Americans with Disabilities Act (ADA) Improvements
Building Infrastructure Upgrades (Plumbing, HVAC, Electrical, Windows, etc.)
Safety/Security Enhancements
» Create Secure Entry » Add Cameras » Add Key Fobs » Add Segmentation Doors
» Replace Door Hardware » Renovate One Set of Bathrooms » Repair/Replace/Add Ramps (where applicable) » Replace Railings (where applicable)
» Replace Water Heater » Add/Replace Water Softener » Update Air Ventilation » Add/Update Air Conditioning » Upgrade to Digital HVAC Controls » Replace Electrical Panels » Partial Lighting Replacement » Partial Addition/Replacement of Electrical Outlets
» New Clock & Bell Systems » New Intercom/PA System » Partial Asbestos Abatement » Partial Ceiling Replacement » Partial Window Replacement
Jan. Kitchen
Cafeteria
Stor.
Art 4th Grade
3rd Grade
2nd Grade
Jan.
CCResource
CCResource
3rd Grade
2nd Grade
3rd Grade
Courtyard
4th Grade
4th Grade
Library
ComputerLab
Speech
WorkRoom
KindergartenKindergarten
Jan.B.T. G.T.
Con. Hlth.Stor.
Princ.
MainOfficeKindergarten
T. T.1st GradeMusic1st Grade2nd Grade
ReadingMath
ResourceT.
Girls’Toilet
Boys’Toilet
Jan.
1st Grade
Gymnasium
B.Tlt.
G.Tlt.
Teacher’sLounge
OfficeStage
IDResouce
5th Grade
5th Grade
5th Grade St.
ELLGuid.
St.
Boiler
Courtyard
El. Eq.
T.
St.
Off. /SGI
CCResource
N
© 2018 Bray Associates Architects, Inc.Project #:3314
October 30, 2018
Spring Road Elementary SchoolNeenah, WI
SCALE: 1” = 30’ - 0”First Floor Plan
Basement
Second Floor
SPRING ROAD ELEMENTARY SCHOOL
THE SOLUTION | MAJOR AREAS OF INVESTMENT
SECURE MAIN ENTRY
Note: This plan is conceptual. Significant input from staff and students will be undertaken if the referendum is supported by the community.
RENOVATION (see below for more details) INFRASTRUCTURE UPDATES (see below for more details)
CONCEPTUAL RENOVATION FLOOR PLAN