SPLOST IV SPLOST IV Addressing Classroom and Technology Needs

SPLOST IV Addressing Classroom and Technology Needs

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SPLOST IV Addressing Classroom and Technology Needs

SPLOST IVSPLOST IVAddressing Classroom and

Technology Needs

Page 2: SPLOST IV Addressing Classroom and Technology Needs

SPLOST IV

The Plan The Plan The Plan… The Plan… for bringing Gwinnett’s building needs in check by g g g y

2014 and for providing technology to support

d i i llstudents instructionally

Page 3: SPLOST IV Addressing Classroom and Technology Needs

SPLOST IV

The PlanThe PlanThe PlanThe Plan Phase I– SPLOST III, approved by voters in 2006

Phase II– General Obligation Bonds, approved by voters in 2008voters in 2008

Phase III- SPLOST IV

Page 4: SPLOST IV Addressing Classroom and Technology Needs

SPLOST IV

SPLOST IV SPLOST IV Funding Funding SPLOST IV SPLOST IV –– Funding Funding Phase III of “The Plan”Phase III of “The Plan”Phase III of The PlanPhase III of The Plan

Page 5: SPLOST IV Addressing Classroom and Technology Needs

SPLOST IV

SPLOST IV SPLOST IV SPLOST IV SPLOST IV Addresses the school district’s need to provide

l i d i i h l f classrooms, continue modernizing technology for teaching and learning, and make ongoing, systemwide facility and infrastructure systemwide facility and infrastructure improvements

Will affect school district’s continued ability to provide a quality educational program

Page 6: SPLOST IV Addressing Classroom and Technology Needs

SPLOST IV

SPLOST IV SPLOST IV SPLOST IV SPLOST IV The sales tax would be collected beginning on

J l 1 2012 d ld i J 30 2017July 1, 2012 and would expire on June 30, 2017

SPLOST IV is projected to generate $876 million p j g $at best.

• $858.9 million for GCPS$17 1 million for Buford City Schools• $17.1 million for Buford City Schools

Approval of SPLOST IV also authorizes the sale of $275 million in G.O. bonds to be repaid with sales tax proceeds

Page 7: SPLOST IV Addressing Classroom and Technology Needs

SPLOST IV

SPLOST IV Projects SPLOST IV Projects SPLOST IV Projects SPLOST IV Projects 5 new schools

8 additions at existing schools

1 i i i h l 1 renovation to an existing school

433 new classrooms

Technology improvements systemwide

Page 8: SPLOST IV Addressing Classroom and Technology Needs

SPLOST IV

Put your cluster-specific page here.y p f p g

See the Cluster-by-Cluster Details.

Page 9: SPLOST IV Addressing Classroom and Technology Needs

Other Capital ImprovementsAll Special Entities/Schools School-wide technology upgrades that may include teacher

laptops, student research stations, network printers, projectors, screens, wireless notebook carts, computer labs, media center and

h l id b d t i t t k i f t t school video broadcast equipment, network infrastructure improvements, increased wireless access.

GIVE Center East Gym AC; HVAC improvements; re-roofing; energy efficiency upgrades

GSMST Gym AC; technology upgrades

Maxwell HS Energy efficiency upgrades

Buice School Gym AC; kitchen AC; energy efficiency upgradesBuice School Gym AC; kitchen AC; energy efficiency upgrades

Hooper Renwick School Modification of space utilization; energy efficiency upgrades; gym AC; kitchen AC

Oakland Meadow School Gym AC; energy efficiency upgradesOakland Meadow School Gym AC; energy efficiency upgrades

Phoenix HS Gym AC; HVAC improvements; energy efficiency upgrades

Ivy Preparatory Academy Enhanced access to data and digital contentIvy Preparatory Academy Enhanced access to data and digital content

New Life Academy of Excellence

Enhanced access to data and digital content

Page 10: SPLOST IV Addressing Classroom and Technology Needs

Other Capital ImprovementsSystemwideTechnology Improvements

Implementation of eCLASS – enhanced access to data and digital content for students, teachers, and parents, and advanced analytical capabilities; upgrades to PeopleSoftImprovements advanced analytical capabilities; upgrades to PeopleSoft

A digital Content, Learning, Assessment, and Support System for G i tt C t P bli S h l E h i t d t Gwinnett County Public Schools... Enhancing student

engagement and improving teaching and learning

Page 11: SPLOST IV Addressing Classroom and Technology Needs

eCLASS will…

Provide teachers with better information about their students’ learning needsstudents learning needs.

Enhance ways students use digital content.

Help district realize cost savings in terms of textbooks Help district realize cost savings in terms of textbooks.

Improve business functions within GCPS.

Provide a more robust technology infrastructure for schools Provide a more robust technology infrastructure for schools.

Increase Wi-Fi capabilities, paving the way for students to bring their own technology/devices.g gy

Expand portal access for employees and parents and lay groundwork for a student portal.

Page 12: SPLOST IV Addressing Classroom and Technology Needs

SPLOST IV

Election Day:Election Day:Election Day:Election Day:November 8 2011November 8 2011November 8, 2011November 8, 2011

One day… possibly two opportunities to vote…y p y ppMany cities are having elections in addition to

the county election. The education SPLOST will appear only on the

county ballot. Your voter registration card lists poll locations for Your voter registration card lists poll locations for

county and city elections.

Page 13: SPLOST IV Addressing Classroom and Technology Needs

SPLOST IVCluster by Cluster DetailsCluster-by-Cluster Details

Page 14: SPLOST IV Addressing Classroom and Technology Needs

Archer Cluster

All Archer Schools

School-wide technology upgrades including, but not limited to, teacher laptops, student research stations, network printers,

All Archer Schools

School-wide technology upgrades that may include teacher laptops, student research stations, network printers, p p pprojectors, screens, wireless notebook carts, computer labs, media center and school video broadcast equipment, network infrastructure improvements, increased wireless access.

p p pprojectors, screens, wireless notebook carts, computer labs, media center and school video broadcast equipment, network infrastructure improvements, increased wireless access.

Archer HS See Technology improvements above

McConnell MS Gym AC; kitchen AC; energy efficiency upgrades

Archer HS See Technology improvements above

McConnell MS Gym AC; kitchen AC; energy efficiency upgrades

Cooper ES Gym AC; energy efficiency upgrades

McConnell MS Gym AC; kitchen AC; energy efficiency upgrades

Cooper ES Gym AC; energy efficiency upgrades

Harbins ES Gym AC; kitchen AC; HVAC improvements; energy efficiency upgrades

p y ; gy y pg

Harbins ES Gym AC; kitchen AC; HVAC improvements; energy efficiency upgrades

Lovin ES Gym ACupgrades

Lovin ES Gym AC

Page 15: SPLOST IV Addressing Classroom and Technology Needs

Berkmar ClusterAll BerkmarSchools

School-wide technology upgrades that may include teacher laptops, student research stations, network printers, projectors, screens, wireless notebook carts, computer labs, media center and school video broadcast equipment network infrastructure improvements increased broadcast equipment, network infrastructure improvements, increased wireless access.

Berkmar HS Gym AC; renovations/modifications to systemwide standards; energy efficiency upgrades

Berkmar MS Gym AC; energy efficiency upgrades

Corley ES Gym AC; energy efficiency upgrades

Minor ES Gym AC; kitchen AC; energy efficiency upgradesMinor ES Gym AC; kitchen AC; energy efficiency upgrades

Sweetwater MS Gym AC; kitchen AC; upgrade intercom; upgrade fire alarm; energy efficiency upgrades

lf d S G C C ff dAlford ES Gym AC; HVAC improvements; energy efficiency upgrades

Benefield ES Gym AC

Bethesda ES Gym AC; kitchen AC; HVAC improvements; re-roofing; electrical/emergenc lighting pgrades; energ efficienc pgrades; g m electrical/emergency lighting upgrades; energy efficiency upgrades; gym floor refinish

Kanoheda ES Gym AC; kitchen AC; energy efficiency upgrades

Page 16: SPLOST IV Addressing Classroom and Technology Needs

New Berkmar/Central Gwinnett Cluster

Berkmar/Central

New schoolCentralGwinnett HS

Berkmar/Central

New school

Gwinnett ES

Page 17: SPLOST IV Addressing Classroom and Technology Needs

Brookwood Cluster

All BrookwoodSchools

School-wide technology upgrades that may include teacher laptops, student research stations, network printers, projectors, screens, wireless notebook carts, computer labs, media center and school video , p ,broadcast equipment, network infrastructure improvements, increased wireless access.

Brookwood HS Gym AC; HVAC improvements; re-roofing; upgrade intercom; new lab fixtures; remove folding partitions; energy efficiency upgradesfixtures; remove folding partitions; energy efficiency upgrades

Five Forks MS Gym AC; kitchen AC; HVAC improvements; upgrade fire alarm; replace gym bleachers; energy efficiency upgrades

Gwin Oaks ES Gym AC; kitchen AC; HVAC improvements; upgrade intercom; upgrade y ; ; p ; pg ; pgfire alarm; replace cabinets in classrooms; energy efficiency upgrades

Head ES Gym AC; kitchen AC; re-roofing; upgrade intercom; upgrade fire alarm; energy efficiency upgrades

Crews MS Gym AC; kitchen AC; HVAC improvements; energy efficiency upgrades; replace fire alarm

Brookwood ES Gym AC; HVAC improvements; upgrade intercom; energy efficiency upgradesupgrades

Craig ES Gym AC; HVAC improvements; re-roofing; energy efficiency upgrades; upgrade intercom

Page 18: SPLOST IV Addressing Classroom and Technology Needs

Central Gwinnett ClusterAll Central Gwinnett Schools

School-wide technology upgrades that may include teacher laptops, student research stations, network printers, projectors, screens, wireless notebook carts, computer labs, media center/school video broadcast equipment, network infrastructure improvements, increased wireless access.p

Central Gwinnett HS Gym AC; HVAC improvements; exterior lighting upgrades; upgrade intercom; renovate auxiliary gym; energy efficiency upgrades

Richards MS Gym AC; HVAC improvements; re-roofing; upgrade intercom; i li h i d ffi i d l exterior lighting upgrade; energy efficiency upgrades; replace gym

bleachers

Cedar Hill ES Gym AC; kitchen AC; HVAC improvements; re-roofing; intercom upgrades; energy efficiency upgrades; replace cabinets in pg ; gy y pg ; pclassrooms

Jenkins ES Gym AC

Simonton ES Gym AC; kitchen AC; re-roofing; energy efficiency upgrades; upgrade y ; ; g; gy y pg ; pgfire alarm and intercom; replace cabinets in classrooms

Moore MS Gym AC

Lawrenceville ES Gym AC; kitchen AC; HVAC improvements; re-roofing; energy ffi i d f / l l fi l efficiency upgrades; new entry storefront/glass; replace fire alarm;

replace cabinets in classrooms

Winn Holt ES Gym AC; energy efficiency upgrades

Page 19: SPLOST IV Addressing Classroom and Technology Needs

Collins Hill Cluster

All Collins Hill Schools

School-wide technology upgrades that may include teacher laptops, student research stations, network printers, projectors screens wireless notebook carts computer projectors, screens, wireless notebook carts, computer labs, media center and school video broadcast equipment, network infrastructure improvements, increased wireless access.

Collins Hill HS Gym AC; HVAC improvements; energy efficiency upgrades

Creekland MS Gym AC; kitchen AC; replace fire alarm; energy efficiency upgradesupgrades

McKendree ES Gym AC; kitchen AC; HVAC improvements; energy efficiency upgrades

Rock Springs ES Gym AC; energy efficiency upgrades

Taylor ES Gym AC; kitchen AC; energy efficiency upgrades

Walnut Grove ES Gym AC; HVAC improvements; re-roofing; energy efficiency upgrades

Page 20: SPLOST IV Addressing Classroom and Technology Needs

Dacula Cluster

All DaculaSchools

School-wide technology upgrades that may include teacher laptops, student research stations, network printers, projectors, screens, wireless notebook carts, computer labs, media center and school video broadcast equipment, network infrastructure improvements, increased wireless access.

Dacula HS Gym AC; re-roofing; energy efficiency upgrades

Dacula MS Gym AC; kitchen AC; energy efficiency upgradesDacula MS Gym AC; kitchen AC; energy efficiency upgrades

Alcova ES 20-classroom addition; Gym AC; kitchen AC; HVAC improvements; energy efficiency upgrades

Dacula ES Gym AC; energy efficiency upgrades

Mulberry ES Gym ACMulberry ES Gym AC

Page 21: SPLOST IV Addressing Classroom and Technology Needs

Duluth Cluster

All Duluth Schools School-wide technology upgrades that may include teacher laptops, student research stations, network

i t j t i l t b k t printers, projectors, screens, wireless notebook carts, computer labs, media center and school video broadcast equipment, network infrastructure improvements, increased wireless access.

Duluth HS Gym AC; HVAC improvements; energy efficiency upgrades

Duluth MS Gym AC; energy efficiency upgradesy ; gy y pg

Berkeley Lake ES Gym AC; kitchen AC; energy efficiency upgrades

Chattahoochee ES Gym AC; re-roofing; energy efficiency upgrades

Chesney ES Gym AC; energy efficiency upgrades

B.B. Harris ES Gym AC; kitchen AC; upgrade intercom; replace fire alarm; energy efficiency upgrades

Monarch School Convert to new Duluth Cluster middle school

Page 22: SPLOST IV Addressing Classroom and Technology Needs

Grayson Cluster

All Grayson Schools

School-wide technology upgrades that may include teacher laptops, student research stations, network printers, p p pprojectors, screens, wireless notebook carts, computer labs, media center and school video broadcast equipment, network infrastructure improvements, increased wireless access.

Grayson HS Gym AC; energy efficiency upgrades

Bay Creek MS Gym AC

Grayson ES Gym AC; kitchen AC; energy efficiency upgrades; exterior lighting upgrades

Trip ES Gym ACp y

Couch MS Gym AC

Pharr ES Gym AC; kitchen AC; energy efficiency upgradesPharr ES Gym AC; kitchen AC; energy efficiency upgrades

Starling ES Gym AC

Page 23: SPLOST IV Addressing Classroom and Technology Needs

Lanier Cluster

All Lanier Schools

School-wide technology upgrades that may include teacher laptops, student research stations, network printers, projectors, p p p p jscreens, wireless notebook carts, computer labs, media center and school video broadcast equipment, network infrastructure improvements, increased wireless access.

Lanier HS HVAC modifications in old middle school building and old gym

Lanier MS Gym AC

Sugar Hill ES Gym AC; kitchen AC; energy efficiency upgrades

Sycamore ES Gym AC; energy efficiency upgrades

White Oak ES Gym AC

Page 24: SPLOST IV Addressing Classroom and Technology Needs

Meadowcreek ClusterAll MeadowcreekSchools

School-wide technology upgrades that may include teacher laptops, student research stations, network printers, projectors, screens, wireless notebook carts, computer labs, media center and school id b d t i t t k i f t t i t video broadcast equipment, network infrastructure improvements,

increased wireless access.

Meadowcreek HS 3rd floor, 14-classroom build-out; Gym AC; energy efficiency upgrades

Lilburn MS Gym AC; kitchen AC; HVAC improvements; intercom upgrade; energy Lilburn MS Gym AC; kitchen AC; HVAC improvements; intercom upgrade; energy efficiency upgrades

Lilburn ES Gym AC; energy efficiency upgrades

Nesbit ES Gym AC; energy efficiency upgradesNesbit ES Gym AC; energy efficiency upgrades

Rockbridge ES 15-classroom addition/major renovation; Gym AC; kitchen AC; energy efficiency upgrades

Radloff MS Gym AC; energy efficiency upgradesRadloff MS Gym AC; energy efficiency upgrades

Ferguson ES Gym AC

Hopkins ES Gym AC; energy efficiency upgrades

Meadowcreek ES Gym AC; kitchen AC; energy efficiency upgradesMeadowcreek ES Gym AC; kitchen AC; energy efficiency upgrades

MeadowcreekCluster ES

New school

Page 25: SPLOST IV Addressing Classroom and Technology Needs

Mill Creek ClusterAll Mill Creek Schools

School-wide technology upgrades that may include teacher laptops, student research stations, network printers, projectors, screens, wireless notebook carts, computer labs, p j , , , p ,media center and school video broadcast equipment, network infrastructure improvements, increased wireless access.

Mill Creek HS Gym AC; energy efficiency upgrades

Jones MS Gym AC; energy efficiency upgrades

Harmony ES Gym AC; kitchen AC; re roofing; energy efficiency upgradesHarmony ES Gym AC; kitchen AC; re-roofing; energy efficiency upgrades

Ivy Creek ES Gym AC; energy efficiency upgrades

Patrick ES Gym AC

Osborne MS Gym AC; energy efficiency upgrades

Duncan Creek ES Gym AC; energy efficiency upgrades

F t D i l ES G AC ki h AC ffi i dFort Daniel ES Gym AC; kitchen AC; energy efficiency upgrades

Puckett’s Mill ES Gym AC

Page 26: SPLOST IV Addressing Classroom and Technology Needs

Mountain View Cluster

All Mountain View Schools

School-wide technology upgrades that may include teacher laptops, student research stations, network p pprinters, projectors, screens, wireless notebook carts, computer labs, media center and school video broadcast equipment, network infrastructure improvements, increased wireless accessincreased wireless access.

Mountain View HS See Technology improvements above

Twin Rivers MS 15 classroom addition; Gym ACTwin Rivers MS 15-classroom addition; Gym AC

Dyer ES Gym AC

Freeman’s Mill ES Gym AC; kitchen AC; energy efficiency upgrades

Woodward Mill ES Gym AC

Page 27: SPLOST IV Addressing Classroom and Technology Needs

Norcross Cluster

All Norcross Schools

School-wide technology upgrades that may include teacher laptops, student research stations, network

i t j t i l t b k t printers, projectors, screens, wireless notebook carts, computer labs, media center and school video broadcast equipment, network infrastructure improvements, increased wireless access.

Norcross HS Gym AC; energy efficiency upgrades

Pinckneyville MS Gym AC; kitchen AC; energy efficiency upgrades

h k h ff dPeachtree ES Gym AC; kitchen AC; energy efficiency upgrades

Stripling ES Gym AC; energy efficiency upgrades

Simpson ES Gym AC; energy efficiency upgrades

Summerour MS See Technology improvements above

Beaver Ridge ES Gym AC; HVAC improvements; energy efficiency upgrades

Norcross ES Gym AC; energy efficiency upgrades

Page 28: SPLOST IV Addressing Classroom and Technology Needs

North Gwinnett Cluster

All North Gwinnett Schools

School-wide technology upgrades that may include teacher laptops, student research stations, network printers, projectors screens wireless notebook carts computer projectors, screens, wireless notebook carts, computer labs, media center and school video broadcast equipment, network infrastructure improvements, increased wireless access.

North Gwinnett HS 10-classroom addition/major renovation; Gym AC; re-roofing; energy efficient lighting; energy efficiency upgrades

North Gwinnett MS 15-classroom addition; Gym AC

Level Creek ES Gym AC; energy efficiency upgrades

Riverside ES Gym AC; kitchen AC; energy efficiency upgrades

Roberts ES Gym AC

Suwanee ES Gym AC; kitchen AC; HVAC improvements; replace fire alarm; energy efficiency upgrades

Page 29: SPLOST IV Addressing Classroom and Technology Needs

Parkview Cluster

All Parkview Schools

School-wide technology upgrades that may include teacher laptops, student research stations, network printers, projectors, screens, wireless notebook carts, printers, projectors, screens, wireless notebook carts, computer labs, media center and school video broadcast equipment, network infrastructure improvements, increased wireless access.

Parkview HS Gym AC; HVAC improvements; energy efficient lighting; energy efficiency upgrades; remove folding partitions

Trickum MS Gym AC; energy efficiency upgradesTrickum MS Gym AC; energy efficiency upgrades

Arcado ES Gym AC; energy efficiency upgrades

Camp Creek ES 15 classroom addition; Gym AC; upgrade intercom; Camp Creek ES 15-classroom addition; Gym AC; upgrade intercom; energy efficiency upgrades

Knight ES Gym AC; energy efficiency upgrades

Mountain Park ES Gym AC; kitchen AC; energy efficiency upgrades

Page 30: SPLOST IV Addressing Classroom and Technology Needs

Peachtree Ridge ClusterAll Peachtree Ridge Schools

School-wide technology upgrades that may include teacher laptops, student research stations, network printers, projectors, screens, wireless notebook carts, printers, projectors, screens, wireless notebook carts, computer labs, media center and school video broadcast equipment, network infrastructure improvements, increased wireless access.

Peachtree Ridge HS

16-classroom addition; Gym AC; energy efficiency upgrades

H ll MS G AC kit h AC ffi i dHull MS Gym AC; kitchen AC; energy efficiency upgrades

Burnette ES Gym AC

Jackson ES Gym AC; energy efficiency upgradesJackson ES Gym AC; energy efficiency upgrades

Mason ES Gym AC; kitchen AC; energy efficiency upgrades

Parsons ES Gym AC; kitchen AC; energy efficiency upgradesy gy y pg

New Peachtree Ridge Cluster MS

New school

Page 31: SPLOST IV Addressing Classroom and Technology Needs

Shiloh ClusterAll Shiloh Schools School-wide technology upgrades that may include

teacher laptops, student research stations, network printers, projectors, screens, wireless notebook carts, computer labs, media center and school video broadcast equipment, network infrastructure improvements, increased wireless access.

Shil h HS G AC d i t ffi i dShiloh HS Gym AC: upgrade intercom; energy efficiency upgrades

Shiloh MS Gym AC; kitchen AC; re-roofing; upgrade fire alarm; add energy efficient entry glass; energy efficiency upgrades

Anderson-Livsey ES Gym AC

Annistown ES Gym AC; kitchen AC; replace cabinets in classrooms; energy efficiency upgrades

Centerville ES Gym AC; kitchen AC; add energy efficient entry glass; upgrade intercom; upgrade fire alarm; energy efficiency upgrades

Partee ES Gym AC; kitchen AC; energy efficiency upgrades

Shiloh ES Gym AC; kitchen AC; energy efficiency upgrades

Page 32: SPLOST IV Addressing Classroom and Technology Needs

South Gwinnett ClusterAll South Gwinnett Schools

School-wide technology upgrades that may include teacher laptops, student research stations, network printers, projectors, screens, wireless notebook carts, computer labs, media center and school video broadcast equipment, network infrastructure improvements, increased wireless access.

S h G i HS G AC ffi i li h i ffi i South Gwinnett HS Gym AC; energy efficient lighting; energy efficiency upgrades

Grace Snell MS Gym AC

Magill ES Gym AC; energy efficiency upgrades

Rosebud ES Gym AC

Snellville MS Gym AC; kitchen AC; HVAC improvements; energy efficiency upgrades

Britt ES Gym AC; kitchen AC; HVAC improvements; energy ffi i defficiency upgrades