12
eerpunt Ecosystem & Landscape Services (SELS Dolf de Groot Environmental Systems Analysis Group Leon Braat Alterra Workshop 19 Mei 2009 [4 Nov 2008] ent preliminary results ent plans/what needs to be done to achieve final pr uss possible problems uss future developments (+ strengthen collaboration Exploring the potential of nature to improve quality Thema “Duurzame Ontwikkeling v.d. Groen-Blauwe Ruimte…(Paul O B2 Thema “Klimaatverandering (Pier Vellinga & Pavel Kabat)]

Speerpunt Ecosystem & Landscape Services (SELS)

Embed Size (px)

DESCRIPTION

Speerpunt Ecosystem & Landscape Services (SELS). KB1 Thema “Duurzame Ontwikkeling v.d. Groen-Blauwe Ruimte …(Paul Opdam) [KB2 Thema “Klimaatverandering (Pier Vellinga & Pavel Kabat)]. Dolf de Groot Environmental Systems Analysis Group Leon Braat Alterra. - PowerPoint PPT Presentation

Citation preview

Speerpunt Ecosystem & Landscape Services (SELS)

Dolf de Groot Environmental Systems Analysis Group Leon Braat Alterra

Workshop 19 Mei 2009 [4 Nov 2008]Present preliminary resultsPresent plans/what needs to be done to achieve final productsDiscuss possible problems

Discuss future developments (+ strengthen collaboration)

Exploring the potential of nature to improve quality of life

KB1 Thema “Duurzame Ontwikkeling v.d. Groen-Blauwe Ruimte…(Paul Opdam) [KB2 Thema “Klimaatverandering (Pier Vellinga & Pavel Kabat)]

13:00 Aims and achievements (Dolf de Groot)

16:20 Plans 2009/2010 (Leon Braat)

16:00 Case “Groene Woud” (Carla Grashof)

13:15 – 15:00 Theme 1 (Quantifying E&L Services) Theme 2 (Valuation & Financing) Theme 3 (Trade-off analysis & Decision m.)

15:00 – 15:30 BREAK

15:30 – 16:00 Theme 4 (Planning, Management & design)

16:35 – 17:00 Discussion / general questions

> 17:00 Drinks

P R O G R A M M A

Changes after mid-term review

Projects: 16 + 2I: 1 (quantifying) : 3 +1 (Erik) projects & 2 (valuation & fin.): 5 project = 9 proj.II: 4 + 1 (Henk) = 5 projects III: 4 projects

+ 3 new PhD-trajectories: quantif. (ESA), modelling (PBL), valuation (LEI)

Management team-Dolf & Leon (ESG)-Roel (SSG)-Abco (PSG)

Budget:

Themes I: Impact of LUC and Management on E&L Services [quantification –less on val.]II: (Participatory) trade-off and decision-support instruments (incl. mapping)III: Integrated planning, management and design

Proj. Coord Symp TOT

ESG 258 20 12 290

SSG 170 10 15 205

PSG 63 5 5 73

491 35 32 568

6 big projects(54k average)

10 small proj.(17k average)

1.Scientific progress and innovation (“scientific relevance”)

scientific articles: 1 (?) – dec 2008 + 9 in review + many in prep. presentations at scientif. Conferences: 30 +

Main aims (ambition) of SELS (to achieve in 3-5 years = 2009/2011)

“Strategy Paper” “Challenges in integrating the concept of ecosystem services and values in landscape planning, management and decision making” Submitted to Journal Ecological Complexity [conference in Kiel, 2008]

SENSE Research Cluster XIII (Land use, Spatial Analysis and Modelling, with special attention to ecosystem and landscape services” (Paul Opdam & Dolf de Groot)- Stimulate collaboration among PhD-students + SENSE questions

2.Develop management tools & demonstration projects

Guidelines how to apply integrated “SELS-approach” [strategy-paper]

case studies - Groene Woud- PRESENCE

Main aims (ambition) of SELS (to achieve in 3-5 years = 2009/2011)

3. Improve planning & decision-making tools (“policy-relevance”) = Theme II / 3

- RITAM & GIS/Internet-tools

- MKBA (was climate adaptation, now: …?)

-> Link met discussie over kosten & baten EHS

Main aims (ambition) of SELS (to achieve in 3-5 years = 2009/2011)

4.Contribute to monitor changes in E&L services

development of indicators

-> Theme 1 (fijnstof, plaagbestr., waterkwal.)

+ Natuurverkenning 2011

Main aims (ambition) of SELS (to achieve in 3-5 years = 2009/2011)

5. Improve communication and awareness (about E&LS)

visualisation-tools, data bases, etc- Internet (“daarmoetikzijn”/- belevingsGIS)- DataBase (ism TEEB en NV&F)

Persberichten / interviews / etc-> mention KB1 / SELS !

Conferences for gen. public & policy makers- KB-dag Den Haag (12 mei 2009)

Main aims (ambition) of SELS (to achieve in 3-5 years = 2009/2011)

6. Establish an (inter)nationally recognized network (“make WUR more visible”)

Meetings / conferences [2009/2010]

NV&F Platform (www.natuurwaardering.nl)

International projects / assessmentseg. TEEB + European Millennium Assessment)

Main aims (ambition) of SELS (to achieve in 3-5 years = 2009/2011)

Website (www.ecosystemservices.nl)

13:00 Aims and achievements (Dolf de Groot)

16:20 Plans 2009/2010 (Leon Braat)

16:00 Case “Groene Woud” (Carla Grashof)

13:15 – 15:00 Theme 1 (Quantifying E&L Services) Theme 2 (Valuation & Financing) Theme 3 (Trade-off analysis & Decision m.)

15:00 – 15:30 BREAK

15:30 – 16:00 Theme 4 (Planning, Management & design)

16:35 – 17:00 Discussion / general questions

> 17:00 Drinks

P R O G R A M M A

SELS Plans 2009 / 2010

-Internationaal Congres (najaar 2010)- Key note speakers per cluster/theme- presentations per SELS theme/cluster

- The challenge is: - spatial dynamics of ecosystem and landscape services!- science for policy: applicability, useful indicators

- Article(s) [also background doc. for int. conference] “Challenges in integrating the concept of ecosystem services and values in landscape planning, management and decision making” Submitted to Journal Ecological Complexity

1.Research planswhat SELS / WUR contributes to advance the science in this field ?

SELS Plans 2009 / 2010

- National Symposium (najaar 2009) “Biodiversiteit Werkt” (BB) / “Investeren in Landschap (EHS) Loon

- ism Nature Valuation & Financing Network

1a) National: - Beleidsprogramma Biodiversiteit (Task Force/ Themagroep)

2. Policy- influencing

1b) International- September 2009 TEEB D0 & D1

-=> presentation to EU meeting during Swedish Presidency

- October 2010 TEEB D0 – D4 => presentation at CBD CoP 10 in Nagoya, Japan

- Natuurverkenning 2011