Full Depth Reclamation with Asphalt Binders Workshop SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION & FOAMED ASPHALT Richard Izzo, P.E. Soils & Aggregates Section Materials & Tests Division Full Depth Reclamation State of the Art Workshops January 21, 2020

SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop

SPECIFICATIONS

FULL DEPTH RECLAMATION (FDR) - EMULSION & FOAMED ASPHALT

Richard Izzo, P.E.

Soils & Aggregates Section

Materials & Tests Division

Full Depth Reclamation State of the Art Workshops January 21, 2020

Page 2: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop January 21, 2020

Table of contents

2

12-30

3-7Background of Specifications used for FDR Emulsion

Revisions to the Current Special Specifications

1

3

31-32Support Available to Districts4

8-11Background of Specifications used for FDR Foamed Asphalt2

Page 3: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop January 21, 2020 3

TxDOT does not have an Item # in 2014 standard specifications book for FDR with asphalt.

Construction lettings are using Statewide or One-Time Use special specifications.

Special specifications are generally used for new materials/processes or for significant revisions to

TxDOT Item #’s in standard specification book.

Special specifications 3,000 to 3,999 assigned for Surface Courses/Pavements

Background of Specifications for FDR using Emulsion & Foamed Asphalt

Page 4: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop January 21, 2020 4

49 project lettings from 10 Districts.

February, 1994 - First Special Specification (3017) was used for a project letting in Abilene.

(1993 Standard Specifications - Blue Book).

July, 2013 - First Statewide Special Specification (3273) was used for a project letting in San Antonio.

(2004 Standard Specifications - Maroon Book).

35 One-Time Use special specifications were used until Statewide specification was approved. There have been

several revisions from 1994 to 2013.

Background of Specifications used for FDR Emulsion

Page 5: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop January 21, 2020 5

April, 2015 – New Statewide Specification (3003) used for a project letting.

(2014 Standard Specifications - White & Blue Book)

3003 and one-time use specifications currently being used for project lettings.

Background of Specifications used for FDR Emulsion

Page 6: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop January 21, 2020 6

PROJECT LETTINGSBEFORE 2014

(1993 & 2004 SPECIFICATIONS)

2014 & LATER

(2014 SPECIFICATIONS)

DISTRICT # PROJECTS YEAR # PROJECTS YEAR

ABILENE 1 1994 - -

AMARILLO* 5 2004 – 2011 7 2014 – 2019

AUSTIN 1 2001 - -

BEAUMONT - - 5 2014 – 2018

DALLAS 9 1999 – 2010 - -

EL PASO* - - 1 2019

ODESSA* - - 6 2015 – 2020

SAN ANGELO - - 2 2016 – 2017

SAN ANTONIO 11 2004 – 2013 - -

YOAKUM 1 2007 - -

TOTAL 28 Projects 21 Projects**

* - Districts using High-Yield emulsion.

** - Statewide average bid price including emulsion, cement, and treatment is $13.49/SY.

Statewide Construction Lettings for FDR Emulsion

Page 7: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop January 21, 2020

AMARILLO

(5 & 7)

CORPUS

CHRISTI

AUSTIN

(1)

SAN ANTONIO

(11)

FORT WORTHDALLAS

(9)

WACO

YOAKUM

(1)

BRYAN

LUBBOCK

CHILDRESS

ABILENE

(1)

SAN ANGELO

(2)

ODESSA

(6)

EL PASO

(1)

LAREDO

PHARR

WICHITA FALLSPARIS

ATLANTA

TYLER

HOUSTON

LUFKIN

BEAUMONT

(5)

LETTINGS BEFORE 2014 (23 PROJECTS)

LETTINGS AFTER 2014 (14 PROJECTS)

LETTINGS BEFORE & AFTER 2014 (5 & 7 PROJECTS)

Statewide Construction Lettings for FDR Emulsion

HIGH YIELD EMULSION

• AMARILLO

• EL PASO

• ODESSA

7

Page 8: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop January 21, 2020 8

Total of 12 project lettings from 9 Districts.

August, 1999 - Special Specification (3158) was used for first project letting in Wichita Falls.

(1993 Standard Specifications - Blue Book).

December, 2013 - Special specification (3279) was used for second project letting in Corpus Christi

(2004 Standard Specifications – Maroon Book).

First Statewide special specification (3063) became available in July, 2018.

Background of Specifications used for FDR Foamed Asphalt

Page 9: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop January 21, 2020 9

PROJECT LETTINGSBEFORE 2014

(1993 & 2004 SPECIFICATIONS)

2014 & LATER

(2014 SPECIFICATIONS)

DISTRICT # PROJECTS YEAR # PROJECTS YEAR

ATLANTA - - 2 2018

BRYAN - - 1 2015

CORPUS CHRISTI 1 2013 - -

LAREDO - - 1 2016

LUBBOCK - - 2 2018 & 2019

SAN ANGELO - - 1 2019

SAN ANTONIO - - 1 2014

WACO - - 2 2018 & 2019

WICHITA FALLS 1 1999 - -

TOTAL 2 PROJECTS 10 PROJECTS*

* - Statewide average bid price including foamed asphalt, cement, and treatment is $10.63/SY.

Statewide Construction Lettings for FDR Foamed Asphalt

Page 10: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop January 21, 2020

LETTINGS BEFORE 2014 (2 PROJECTS)

LETTINGS AFTER 2014 (10 PROJECTS)

EL PASO

AMARILLO

CORPUS

CHRISTI

(1)

AUSTIN

SAN ANTONIO

(1)

FORT WORTH DALLAS

WACO

(2)

YOAKUM

BRYAN

(1)

LUBBOCK

(2)

CHILDRESS

ABILENE

SAN ANGELO

(1)

ODESSA

LAREDO

(1)

PHARR

WICHITA FALLS

(1) PARIS

ATLANTA

(2)

TYLER

HOUSTON

LUFKIN

BEAUMONT

10

Statewide Construction Lettings for FDR Foamed Asphalt

Page 11: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop January 21, 2020 11

First project was let in 1999 and the second in 2013.

First project experienced severe rutting and cracking.

Finer, higher PI material was reclaimed and mixed with foamed

asphalt.

Upfront sampling & testing critical for project selection and success.

CENTER/BETWEEN WHEELPATHS OUTSIDE WHEELPATH

SEVERE RUTTING, ALLIGATOR & LONGITUDINAL

CRACKING

Why is there a big gap in time between foamed asphalt project lettings?

Page 12: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop January 21, 2020

Revisions to the Current Special Specifications

12

New Statewide Special Specifications will be required for all project lettings in March.

Collaborative effort with Industry and Texas A&M Transportation Institute (TTI) to address concerns

observed from projects.

Implement current mixture design practices.

Compliance with Code of Federal Regulations (CFR) for using ‘Quality Control’ test results for

acceptance.

CFR allows the use of contractor test

results in making the acceptance

decision…..

Page 13: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop January 21, 2020 13

TxDOT must validate Contractor’s Quality Control test results used for acceptance.

Revisions to the Current Special Specifications

Page 14: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop January 21, 2020 14

Move away from one-time-use specifications so all project lettings use the same Statewide

specification

Harmonize the special specifications to have similar content and intent.

Include similar language and format from 2014 specifications for treatment Items using cement,

fly-ash, and lime.

Same Section numbers, names, and comparable information for alternate bidding.

Goal is to have one Statewide special specification

for Full-Depth Reclamation (FDR) Using Asphalt.

Big picture is to have a new Item in the

2024 Standard Specification book for FDR using

asphalt.

Revisions to the Current Special Specifications

Page 15: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop January 21, 2020

SECTION 1. DESCRIPTION

15

Perform full depth reclamation (FDR) using a cold in-place mixing process to obtain a homogenous

mixture of the existing surface and the underlying base material (with or without new material and

additive added) using an emulsified asphalt or foamed asphalt.

Page 16: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop January 21, 2020

FOAMED ASPHALT

PG 64-22

SECTION 2. MATERIALS

16

Emulsion

Material specifications listed in a table.

Standard emulsion (CSS-1H)

High Yield (CSS-1H with a rejuvenating agent)

Foamed Asphalt

Reference to TxDOT Item 300, Asphalts, Oils, and Emulsions

Performance-Graded (PG) Binders

PG 64-22

Foamed Asphalt Properties listed in a table.

EMULSION

CSS-1H

Page 17: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop January 21, 2020

SECTION 2. MATERIALS

17

Additional Material

Flexible Base, Item 247

Allows RAP

LIME – DRY & SLURRY APPLICATIONS CEMENT – BLOWN & SPREADER APPLICATIONS

FLEX BASE RAP

Additive

Lime

Cement

Fly Ash

Do not exceed 1.5%,

or as shown on plans.

Water

Free of industrial waste

and other objectionable

material.

Page 18: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop January 21, 2020

SECTION 2. MATERIALS

18

MIXTURE DESIGN

Engineer will provide an approved mixture design, unless otherwise directed by the Engineer.

Allows District the option to require Contractor to provide mix design.

Required to use Materials & Tests Division’s new mixture design procedure (draft, not published yet).

Private labs have limited to no experience with the procedure thus defaulting to Engineer providing the

mixture design.

Will move back to the Contractor’s responsibility in the future.

E. Preparation of the Base Specimens Stabilized with the Emulsion-Cement Mix - CONTINUED

10. Mix for no more than 60 ± 10 seconds.

11. Place the loose mixture into a bowl.

12. Move the blended specimens into an oven and

cure at 60°C (140°F) for 30 minutes. Do not mix

during curing.

13. Compact the cured mixtures according to (B).

14. Place the compacted specimens on the porous

stones.

Day 3

Day 4

15. Move the specimens into a climate chamber set

at 60°C (140°F).

16. Cure the specimens in the chamber for 48 hours

(2 days).

17. Remove the specimens from the hot chamber

and cool them at 25°C (77°F) for 24 hours (1 day),

but not more than 48 hours (2 days).

MIXTURE DESIGN VERIFICATION

At the Engineer’s discretion.

Page 19: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop January 21, 2020 19

Equipment, Staffing, and Control Section

SECTION 3. EQUIPMENT

Additive, rollers, and reclaimer.

SECTION 4. STAFFING REQUIREMENTS

Provide staff onsite for a minimum of 3 days from the start of FDR process for both emulsion & foamed asphalt.

Minimum experience of 2 years supervising FDR projects.

Certification by Department-approved Soils & Base Certification Program to conduct all sampling and testing

(SB 102 - TXAPA).

SECTION 5. CONTROL SECTION

Construct a control section only when directed by the Engineer.

Lane width, minimum 300 feet in length, and depth

shown on the plans.

Page 20: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop January 21, 2020

SiteManager Template

20

SECTION 6. CONSTRUCTION

REPORTING AND RESPONSIBILITIES

Requires to record and electronically submit all test results and pertinent information using

Department-provided templates.

SiteManager templates created for emulsion (Tex-122-E) and

foamed asphalt (Tex-134-E) draft mix design test procedures.

PRE-SHAPING

Shape existing material to conform to typical sections

shown on the plans, such as cross slope; not very often.

APPLICATION OF ADDITIVE

Dry & slurry placement.

No significant changes from Items 260 & 275, lime & cement

treatment.

Page 21: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop January 21, 2020 21

WEATHER RESTRICTIONS

Surface temperature below 50°F.

Weather forecast calls for freezing temperatures within 3 days after treatment.

MIXING

Emulsion - do not start mixing if the in-situ moisture content is greater than 70% of optimum moisture

content from the mixture design.

Includes frequency of sampling & testing for Engineer because

specifications and materials are not listed in the Guide Schedule.

Engineer determines emulsion and foamed asphalt %

using meter readings or truck weight tickets.

Engineer determines gradation.

SECTION 6. CONSTRUCTION

Page 22: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop January 21, 2020 22

COMPACTION

Suspend field operations and notify the Engineer when significant changes of materials being treated occur.

Engineer may suspend field operations and investigate areas of concern.

‘Investigate’ may include:

• Reviewing Process Control (Quality Control) test results

• Field testing, such as Ground Penetrating Radar (GPR) and Dynamic Cone Penetrometer (DCP).

• Sampling & testing of materials.

SECTION 6. CONSTRUCTION

Page 23: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop January 21, 2020

SEVERE/DEEP RUTTING

23

What may be the consequences when there are significant changes of materials being treated in the field?

Inadequate mixing & bonding of reclaimed materials.

Does not meet density & moisture requirements.

Is not stable and prone to shoving & rutting.

Does not meet gradation requirements.

Surface too fine and not bond with seal coat delamination.

ALLIGATOR & LONGITUDINAL CRACKING

DELAMINATION OF SEAL COAT

SECTION 6. CONSTRUCTION

Page 24: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop January 21, 2020

ORDINARY COMPACTION

Roll with approved compaction equipment as directed by the Engineer.

DENSITY AND MOISTURE CONTROL

Full depth layer must be compacted to an average 97.0% density.

Added ‘Moisture Control’ within 2% below the optimum moisture content (OMC)

and no more than 0.5% above.

• When material does not meet density but meets moisture content;

perform additional compaction or rework and recompact.

• When moisture content is more than 0.5% above the OMC;

aerate and recompact.

• When moisture content is more than 2.0% below the OMC;

rework, add moisture, and Recompact.

24

SECTION 6. CONSTRUCTION

Page 25: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop January 21, 2020 25

CURING

Emulsion – moisture content is a minimum 2% below the optimum moisture content.

Foamed Asphalt – minimum of 2 hours.

Foamed Asphalt - removed language requiring fog or fog/sand sealing.

SECTION 6. CONSTRUCTION

Page 26: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop January 21, 2020 26

Contractor is required to perform process control (quality control) testing during treatment process at

locations independent from the Engineer’s testing locations.

Process control test results will not be used for acceptance.

Contractor may perform any additional testing as they deem necessary for process control.

Modify operations when process control

test results do not meet specification

requirements.

Suspend operations when process control

test results performed after modifications

do not meet specification requirements.

DOES NOT MEET SPECS MEET SPECS

SECTION 7. PROCESS CONTROL (QUALITY CONTROL)

Page 27: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop January 21, 2020 27

CONTRACTOR MINIMUM TESTING FREQUENCY

(EMULSION & FOAMED ASPHALT)

DESCRIPTION TEST METHOD MINIMUM FREQUENCY

Depth of Pulverization Tex-140-E

1 per Day of Production

Gradation Tex-101-E, Part III

Emulsion or Foamed

Asphalt Content

Meter Readings or

Truck Weight Tickets

Foamed Asphalt Treatment

Water ContentMeter Readings

Moisture Content* Tex-103-E 3 per Day of Production

* - Moisture content is measured before adding the emulsion or foamed asphalt.

SECTION 7. PROCESS CONTROL (QUALITY CONTROL)

Page 28: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop January 21, 2020 28

Asphalt, Flexible Base, AdditiveQuality Monitoring (QM) Program or

1 per project

Mixture Design Materials & Tests Division (MTD) or

Contractor when required by DistrictMixture Design Verification

Control Section Witness Contractor Sampling and Testing

Gradation Tex-101-E, Part III

1 per 3,000 CYDepth of Pulverization Tex-140-E

Density and Moisture Content Tex-115-E

TxDOT/Engineer’s Minimum Testing Frequency

No tests and testing frequencies listed in Guide Schedule (June 2019) for FDR using asphalt.

Sampling & testing requirements will be in SiteManager.

Mixture design & field testing SiteManager templates will be available.

Page 29: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop January 21, 2020 29

Measurement and Payment

SECTIONS 8 & 9. MEASUREMENT & PAYMENT

Three item bid description codes required for project lettings.

1. EMULSION OR FOAMED ASPHALT

Unit of measure by weight in tons or volume in gallons.

Emulsion is not residual, bid includes water and emulsifying agent.

Emulsion measured by volume for all TxDOT lettings so far.

Foamed Asphalt measured by weight for all TxDOT lettings so far.

Page 30: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop January 21, 2020 30

Measurement and Payment

2. ADDITIVE – Unit of measure by ton.

3. TREATMENT – Unit of measure by square yard.

Existing Material or,

Mix Existing Material & New Base or,

Mix Existing Material & RAP.

Specified depth, inches is included.

Density Control, DC may be included.

ITEM BID DESCRIPTION UNIT

1. ASPHALT BINDER (PG 64-22) TON

2. CEMENT TON

3. FOAMED ASPHALT TREAT (8") (DC) SY

ITEM BID DESCRIPTION UNIT

1. EMULSION GAL

2. CEMENT TON

3. EMUL TRTMNT (MX EXST MTRL) 8" SY

3. EMUL TRTMNT(MX EXST MTRL & NEW BASE)12" SY

Page 31: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop

Implementation project funded as a continuation from Research Project 0-6880.

‘Full Depth Reclamation in Maintenance Operations using Emerging Technologies’

Texas A&M Transportation Institute (TTI)

Analyze use of next-generation FDR technology in

maintenance operations.

31

Support Available to Districts

Expand the toolkit for effective FDR treatment.

Page 32: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop January 21, 2020 32

Support Available to Districts

1. Maintenance Division (MNT)

2. Materials & Tests Division (MTD)

3. Fleet Operations Division (FOD)

4. Texas A&M Transportation Institute (TTI)

Field testing and sampling of materials.

Mixture design recommendations.

Pavement design recommendations.

Provide pavement rehabilitation options.

Project start-up and inspection support.

Page 33: SPECIFICATIONS FULL DEPTH RECLAMATION (FDR) - EMULSION ... · Minimum experience of 2 years supervising FDR projects. Certification by Department-approved Soils & Base Certification

Full Depth Reclamation with Asphalt Binders Workshop 33

Rapidly Strengthen Pavement

Improve Safety

Save Time

Save Money

Save Natural Resources

FDR

QUESTIONS?