Stair-Pressurization Bin Mahmoud

Embed Size (px)

Citation preview

  • 8/16/2019 Stair-Pressurization Bin Mahmoud

    1/1

     (2B+G+7) RESIDENTIAL BUILDING @ Bin Mahmoud

    # 01 AAE 1999 AC A 51.9

      D = D + B / 1 + ( A/A)2    B = 7.64 * ( 1/ 1/ )

    = (D)3/2

      (D)3/2

      / D D   = 1740 * * A *

    1: D A

    H () 6.88

    () 3.28 A (2) I D : A = A1 , A2, A

    A (2) 22.5664 A 1/8" 0.21   C E A (A)

    () 20.32 3/4" 0.36   A = A1 + A2 + + A

    2: E D   4   A CF D   A1

    A (2)   # D (6.8' 3.28')

    0.55   D 1 3 4

    0.70   25   564 1,692 2,257

    50   1,128 3,385 4,513

     3: A: , F 100   2,257 6,770 9,027

    A = A A = A   200   4,513 13,540 18,053

    C A/A   A

    E 0.00007

    A 0.00021   D : A = A1 , A2, A3, A

    0.00042

    0.00002 A1 A

    A 0.00011

    0.00035 E A (A) D

    E 0.00018   A = 1/A12 + 1/A22 + 1/A32 + + 1/A2  0.5

    A 0.00084

    0.00180 AHAE (. H2) = 0.052

    F A 0.00005 (. H2) = 0.551

    B ()     111.5  

    B ()   77.5  

    ()   16.4  

    ()   8.2  

    A ( F)   50  

    A 510 = + 460 

    A ( F)   95

    A ( ) 555 = + 460

    D   D & B B () 0.2   D

    B B = 7.64 * ( 1/ 1/ ) 0.00121 B = 7.64 * ( 1/ 1/ ) F   11  

    F F H ()   11.8   H

    D B () 130 = * H

    A A D & B F (2)   0.21   D 1 2

    A & B (2) 580.56 = 2 * ( + ) * H

    A (2)   0.00011   3

    A F A & B F (2) 0.063862 F = *

    E A B F (2) 4460.4 = 2 * ( + ) * H *

    B E A (2)   0.00021   B 3

    A F A B & F (2) 0.93668 F = * B

    A F A & (2) 0.27386 = D +

    D   A D & B () 0.34524   F

    D   A D & B () 0.27262   D = ( D + D ) / 2

    (D)3/2 (D)3/2 0.11341 D = D +

    D D 0.14524 (B*) / (1+(/F)2 )

    A () 4,093   = 1740**A*/

    A (3 @200 ) = 13540

    A = 13540+4093

    A = 17633