Stakeholder Briefing Knysna 19 th January 2016

Stakeholder Briefing Knysna 19th January · PDF fileStakeholder Briefing Knysna ... storage and bulk distribution: R38m •Waste water reticulation and treatment: R28m Bulk Infrastructure

Embed Size (px)

Citation preview

Stakeholder BriefingKnysna

19th January 2016

• Alignment of N2 Bypass Expropriated Land

• Human Settlements on Expropriated Land in Northern Areas

• Local Context in the Northern Areas

• Human Settlements Needs in Knysna Municipal Area

• Integrated Human Settlement Strategy

• Housing Pipeline

• Projects Close to Expropriated Land

• Requirements for Integrated Settlements in Northern Areas

• Short term Road Issues

• Other Relevant Contextual issues

Contents of Presentation

Housing Demand database

• Municipal Area 5251

• Knysna 4578

• Northern Areas 4178

• Expropriated Land +-500

Number of Informal Structures

Housing Demand Projections

Principles Proposed in Knysna Draft IHSS

Approved Human Settlements Projects

• 9.5km upgrading and improvement.

• Design interventions to address street edges and pedestrian walkways, improving

accessibility and safety along the road as well as promoting a pleasant pedestrian

environment

Proposed Intervention (NDPG)

• Street lighting • Trader opportunities • Service infrastructure

• Tree planting • Pedestrian facilities • Widening and resurfacing

of the road where

necessary

• Urban furniture • Signage (street names as

well as direction signage)

• Taxi embayment's

NDPG Projects (Northern Corridor)

• Upgrade of the existing field which will to Astroturf for soccer and/or

rugby.

• Three storey multi-purpose centre:

a) Indoor sports: ball court, matt court, action sport, gymnasium

b) Arts and culture: function hall, dancing, drama area, arts and crafts

room

c) Commercial opportunities: tuck shop, refreshment and coffee bar,

sports shop, maintenance and cleaning, vendors

d) Management: caretaker facility, manager centre

Proposed Intervention (NDPG)

NDPG Projects (White Location MPC)

• Development of the Water Source: R87m

• Water treatment, storage and bulk

distribution: R38m

• Waste water reticulation and treatment:

R28m

Bulk Infrastructure Requirements by 2017

NDPG Projects (N2 Alignment Sedgefield)

• Project implementation coordination structure

• Access to Land – Kruisfontein

• NDPG funding

• Assistance with Bulk Infrastructure Funding

• Alternative provision for traffic through the CBD

• Consideration of Sedgefield Land

Summary