11
CAD FILE: C:\Users\hcampbell\vaporremoval.com\Production - JOBS\01 - Active\19-0572_WSU Gateway Theater_MI\002 - CAD Drawings\01 - Drafts\19-0572_Draft.dwg PLOT DATE/TIME: 7/19/2019 5:14 PM LAYOUT: Cover Sheet USER: Campbell, Hannah PREPARED BY: 7681 Tim Ave NW N. Canton, Ohio 44720 330-915-2650 www.vaporremoval.com System Designed By: Tony McDonald - NRPP Cert# 107330 INDEX OF SHEETS COVER SHEET V0- SPEC SHEETS V1- CONSTRUCTION SHEETS V2- DETAIL SHEETS V3- AS NEEDED SSD System Design FOR Gateway Theater Complex Wayne State University 5454 Cass Avenue Detroit, MI 448202 PLANS PREPARED FOR: Hamilton Anderson Associates 1435 Randolph Street, Suite 200, Detroit, MI 48226 PROJECT NUMBER: 19-0572 GOVERNING STANDARDS: ANSI/AARST RMS-LB PROJECT BENCHMARK: -0.020" WC

SSD System Design · 8.4 pipe routing and thermal insulation 8.5 pipe supports 8.6 exhaust vent pipe equivalent length 8.7 piping materials ... all conveyance piping for the ssd system

  • Upload
    others

  • View
    10

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SSD System Design · 8.4 pipe routing and thermal insulation 8.5 pipe supports 8.6 exhaust vent pipe equivalent length 8.7 piping materials ... all conveyance piping for the ssd system

CAD

FILE: C:\U

sers\hcam

pbell\vaporrem

oval.com

\Production - JO

BS\01 - Active\19-0572_W

SU

G

atew

ay Theater_M

I\002 - CAD

D

raw

ings\01 - D

rafts\19-0572_D

raft.dw

g

PLO

T D

ATE/TIM

E: 7/19/2019 5:14 PM

LAYO

UT: Cover Sheet U

SER: Cam

pbell, H

annah

PREPARED BY:

7681 Tim Ave NW

N. Canton, Ohio 44720

330-915-2650

www.vaporremoval.com

System Designed By:

Tony McDonald - NRPP Cert# 107330

INDEX OF SHEETS

COVER SHEET

V0- SPEC SHEETS

V1- CONSTRUCTION SHEETS

V2- DETAIL SHEETS

V3- AS NEEDED

SSD System Design

FOR

Gateway Theater Complex

Wayne State University

5454 Cass Avenue

Detroit, MI 448202

PLANS PREPARED FOR:

Hamilton Anderson Associates

1435 Randolph Street, Suite 200,

Detroit, MI 48226

PROJECT NUMBER: 19-0572

GOVERNING STANDARDS: ANSI/AARST RMS-LB

PROJECT BENCHMARK: -0.020" WC

AutoCAD SHX Text
DRAFT NOT FOR CONSTRUCTION
Page 2: SSD System Design · 8.4 pipe routing and thermal insulation 8.5 pipe supports 8.6 exhaust vent pipe equivalent length 8.7 piping materials ... all conveyance piping for the ssd system

V0-01

Sheet Number:

EVENT: DATE:

CAD

FILE: C:\U

sers\hcam

pbell\vaporrem

oval.com

\Production - JO

BS\01 - Active\19-0572_W

SU

G

atew

ay Theater_M

I\002 - CAD

D

raw

ings\01 - D

rafts\19-0572_D

raft.dw

g

PLO

T D

ATE/TIM

E: 7/19/2019 5:14 PM

LAYO

UT: SPEC SH

EET U

SER: Cam

pbell, H

annah

Gatew

ay Theater Com

plex

Wayne State U

niversity

5454 Cass Avenue

Detroit, M

I 448202

Project:

Draw

n By: H

. Cam

pbell

Date: 7/18/19

Job N

um

ber: 19-0572

NRPP Cert#

107330

PROJECT DESCRIPTION AND SYSTEM TYPE

THE SCOPE OF WORK IN THIS SECTION INCLUDES PROVIDING ALL

WORK, MATERIALS, LABOR, EQUIPMENT AND SUPERVISION

NECESSARY TO COMPLETE AND ACTIVE SUB-SLAB DEPRESSURIZATION

(SSD) SYSTEM FOR THE ENTIRE FOOTPRINT OF THE BUILDING.

GENERAL REQUIREMENTS

1. THE SSD SYSTEM SHALL BE INSTALLED IN GENERAL ACCORDANCE

WITH ALL PARTS OF PROJECT SPECIFICATIONS.

2. MATERIALS AND EQUIPMENT SHALL BE PROVIDED AS PER THE

DRAWINGS AND SPECIFICATIONS.

3. MATERIALS AND EQUIPMENT SHALL NOT BE STORED OR USED IN

SUCH A MANNER AS TO CREATE UNSAFE CONDITIONS AND SHALL

MEET REQUIREMENTS OF ANY APPLICABLE CODES.

4. WORK WILL BE CONDUCTED IN CLOSE PROXIMITY TO OTHER

TRADES, SAFETY CONCERNS ARE A PRIORITY.

5. ATTEMPTS SHOULD BE MADE TO MINIMIZE DUST, NOISE, AND

OTHER INCONVENIENCES.

6. ALL SLAB PENETRATIONS SHALL BE SEALED TO REDUCE DRAWING

AIR FROM THE INTERIOR OF THE BUILDING. COORDINATE SEALING

WITH OTHER TRADES.

7. AS MINIMUM REQUIREMENTS, THE CONTRACTOR SHALL OBSERVE

AND FOLLOW ALL APPROPRIATE AND RELEVANT OR APPLICABLE

PROCEDURES IDENTIFIED IN APPLICABLE FEDERAL, STATE, AND

LOCAL RULES AND REGULATIONS IN CONDUCTING THE WORK.

8. OTHER APPLICABLE REGULATIONS NOT EXPLICITLY INCLUDED IN

THESE SPECIFICATIONS SHALL BE ADHERED TO IN CONDUCTING

THE WORK.

9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING

NECESSARY PERMITS AND APPROVALS FOR HIS PROJECT RELATED

WORK AND FACILITIES.

PROJECT BENCHMARK

THE FINISHED SYSTEM SHALL DEMONSTRATE A MINIMUM

DOFFERENTIAL PRESSURE BETWEEN THE SUB SLAB AND INDOOR AIR

OF -0.020”WC AT THE LEAST RESPONSIVE MONITORING POINT.

INSTALLATION MATERIALS

SEE SHEET V0-02 FOR A LIST OF SPECIFIED MATERIALS AND AN

ESTIMATED NECESSARY QUANTITY TO COMPLETE THE PROJECT.

MATERIAL SUBSTITUTIONS

NO SUBSTITUTIONS ARE ALLOWED WITHOUT THE PRIOR WRITTEN

AUTHORIZATION OF THE SYSTEM DESIGN PROFESSIONAL.

CONTRACTOR QUALIFICATIONS

THE PERSON RESPONSIBLE FOR DIAGNOSTIC TESTING, DESIGN,

CONSTRUCTION AND ON-SITE SUPERVISION, AS REQUIRED BY THE

SPECIFICATIONS, SHALL HAVE SUCCESSFULLY COMPLETED THE

REQUIREMENTS OF AND SHALL BE MAINTAINING A CURRENT

CERTIFICATION IN THE NATIONAL RADON PROFICIENCY PROGRAM

(NRPP) AS A MITIGATION SPECIALIST.

CONTRACTOR EXPERIENCE

CONTRACTOR WILL BE REQUIRED TO SUBMIT EVIDENCE

DEMONSTRATING THAT THE CONTRACTOR HAS SUCCESSFULLY

DESIGNED AND INSTALLED AT LEAST 5 SSD SYSTEMS OF THE SAME OR

SIMILAR TYPE REQUIRED HERIN.

ON SITE SUPERVISION

NO WORK AT THE SITE WILL BE PERMITTED WITHOUT THE PRESENCE

OF A PERSON POSESSING A CURRENT VALID MITIGATION SPECIALIST

CERTIFICATION BY THE NRPP.

DESIGN AND INSTALLATION STANDARD

THIS SYSTEM WAS DESIGNED TO MEET OR EXCEED THE 2018 EDITION

OF ANSI/AARST CC-1000: SOIL GAS CONTROL SYSTEMS IN NEW

CONSTRUCTION BUILDINGS STANDARD. THE FOLLOWING SECTIONS

SHALL APPLY TO THIS PROJECT:

1.0 Scope

1.1 General

1.2 Significance of Use

1.3 Applicability

2.0 TERMS AND DEFINITIONS

3.0 REQUIREMENT SUMMARY

3.1 GENERAL

3.2 SOIL GAS VENT SYSTEMS REQUIRED

3.4 MATERIALS AND SPECIFICATIONS

4.0 SOIL GAS COLLECTION PLENUMS

4.1 GENERAL

4.2 PLENUM SIZE CALCULATIONS

4.3 SOIL GAS VENT SYSTEMS PER PLENUM SIZE

4.4 COLLECTIVE EXPANSES AND PLENUM SIZE

4.5 JOINED PLENUMS

4.6 JOINED SOIL GAS VENT SYSTEMS

4.7 LIMITING PLENUM AND VENT SYSTEM SIZE

5.0 PLENUM CONSTRUCTION

5.1 CLOSE THE BOTTOM OF THE PLENUMS

5.2 CLOSE THE SIDES OF THE PLENUMS

5.3 FOUNDATION DRAIN SYSTEMS

5.4 FOOTINGS AND JOINED PLENUMS

5.5 GAS PERMEBLE LAYERS

5.6 DUCT SIZES

5.7 SOIL GAS INLETS AND AIRFLOW CAPACITY

5.9 TEST PORTS

5.10 PRIOR TO CONCRETE OR SOIL GAS RETARDERS

6.0 CLOSE THE TOP OF THE PLENUM

6.1 GENERAL

6.2 CLOSURE OF CONCRETE FLOORS

6.4 SOIL GS RETARDER MATERIALS/INSTALLATION

6.5 INSPECTION PRIOR TO INDOOR FINISHINGS

7.0 PRESSURE FIELD EVALUATION

7.1 GENERAL

7.2 TEST PORT LOCATIONS

7.3 TEST PORT DESIGN

7.4 PFE EVALUATION

8.0 SOIL GAS EXHAUST VENT PIPE

8.1 GENERAL

8.2 SLOPE

8.3 AIR AND WATER LEAKAGE

8.4 PIPE ROUTING AND THERMAL INSULATION

8.5 PIPE SUPPORTS

8.6 EXHAUST VENT PIPE EQUIVALENT LENGTH

8.7 PIPING MATERIALS

8.8 JOINTS

8.9 PROVISIONS FOR ASD FANS

8.10 LABELS REQUIRED FOR EXHAUST PIPING

9.0 EXHAUST LOCATIONS

9.1 GENERAL

9.2 OUTDOORS

9.3 DIRECTIONAL SPREAD

9.4 STRAIGHT LINE TRAJECTORY

9.5 ELEVATION ABOVE GRADE

9.6 ROOF

9.7 SEPERATION FROM OPENINGS AND PEOPLE

9.8 PROTECTION FROM DEBRIS

9.9 INCREASE DISTANCES - LARGE SYSTEMS

9.10 INSPECT THE EXHAUST VENT PIPE

10.0 COMPLETION OF SYSTEMS

10.1 LABELING OR MARKING REQUIRED

10.3 ACTIVATION FOR ASD

12.0 DOCUMENTATION

12.1 OPERATION AND MAINTENANCE PLAN - STAFF

12.2 OM&M MANUAL

12.3 CONSIDERATIONS: CHEMICAL VAPOR

ANNEX A: INSPECTIONS FOR COMPLIANCE

CC-1000 STANDARD SPECIFIC REQUIREMENTS

THE FOLLOWING ITEMS LIMIT THE POTENTIAL INSTALLATION CHOICES

IN THE STANDARD TO THE REQUIREMENTS OF THE DESIGN

PROFESSIONAL.

4.3 SOIL GAS VENT SYSTEMS PER PLENUM SIZE

ALL SOIL GAS COLLECTION PLENUMS IN THIS BUILDING SHALL MEET

THE REQUIREMENTS OF TABLE 4.3.3: CREDIT ALLOWANCE FOR

AIRTIGHT APPLICATIONS. THE MAXIMUM PLENUM SIZE ALLOWED FOR

A 4” RISER PIPE SHALL BE 7,100 FT2.

5.1.1 SUBGRADE SURFACE CLOSURE

EXISTING OR CONSTRUCTED MATERIALS THAT SURROUND THE

BOTTOM AND SIDES OF GAS PERMEABLE LAYERS AND PERMEABLE

COMPONENTS OF FOUNDATION DRAIN SYSTEMS SHALL BE EARTHEN

MATERIALS THAT CONTAIN MORE THAN 35% SAND, ROCK FRAGMENT

FINES, CLAY AND SILT TO RESTRICT PERMEABILITY.

5.2.2 GAS PERMEABLE LAYER CONFIGURATIONS

A MINIMUM 4” LAYER OF MDOT 6AA WHICH CONTAINS NO WASTE

PRODUCTS SHALL BE INSTALLED DIRECTLY ABOVE THE SUBGRADE

AND BENEATH THE VAPOR BARRIER TO SATISFY THE REQUIREMENTS

OF THIS SECTION.

5.6 DUCT SIZING

ALL CONVEYANCE PIPING FOR THE SSD SYSTEM ABOVE AND BELOW

GRADE SHALL BE 4” SCH40 PVC.

6.4.1 MATERIALS UNDER CONCRETE SLABS

A 20MIL EVOH SHEET APPLIED VAPOR BARRIER WITH AIRTIGHT SEEMS

SHALL BE USED ON THIS BUILDING.

6.5 INSPECT FOR CLOSURE PRIOR TO FINISHINGS

IMMEDIATELY AFTER INSTALLATION, ARTIFICIAL SMOKE SHALL BE

PUMPED BENEATH THE BARRIER TO VERIFY THE INTERGRY OF THE

SEAL. ANY LEAKS IN BARRIER SHALL BE REAPIRED AND THE AREA

RETESTED UNTIL NO LEAKS ARE FOUND. THE CLIENT AND ENGINEER

OF RECORD SHALL BE PRESENT DURING THIS CATIVITY TO DOCUMENT

THE SUCCESSFUL INSTALLATION OF THE BARRIER.

9.0 EXHAUST LOCATIONS

ALL DISCHARGE LOCATIONS SHALL MEET THE REQUIREMENTS FOR

VERTICAL DISCHARGE IN THIS SECTION.

AutoCAD SHX Text
DRAFT NOT FOR CONSTRUCTION
Page 3: SSD System Design · 8.4 pipe routing and thermal insulation 8.5 pipe supports 8.6 exhaust vent pipe equivalent length 8.7 piping materials ... all conveyance piping for the ssd system

V0-02

Sheet Number:

EVENT: DATE:

CAD

FILE: C:\U

sers\hcam

pbell\vaporrem

oval.com

\Production - JO

BS\01 - Active\19-0572_W

SU

G

atew

ay Theater_M

I\002 - CAD

D

raw

ings\01 - D

rafts\19-0572_D

raft.dw

g

PLO

T D

ATE/TIM

E: 7/19/2019 5:14 PM

LAYO

UT: M

ATERIALS U

SER: Cam

pbell, H

annah

Gatew

ay Theater Com

plex

Wayne State U

niversity

5454 Cass Avenue

Detroit, M

I 448202

Project:

Draw

n By: H

. Cam

pbell

Date: 7/18/19

Job N

um

ber: 19-0572

NRPP Cert#

107330

PRODUCT MANUFACTURER

ENKA-DRAIN

20 MIL EVOH VAPOR BARRIER

BUTYL SEAM TAPE

RTV SILICONE

VAPOR BOND TAPE

VAPOR BOOT TAPE

TERMINATION BAR

HEX HEAD CONCRETE SCREW

VAPOR PIN INSERT

U-STOP BUSHING

4" SCH40 PVC PIPE AND FITTINGS

FIRESTOP SEALANT

FIRESTOP COLLAR

METAL BOCA PLATE

ROOF FLASHING

EXHAUST SCREEN

490CFM @ 0.5" FAN ASSEMBLY

RUBBER COUPLING WITH WORM DRIVE CLAMPS

RUBBER COUPLING WITH WORM DRIVE CLAMPS

0-5" MINIHELIC GAGE

5/16" OD MINIHELIC TUBING

APPLIANCE CORD

1/4" PRESSURE SWITCH

NETWORX MONITORING STATION

LOW VOLTAGE CABLE

Low & Bonar, Inc

RAVEN INDUSTRIES

RAVEN INDUSTRIES

VARIOUS

RAVEN INDUSTRIES

RAVEN INDUSTRIES

STEGO INDUSTRIES

TAPCON

CONX COLVIN, INC

RADONAWAY

VARIOUS

SPECIFIED TECHNOLOGIES

SPECIFIED TECHNOLOGIES

OATEY

GENOVA

RADONAWAY

FANTECH

FERNCO

FERNCO

DWYER INSTRUMENTS

EASTMAN

WHIRLPOOL

RADONAWAY

GE

VARIOUS

9323

VBP20

TP2BR

RTV SILICONE

TVB4

TBOOT

TERM BAR

1/4" X 1-1/4"

PVC_INSERT.01

79219

VARIOUS

LCI300

LCC400

33897

14564

76041-2

RN4-EC

1006-44

1056-42

2-5005

98562

W10278923RP

73023

NX-8E

18AWG / 4C

ESTIMATED

QUANTITY

1250

15000

63

1500

15

25

575

280

1

6

420

3

12

24

6

6

6

12

12

12

6

6

6

1

UNITS

LF

SF

ROLL

LF

ROLL

ROLL

LF

EACH

EACH

EACH

LF

TUBES

EACH

EACH

EACH

EACH

EACH

EACH

EACH

EACH

LF

EACH

EACH

EACH

LF

MODEL

AutoCAD SHX Text
DRAFT NOT FOR CONSTRUCTION
Page 4: SSD System Design · 8.4 pipe routing and thermal insulation 8.5 pipe supports 8.6 exhaust vent pipe equivalent length 8.7 piping materials ... all conveyance piping for the ssd system

Xref Z:\proj2016\2016034.00 WSU Hillberry Gateway Design Services\00 Correspondence\Consultant_SME - Vapor Mitigation\OUT\New folder\S18 -WSU Hilberry Gateway-9604 - Structural Plan - FOUNDAT-397620-0-rvt-1-FOUNDATION AND FIRST FLOOR FRAMING PLAN - SECTOR B.dwg

3'-1

3

/8

"

40'-1 5/8"

3'-0"

3'-0"

3'-0

"

5'-0

"

5'-0

"

4'-0"

5'-0

"

4'-0

"

4'-0

"

4'-0"

CP-2

CP-2

8'-9"

4'-2

1

/2

"

EQ

EQ

19'-8 1/8" 5'-5 7/8" 14'-11 5/8" 14'-0 3/8" 10'-2" 17'-4" 17'-4" 17'-4" 5'-2 1/4" 12'-1 3/4" 30'-6"

17'-4"4'-3 5/8"15'-6"

1'-4 5/8"

11'-2"

10 1/4"

SB-8

SB-1SB-2

SB-15SB-16

SB-6

SB-13

SB-5

SB-12

CP-2CP-2

CP-2

CP-2CP-2

CP-2

44'-6 12 "

16'-10

1

4

"16'-9"

20'

TYP.

16'-6

3

4

"

10'

21'-4

1

4

"

25'-3

1

2

"15' 15'

21'-0

1

2

"

5'

5'

6'-5"

38'-9

3

4

"

55'-3

1

2

"

5'

5'

5'

5'

5'

5'

5'

5'

5'

49'-3"

5'

TREATMENT AREA

13,400 FT2

V2-02

4

WEST FOREST AVENUE

WEST HANCOCK STREET

SE

CO

ND

A

VE

NU

E

CA

SS

A

VE

NU

E

V1-01

Sheet Number:

EVENT: DATE:

1

V1-01

FOUNDATION LAYOUT

SSD SYSTEM DESIGN

SCALE: NTS

CAD

FILE: C:\U

sers\hcam

pbell\vaporrem

oval.com

\Production - JO

BS\01 - Active\19-0572_W

SU

G

atew

ay Theater_M

I\002 - CAD

D

raw

ings\01 - D

rafts\19-0572_D

raft.dw

g

PLO

T D

ATE/TIM

E: 7/19/2019 5:14 PM

LAYO

UT: V1-01 U

SER: Cam

pbell, H

annah

Project:

NRPP Cert#

107330

LEGEND

4in-CONV4" SCH40 PVC HORIZONTAL CONVEYANCE PIPING

FAN

EXTRACTION POINT

SCH40 PVC VERTICAL CONVEYANCE PIPING

VENT MATTING

MONITORING POINT

Gatew

ay Theater Com

plex

Wayne State U

niversity

5454 Cass Avenue

Detroit, M

I 448202

Draw

n By: H

. Cam

pbell

Date: 7/18/19

Job N

um

ber: 19-0572

KEY MAP

AutoCAD SHX Text
DRAFT NOT FOR CONSTRUCTION
Page 5: SSD System Design · 8.4 pipe routing and thermal insulation 8.5 pipe supports 8.6 exhaust vent pipe equivalent length 8.7 piping materials ... all conveyance piping for the ssd system

SLL

134B

STAGEHOUSE

BOX OFFICE

132

SLL

150C

BOH STORAGE

151

STUDIO THEATER

150

SLL

150B

PROD MGR &

STAGE MGR

OFFICE

140

SLL

134C

SLL

134A

STUDIO THEATER

ENTRY

AUDIENCE

CHAMBER

135

GALL/CRTL

ACCESS

134E

CAFE

131

SSD-1

SSD-2SSD-3

SSD-4

SSD-5

SSD-6

TREATMENT AREA

WEST FOREST AVENUE

WEST HANCOCK STREET

SE

CO

ND

A

VE

NU

E

CA

SS

A

VE

NU

E

V1-02

Sheet Number:

EVENT: DATE:

1

V1-02

FIRST FLOOR LAYOUT

SSD SYSTEM DESIGN

SCALE: 3/4" = 1'

CAD

FILE: C:\U

sers\hcam

pbell\vaporrem

oval.com

\Production - JO

BS\01 - Active\19-0572_W

SU

G

atew

ay Theater_M

I\002 - CAD

D

raw

ings\01 - D

rafts\19-0572_D

raft.dw

g

PLO

T D

ATE/TIM

E: 7/19/2019 5:14 PM

LAYO

UT: V1-02 U

SER: Cam

pbell, H

annah

Project:

NRPP Cert#

107330

Gatew

ay Theater Com

plex

Wayne State U

niversity

5454 Cass Avenue

Detroit, M

I 448202

Draw

n By: H

. Cam

pbell

Date: 7/18/19

Job N

um

ber: 19-0572

KEY MAP

LEGEND

4in-CONV4" SCH40 PVC HORIZONTAL CONVEYANCE PIPING

FAN

SCH40 PVC VERTICAL CONVEYANCE PIPING

AutoCAD SHX Text
DRAFT NOT FOR CONSTRUCTION
Page 6: SSD System Design · 8.4 pipe routing and thermal insulation 8.5 pipe supports 8.6 exhaust vent pipe equivalent length 8.7 piping materials ... all conveyance piping for the ssd system

OPEN TO

BELOW

OPEN TO

BELOW

OPEN TO

BELOWOPEN TO

BELOW

ROOF

BELOW

ROOF

BELOW

ROOF

BELOW

ROOF

BELOW

OPEN TO

BELOW

OPEN TO

BELOW

SSD-1

SSD-2

SSD-3

SSD-4

SSD-5

SSD-6

WEST FOREST AVENUE

WEST HANCOCK STREET

SE

CO

ND

A

VE

NU

E

CA

SS

A

VE

NU

E

V1-03

Sheet Number:

EVENT: DATE:

1

V1-03

SECOND FLOOR LAYOUT

SSD SYSTEM DESIGN

SCALE: 3/4" = 1'

CAD

FILE: C:\U

sers\hcam

pbell\vaporrem

oval.com

\Production - JO

BS\01 - Active\19-0572_W

SU

G

atew

ay Theater_M

I\002 - CAD

D

raw

ings\01 - D

rafts\19-0572_D

raft.dw

g

PLO

T D

ATE/TIM

E: 7/19/2019 5:14 PM

LAYO

UT: V1-03 U

SER: Cam

pbell, H

annah

Project:

NRPP Cert#

107330

Gatew

ay Theater Com

plex

Wayne State U

niversity

5454 Cass Avenue

Detroit, M

I 448202

Draw

n By: H

. Cam

pbell

Date: 7/18/19

Job N

um

ber: 19-0572

KEY MAP

LEGEND

4in-CONV4" SCH40 PVC HORIZONTAL CONVEYANCE PIPING

FAN

SCH40 PVC VERTICAL CONVEYANCE PIPING

AutoCAD SHX Text
DRAFT NOT FOR CONSTRUCTION
Page 7: SSD System Design · 8.4 pipe routing and thermal insulation 8.5 pipe supports 8.6 exhaust vent pipe equivalent length 8.7 piping materials ... all conveyance piping for the ssd system

SSD-1

SSD-2 SSD-3

SSD-4

SSD-5

SSD-6

WEST FOREST AVENUE

WEST HANCOCK STREET

SE

CO

ND

A

VE

NU

E

CA

SS

A

VE

NU

E

V1-04

Sheet Number:

EVENT: DATE:

1

V1-04

ROOF LAYOUT

SSD SYSTEM DESIGN

SCALE: 3/4" = 1'

CAD

FILE: C:\U

sers\hcam

pbell\vaporrem

oval.com

\Production - JO

BS\01 - Active\19-0572_W

SU

G

atew

ay Theater_M

I\002 - CAD

D

raw

ings\01 - D

rafts\19-0572_D

raft.dw

g

PLO

T D

ATE/TIM

E: 7/19/2019 5:14 PM

LAYO

UT: V1-04 U

SER: Cam

pbell, H

annah

Project:

NRPP Cert#

107330

LEGEND

4in-CONV4" SCH40 PVC HORIZONTAL CONVEYANCE PIPING

FAN

SCH40 PVC VERTICAL CONVEYANCE PIPING

Gatew

ay Theater Com

plex

Wayne State U

niversity

5454 Cass Avenue

Detroit, M

I 448202

Draw

n By: H

. Cam

pbell

Date: 7/18/19

Job N

um

ber: 19-0572

KEY MAP

AutoCAD SHX Text
DRAFT NOT FOR CONSTRUCTION
Page 8: SSD System Design · 8.4 pipe routing and thermal insulation 8.5 pipe supports 8.6 exhaust vent pipe equivalent length 8.7 piping materials ... all conveyance piping for the ssd system

VAPOR BLOCK PLUS 20 VAPOR

BARRIER BY RAVEN INDUSTRIES

OR EQUIVALENT

STAINLESS STEEL SECURE COVER

RUBBER BARB CAP

DRILL 1

1

2

" HOLE 1

1

2

" DEEP

BRASS VAPOR PIN BY COX-COLVIN &

ASSOCIATES, INC.

SILICONE SLEEVE

DRILL

5

8

" HOLE THRU SLAB

ON

OFF

ANCHOR PIPE TO

JOIST

SCH40 PVC PIPE

TO EXTRACTION POINT

SCH40 PVC PIPE

1

2

" x

1

2

" WIRE MESH CRITTER

GUARD ON EXHAUST

SERVICE DISCONNECT

SWITCH SUPPLIED AND

INSTALLED BY ELECTRICAL

CONTRACTOR

ROOF FLASHING

FERNCO OR SIMILAR RUBBER

COUPLING

INLINE FAN MOTOR ASSEMBLY

FANTECH MODEL RN4

INSTALLED PRESSURE SWITCH AND

LOW VOLTAGE WIRING TO BUILDING

MONITORING SYSTEM SUPPLIED AND

INSTALLED BY ELECTRICAL

CONTRACTOR

(SEE DETAIL 4/V2-01)

UNISTRUT FAN SUPPORT STAND

LOW VOLTAGE WIRING TO

SYSTEM MONITORING

CONTROL PANEL

TUBING TO BE CONNECTED TO

CONVEYANCE PIPE

6" x 6" x 4" PVC JUNCTION

BOX WITH WEATHER PROOF

COVER

GATE VALVE

MINIHELIC DIFFERENTIAL

PRESSURE GAUGE

FINAL SUB GRADEPER PROJECTGEOTECHNICALREPORT

AGGREGATE LAYERMIN 4" 6AA

CONTAINING NOWASTE PRODUCTS

CONCRETE SLAB

VAPOR BLOCK PLUS 20

VAPOR BARRIER BY

RAVEN INDUSTRIES

OR EQUIVALENT

URETHANE SEALANT

SCH40 PVC PIPE

CONTINUE PIPE

TO ROOF

4" SCH40 PVC PIPE

CONTINUED TO

EXTRACTION PIT

V2-01

Sheet Number:

EVENT: DATE:

1

V2-01

ROOF LAYOUT

SSD SYSTEM DESIGN

SCALE: 3/4" = 1'

CAD

FILE: C:\U

sers\hcam

pbell\vaporrem

oval.com

\Production - JO

BS\01 - Active\19-0572_W

SU

G

atew

ay Theater_M

I\002 - CAD

D

raw

ings\01 - D

rafts\19-0572_D

raft.dw

g

PLO

T D

ATE/TIM

E: 7/19/2019 5:14 PM

LAYO

UT: V2-01 U

SER: Cam

pbell, H

annah

Project:

NRPP Cert#

107330

Gatew

ay Theater Com

plex

Wayne State U

niversity

5454 Cass Avenue

Detroit, M

I 448202

Draw

n By: H

. Cam

pbell

Date: 7/18/19

Job N

um

ber: 19-0572

2

V2-01

TYPICAL DETAIL

VAPOR PIN SCALE: 3" = 1'

4

V2-01

TYPICAL DETAIL

PRESSURE SWITCHSCALE: 3" = 1'

3

V2-01

TYPICAL DETAIL

EXTRACTION POINTSCALE: 1" = 1'

AutoCAD SHX Text
DRAFT NOT FOR CONSTRUCTION
Page 9: SSD System Design · 8.4 pipe routing and thermal insulation 8.5 pipe supports 8.6 exhaust vent pipe equivalent length 8.7 piping materials ... all conveyance piping for the ssd system

VENTMAT

VENTMAT

TAPE

VENTMAT STAPLES

VENTMAT

VENTMAT

VENTMAT STAPLES

TAPE

CONCRETE

20ML VAPOR

BARRIER

VENT MAT

AGGREGATE LAYER

SUB GRADE

EXTEND VAPOR

BARRIER 2' PAST

TREATMENT AREA

END OF TREATMENT AREA

STANDARD VAPOR

BARRIER

VENT MAT

VENT MAT

TAPE

TAPE

VENT MAT STAPLES

V2-02

Sheet Number:

EVENT: DATE:

CAD

FILE: C:\U

sers\hcam

pbell\vaporrem

oval.com

\Production - JO

BS\01 - Active\19-0572_W

SU

G

atew

ay Theater_M

I\002 - CAD

D

raw

ings\01 - D

rafts\19-0572_D

raft.dw

g

PLO

T D

ATE/TIM

E: 7/19/2019 5:14 PM

LAYO

UT: V2-02 U

SER: Cam

pbell, H

annah

Project:

NRPP Cert#

107330

Gatew

ay Theater Com

plex

Wayne State U

niversity

5454 Cass Avenue

Detroit, M

I 448202

Draw

n By: H

. Cam

pbell

Date: 7/18/19

Job N

um

ber: 19-0572

3

V2-02

TYPICAL DETAIL

VENTMAT LAP SEAMSCALE: 3/4" = 1'

4

V2-02

TYPICAL DETAIL

VENTMAT AT THICKEND POUR SCALE: 3/4" = 1'

1

V2-02

TYPICAL DETAIL

VENTMAT END LAP SEAMSCALE: 3/4" = 1'

2

V2-02

TYPICAL DETAIL

VENTMAT CORNER SEAMSCALE: 3/4" = 1'

AutoCAD SHX Text
DRAFT NOT FOR CONSTRUCTION
Page 10: SSD System Design · 8.4 pipe routing and thermal insulation 8.5 pipe supports 8.6 exhaust vent pipe equivalent length 8.7 piping materials ... all conveyance piping for the ssd system

CONCRETE

VAPOR BLOCK PLUS 20 VAPOR BARRIER

BY RAVEN INDUSTRIES

OR EQUIVALENT

AGGREGATE LAYER

MIN 4" 6AA CONTAINING

NO WASTE PRODUCTS

VENT MAT

FINAL SUB GRADE PER

PROJECT GEOTECHNICAL

REPORT

3

4

" CDX PLYWOOD

AGGREGATE LAYER

MIN 4" 6AA CONTAINING NO

WASTE PRODUCTS

FINAL SUB GRADE PER

PROJECT GEOTECHNICAL

REPORT

CONCRETE

VENT MAT

VAPOR BLOCK PLUS 20 VAPOR BARRIER

BY RAVEN INDUSTRIES

OR EQUIVALENT

4' x 4' x 8" EXTRACTION

AREA

4" SCH40 PVC PIPE

8"x4"x16" CMU BLOCK

12" MINIMUM

VAPOR BLOCK PLUS 20

VAPOR BARRIER BY

RAVEN INDUSTRIES

OR EQUIVALENT

4" SEAM TAPE

BY RAVEN INDUSTRIES

2" BUTYL SEAM TAPE

BY RAVEN INDUSTRIES

8" MINIMUM

VAPOR BLOCK PLUS 20

VAPOR BARRIER BY

RAVEN INDUSTRIES

OR EQUIVALENT

VAPOR BARRIER

PATCH PIECE

2" BUTYL SEAM TAPE

BY RAVEN INDUSTRIES

2" VAPOR BOOT TAPE

BY RAVEN INDUSTRIES

4" SEAM TAPE

BY RAVEN INDUSTRIES

V2-03

Sheet Number:

EVENT: DATE:

CAD

FILE: C:\U

sers\hcam

pbell\vaporrem

oval.com

\Production - JO

BS\01 - Active\19-0572_W

SU

G

atew

ay Theater_M

I\002 - CAD

D

raw

ings\01 - D

rafts\19-0572_D

raft.dw

g

PLO

T D

ATE/TIM

E: 7/19/2019 5:14 PM

LAYO

UT: V2-03 U

SER: Cam

pbell, H

annah

Project:

NRPP Cert#

107330

Gatew

ay Theater Com

plex

Wayne State U

niversity

5454 Cass Avenue

Detroit, M

I 448202

Draw

n By: H

. Cam

pbell

Date: 7/18/19

Job N

um

ber: 19-0572

1

V2-03

TYPICAL DETAIL

COLLECTION PIT SCALE: 3/4" = 1'

2

V2-03

TYPICAL DETAIL

VENT MAT SCALE: 3/4" = 1'

4

V2-03

TYPICAL DETAIL

VAPOR BARRIER LAP JOINTSCALE: 1-1/2" = 1'

3

V2-03

TYPICAL DETAIL

VAPOR BARRIER PENETRATION FLASHINGSCALE: 1-1/2" = 1'

AutoCAD SHX Text
DRAFT NOT FOR CONSTRUCTION
Page 11: SSD System Design · 8.4 pipe routing and thermal insulation 8.5 pipe supports 8.6 exhaust vent pipe equivalent length 8.7 piping materials ... all conveyance piping for the ssd system

2'-0"

GROUT MASONRY SOLID

BELOW FLOOR LINE

SLAB ON GRADE

COLUMN

HORIZ. JOINT REINF.

@ 16" O.C. MAX

12" PRE-MOLDED

JOINT

12" CMU

MASONRY WALL

DOWELS TO MATCH VERTICAL

REINFORCEMENT (TYP.)

VAPOR BLOCK PLUS 20 VAPOR

BARRIER BY RAVEN INDUSTRIES

OR EQUIVALENT

VAPOR BLOCK PLUS 20

VAPOR BARRIER BY

RAVEN INDUSTRIES

OR EQUIVALENT

SLAB ON GRADE

COMPACTED

GRANULAR FILL

METAL WALL PANEL

FINISHED GRADE

4" CMU

GROUT MASONRY SOLID

BELOW FLOOR LINE

DOWELS TO MATCH

VERTICAL REINFORCEMENT

ALTERNATE LEG DIRECTION

VAPOR BLOCK PLUS 20 VAPOR

BARRIER BY RAVEN INDUSTRIES

OR EQUIVALENT

V2-04

Sheet Number:

EVENT: DATE:

CAD

FILE: C:\U

sers\hcam

pbell\vaporrem

oval.com

\Production - JO

BS\01 - Active\19-0572_W

SU

G

atew

ay Theater_M

I\002 - CAD

D

raw

ings\01 - D

rafts\19-0572_D

raft.dw

g

PLO

T D

ATE/TIM

E: 7/19/2019 5:14 PM

LAYO

UT: V2-04 U

SER: Cam

pbell, H

annah

Project:

NRPP Cert#

107330

Gatew

ay Theater Com

plex

Wayne State U

niversity

5454 Cass Avenue

Detroit, M

I 448202

Draw

n By: H

. Cam

pbell

Date: 7/18/19

Job N

um

ber: 19-0572

1

V2-04

TYPICAL DETAIL

VAPER BARRIER EXTERIOR WALL SCALE: 1/2" = 1'

2

V2-04

TYPICAL DETAIL

VAPER BARRIER INTERIOR WALL SCALE: 3/4" = 1'

AutoCAD SHX Text
DRAFT NOT FOR CONSTRUCTION