Page 1: SPU Right-of-Way Coordination Program (Move Seattle)...SPU Project Delivery and Engineering Jon Ford, SPU Water Line of Business. ... • Over 30 miles of pipe video inspected •

Department NameSeattle Public UtilitiesSeattle Public Utilities

SPU Right-of-Way Coordination Program

(Move Seattle)

Bill Benzer, SPU Project Delivery and EngineeringJon Ford, SPU Water Line of BusinessShannon Kelleher, SPU Drainage and Wastewater Line of Business

December 5, 2018

Page 2: SPU Right-of-Way Coordination Program (Move Seattle)...SPU Project Delivery and Engineering Jon Ford, SPU Water Line of Business. ... • Over 30 miles of pipe video inspected •

Department NameSeattle Public Utilities

Why are we here?

1. Update on SPU Right-of-Way Coordination Program (Move Seattle)

2. Describe impacts of SDOT’s Move Seattle Reset on SPU

3. Answer questions about our program

2

Page 3: SPU Right-of-Way Coordination Program (Move Seattle)...SPU Project Delivery and Engineering Jon Ford, SPU Water Line of Business. ... • Over 30 miles of pipe video inspected •

Department NameSeattle Public Utilities

SDOT Move Seattle Levy

• Nine-year (2016-2024), $930 million levy

• Funding for SDOT, utilities not included

• Levy listed projects by SDOT program:

• Arterial Paving • Transit Corridors • Safe Routes to School • Bike improvements, etc.

• SPU has budgeted a total of approximately $200 million

3

Page 4: SPU Right-of-Way Coordination Program (Move Seattle)...SPU Project Delivery and Engineering Jon Ford, SPU Water Line of Business. ... • Over 30 miles of pipe video inspected •

Department NameSeattle Public Utilities

SPU’s ROW program

1. SDOT initiates a project

2. SPU identifies coordination and potential opportunity work

3. SPU performs condition assessment

4. SPU creates a scope of work to include in the SDOT project

5. SDOT and SPU negotiate an MOA for the work.

6. Both department’s goals are met, financial efficiencies are achieved and the citizens get ONE construction project not multiple.

4

Page 5: SPU Right-of-Way Coordination Program (Move Seattle)...SPU Project Delivery and Engineering Jon Ford, SPU Water Line of Business. ... • Over 30 miles of pipe video inspected •

Department NameSeattle Public Utilities

Accomplishments• 17 projects analyzed and Water

and DWW scopes sent to SDOT for implementation

• Over 30 miles of pipe video inspected

• Currently 12 projects in the initiation/planning stage

• Projects include pipe rehab, new mainline installations, fire flow improvements, localized flooding fixes, pipe protection, asset rehabilitations and relocations.

5

Page 6: SPU Right-of-Way Coordination Program (Move Seattle)...SPU Project Delivery and Engineering Jon Ford, SPU Water Line of Business. ... • Over 30 miles of pipe video inspected •

Department NameSeattle Public Utilities

Water S. Lander St. Grade Separation

• Water scope driven by SDOT project impacts –water main needs to be relocated away from bridge columns

• Water main replaced with seismically resistant pipe (earthquake-resistant ductile iron pipe and HDPE)

6

Page 7: SPU Right-of-Way Coordination Program (Move Seattle)...SPU Project Delivery and Engineering Jon Ford, SPU Water Line of Business. ... • Over 30 miles of pipe video inspected •

Department NameSeattle Public Utilities

Drainage and WastewaterGreen Lake Drainage Mainline replacement / Water main replacement

7

Page 8: SPU Right-of-Way Coordination Program (Move Seattle)...SPU Project Delivery and Engineering Jon Ford, SPU Water Line of Business. ... • Over 30 miles of pipe video inspected •

Department NameSeattle Public Utilities

Drainage and WastewaterGreen Lake Drainage Mainline replacement / Water main replacement

8

Auger in the outfall

Broken pipeWater service meets drainage pipe

Damaged pipe

Page 9: SPU Right-of-Way Coordination Program (Move Seattle)...SPU Project Delivery and Engineering Jon Ford, SPU Water Line of Business. ... • Over 30 miles of pipe video inspected •

Department NameSeattle Public Utilities

Impacts of SDOT’s Reset of Move Seattle

• Affects when SPU’s money is spent, not overall scope

• No changes to SPU’s analyses or budgeting for projects

• Expecting spending to shift to last few years of levy (2022-2024)

• May create challenges for SPU to meet SDOT’s new design schedules

9

Page 10: SPU Right-of-Way Coordination Program (Move Seattle)...SPU Project Delivery and Engineering Jon Ford, SPU Water Line of Business. ... • Over 30 miles of pipe video inspected •

Department NameSeattle Public Utilities

Planning$138M

71%

Design/Construction

$36M18%

Initiation$21M11%

Spending Overview*

*Project Spending by Current Project Status

10

Page 11: SPU Right-of-Way Coordination Program (Move Seattle)...SPU Project Delivery and Engineering Jon Ford, SPU Water Line of Business. ... • Over 30 miles of pipe video inspected •

Department NameSeattle Public Utilities

Other Projects on the Horizon Include:

• Sound Transit – ST-3• WSDOT – Paving, viaduct demo• Seattle City Light – Transmission line

projects

11

Page 12: SPU Right-of-Way Coordination Program (Move Seattle)...SPU Project Delivery and Engineering Jon Ford, SPU Water Line of Business. ... • Over 30 miles of pipe video inspected •

Department NameSeattle Public Utilities

Questions