Stage Gate Gamij
Gated process of large E&P players for project delivery
1
Stage-gate variant
FeasibilityConcept
selectionSanction
Ready for
start-upGates
•Appraise •Select •Define •Execute •Operate
•Feasibility
•Evaluation
and
selection
•FEED &
Detailed
design
•Constru-
ction•Operation
•Identify and
select
alternatives
•Generate
and select
alternatives
•Develop
alternatives•Execute
•Operate
and evaluate
•Identify and
assess
•Select •Define •Execute •Operate
Company
• Key
objectives of
phase
• Evaluate
feasibility and
commercial
viability of
development
• Generate,
select and
propose
concept
• Define concept
and finalize
cost, schedule
and technical
specifications,
and obtain
sanction
• Design, build
and
commission
facility/asset
within agreed
parameters
• Safe start-up
and final
proving of
facilities ready
for steady-
state
7/14/2019 Stage Gate
http://slidepdf.com/reader/full/stage-gate-563279f24d799 2/16
Stage Gate Gamij
Invented by Robert G. Cooper in 1980’s. Oil & Gas industry
adopted this after 2000 onwards.
Stage-1 : Identification and Assessment of Opportunities.
Stage-2&3 : Development Planning stages
Stage-4 :Execution of the Development Plan
Stage-5 :Management of Production Operations
Stage-gate PMP – in general
2
7/14/2019 Stage Gate
http://slidepdf.com/reader/full/stage-gate-563279f24d799 3/16
Stage Gate Gamij
Role of Project Teams & Executive Decision Board -
Stage-gate PMP helps organization -
In ensuring that all data/deliverables are available beforemoving to next stage
Defines the points & procedures for making management
decisions based on economics/supporting information from
Project Teams whether to proceed or to short close it
Stage-gate PMP – in general
3
7/14/2019 Stage Gate
http://slidepdf.com/reader/full/stage-gate-563279f24d799 4/16
Stage Gate Gamij
Model showing how shareholder value is created,
beginning with identification and ending with valuedelivery –
Companies using Stage-gate PMP under different names
Stage-gate PMP – in general
4
7/14/2019 Stage Gate
http://slidepdf.com/reader/full/stage-gate-563279f24d799 5/16
Stage Gate Gamij
• CPDEP - Chevron Project Development and Execution Process
• OPREP – Woodside Opportunity and Project Realisation Process
• ORP – Shell Opportunity Realisation Process
• CVP – BP’s Capital Value Process
• OM - Exxon-Mobil’s Opportunity Management Process
• VAF – BG Group Value Assurance Framework
• ACES - Anadarko Capital Effectiveness Systems
• CVP – Statoil’s Capital Value Process
• SGM – OMV Stage Gate Manager
• MPMP - Marathon Project Management Process
• SQAD - Santos Quality Asset Development Process
• AGP - Apache Gate Process, in development
• Stage Coach – Mustang Engineering’s method to support Owners systems
• IPA - Stage Gate Capital Value Processes (FEL 1 -5) – Recognised Independent method of measurement
• PMBOK ( Project Management Book of Knowledge ) – 4th Edition Chapter 2
• SPE – Recognised by the Society of Petroleum Engineers ( SPE 102926 )
• IHRDC – Online Training courses in Stage Gate Competencies
• Ernst & Young – “Capital Projects life cycle” – www.ey.com/GL/en/Industries/Oil--Gas/Capital-
Projects-life-cycle
This is an accepted Industry Standard……
5
7/14/2019 Stage Gate
http://slidepdf.com/reader/full/stage-gate-563279f24d799 6/16
Stage Gate Gamij
Recommended Stage-gate PMP for ONGC
Gate
1
3
4
5
6
7
8
CR ( Concept Report)
FDP (Field Development Plan)
Commencement
Steady state
Discovery
Commerciality
RFSU
( Ready For Start up)
Reserves
Execute
Define
(detail FR)
Select
Concept
Reserve
Appraisal
Explore to
Discover
Commission
& Start-up
Steady state
Operations
Commerciality
Assessment
Stage2
6
7/14/2019 Stage Gate
http://slidepdf.com/reader/full/stage-gate-563279f24d799 7/16Stage Gate Gamij
Stage 1: EXPLORE to DISCOVER
The objective of this stage is to establish hydrocarbons in the acreage. In thisstage G&G data is analyzed, probable locations for exploration are finalized and
exploration well program is executed to confirm the discovery. Revision of drilling
exploration portfolio after completion of drilling is undertaken. The decision of
whether the discovery merits further appraisal will be taken.
FPR(Gate Keeper) – Basin Manager; Gate Owner :-Director (Exploration)
Stage 2: RESERVE APPRAISAL
The objective of this stage is to reduce geological uncertainty so that further
development can be planned. In this stage, an appraisal program is chalked out to
drill further exploration wells for the purpose of delineation of the reservoir/ field.
Based on which the geological model is reviewed and reservoir characterization is
carried out. In this stage, commerciality of the discovery is established and decisionto develop further will be taken. Reservoir volumes are refined and firmed up for
development.
FPR(Gate Keeper) – Basin Manager; Gate Owner :-Director (Exploration)
Details of Stages (1/4)
7
7/14/2019 Stage Gate
http://slidepdf.com/reader/full/stage-gate-563279f24d799 8/16Stage Gate Gamij
Stage 3: COMMERCIALITY ASSESSMENT
The objective of this stage is to prove feasibility & commerciality of the fielddevelopment. In this stage simulations and dynamic modeling are done extensively.
Preliminary feasibility of facilities and development well are studied. Based on which
commercial analyses are carried out for various price scenarios. At the end of this
stage, declaration of commerciality (DOC) will be submitted to DGH.
FPR(Gate Keeper) – Chief NMFD; Gate Owner : Dir (Exploration)
FPR(Gate Keeper) – Asset Manager; Gate Owner - Dir (Offshore)/ Dir (Onshore)
Stage 4: SELECT CONCEPT
The objective of this stage is to select best development concept from range of
options for reservoir management & facilities etc. In this stage, facility & well concept
studies, flow assurance studies, contract strategy and risk management processes arecarried out. Commercial analyses conducted and cost estimates are worked out. At the
end of this stage, plans for technology, preliminary wells, stake holder management,
Scope of work and contracting strategy are finalized. In principle approval of Concept
Report (CR) is the major outcome of this stage.
FPR(Gate Keeper) – Asset Manager; Gate Owner - D (Off)/ D(On) and D(Expl)
Details of Stages (2/4)
8
7/14/2019 Stage Gate
http://slidepdf.com/reader/full/stage-gate-563279f24d799 9/16Stage Gate Gamij
Stage 5: DEFINE DETAILED FEASIBILITY REPORT
The objective of this stage is to generate and get approval of Field DevelopmentPlan (FDP). In this stage, detailed field development plan consisting of Front End
Execution Design (FEED), Functional & technical specifications, well designs,
cementing, Drilling policies etc. HAZOP / HAZID are carried out. Commercial
analyses for the project are conducted. Government approvals, environment
clearances, regulatory approvals are obtained in this stage.
FPR(Gate Keeper) – Asset Manager; Gate Owner - D (Off)/ D(On) and D (Expl)
Stage 6: EXECUTE & BUILD
The objective of this stage is to build and make facility ready for startup as per
schedule. In this stage all contracts are awarded and executed. The facilities are
commissioned. Regulatory approvals are obtained for startup. At the end of this
stage, the facilities are ready for startup and handed over to the concerned Asset bythe executing agency. Asset Development Board (ADB) releases the development
well locations which are drilled by the Drilling services.
FPR(Gate Keeper) – Asset Manager; Gate Owner - D (Off)/ D(On)
Details of Stages (3/4)
9
7/14/2019 Stage Gate
http://slidepdf.com/reader/full/stage-gate-563279f24d799 10/16Stage Gate Gamij
Stage 7: COMMISSION & START UP
The objective of this stage is to commission the facilitiesand drilling of wells will be completed and finally, production
will be started. In this stage, facilities are hooked up with
pipe lines etc., HAZOP/ HAZID status are some of the
activities undertaken.
FPR(Gate Keeper) – Asset Manager; Gate Owner : D (Off)/ D(On)
Stage 8: STEADY STATE OPERATIONS
The objective of this stage is to attain steady state in the
operations and handover accountability of operations to the
Asset Group. In this stage, reservoir management plan,
field surveillance plan & well optimization plans are
implemented.
FPR(Gate Keeper) – Asset Manager; Gate Owner : D (Off)/ D(On)
Details of Stages (4/4)
10
7/14/2019 Stage Gate
http://slidepdf.com/reader/full/stage-gate-563279f24d799 11/16Stage Gate Gamij
Each checklist is divided into 8 broad criteria - Objective Gate criterion/ decision
Governance Gate owner
Gatekeeper
Data/ tools availability
Focus activities
Detailed activities/ execution approach
Review mechanism Internal peer review External Review
Key deliverables & documentation
Provision of exception report
Salient Features of Checklists
11
I t d ti f Ph & St G t
7/14/2019 Stage Gate
http://slidepdf.com/reader/full/stage-gate-563279f24d799 12/16Stage Gate Gamij
Introduction of Phases & Stage GatesAbility to control from start to finish, ability to assess risk, ability to assign
roles & responsibilities more clearly
ExploreAppraise/
AssessSelect
Commerciality
1 2
DiscoveryGATE
PHASE
Identify leads,
prospects and
acquire acreage
Prove
commerciality of
development over
range of likely
outcomes
Generate, select
and propose
concept (Reservoir
evacuation and
Facilities)Objective
Key
activity
Prospect evaluation
Data acquisition,
and feasibility
studies
Define range of
reserves and
economic range of
development
options
Data acquisition
and feasibility
studies
DOC approval
Concept selection
studies
Contracting strategy
Approach market for
key contracts
KeyQuestion atclosure Gate
“Does this align
wi th the business
object ives and d o
we know what we
are getting into?”
“Do we have at
least one
commercial ly
feasible
development?”
“Have we selected
th e
correct/opt imal
concept?”
ConceptSelect
Define Execute Operate
RFSU
Detail technical
definition to be able
to place detail
design contracts
Establish sales
agreements
Obtain sanction
Project mgmnt
Deliver facilities,
handover to
operations
Operations
readiness
Regulatory
approvals
Final hot
commissioning &
introduction of
hydrocarbons
Production and
optimisation of plant
operating methods
“Is everything in
place to ensure
success?”
“Are we ready to
star t up and is
everything safe?”
Define concept and
finalise cost,
schedule and
technical
specifications and
obtain project
sanction
Design, build and
commission facility/
asset within agreed
parameters and
hand-over to
operations
Safe start-up and
final approval to
facilities ready for
steady state
Project closeout
3 4 5
FID
12
7/14/2019 Stage Gate
http://slidepdf.com/reader/full/stage-gate-563279f24d799 13/16Stage Gate Gamij
Key Decision to be made
Resource Category
Class of Estimate
Focus Activities ( Level 1 )
Key Deliverables
Objective of Phase
Key Activity
Peer Reviews
Phase Gates – Key Decision PointsSub-Gates – Handover Points
What is the Gate Plan / Roadmap….?
13
7/14/2019 Stage Gate
http://slidepdf.com/reader/full/stage-gate-563279f24d799 14/16Stage Gate Gamij
Definition of Select Phase Activities &
Deliverables
Deliverables (Subject to Project Size & Complexity)•Concept Selection Report
•Statement of Requirements
•Concept Risk Assessment
•FDP prepared and ready for OC submission
•Development Budget
•PEP for Define Phase Inc Level 2 Schedule & Class 4 Cost
•Prelim Well Plan
•Technology Plan
•Risk Register & plan
•Regulatory Approvals Plan
•Stakeholder Management Plan
•Prelim CR Management Plan & Compliance Report
•Operations Philosophy
•Contracting Strategy
•Updated economics
•Lessons Learned review & Compile
•AFE for subsequent Phase
Focus Activities•Facility and Wells Concept Studies
•Flow assurance studies
•Environmental Studies & data acquisition
•Carryout PHSER 1
•Initiate Risk Management Process
•Prepare contracting strategy•Seek EOI’s / Markey survey
•Commence Contractor prequalification
•Alignment with JVP’s
•Facility & Wells concept studies.
•Pipeline Route Studies
•Prepare and gain approval of Statement of Requirements
•Plan & Budget for subsequent Phase
•Finance planning and sign off on tax offsets
•Sales strategy
ExploreAppraise/
AssessSelect
Commerciality
1 2
Discovery Concept Select
Define Execute Operate
RFSU
3 4 5
Select
Objectives•Generate, Select and Propose Concept
(Reservoir evacuation and Facilities)•Generate FDP
Key Decisions•Submit FDP for Approval
•Agree contracting strategy
•Gate 3 - Agree Concept and initiate definition phase.•Authorise Funds for next Phase
“Have we selected the correct/optimal concept?”
14
f f f &
7/14/2019 Stage Gate
http://slidepdf.com/reader/full/stage-gate-563279f24d799 15/16Stage Gate Gamij
Definition of Define Phase Activities &
Deliverables
Deliverables (Subject to Project Size & Complexity)•Final Business Proposal inc Updated Economics
•Approved FDP
•Project Specifications, Codes & Standards
•Asset/Operating Plan
•PEP Inc Level 3 Schedule & Class 3 Cost & Performance Metrics
•Interface Management Plan
•Risk Management Plan
•Quality Assurance Plan•HAZOP / HAZID
•HSE Plan & Contractor HSE MP
•Emergency Response Plan (ERP)
•CR Management Plan & Compliance report
•Public Consultation Plan (PCDP)
•Major Contracts recommendations
•Environmental Clearance
•Lessons Learned review & Compile
•AFE for Construct Phase
•Oil/Gas/LNG sales agreement (HOA)
Focus Activities•Finalise basis of design
•Finalise well basis of design
•FEED/ Technical & Functional specifications
•Mobilise project team / project office
•Secure land (onshore) contingent on final investment decision
/ ROU’s
•Execution Planning
•Government & Environmental approvals
•Implement Management of Change
•Prepare contracts / T&C’s / Scopes of work
•Finance sign-off on contracts - Tax efficiencies
•Tender & Review all major facility contracts
•Tender & review all drilling/wells contracts
•Define long lead item commitment plan
•Engage Operations Manager
•Prepare Oil/Gas sales agreement(s)
ExploreAppraise/
AssessSelect
Commerciality
1 2
DiscoveryConceptSelect
Define Execute Operate
RFSU
3 4 5
Select
Objectives
•Gain approval of FDP•Fully define concept including FEED &
tendering of main packages.
Key Decisions•Gate 4a – Handover from Developments to Projects
•Gate 4 – Agree state of readiness to proceed•Authorise funds for full sanction of Project
“Is everything in place to ensure success?”
15
7/14/2019 Stage Gate
http://slidepdf.com/reader/full/stage-gate-563279f24d799 16/16Stage Gate Gamij
Recommendations & Way forward (1/2)
Stage-gate PMP is recommended for both Green field &
Brown field development projects. All future and current development projects proposed to be
executed with Stage-gate PMP .
Templates for each stage deliverables & underlying process
to be prepared.
Empowerment: Project Leaders with L-III powers under CRC.
Resourcing: As per MDT structure proposed.
Outsourcing of services & empanelment to fill skill gap through
fast track process as under.
IOGPT – for Operations & Facilities
IRS – Reservoir simulation & management
IDT – Drilling/mud technology
IEOT – GeoMechnical
16