2

SQFT Studios€¦ · and receives final inspection and certificate of occupancy by June 30, 2019 (the "SDC ADU Waiver Program"). WHEREAS, ADUs are integral to the achievement of the

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SQFT Studios€¦ · and receives final inspection and certificate of occupancy by June 30, 2019 (the "SDC ADU Waiver Program"). WHEREAS, ADUs are integral to the achievement of the
Page 2: SQFT Studios€¦ · and receives final inspection and certificate of occupancy by June 30, 2019 (the "SDC ADU Waiver Program"). WHEREAS, ADUs are integral to the achievement of the