57
1 Sponsored Projects Office RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

Embed Size (px)

Citation preview

Page 1: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

1Sponsored Projects Office

RAPID Data Quality

Phyllis M. Housel Gale

Sponsored Projects Office

SPO Process Review Meeting

August 25, 2008

Page 2: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

2Sponsored Projects Office

RAPID Data QualityMenu Driven RAPID

Menu Driven RAPID is Mechanism specific:

WFO – Work for Others

Federal

NIH

Non Federal (includes NIH and other Federal

subawards from universities)

User Agreements

Gifts

DOE Indirect Funding

CRADAs

Page 3: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

3Sponsored Projects Office

RAPID Data Quality Menu Driven RAPID

NOT

Menu Driven RAPID Menu Driven RAPID

Cannot create a proposal from “Proposals”

Page 4: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

4Sponsored Projects Office

RAPID Data Quality Menu Driven RAPID

WFO Menu Driven RAPID then has 3 sub-sections for type of Sponsor

Page 5: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

5Sponsored Projects Office

RAPID Data Quality Menu Driven RAPID

Each Mechanism and WFO Sponsor has its own set of panels and actions that are specific to the information requirements of that mechanism.

Page 6: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

6Sponsored Projects Office

RAPID Data Quality Menu Driven RAPID

Information is Mechanism Specific – for example Federal Proposal Review Factors does not have a panel for IP Review FCTRS, but Non-Federal does. A federal flow-through from a university is non-federal and these flow-through questions are here.

Page 7: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

7Sponsored Projects Office

RAPID Data Quality Menu Driven RAPID

Examples are Mechanism Specific

Federal Non-Federal

Page 8: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

8Sponsored Projects Office

RAPID Data Quality Menu Driven RAPID

Examples are Mechanism Specific

Federal Non-Federal

Page 9: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

9Sponsored Projects Office

RAPID Data Quality Menu Driven RAPID

Examples are Mechanism Specific

Federal Non-Federal

Page 10: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

10Sponsored Projects Office

RAPID Data Quality Maintain Proposal - Header

Title

• Needs to make scientific sense

• Needs to stand alone (not just truncated from a very long title)

• Do you want DOE or GAO to read this title? Will they understand it?

Page 11: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

11Sponsored Projects Office

RAPID Data Quality Maintain Proposal - Header

Page 12: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

12Sponsored Projects Office

RAPID Data Quality Maintain Proposal - Header

Update “Draft” → “Approved by Division”

when proposal is ready for SPO

Update “Draft” → “Discontinued”

if proposal is cancelled

Page 13: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

13Sponsored Projects Office

RAPID Data Quality Maintain Proposal - Header

Status needs to be correct when submitted to SPO

Update “Draft” → “Approved by Division”

when proposal

is ready for SPO

Page 14: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

14Sponsored Projects Office

RAPID Data Quality Maintain Proposal - Header

Proposal Status Maintenance

~ 6 months:

“Draft” moves to “Discontinued”

~ 14 months

“Approved by Institution” moves to “Not Funded”

Page 15: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

15Sponsored Projects Office

RAPID Data Quality Maintain Proposal - Projects

Dept Rep

is the division Director or designee signing the SPPF

must be the same as on the Approvals Page

Page 16: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

16Sponsored Projects Office

RAPID Data Quality Maintain Proposal - Projects

Page 17: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

17Sponsored Projects Office

RAPID Data Quality Maintain Proposal - Resources

• Professional needs to include fellow as the PI and the mentor as mentor on fellowships

• Co-Investigators should also be included

Page 18: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

18Sponsored Projects Office

RAPID Data Quality Maintain Proposal - Resources

Divisions set up PI status for fellows and Co-Investigators in the Professional Data Panel

Page 19: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

19Sponsored Projects Office

RAPID Data Quality Maintain Proposal - Resources

Click to provide Eligible PI status in RAPID.

Note: Must follow the division guidelines and procedures for who is an eligible PI or a fellow on a fellowship.

Page 20: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

20Sponsored Projects Office

RAPID Data Quality Maintain Proposal - Certification

On New Proposals

• Division Staff only enter information for Animals and Humans.

• Only one possible answer for division staff to enter.

• N/A = “not applicable” = there are no human or animal research subjects

Page 21: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

21Sponsored Projects Office

RAPID Data Quality Maintain Proposal - Certification

• All other lines should be left in default status and will be answered by others.

Page 22: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

22Sponsored Projects Office

RAPID Data Quality Maintain Proposal - Certification

• Only one possible answer for division staff to enter.

• N/A = “not applicable” = there are no human or animal research subjects

Should have date and the PI’s name if the answer is “N/A”

This is the date the PI indicated that there are no human or animal research subjects involved with this research

Page 23: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

23Sponsored Projects Office

RAPID Data Quality Maintain Proposal - Certification

Date is missing here.

Page 24: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

24Sponsored Projects Office

RAPID Data Quality Maintain Proposal - Certification

•Division Staff does not determine “yes” or “no”

•PI determines “pending” or “N/A”

•final determination is only made by HARC.

Page 25: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

25Sponsored Projects Office

RAPID Data Quality Maintain Proposal - Certification

On Amendments and Supplements

(additional statement of work)

• Update Humans, Animals, and NEPA/CEQA.–Divisions update Humans and Animals for the new

work and the new work only.–Division requests NEPA/CEQA review.–SPO enters the NEPA/CEQA approval

Page 26: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

26Sponsored Projects Office

RAPID Data Quality Maintain Proposal - Certification

NEPA/CEQA

is correctly updated

(this data is entered

by SPO)

Page 27: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

27Sponsored Projects Office

RAPID Data Quality Maintain Proposal - Certification

• Humans and Animals were NOT updated correctly.

• The date is the same as on the original proposal.

• New work requires new certification by PI about animals and humans.

Page 28: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

28Sponsored Projects Office

RAPID Data Quality Maintain Proposal - Certification

On continuation progress report

• Only update Human and Animals if there has been a change to the research.

• SPO will accept the PI’s signature that the annual review is in place and conforms to NIH requirements for continuation progress reports.

• Do not update the NEPA/CEQA because a new statement of work is not being reviewed.

• If required, these dates need to be updated before the proposal is submitted to SPO.

• No other information is changed by the division.

Page 29: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

29Sponsored Projects Office

RAPID Data Quality Maintain Proposal - Certification

New SPPF language is being developed for the non-competing continuations above the signature line for the PI to provide affirmative confirmation that all approvals are in place according to NIH requirements.

More on this to come…..

Page 30: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

30Sponsored Projects Office

RAPID Data Quality Maintain Proposal - Certification

Division does NOT removed approvals from the certification page that are carried forward when the continuation proposal is created.

correct

incorrect

Page 31: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

31Sponsored Projects Office

RAPID Data Quality Proposal Review Factors – DOE Review FCTRS

Work with/within DOE Mission

Includes B&R code and description

Must be the same as the related B&R page

Page 32: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

32Sponsored Projects Office

RAPID Data Quality Proposal Review Factors – DOE Review FCTRS

Subcontract Justification

narrative justification is required by DOE

Page 33: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

33Sponsored Projects Office

RAPID Data Quality Proposal Review Factors – DOE Review FCTRS

BAA

1. Title

2. Reference #

3. URL

Page 34: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

34Sponsored Projects Office

RAPID Data Quality Proposal Review Factors – DOE Review FCTRS

Human/Animal Involvement

requires narrative description

Page 35: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

35Sponsored Projects Office

RAPID Data Quality Proposal Review Factors – NEPA Review FCTRS

Location should include all locations where research will take place, LBNL and subcontract locations

Page 36: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

36Sponsored Projects Office

RAPID Data Quality Proposal Review Factors – NEPA Review FCTRS

For LBNL – use the building #

Page 37: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

37Sponsored Projects Office

RAPID Data Quality Proposal Review Factors – Related B&Rs

• Do NOT use the “WFO” BNR code. It is not the DOE Related Program Related B&R.

• Tab out to ensure name is correct. (We use the Budget Office B&R table)

• If the title is incorrect or the B&R is not in the look-up list, please call Direct Budget Office and request the update.

• This must be done prior to the proposal being submitted to SPO.

Page 38: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

38Sponsored Projects Office

RAPID Data Quality Proposal Review Factors – NEPA Review FCTRS

Must match the B&R code(s) listed in the DOE Review FCTRS

You can have

more than one

Page 39: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

39Sponsored Projects Office

RAPID Data Quality Proposal Review Factors – NEPA Review FCTRS

Always TAB out of the B&R code field so the title appears for your review.

Page 40: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

40Sponsored Projects Office

RAPID Data Quality Proposal Review Factors – Proposal Burdens

• Refer to the Burden Matrix

• Burden questions should be referred to the Budget Office

• Field Operations personnel are responsible for the correctness of the Burdens.

• The SPO cannot update the burdens in RAPID, only the Field Operations personnel.

Page 41: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

41Sponsored Projects Office

RAPID Data Quality Proposal Review Factors – Background/Property IP

For Non-Federal Sponsors

Page 42: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

42Sponsored Projects Office

RAPID Data Quality Proposal Review Factors – Background/Property IP

Policy

Non-Federal sponsors will receive title to LBNL inventions under this project, unless one of a. through f. applies. Provide explanation for a "Yes" answer:

Sponsor Declines

The Sponsor declines its right to title in LBNL inventions. Provide reason and reference correspondence below.

Page 43: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

43Sponsored Projects Office

RAPID Data Quality Proposal Review Factors – Background/Property IP

Research Tools

Likely inventions would be research tool(s), which should be available to many organizations. Indicate research tools and why below:

Field of Use

A domestic Sponsor's interest to appropriately commercialize is in fewer fields of use than are realistically commercially feasible for the invention. Provide explanation below:

Page 44: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

44Sponsored Projects Office

RAPID Data Quality Proposal Review Factors – Background/Property IP

Federal Flow Thru

Sponsor's funding is from a Federal agency. Provide Agency below:

UC

Sponsor is UC.

Page 45: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

45Sponsored Projects Office

RAPID Data Quality Proposal Review Factors – Background/Property IP

Special

There are special facts and it is not in the best interests of the United States. Provide explanation below:

Other Issues

Is there LBNL background intellectual property (IP) that may be used in the proposed project? Are there any other issues that need to be considered in allocating IP rights? Provide explanation below.

Page 46: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

46Sponsored Projects Office

RAPID Data Quality Proposal Review Factors – Background/Property IP

This must also be completed for non-federal sponsors

If the answer is “yes”, must provide explanation.

SPPF is being updated to print this correctly.

Page 47: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

47Sponsored Projects Office

RAPID Data Quality Submit Proposal - Approvals

• Dept Rep is the division Director or designee signing the SPPF.

• Dept Rep must be the same as used on the Maintain Proposals – Projects Page

Page 48: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

48Sponsored Projects Office

RAPID Data Quality Submit Proposal - Approvals

Correct SPO CO must be selected

before proposal is place in

Approved by Division Status

Page 49: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

49Sponsored Projects Office

RAPID Data Quality Submit Proposal - Submission

Sponsor Proposal ID

Complete whenever ID # is known

Page 50: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

50Sponsored Projects Office

RAPID Data Quality Submit Proposal - Submission

Sponsor Proposal ID

• Known for NASA and DOD CDMRP

• Known for NIH non-competing continuations

• If proposal # is identified by the sponsor when the proposal is being submitted; it should be entered here

Page 51: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

51Sponsored Projects Office

RAPID Data Quality Submit Proposal - Submission

Transmission Code

Page 52: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

52Sponsored Projects Office

RAPID Data Quality Submit Proposal - Submission

• U. S. Postal Service plus email

• U. S. Postal Service

• Express Mail

• Sponsor Online System

• Email only

• Fax

• Grants.gov

Page 53: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

53Sponsored Projects Office

RAPID Data Quality Submit Proposal - Submission

Mailing Instructions

Use for narrative information

Page 54: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

54Sponsored Projects Office

RAPID Data Quality Submit Proposal - Submission

Mailing Instructions

No longer use this box for contact information

– use the contact panel instead

Page 55: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

55Sponsored Projects Office

RAPID Data Quality Submit Proposal - Contact

This is REQUIRED information

Page 56: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

56Sponsored Projects Office

RAPID Data Quality Submit Proposal - Contact

Page 57: Sponsored Projects Office 1 RAPID Data Quality Phyllis M. Housel Gale Sponsored Projects Office SPO Process Review Meeting August 25, 2008

57Sponsored Projects Office

RAPID Data Quality Submit Proposal - Contact

• ADMINAdmin personnel including NIH SRA or person a proposal is “submitted” to.

• ADVINVAdvance Invoice Address (for non-federal)

• LEGALSigns and/or negotiates contracts on other end

• PIPI at prime institution when LBNL is subaward

• PRGRAMSponsor Program Official