 22: Standard Drafting Team Rosters · Project 2014-03 Revisions to TOP/IRO Standards Standard Drafting Team ..... 25 1 NERC Standard Drafting Team Rosters – March 2014 . Standard Drafting

Project 2013-03 Geomagnetic Disturbance Mitigation

Standard Drafting Team

Chair Frank Koza PJM Interconnection

Vice Chair Randy Horton Southern Company

Member Donald Atkinson Georgia Transmission Corporation

Emanuel Bernabeu Dominion Resource Services, Inc

Kenneth Fleischer NextEra Energy

Luis Marti Hydro One Networks

Antti Pulkkinen NASA Goddard Space Flight Center

Qun Qiu American Electric Power

NERC Staff Mark Olson – Standards Developer North American Electric Reliability Corporation

21 NERC Standard Drafting Team Rosters – March 2014

Page 23: Standard Drafting Team Rosters · Project 2014-03 Revisions to TOP/IRO Standards Standard Drafting Team ..... 25 1 NERC Standard Drafting Team Rosters – March 2014 . Standard Drafting

Project 2013-04 Voltage and Reactive Control (VAR)

Standard Drafting Team

Chair Bill Harm PJM Interconnection, L.L.C.

Vice Chair Martin Kaufman Exxon Mobil Research and Engineering

Member Joshua Pierce Southern Company Transmission Planning

Sharma Kolluri Entergy Services Inc.

Scott Berry Indiana Municipal Power Agency

Hari Singh Xcel Energy

Hamid Zakery Calpine Corporation

Steve Hitchens Bonneville Power Administration

Joe Seabrook Puget Sound Energy, Inc.

Brian Buckley TECO Energy

Mike Swearingen Tri-County Electric

NERC Staff Soo Jin Kim – Standards Developer North American Electric Reliability Corporation

NERC Standard Drafting Team Rosters – March 2014 22

Page 24: Standard Drafting Team Rosters · Project 2014-03 Revisions to TOP/IRO Standards Standard Drafting Team ..... 25 1 NERC Standard Drafting Team Rosters – March 2014 . Standard Drafting

Project 2014-01 Standards Applicability for Dispersed Generation Resources

Standard Drafting Team

Co-Chair Tony Jankowski We Energies

Vice-Chair Tom Pruitt Duke Energy

Member David Belanger Exelon Generation

George Brown Acciona Energy North America

Stephen Enyeart Bonneville Power Administration

Brian Evans-Mongeon Utility Services, Inc.

Jessie Nevarez Terra-Gen Operating Company

Jeffrey Plew NextEra Energy Resources

Dana Showalter E.ON Climate & Renewables

Randhir Singh PSEG Fossil

Eric White MidAmerican Energy

NERC Staff Sean Cavote – Lead Standards Developer

North American Electric Reliability Corporation

Ryan Stewart – Supporting Standards Developer

North American Electric Reliability Corporation

Laura Hussey – Director of Standards Development

North American Electric Reliability Corporation

23 NERC Standard Drafting Team Rosters – March 2014

Page 25: Standard Drafting Team Rosters · Project 2014-03 Revisions to TOP/IRO Standards Standard Drafting Team ..... 25 1 NERC Standard Drafting Team Rosters – March 2014 . Standard Drafting

Project 2014-02 CIP Version 5 Revisions Standard Drafting Team

Co-Chair Philip Huff Arkansas Electric Cooperative Corporation

Co-Chair Maggy Powell Exelon Corporation

Member Steven Brain Dominion

Jay Cribb Southern Company

David Dockery Associated Electric Cooperative, Inc.

Greg Goodrich New York Independent System Operator

Christine Hasha Electric Reliability Council of Texas

Forrest Krigbaum Bonneville Power Administration

David Revill Georgia Transmission Corporation

Scott Saunders Sacramento Municipal Utilities District

NERC Staff Marisa Hecht North American Electric Reliability Corporation

Ryan Stewart North American Electric Reliability Corporation

Scott Mix North American Electric Reliability Corporation

NERC Standard Drafting Team Rosters – March 2014 24

Page 26: Standard Drafting Team Rosters · Project 2014-03 Revisions to TOP/IRO Standards Standard Drafting Team ..... 25 1 NERC Standard Drafting Team Rosters – March 2014 . Standard Drafting

Project 2014-03 Revisions to TOP/IRO Standards

Standard Drafting Team

Chair David Souder

PJM Interconnection LLC

Vice Chair Andrew Pankratz Florida Power & Light

Member David Bueche

CenterPoint Energy Houston Electric, LLC

James Case Entergy

Allen Klassen Westar Energy

Bruce Larsen WE-Energies

Jason Marshall ACES Power Marketing

Bert Peters

Arizona Public Service Co.

Robert Rhodes SPP

Eric Senkowicz FRCC

Kevin Sherd

Midcontinent Independent System Operator (MISO)

NERC Staff Ed Dobrowolski – Standards Developer

North American Electric Reliability Corporation

Mark Olson – Supporting Standards Developer

North American Electric Reliability Corporation

Stacey Tyrewala – Senior Counsel North American Electric Reliability Corporation

25 NERC Standard Drafting Team Rosters – March 2014