15
Sprint 103 Review / Sprint 104 Planning March 25, 2013

Sprint 103 Review / Sprint 104 Planning March 25, 2013

Embed Size (px)

Citation preview

Page 1: Sprint 103 Review / Sprint 104 Planning March 25, 2013

Sprint 103 Review / Sprint 104 PlanningMarch 25, 2013

Page 2: Sprint 103 Review / Sprint 104 Planning March 25, 2013

Sprint Resource Pages

• For this sprint, visit: https://developer.connectopensource.org/display/NHINProgress/Sprint+103

• For next sprint, visit:https://developer.connectopensource.org/display/NHINProgress/Sprint+104

• For information on the CONNECT 4.0 release, visit:https://developer.connectopensource.org/display/CONNECT40/CONNECT+4.0

• For information on the CONNECT 4.1 release visit: (Currently Under Construction) https://developer.connectopensource.org/display/CONNECT40/4.1+%28Draft%29

2

Page 3: Sprint 103 Review / Sprint 104 Planning March 25, 2013

Sprint 103 - Community Contributions

• Open forum for community members to shareo Their work of the last two weeks

o Their needs from CONNECT

o Ideas and suggestions

• Community contributionso UPMC - CONNECT 4.0 Alpha 1 / WebSphere

o SSA - CONNECT 4.0 WebSphere

3

Page 4: Sprint 103 Review / Sprint 104 Planning March 25, 2013

Sprint 103 Summary - Cumulative Flow

4

To Do

In Progress

QA

Done

Page 5: Sprint 103 Review / Sprint 104 Planning March 25, 2013

Sprint 103 Summary - Burndown Chart

5

Page 6: Sprint 103 Review / Sprint 104 Planning March 25, 2013

Sprint 103 Summary –Sprint Stats

• Points committed = 24

• Pulled out 1 point of effort, totaling 23 points for sprint

• Points remaining (unclosed) at end of sprint = 4

• Points completed in sprint (velocity) = 19

6

Page 7: Sprint 103 Review / Sprint 104 Planning March 25, 2013

Sprint 103 – Themes & Tasks

• 4.0 Partner and Community Support– SSA 4.0 install on WAS

– CMS-CCSQ 4.0 install on WL 11g or 12c

– CMS-OFM 4.0 install on WAS 7 JDK 1.7

– Respond to IHS re the Direct ticket (CONN-279)

– Community support through forum responses and guidance

• 4.1 Enhancements– Multi Spec QD/ RD End point enhancement for DoD/SSA (pending DE&I approval)

– Installation improvements through community engagement

– Continued development of a robust CI and automated test environment

– JBoss - (CONN-25) in the Ordered features list

• Product Backloghttps://issues.connectopensource.org/secure/VersionBoard.jspa?

selectedProjectId=10140

7

Page 8: Sprint 103 Review / Sprint 104 Planning March 25, 2013

Sprint 103 - What We are Showing Today4.0 Community and Partner Support

• Work Completed to Support the CONNECT Community and Federal Partners– CONN-310 Standardize recommended java options (heap sizes, perm sizes)

across installation instructions

– CONN-288 Provide support for SSA and their efforts to download and install CONNECT 4.0 into their development environment

– CONN-279 As a CONNECT adopter, I want CONNECT 4.0 to be tested on WebSphere 7.x to validate whether CONNECT will work in my

preferred environment

– CONN-278 As a CONNECT adopter, I would like assistance installing and configuring "Direct only" for CONNECT 4.

– CONN-183 Missing DIRECT_ERROR event in use case (Direct-A-Thon)

– CONN-74As a CONNECT adopter/developer I want a clean property file (gateway.properties) so that there is no confusion with regards to

the unused properties or default values.

8

Page 9: Sprint 103 Review / Sprint 104 Planning March 25, 2013

Sprint 103 - What We are Showing TodayCONNECT 4.1

• CONNECT 4.1 JBoss Support– Another strategic application server the community wanted CONNECT 4.0 tested with

was JBoss

– JBoss provides an open source app server that supports FIPS requirements

– CONN-303 - As a CONNECT adopter, I want CONNECT to be deployable in JBOSS, so that I can use my preferred application server for health data exchange

– CONN-314 - Add JBoss 7 profile

– CONN-315 - Create JBoss 7 configuration info

CI and Build Improvements– A key goal for 4.1 was to increase the JUnit code coverage and reduce FindBugs

errors for the Connect Core Library

– The initial target was to remove all possible bugs from the library using the FindBugs tool and increase both our line and branch coverage by 20%

– https://developer.connectopensource.org/display/CONNECT40/4.1+Code+Coverage

9

Page 10: Sprint 103 Review / Sprint 104 Planning March 25, 2013

Sprint 103 - What We are Showing TodayCONNECT 4.1

• CONNECT 4.1

Resolved Support Tickets– CONN-319 Fix testMpi resource so it doesn't always get updated

– CONN-307 Interop testing for 4.1

– CONN-305 Reverification testing for 4.1

– CONN-304 Regression testing for 4.1

– CONN-301 As a CONNECT user, I want the Direct feature to work out of the box on binary installations, so I can set up Direct more easily.

– CONN-299 4.1 patch release test plan

– CONN-298 release 4.0 as 4.1

– CONN-297 merge all fixes in CONNECT_integration into branch 4.0-integration in order to prepare to release 4.1

– CONN-295 Interop: Update harness for repeatable Ldev11 tests

– CONN-292 CONNECTSamlAssertionValidator Logic needs review

10

Page 11: Sprint 103 Review / Sprint 104 Planning March 25, 2013

Sprint 103 - What We are Showing TodayCONNECT 4.1

• CONNECT 4.1

Resolved Support Tickets– CONN-280 PatientDB implementation does not work

– CONN-244 Create QA Mail Server

– CONN-92Remove NHINC_PROPERTIES_DIR environment variable

– CONN-61GUIs deployed in the EAR (GF) cause the admin console to misbehave after restart

– CONN-40Audit Log Transforms (PD) throws exception in server log

– CONN-37NPI SAML attribute is not supported in CONNECT

11

Page 12: Sprint 103 Review / Sprint 104 Planning March 25, 2013

Sprint 103 - What We are Showing TodayCONNECT 4.0 Implementation Support

• CONNECT 4.0 Implementation Support– Forums + Community Support

• http://www.connectopensource.org/developer-resources/forums

12

Page 13: Sprint 103 Review / Sprint 104 Planning March 25, 2013

Sprint 104 - Proposed Themes

• 4.1 Release Preparation– Complete functional and regression testing

– Continue with installation testing

– Complete and finalize supporting documentation

• 4.0 Partner and Community Support– CMS-OFM 4.0 install on WAS 7 JDK 1.6

– Support CMS with their planned Direct Pilot

– Provide support for SSA testing of 4.0

– Community support through forum responses and guidance

• Incorporate CI Testing Improvements to Additional App Servers

• Start Work on Design for Enhancements to Auditing

• Product Backloghttps://issues.connectopensource.org/secure/VersionBoard.jspa?selectedProjectId=10140

13

Page 14: Sprint 103 Review / Sprint 104 Planning March 25, 2013

CONNECT 4.0Community Announcements

• CONNECT Awareness

– Open sprint review and planning meetings

Next sprint meeting will be April 8th

– CONNECT 4.0 Blogs and Forum posts

– CONNECT 4.0 user group meeting being planned for mid to late May at George Washington University

14

Page 15: Sprint 103 Review / Sprint 104 Planning March 25, 2013

Questions and Discussion

15