SR 1 & Minos Conaway G R A D E S E P A R A T E D I N T E R S E C T I O N Winter Workshop - 2021 1

SR 1 & Minos Conaway - DelDOT

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SR 1 & Minos Conaway - DelDOT

SR 1 & Minos Conaway G R A D E S E P A R A T E D I N T E R S E C T I O N

Winter Workshop - 2021

1

Page 2: SR 1 & Minos Conaway - DelDOT

• Project Background

• Project Key Aspects

2

• Preferred Alternative

• Highway Design

• Structures

• SWM/Drainage

• Bike/Ped Connectivity

• Noise Analysis and impacts

• Project Cost/Schedule

• Questions/Discussion

Agenda

Page 3: SR 1 & Minos Conaway - DelDOT

3

Project Location

Page 4: SR 1 & Minos Conaway - DelDOT

4

Purpose & Need

• To maintain capacity of the SR 1 corridor and improve safety at the unsignalized

intersection of SR 1 and Minos Conaway while improving mobility and access for

local traffic.

• To enhance multi-modal transportation in the project area.

Page 5: SR 1 & Minos Conaway - DelDOT

Project Background

• SR 1 Corridor Capacity Location

• Minos Conaway GSI Initiated (2016)

• Tulip Drive Signal Study (2017)

• Delaware Coast Line Railroad Decommissioned (2017)

• Concepts revised to utilize railroad corridor (2018)

5

Page 6: SR 1 & Minos Conaway - DelDOT

Project Background

• SR 1 Corridor Capacity Location

• Minos Conaway GSI Initiated (2016)

• Tulip Drive Signal Study (2017)

• Delaware Coast Line Railroad

Decommissioned (2017)

• Concepts revised to utilize railroad

corridor (2018)

6

Page 7: SR 1 & Minos Conaway - DelDOT

Project Background

• SR 1 Corridor Capacity Location

• Minos Conaway GSI Initiated (2016)

• Tulip Drive Signal Study (2017)

• Delaware Coast Line Railroad

Decommissioned (2017)

• Concepts revised to utilize railroad

corridor (2018)

7

Page 8: SR 1 & Minos Conaway - DelDOT

8

Preferred Alternative

Page 9: SR 1 & Minos Conaway - DelDOT

9

Preferred Alternative

Page 10: SR 1 & Minos Conaway - DelDOT

10

Typical Section

Page 11: SR 1 & Minos Conaway - DelDOT

11

StructuresProposed Culvert replacement/extension

Page 12: SR 1 & Minos Conaway - DelDOT

12

StructuresProposed Retaining Wall

Page 13: SR 1 & Minos Conaway - DelDOT

13

• Height = 8’

• Length = 266’

• Form lined face

• Face of wall to be

constructed against the

pedestrian pathway

StructuresProposed Retaining Wall

Page 14: SR 1 & Minos Conaway - DelDOT

14

StructuresProposed Retaining Wall

Page 15: SR 1 & Minos Conaway - DelDOT

15

• Mix of Closed & Open Drainage

• Two Natural Outfalls

• Wet Extended Detention Basin

• Dry Pond

• Red Mill Pond

• Black Hog Gut

• Both eventually lead to the

Broadkill River

SWM & Drainage

Page 16: SR 1 & Minos Conaway - DelDOT

16

Red Mill Pond

Black Hog Gut

Page 17: SR 1 & Minos Conaway - DelDOT

17

Shared Use Path / Sidewalk

Page 18: SR 1 & Minos Conaway - DelDOT

18

Noise Analysis

Page 19: SR 1 & Minos Conaway - DelDOT

19

Noise – Proposed Earth Berm

Page 20: SR 1 & Minos Conaway - DelDOT

Cost

20

Contractor Items

Construction Contingency (10%)

Construction Engineering

Traffic

Utilities

Construction Cost

Right-of-Way Cost

Total Project Cost

$22,964,975

$2,296,498

$6,500,000

$500,000

$2,500,000

$34,761,473

$4,454,800

$39,216,773

Page 21: SR 1 & Minos Conaway - DelDOT

21

• Semi-Final Construction Plans……………………………Completed - June 2020

• Value Engineering Workshop………………………...….Completed - July 2020

• Value Engineering Implementation Committee…….Completed - August 2020

• Final Right-of-Way Plans…………………………………..Completed - October 2020

• Final Construction Plans…………………………………..June 2022

• PS&E…………………………………………………………...October 2022

• Begin Construction…………………………………………Spring/Summer 2023 (2.5

years)

Schedule