14
Sprint 110 Review / Sprint 111 Planning July 1 st , 2013

Sprint 110 Review / Sprint 111 Planning July 1 st, 2013

Embed Size (px)

Citation preview

Page 1: Sprint 110 Review / Sprint 111 Planning July 1 st, 2013

Sprint 110 Review / Sprint 111 PlanningJuly 1st, 2013

Page 2: Sprint 110 Review / Sprint 111 Planning July 1 st, 2013

Sprint Resource Pages

• For this sprint, visit: https://developer.connectopensource.org/display/NHINProgress/Sprint+110+Progress+Summary

• For next sprint, visit:https://developer.connectopensource.org/display/NHINProgress/Sprint+111+Progress+Summary

• For information on the CONNECT 4.2 release visit: https://developer.connectopensource.org/x/AoBWC

2

Page 3: Sprint 110 Review / Sprint 111 Planning July 1 st, 2013

Sprint 110 Summary - Cumulative Flow

3

To Do

In Progress

QA

Done

Page 4: Sprint 110 Review / Sprint 111 Planning July 1 st, 2013

Sprint 110 Summary - Burndown Chart

4

Page 5: Sprint 110 Review / Sprint 111 Planning July 1 st, 2013

Sprint 110 Summary –Sprint Statistics

• Points committed = 16.0– Initial points committed – 16.0

– 0 ticket was moved to sprint 111 for 0.0

– 0 tickets pulled into sprint for 0.0

• Points remaining (unclosed) at end of sprint = 1.0

• Points completed in sprint (velocity) = 15.0

5

Page 6: Sprint 110 Review / Sprint 111 Planning July 1 st, 2013

Sprint 110 - Proposed Themes

• Multi-Specification Identification for QD/RD

– Complete any remaining QA for both responding and initiating Multi-specification identification

• Ensure all unit testing from Pilot and Feature tickets are incorporated into regression and validation suites

• Finalize Release 4.2 testing plan and begin setting up necessary infrastructure

• Continue working with Healtheway certification test cases (Table 2) and address any findings

• https://developer.connectopensource.org/display/CONNECTWIKI/Table+2+-+Test+Cases+%28subset%29

• Continue working on CI tickets or work on Adapter tickets (CONN-424/ 425) needed for certification testing

6

Page 7: Sprint 110 Review / Sprint 111 Planning July 1 st, 2013

Sprint 110 - What We are Showing TodayMulti-spec Message Identification

• CONNECT 4.2 Enhancing multi-specification version support for QD and

RD (responding and initiating) (Feature request – CONN 46, 15 & 215)

– Completed final remaining ticket CONN-437

• Addressing Security Adapter Interfaces

• Updated the design document to reflect the logic for secured and unsecured interfaces

– Link to initiating design approach- https://developer.connectopensource.org/x/GoA0C

– Link to responding design approach - https://developer.connectopensource.org/x/kYDvBw

7

Page 8: Sprint 110 Review / Sprint 111 Planning July 1 st, 2013

Sprint 110 - What We are Showing TodayRelease 4.2 Release Testing

• Updates Test Suites

– Added all feature work test cases

– Ensured all tickets related to eHealth Exchange testing pilot were included

• Work on Testing Infrastructure

– Interoperability lab environments

• Continued work on Release 4.2 Test Plan

– Release testing planning meetings

– Updates to Release 4.2 Test Plan

– The Release 4.2 Testing Wiki page: https://developer.connectopensource.org/display/CONNECT4/4.2+Release+Testing

8

Page 9: Sprint 110 Review / Sprint 111 Planning July 1 st, 2013

Sprint 110 - What We are Showing TodayHealtheway Testing Pilot

• Participation in the Healtheway Pilot

– Completed certificate revocation test cases

– Resolved remaining work on tickets related to pilot

• Begin working on additional test cases for Healtheway certification (CONN-471)

– Have run 95% of the draft certification test cases

• Most have passed, still working with CCHIT on several test areas and looking at required Adapter updates

– No additional issues or tickets created to date

Demo (Status on test cases)

https://developer.connectopensource.org/display/CONNECTWIKI/Table+1+-+Test+Cases+%

28subset%29

https://developer.connectopensource.org/display/CONNECTWIKI/Table+2+-+All+applicable+Test+Cases9

Page 10: Sprint 110 Review / Sprint 111 Planning July 1 st, 2013

Sprint 110 - What We are Showing TodayCI and Automated Testing Improvements

• CI Running in Standard and Passthru Mode (CONN-473)

– Ability switch between Standard and Passthru without restarting the server

– CI will be able to perform automated test in both modes

• CI and Automated Test Suite in WebSphere (CONN-358)

– Jenkins now running automatically running validation suite

• CI and Automated Test Suite in WebLogic (CONN-360)

– Jenkins now running automatically running validation suite

• Link to Github

https://issues.connectopensource.org/secure/VersionBoard.jspa?selectedProjectId=10140

10

Page 11: Sprint 110 Review / Sprint 111 Planning July 1 st, 2013

Sprint 110 - What We are Showing TodayCustodial Agent and Community Support

• Working on updates to the CONNECT Roadmap to reflect current needs and industry requirements

• Other tasks

– Partner and Community Support

– Ongoing Custodial Agent Duties

• Product Backlog

https://issues.connectopensource.org/secure/VersionBoard.jspa?selectedProjectId=10140

11

Page 12: Sprint 110 Review / Sprint 111 Planning July 1 st, 2013

Sprint 111 - Proposed Themes

• Finalize Release 4.2 testing plan and complete infrastructure set up

• Begin Release 4.2 Testing

– Installation testing

– Validation testing

– Interoperability testing

• Continue working with Healtheway certification test cases (Table 2)

– Any issues found will be addressed on a case by case basis

– https://developer.connectopensource.org/display/CONNECTWIKI/Table+2+-+Test+Cases+%28subset%29

• Continue working on CI tickets or work on Adapter tickets (CONN-424/ 425) needed for certification testing

12

Page 13: Sprint 110 Review / Sprint 111 Planning July 1 st, 2013

CONNECT 4.0Community Announcements

• CONNECT Awareness

– Open sprint review and planning meetings Next sprint meeting will be July 15th

– CONNECT 4.0 Blogs and Forum posts

– http://www.connectopensource.org/developer-resources/forums

13

Page 14: Sprint 110 Review / Sprint 111 Planning July 1 st, 2013

Questions and Discussion

14