AMERICAN TANK & VESSEL, Inc.
Spheres
Job # 11503 Westlake PetrochemicalsLake Charles, LAAT&V performed all engineering,
forming, shop fabrication, field erection subbing out NDE at the site. Hydro‐pneumatic testing was performed by AT&V.Lump sum contract based on a critical
schedule.Award November, 1996Completion September, 1997 (for all
work)Customer safety awards, Zero
recordables and Zero Lost Time
www.at-v.com© 2016 Rev 2
AMERICAN TANK & VESSEL, Inc.
Spheres
Job # 11504Westlake PetrochemicalsLake Charles, LAAT&V was responsible for geotechnical
and foundation design for the spheres and (1) tank. (2) spheres were 44’ Ø ASME Sec. VIII, Div 2 for refrigerated/pressure service.Lump sum contract based on a critical
schedule.Award November, 1996Completion September, 1997 (for all
work)Customer safety awards, Zero
recordables and Zero Lost Time
www.at-v.com© 2016 Rev 2
AMERICAN TANK & VESSEL, Inc.
Spheres
Job # 12622ConocoPhillips LCR Lake Charles, LAConstruction of (1) 84’ ASME Section
VIII, Div 1 sphere including pile, foundations, 100% engineering, and constructionLump sum contractRadiographic work on the sphere
required radiographs to be shot with zero rejects and zero U.T. rejectsWith an impaired site and dozens of
impacts to the schedule, the sphere was constructed 4 weeks ahead of schedule
www.at-v.com© 2016 Rev 2
AMERICAN TANK & VESSEL, Inc.
Spheres
Job #10926Stone & Webster for Enterprise ProductsMont Belvieu, TX
(1) 60’Ø ASME Section VIII, Div 1 Sphere Full design, procurement, fabrication 100% by AT&V, and field erection. AT&V was also responsible for design loads for foundation, fireproofing, stairways, platforms, and finish paint. Lump sum contract executed with
minimal Change OrdersSphere was built approximately 2
months ahead of schedule