Americans with Disabilities Act (ADA) Improvements Building Infrastructure Upgrades (Plumbing, HVAC, Electrical, Windows, etc.) Safety/Security Enhancements » Create Secure Entry » Add Cameras » Add Key Fobs » Add Segmentation Doors » Replace Door Hardware » Renovate One Set of Bathrooms » Repair/Replace/Add Ramps (where applicable) » Replace Railings (where applicable) » Replace Water Heater » Add/Replace Water Softener » Update Air Ventilation » Add/Update Air Conditioning » Upgrade to Digital HVAC Controls » Replace Electrical Panels » Partial Lighting Replacement » Partial Addition/Replacement of Electrical Outlets » New Clock & Bell Systems » New Intercom/PA System » Partial Asbestos Abatement » Partial Ceiling Replacement » Partial Window Replacement Jan. Kitchen Cafeteria Stor. Art 4th Grade 3rd Grade 2nd Grade Jan. CC Resource CC Resource 3rd Grade 2nd Grade 3rd Grade Courtyard 4th Grade 4th Grade Library Computer Lab Speech Work Room Kindergarten Kindergarten Jan. B.T. G.T. Con. Hlth. Stor. Princ. Main Office Kindergarten T. T. 1st Grade Music 1st Grade 2nd Grade Reading Math Resource T. Girls’ Toilet Boys’ Toilet Jan. 1st Grade Gymnasium B. Tlt. G. Tlt. Teacher’s Lounge Office Stage ID Resouce 5th Grade 5th Grade 5th Grade St. ELL Guid. St. Boiler Courtyard El. Eq. T. St. Off. / SGI CC Resource Basement Second Floor SPRING ROAD ELEMENTARY SCHOOL THE SOLUTION | MAJOR AREAS OF INVESTMENT SECURE MAIN ENTRY Note: This plan is conceptual. Significant input from staff and students will be undertaken if the referendum is supported by the community. RENOVATION (see below for more details) INFRASTRUCTURE UPDATES (see below for more details) CONCEPTUAL RENOVATION FLOOR PLAN

SPRING ROAD - Neenah High School · Tlt. G. Tlt. Teacher’s Lounge Stage Office ID Resouce 5th Grade 5th Grade 5th Grade St. ELL Guid. St. Boiler Courtyard El. Eq. T. St. Off

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SPRING ROAD - Neenah High School · Tlt. G. Tlt. Teacher’s Lounge Stage Office ID Resouce 5th Grade 5th Grade 5th Grade St. ELL Guid. St. Boiler Courtyard El. Eq. T. St. Off

Americans with Disabilities Act (ADA) Improvements

Building Infrastructure Upgrades (Plumbing, HVAC, Electrical, Windows, etc.)

Safety/Security Enhancements

» Create Secure Entry » Add Cameras » Add Key Fobs » Add Segmentation Doors

» Replace Door Hardware » Renovate One Set of Bathrooms » Repair/Replace/Add Ramps (where applicable) » Replace Railings (where applicable)

» Replace Water Heater » Add/Replace Water Softener » Update Air Ventilation » Add/Update Air Conditioning » Upgrade to Digital HVAC Controls » Replace Electrical Panels » Partial Lighting Replacement » Partial Addition/Replacement of Electrical Outlets

» New Clock & Bell Systems » New Intercom/PA System » Partial Asbestos Abatement » Partial Ceiling Replacement » Partial Window Replacement

Jan. Kitchen

Cafeteria

Stor.

Art 4th Grade

3rd Grade

2nd Grade

Jan.

CCResource

CCResource

3rd Grade

2nd Grade

3rd Grade

Courtyard

4th Grade

4th Grade

Library

ComputerLab

Speech

WorkRoom

KindergartenKindergarten

Jan.B.T. G.T.

Con. Hlth.Stor.

Princ.

MainOfficeKindergarten

T. T.1st GradeMusic1st Grade2nd Grade

ReadingMath

ResourceT.

Girls’Toilet

Boys’Toilet

Jan.

1st Grade

Gymnasium

B.Tlt.

G.Tlt.

Teacher’sLounge

OfficeStage

IDResouce

5th Grade

5th Grade

5th Grade St.

ELLGuid.

St.

Boiler

Courtyard

El. Eq.

T.

St.

Off. /SGI

CCResource

N

© 2018 Bray Associates Architects, Inc.Project #:3314

October 30, 2018

Spring Road Elementary SchoolNeenah, WI

SCALE: 1” = 30’ - 0”First Floor Plan

Basement

Second Floor

SPRING ROAD ELEMENTARY SCHOOL

THE SOLUTION | MAJOR AREAS OF INVESTMENT

SECURE MAIN ENTRY

Note: This plan is conceptual. Significant input from staff and students will be undertaken if the referendum is supported by the community.

RENOVATION (see below for more details) INFRASTRUCTURE UPDATES (see below for more details)

CONCEPTUAL RENOVATION FLOOR PLAN