Upload
truongdien
View
216
Download
0
Embed Size (px)
Citation preview
• Alignment of N2 Bypass Expropriated Land
• Human Settlements on Expropriated Land in Northern Areas
• Local Context in the Northern Areas
• Human Settlements Needs in Knysna Municipal Area
• Integrated Human Settlement Strategy
• Housing Pipeline
• Projects Close to Expropriated Land
• Requirements for Integrated Settlements in Northern Areas
• Short term Road Issues
• Other Relevant Contextual issues
Contents of Presentation
• Municipal Area 5251
• Knysna 4578
• Northern Areas 4178
• Expropriated Land +-500
Number of Informal Structures
• 9.5km upgrading and improvement.
• Design interventions to address street edges and pedestrian walkways, improving
accessibility and safety along the road as well as promoting a pleasant pedestrian
environment
Proposed Intervention (NDPG)
• Street lighting • Trader opportunities • Service infrastructure
• Tree planting • Pedestrian facilities • Widening and resurfacing
of the road where
necessary
• Urban furniture • Signage (street names as
well as direction signage)
• Taxi embayment's
• Upgrade of the existing field which will to Astroturf for soccer and/or
rugby.
• Three storey multi-purpose centre:
a) Indoor sports: ball court, matt court, action sport, gymnasium
b) Arts and culture: function hall, dancing, drama area, arts and crafts
room
c) Commercial opportunities: tuck shop, refreshment and coffee bar,
sports shop, maintenance and cleaning, vendors
d) Management: caretaker facility, manager centre
Proposed Intervention (NDPG)
• Development of the Water Source: R87m
• Water treatment, storage and bulk
distribution: R38m
• Waste water reticulation and treatment:
R28m
Bulk Infrastructure Requirements by 2017
• Project implementation coordination structure
• Access to Land – Kruisfontein
• NDPG funding
• Assistance with Bulk Infrastructure Funding
• Alternative provision for traffic through the CBD
• Consideration of Sedgefield Land
Summary