7
Sl'£CII'ICAnONS Fa! UNIFILL lJNER I'OR UNIFILL • RESOORCE RllXJIIEXl' I tHC. SHI!IIIUU>, R.I. 02876 1.0 General z.o Sc(l)e ).0 Site Preparation 4o0 Uner spei1t1cat,lcn 4.1 Qononl 4.2 fh>o1cal Roquinaont.a 4o) Fabrieat.loa 4·4 lliH 5.0 lMt.dlaUGD 5.1 Qooonl 5o2 Fhld Spllci"C 5o) Technlcal J.aaiat.ance 6.0 Coot. Jebzua17 24 1 198).

SPECIFICATIONS FOR LANDFILL LINER · 2.0 Scope Tbt work includ• tbe auppl)o tn:! delive17 of an bpeme.able •embnnt tor the Uolation Or vute 111&\.er.ltl.l within a lardf'ill

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SPECIFICATIONS FOR LANDFILL LINER · 2.0 Scope Tbt work includ• tbe auppl)o tn:! delive17 of an bpeme.able •embnnt tor the Uolation Or vute 111&\.er.ltl.l within a lardf'ill

SlpoundCIIICAnONS

Fa

UNIFILL lJNER

IOR

UNIFILL bull RESOORCE RllXJIIEXl I tHC

~H SHIIIIUUgt RI 02876

10 General

zo Sc(l)e

)0 Site Preparation

4o0 Uner spei1t1catlcn

41 Qononl

42 fhgto1cal Roquinaonta

4o) Fabrieatloa

4middot4 lliH

50 lMtdlaUGD

51 Qooonl

5o2 Fhld SpllciC

5o) Technlcal Jaaiatance

60 Coot

Jebzua17 241 198)

(

SPlCinCATIONS FOR LANDFill LlNER

l UNIFIU A RESOORCE RXXWXf1 INC I

IIORTII SKITIIIIELD1 RI 0286

10 General

LanUUlil Jlelcurce Reccvezy Inc viahe1 to solicit ccet propceala to

aupplJ a 20 11111 unldnforce polyrlVl chlorlde (PVC) liner to ccwar all

of their aite located in North Sm1thield1 JtJ

All work in prepamp riDamp the aite and installinamp ~he 31ner will be

con1ucted b7 Lanr111U A Raource JlecCNezy PenoMel The supplier v1ll be

responsible for tht Mlllacture and deliveJ7 of the liner anS techtdeal

aupenbion or the i~Ullatioa

be bide an bei~ aollcited bT Landt1ll ~ Jlbullource Recoreq tac

65 Obefe 1-ne Warrick RI 02888 on behalt or the L A I L Site

located in Rorth sitht1eld Bidl vill be accepted at tbe L 1 RR otnce

) 6S Oleete Lane Vanrlck RI 028881 no later than 12 loce TalldiJ1

Karch 131 1984bull The bid packap thampllincllle tbe c01U1 u diiCUId

in SecUCD 601 to conluot the work dbullcrlbS heniD Allo to be incllldS

iD the bid pacbampe an the Uner tc1tlcat1cn u cutlintd 1D Sectloa 401

an e~Uaate b) the supplier of the bullrlibullt date on which the nc linu

can be dellnnd at tbe aite end four (4) rererencbull or pnrlcua aiaUar

wortlt

Upon recdpt or the bldl L A ttTt Inc vU1 aelect a aupplier bued

on leMa~ total coat for all it- M~nld 1n ~ apecitlceticm Ala

evant of the contftct wUl be ccnpletedb 1lesdq March rr lfJ84

t A ER Inc reaezvbull the riampbt to reject aV an all bidl for Uf

reason but this U unlik~ No bid will be considered if total deliYeiJ

caMot be accOIDplisbed by the m1 or lq Total payment for the liner INIt

be lllampcle before the eni or June the cl~ or our 11acal 7812

(J

20 Scope

Tbt work includbull tbe auppl)o tn delive17 of an bpemeable bullembnnt

tor the Uolation Or vute 111amperltll within a lardfill Abo included

v1U bt technical usiltance and advice on installation ard bordinamp of

tha liner The liner U to be installecl overtop a prMOJIlt placed

ard ended acdl conr anl a aU portion vill be imtllled on rlrJIa

ampmmcS u a bottCII Uner All work on unloadinamp1 placinamp1 field aplicina

tnf otber ibulltallation relatecl itfllll will bt conucted b7 t A RR

peronnel

o Site Preparation

All aitt preparation woJ1c will bt pertontd b7 L A JtA penonltlbull

Hottnr tht tupplbr ahall awit1 tdtb h1a quotation nc~erdaUom

u tha the 11ral amprediDamp or tht 11nbhed lanU111 audac L 1 Blshy

penonnel ban auccbullafll1lJ1 in 19791 prnious~ ibulltllltd 2001000 sr

ot 20 ldl PfC llntr ard are tu1liar vlth ) 40 Liner SpeeU1ut1orw

tl o-ral

The bullbullnne to be aupplied thall bt thHtinamp aadt of QDJdntorcld

J)OlTdqrlchloride (nc) ud aball bt 20 IIlla 1a Wclcnct nc bullterlala

thall be -tacturtd rna dcabulltic ~rampfn ~IV~ chlo~dt swia aid

tpecU1callt c(lllpCWdS tor at in hJdmaUo tacU1t1bull in a ttandalll

llirdlll- width ot S4 incbbullbull lltiprocecl bullterlal bullbAll not be Uiecl

42 PhYsical RCNirtaerampe

The polyrlJl7l chloride bullmbrtne shall bullbullet the pvwical requii8Denta

lilted belCMI PJeue also pn an bulltibullte of anticipated lite vben liner 1a

in contact witb clbulln fbe bullbullrd1 and conred with 2 ot clean f1ne aard1

to prevent bullunliamphtbull Please pve an estimate ot life wbile exposed to

bullJ 0

PHYSICAL REOUJR[tfNTS

MtnfmUII lest Tnt Valued ~

Thickness bull11 20 SS ASTII 0-1593 SptcHfc Gravfv 123-130 - ASTII 0-712-A lfnsth Strength psi bullhi 2200 ASTII OBBZ-A Elongetfon lllin 3001 ASTM OBBZ-A 100~ Modulus psi 1000-1600 ASTM OBBZ-A pound1mendorf Tur gbulls1111 bulltn 160 ASTM 01912 Gr1ves Tur lbsfnbullfn 270 bull ASTM 01004 Weter tatnctfon bullbullmiddot 035 ASTM 01239 Volltilfty s 1000 Nx 075 ASTM 01203 lmp1ct Cold tr1ct F 20 ASTM 1790 Dhaenston1l Stability (It 100 C 15 bull1n1

~ NX change 5 Bonded Stbull Strength I of

Tensnt bullfn 80S ASTM DBBZshyP1 nholeslo sq yds bull none Rtshtenct to Bur-111 middot Par 14c (1) ptr

Tenstlt Strength lou I IIIX bull USBR procedure Elongation loss I bullbull

Color Black or_ J The supp11tr shall suttt with hh quotlt 1on tht

values end test aethods of h1 s proposal Nlllbrane bull

4 l Fabrication

The aellbran ahall ba ahop fabricated into atanani abed larampbull

aectiorw bullbull deecribed in 44 lldinto odd-abed piecbull u nqdred to middotmiddot auit the tacllit)- to adrdsaa_the llllber of fSeld 1pl1cbullbull shy

After tabrlcati~ tha sembrana aball be packed for eu7 ard smshybampndlinamp in tbe 11eld Shippina ccmtainen capab~l of prenntinamp daaampe

to thl content1 durlnc abipmeat ard 11el4 han111nc bullhall be prcwidcd b7 tha

aupplier The containan ahall be adequatelT bullrtted with piJItl llllllben

correepordinamp to t he panel la)wt dnodnamp prov14ad in aectica 1

44 SUo

lba tctal bull~ to b1 covered b7 the PVC 1-bnne vU1 b1 1 10601000

aquare teat ot llnbull aquare Jlrda pllll 100000 aquare feat tor bull bottaa

11nar1 Nkinc a total or 111601000 aquare teat or 1281889 aquan ~middotmiddot

The area to ba cgvand hu the 4lmens1o- of 100 tett bJ UOO tett1 plu

300 teet a 600 Iaamp includina lllawancbull tor alcpa The botaa 11nar _

1a 200 r- b7 500 r- Sach poMl oball bo bull-liod in JJPIOXiloaolT

83 root victtb 250 teet lq Allrnata panel aisbull alao ba propcraquoad

it thbull v1U aana to alnbdsa the IUiber of f1al4 aUcbull ant bantliDampshy

In bulltibulltlDamp the v1dth ot tha irdhidual panala1 the aQWllar aball pnwida

tor allawancbull tor apllcbull betwaiD panala Maila on apUciq are d1acw1S

1D s2 llota abcut eooooo bullbullr or liner will be Utlllllt oa bull aicpa that

hu a) borisontal run 1rT 1 1 Yertical helamph incrae () ca 1)

middot0 Inat allatioo

S l General

lba PVC membrana v1ll be inatalled bJ t A JlL penonnal middotfbe auppliar

ahall aubcdt1 with h1a quotaticm a Mama1 or Me~~~brana

u

tnstallaUon Practicebull tncludtng u a 11fnf11U111 tCIIIpltte drawings

andor sketches and Httrature fndtcatfng the dhttnsfons of each

standarcS-s1zt section of Mtlllbrane type sbe end weight of shipping

container procdure for splicing connecting end anchoring iecbrane

to soil around ptpu and other appurtenances and re-ccxnnended

aethods of h1ndltng llttllbrane by field Personnel during tnelftbrane

fnste11atfon The supplier shall suppiy four-(4) tddfUonal copies

of the bullManual of Membnne lnsUllatton Pr~cUcebull ff bUdtd the

contract bull

52 Field SpllciM

Lap joints shall be used to seal adjacent lengths of factory hbrfctted

pftces of PVC together fn the fteld Joints shill overhp a bullfnf

of sb tnches ) The supplier shall prov1de i ufftc1ent solvent ct~~tnt or adhtlfyen1

to uke fut and tfffctent field splices at tellptratures ranging

rr zortoIOr 53 Tbullchnical An1stanct

The supp11tr shall usfgn a rtpresentatht to i_nspect tht supporting

I surface prior to installation of the ~~t~~brane The represenUthe

shall reufn at thl site to supervise the ~~e~~brane installation for

appro~t1utely one (ll worti ng day and shall be responsible for

tra1n1ng middot1middot 1 R~personnel for the bulle~~~brant installation operation

The supplier shall bur the upense of the rePresentathe for the

duration of the inspection period (one (1) vorking ctayfbull

0 bull

~ The cost to perfoiWI the work outlined in 10 through 40 1h11l bt

provided by the supplier IS pnt of the bid packlge The sttppl1er shall

supply the total cost middot ~ do the above wort u well as 1 cost breakdown

shoVfng unit cost of the PVC 11ner in dollars per square foot (Sft2)

u delivered to the site cost for adhesive 111tertals Ugbullllonl and amiddot

cost for techn1ul supervh1on (Sday) All costs middotu quoted shall hold

for 1 perfod of not hn than 60 days frca the date of quotaUon A

propo sd cost pi)llfnt schedul e shai 1 al so be requt sted by the suppl fer

)

  1. barcode 561515
  2. barcodetext SDMS Doc ID 561515
Page 2: SPECIFICATIONS FOR LANDFILL LINER · 2.0 Scope Tbt work includ• tbe auppl)o tn:! delive17 of an bpeme.able •embnnt tor the Uolation Or vute 111&\.er.ltl.l within a lardf'ill

(

SPlCinCATIONS FOR LANDFill LlNER

l UNIFIU A RESOORCE RXXWXf1 INC I

IIORTII SKITIIIIELD1 RI 0286

10 General

LanUUlil Jlelcurce Reccvezy Inc viahe1 to solicit ccet propceala to

aupplJ a 20 11111 unldnforce polyrlVl chlorlde (PVC) liner to ccwar all

of their aite located in North Sm1thield1 JtJ

All work in prepamp riDamp the aite and installinamp ~he 31ner will be

con1ucted b7 Lanr111U A Raource JlecCNezy PenoMel The supplier v1ll be

responsible for tht Mlllacture and deliveJ7 of the liner anS techtdeal

aupenbion or the i~Ullatioa

be bide an bei~ aollcited bT Landt1ll ~ Jlbullource Recoreq tac

65 Obefe 1-ne Warrick RI 02888 on behalt or the L A I L Site

located in Rorth sitht1eld Bidl vill be accepted at tbe L 1 RR otnce

) 6S Oleete Lane Vanrlck RI 028881 no later than 12 loce TalldiJ1

Karch 131 1984bull The bid packap thampllincllle tbe c01U1 u diiCUId

in SecUCD 601 to conluot the work dbullcrlbS heniD Allo to be incllldS

iD the bid pacbampe an the Uner tc1tlcat1cn u cutlintd 1D Sectloa 401

an e~Uaate b) the supplier of the bullrlibullt date on which the nc linu

can be dellnnd at tbe aite end four (4) rererencbull or pnrlcua aiaUar

wortlt

Upon recdpt or the bldl L A ttTt Inc vU1 aelect a aupplier bued

on leMa~ total coat for all it- M~nld 1n ~ apecitlceticm Ala

evant of the contftct wUl be ccnpletedb 1lesdq March rr lfJ84

t A ER Inc reaezvbull the riampbt to reject aV an all bidl for Uf

reason but this U unlik~ No bid will be considered if total deliYeiJ

caMot be accOIDplisbed by the m1 or lq Total payment for the liner INIt

be lllampcle before the eni or June the cl~ or our 11acal 7812

(J

20 Scope

Tbt work includbull tbe auppl)o tn delive17 of an bpemeable bullembnnt

tor the Uolation Or vute 111amperltll within a lardfill Abo included

v1U bt technical usiltance and advice on installation ard bordinamp of

tha liner The liner U to be installecl overtop a prMOJIlt placed

ard ended acdl conr anl a aU portion vill be imtllled on rlrJIa

ampmmcS u a bottCII Uner All work on unloadinamp1 placinamp1 field aplicina

tnf otber ibulltallation relatecl itfllll will bt conucted b7 t A RR

peronnel

o Site Preparation

All aitt preparation woJ1c will bt pertontd b7 L A JtA penonltlbull

Hottnr tht tupplbr ahall awit1 tdtb h1a quotation nc~erdaUom

u tha the 11ral amprediDamp or tht 11nbhed lanU111 audac L 1 Blshy

penonnel ban auccbullafll1lJ1 in 19791 prnious~ ibulltllltd 2001000 sr

ot 20 ldl PfC llntr ard are tu1liar vlth ) 40 Liner SpeeU1ut1orw

tl o-ral

The bullbullnne to be aupplied thall bt thHtinamp aadt of QDJdntorcld

J)OlTdqrlchloride (nc) ud aball bt 20 IIlla 1a Wclcnct nc bullterlala

thall be -tacturtd rna dcabulltic ~rampfn ~IV~ chlo~dt swia aid

tpecU1callt c(lllpCWdS tor at in hJdmaUo tacU1t1bull in a ttandalll

llirdlll- width ot S4 incbbullbull lltiprocecl bullterlal bullbAll not be Uiecl

42 PhYsical RCNirtaerampe

The polyrlJl7l chloride bullmbrtne shall bullbullet the pvwical requii8Denta

lilted belCMI PJeue also pn an bulltibullte of anticipated lite vben liner 1a

in contact witb clbulln fbe bullbullrd1 and conred with 2 ot clean f1ne aard1

to prevent bullunliamphtbull Please pve an estimate ot life wbile exposed to

bullJ 0

PHYSICAL REOUJR[tfNTS

MtnfmUII lest Tnt Valued ~

Thickness bull11 20 SS ASTII 0-1593 SptcHfc Gravfv 123-130 - ASTII 0-712-A lfnsth Strength psi bullhi 2200 ASTII OBBZ-A Elongetfon lllin 3001 ASTM OBBZ-A 100~ Modulus psi 1000-1600 ASTM OBBZ-A pound1mendorf Tur gbulls1111 bulltn 160 ASTM 01912 Gr1ves Tur lbsfnbullfn 270 bull ASTM 01004 Weter tatnctfon bullbullmiddot 035 ASTM 01239 Volltilfty s 1000 Nx 075 ASTM 01203 lmp1ct Cold tr1ct F 20 ASTM 1790 Dhaenston1l Stability (It 100 C 15 bull1n1

~ NX change 5 Bonded Stbull Strength I of

Tensnt bullfn 80S ASTM DBBZshyP1 nholeslo sq yds bull none Rtshtenct to Bur-111 middot Par 14c (1) ptr

Tenstlt Strength lou I IIIX bull USBR procedure Elongation loss I bullbull

Color Black or_ J The supp11tr shall suttt with hh quotlt 1on tht

values end test aethods of h1 s proposal Nlllbrane bull

4 l Fabrication

The aellbran ahall ba ahop fabricated into atanani abed larampbull

aectiorw bullbull deecribed in 44 lldinto odd-abed piecbull u nqdred to middotmiddot auit the tacllit)- to adrdsaa_the llllber of fSeld 1pl1cbullbull shy

After tabrlcati~ tha sembrana aball be packed for eu7 ard smshybampndlinamp in tbe 11eld Shippina ccmtainen capab~l of prenntinamp daaampe

to thl content1 durlnc abipmeat ard 11el4 han111nc bullhall be prcwidcd b7 tha

aupplier The containan ahall be adequatelT bullrtted with piJItl llllllben

correepordinamp to t he panel la)wt dnodnamp prov14ad in aectica 1

44 SUo

lba tctal bull~ to b1 covered b7 the PVC 1-bnne vU1 b1 1 10601000

aquare teat ot llnbull aquare Jlrda pllll 100000 aquare feat tor bull bottaa

11nar1 Nkinc a total or 111601000 aquare teat or 1281889 aquan ~middotmiddot

The area to ba cgvand hu the 4lmens1o- of 100 tett bJ UOO tett1 plu

300 teet a 600 Iaamp includina lllawancbull tor alcpa The botaa 11nar _

1a 200 r- b7 500 r- Sach poMl oball bo bull-liod in JJPIOXiloaolT

83 root victtb 250 teet lq Allrnata panel aisbull alao ba propcraquoad

it thbull v1U aana to alnbdsa the IUiber of f1al4 aUcbull ant bantliDampshy

In bulltibulltlDamp the v1dth ot tha irdhidual panala1 the aQWllar aball pnwida

tor allawancbull tor apllcbull betwaiD panala Maila on apUciq are d1acw1S

1D s2 llota abcut eooooo bullbullr or liner will be Utlllllt oa bull aicpa that

hu a) borisontal run 1rT 1 1 Yertical helamph incrae () ca 1)

middot0 Inat allatioo

S l General

lba PVC membrana v1ll be inatalled bJ t A JlL penonnal middotfbe auppliar

ahall aubcdt1 with h1a quotaticm a Mama1 or Me~~~brana

u

tnstallaUon Practicebull tncludtng u a 11fnf11U111 tCIIIpltte drawings

andor sketches and Httrature fndtcatfng the dhttnsfons of each

standarcS-s1zt section of Mtlllbrane type sbe end weight of shipping

container procdure for splicing connecting end anchoring iecbrane

to soil around ptpu and other appurtenances and re-ccxnnended

aethods of h1ndltng llttllbrane by field Personnel during tnelftbrane

fnste11atfon The supplier shall suppiy four-(4) tddfUonal copies

of the bullManual of Membnne lnsUllatton Pr~cUcebull ff bUdtd the

contract bull

52 Field SpllciM

Lap joints shall be used to seal adjacent lengths of factory hbrfctted

pftces of PVC together fn the fteld Joints shill overhp a bullfnf

of sb tnches ) The supplier shall prov1de i ufftc1ent solvent ct~~tnt or adhtlfyen1

to uke fut and tfffctent field splices at tellptratures ranging

rr zortoIOr 53 Tbullchnical An1stanct

The supp11tr shall usfgn a rtpresentatht to i_nspect tht supporting

I surface prior to installation of the ~~t~~brane The represenUthe

shall reufn at thl site to supervise the ~~e~~brane installation for

appro~t1utely one (ll worti ng day and shall be responsible for

tra1n1ng middot1middot 1 R~personnel for the bulle~~~brant installation operation

The supplier shall bur the upense of the rePresentathe for the

duration of the inspection period (one (1) vorking ctayfbull

0 bull

~ The cost to perfoiWI the work outlined in 10 through 40 1h11l bt

provided by the supplier IS pnt of the bid packlge The sttppl1er shall

supply the total cost middot ~ do the above wort u well as 1 cost breakdown

shoVfng unit cost of the PVC 11ner in dollars per square foot (Sft2)

u delivered to the site cost for adhesive 111tertals Ugbullllonl and amiddot

cost for techn1ul supervh1on (Sday) All costs middotu quoted shall hold

for 1 perfod of not hn than 60 days frca the date of quotaUon A

propo sd cost pi)llfnt schedul e shai 1 al so be requt sted by the suppl fer

)

  1. barcode 561515
  2. barcodetext SDMS Doc ID 561515
Page 3: SPECIFICATIONS FOR LANDFILL LINER · 2.0 Scope Tbt work includ• tbe auppl)o tn:! delive17 of an bpeme.able •embnnt tor the Uolation Or vute 111&\.er.ltl.l within a lardf'ill

(J

20 Scope

Tbt work includbull tbe auppl)o tn delive17 of an bpemeable bullembnnt

tor the Uolation Or vute 111amperltll within a lardfill Abo included

v1U bt technical usiltance and advice on installation ard bordinamp of

tha liner The liner U to be installecl overtop a prMOJIlt placed

ard ended acdl conr anl a aU portion vill be imtllled on rlrJIa

ampmmcS u a bottCII Uner All work on unloadinamp1 placinamp1 field aplicina

tnf otber ibulltallation relatecl itfllll will bt conucted b7 t A RR

peronnel

o Site Preparation

All aitt preparation woJ1c will bt pertontd b7 L A JtA penonltlbull

Hottnr tht tupplbr ahall awit1 tdtb h1a quotation nc~erdaUom

u tha the 11ral amprediDamp or tht 11nbhed lanU111 audac L 1 Blshy

penonnel ban auccbullafll1lJ1 in 19791 prnious~ ibulltllltd 2001000 sr

ot 20 ldl PfC llntr ard are tu1liar vlth ) 40 Liner SpeeU1ut1orw

tl o-ral

The bullbullnne to be aupplied thall bt thHtinamp aadt of QDJdntorcld

J)OlTdqrlchloride (nc) ud aball bt 20 IIlla 1a Wclcnct nc bullterlala

thall be -tacturtd rna dcabulltic ~rampfn ~IV~ chlo~dt swia aid

tpecU1callt c(lllpCWdS tor at in hJdmaUo tacU1t1bull in a ttandalll

llirdlll- width ot S4 incbbullbull lltiprocecl bullterlal bullbAll not be Uiecl

42 PhYsical RCNirtaerampe

The polyrlJl7l chloride bullmbrtne shall bullbullet the pvwical requii8Denta

lilted belCMI PJeue also pn an bulltibullte of anticipated lite vben liner 1a

in contact witb clbulln fbe bullbullrd1 and conred with 2 ot clean f1ne aard1

to prevent bullunliamphtbull Please pve an estimate ot life wbile exposed to

bullJ 0

PHYSICAL REOUJR[tfNTS

MtnfmUII lest Tnt Valued ~

Thickness bull11 20 SS ASTII 0-1593 SptcHfc Gravfv 123-130 - ASTII 0-712-A lfnsth Strength psi bullhi 2200 ASTII OBBZ-A Elongetfon lllin 3001 ASTM OBBZ-A 100~ Modulus psi 1000-1600 ASTM OBBZ-A pound1mendorf Tur gbulls1111 bulltn 160 ASTM 01912 Gr1ves Tur lbsfnbullfn 270 bull ASTM 01004 Weter tatnctfon bullbullmiddot 035 ASTM 01239 Volltilfty s 1000 Nx 075 ASTM 01203 lmp1ct Cold tr1ct F 20 ASTM 1790 Dhaenston1l Stability (It 100 C 15 bull1n1

~ NX change 5 Bonded Stbull Strength I of

Tensnt bullfn 80S ASTM DBBZshyP1 nholeslo sq yds bull none Rtshtenct to Bur-111 middot Par 14c (1) ptr

Tenstlt Strength lou I IIIX bull USBR procedure Elongation loss I bullbull

Color Black or_ J The supp11tr shall suttt with hh quotlt 1on tht

values end test aethods of h1 s proposal Nlllbrane bull

4 l Fabrication

The aellbran ahall ba ahop fabricated into atanani abed larampbull

aectiorw bullbull deecribed in 44 lldinto odd-abed piecbull u nqdred to middotmiddot auit the tacllit)- to adrdsaa_the llllber of fSeld 1pl1cbullbull shy

After tabrlcati~ tha sembrana aball be packed for eu7 ard smshybampndlinamp in tbe 11eld Shippina ccmtainen capab~l of prenntinamp daaampe

to thl content1 durlnc abipmeat ard 11el4 han111nc bullhall be prcwidcd b7 tha

aupplier The containan ahall be adequatelT bullrtted with piJItl llllllben

correepordinamp to t he panel la)wt dnodnamp prov14ad in aectica 1

44 SUo

lba tctal bull~ to b1 covered b7 the PVC 1-bnne vU1 b1 1 10601000

aquare teat ot llnbull aquare Jlrda pllll 100000 aquare feat tor bull bottaa

11nar1 Nkinc a total or 111601000 aquare teat or 1281889 aquan ~middotmiddot

The area to ba cgvand hu the 4lmens1o- of 100 tett bJ UOO tett1 plu

300 teet a 600 Iaamp includina lllawancbull tor alcpa The botaa 11nar _

1a 200 r- b7 500 r- Sach poMl oball bo bull-liod in JJPIOXiloaolT

83 root victtb 250 teet lq Allrnata panel aisbull alao ba propcraquoad

it thbull v1U aana to alnbdsa the IUiber of f1al4 aUcbull ant bantliDampshy

In bulltibulltlDamp the v1dth ot tha irdhidual panala1 the aQWllar aball pnwida

tor allawancbull tor apllcbull betwaiD panala Maila on apUciq are d1acw1S

1D s2 llota abcut eooooo bullbullr or liner will be Utlllllt oa bull aicpa that

hu a) borisontal run 1rT 1 1 Yertical helamph incrae () ca 1)

middot0 Inat allatioo

S l General

lba PVC membrana v1ll be inatalled bJ t A JlL penonnal middotfbe auppliar

ahall aubcdt1 with h1a quotaticm a Mama1 or Me~~~brana

u

tnstallaUon Practicebull tncludtng u a 11fnf11U111 tCIIIpltte drawings

andor sketches and Httrature fndtcatfng the dhttnsfons of each

standarcS-s1zt section of Mtlllbrane type sbe end weight of shipping

container procdure for splicing connecting end anchoring iecbrane

to soil around ptpu and other appurtenances and re-ccxnnended

aethods of h1ndltng llttllbrane by field Personnel during tnelftbrane

fnste11atfon The supplier shall suppiy four-(4) tddfUonal copies

of the bullManual of Membnne lnsUllatton Pr~cUcebull ff bUdtd the

contract bull

52 Field SpllciM

Lap joints shall be used to seal adjacent lengths of factory hbrfctted

pftces of PVC together fn the fteld Joints shill overhp a bullfnf

of sb tnches ) The supplier shall prov1de i ufftc1ent solvent ct~~tnt or adhtlfyen1

to uke fut and tfffctent field splices at tellptratures ranging

rr zortoIOr 53 Tbullchnical An1stanct

The supp11tr shall usfgn a rtpresentatht to i_nspect tht supporting

I surface prior to installation of the ~~t~~brane The represenUthe

shall reufn at thl site to supervise the ~~e~~brane installation for

appro~t1utely one (ll worti ng day and shall be responsible for

tra1n1ng middot1middot 1 R~personnel for the bulle~~~brant installation operation

The supplier shall bur the upense of the rePresentathe for the

duration of the inspection period (one (1) vorking ctayfbull

0 bull

~ The cost to perfoiWI the work outlined in 10 through 40 1h11l bt

provided by the supplier IS pnt of the bid packlge The sttppl1er shall

supply the total cost middot ~ do the above wort u well as 1 cost breakdown

shoVfng unit cost of the PVC 11ner in dollars per square foot (Sft2)

u delivered to the site cost for adhesive 111tertals Ugbullllonl and amiddot

cost for techn1ul supervh1on (Sday) All costs middotu quoted shall hold

for 1 perfod of not hn than 60 days frca the date of quotaUon A

propo sd cost pi)llfnt schedul e shai 1 al so be requt sted by the suppl fer

)

  1. barcode 561515
  2. barcodetext SDMS Doc ID 561515
Page 4: SPECIFICATIONS FOR LANDFILL LINER · 2.0 Scope Tbt work includ• tbe auppl)o tn:! delive17 of an bpeme.able •embnnt tor the Uolation Or vute 111&\.er.ltl.l within a lardf'ill

bullJ 0

PHYSICAL REOUJR[tfNTS

MtnfmUII lest Tnt Valued ~

Thickness bull11 20 SS ASTII 0-1593 SptcHfc Gravfv 123-130 - ASTII 0-712-A lfnsth Strength psi bullhi 2200 ASTII OBBZ-A Elongetfon lllin 3001 ASTM OBBZ-A 100~ Modulus psi 1000-1600 ASTM OBBZ-A pound1mendorf Tur gbulls1111 bulltn 160 ASTM 01912 Gr1ves Tur lbsfnbullfn 270 bull ASTM 01004 Weter tatnctfon bullbullmiddot 035 ASTM 01239 Volltilfty s 1000 Nx 075 ASTM 01203 lmp1ct Cold tr1ct F 20 ASTM 1790 Dhaenston1l Stability (It 100 C 15 bull1n1

~ NX change 5 Bonded Stbull Strength I of

Tensnt bullfn 80S ASTM DBBZshyP1 nholeslo sq yds bull none Rtshtenct to Bur-111 middot Par 14c (1) ptr

Tenstlt Strength lou I IIIX bull USBR procedure Elongation loss I bullbull

Color Black or_ J The supp11tr shall suttt with hh quotlt 1on tht

values end test aethods of h1 s proposal Nlllbrane bull

4 l Fabrication

The aellbran ahall ba ahop fabricated into atanani abed larampbull

aectiorw bullbull deecribed in 44 lldinto odd-abed piecbull u nqdred to middotmiddot auit the tacllit)- to adrdsaa_the llllber of fSeld 1pl1cbullbull shy

After tabrlcati~ tha sembrana aball be packed for eu7 ard smshybampndlinamp in tbe 11eld Shippina ccmtainen capab~l of prenntinamp daaampe

to thl content1 durlnc abipmeat ard 11el4 han111nc bullhall be prcwidcd b7 tha

aupplier The containan ahall be adequatelT bullrtted with piJItl llllllben

correepordinamp to t he panel la)wt dnodnamp prov14ad in aectica 1

44 SUo

lba tctal bull~ to b1 covered b7 the PVC 1-bnne vU1 b1 1 10601000

aquare teat ot llnbull aquare Jlrda pllll 100000 aquare feat tor bull bottaa

11nar1 Nkinc a total or 111601000 aquare teat or 1281889 aquan ~middotmiddot

The area to ba cgvand hu the 4lmens1o- of 100 tett bJ UOO tett1 plu

300 teet a 600 Iaamp includina lllawancbull tor alcpa The botaa 11nar _

1a 200 r- b7 500 r- Sach poMl oball bo bull-liod in JJPIOXiloaolT

83 root victtb 250 teet lq Allrnata panel aisbull alao ba propcraquoad

it thbull v1U aana to alnbdsa the IUiber of f1al4 aUcbull ant bantliDampshy

In bulltibulltlDamp the v1dth ot tha irdhidual panala1 the aQWllar aball pnwida

tor allawancbull tor apllcbull betwaiD panala Maila on apUciq are d1acw1S

1D s2 llota abcut eooooo bullbullr or liner will be Utlllllt oa bull aicpa that

hu a) borisontal run 1rT 1 1 Yertical helamph incrae () ca 1)

middot0 Inat allatioo

S l General

lba PVC membrana v1ll be inatalled bJ t A JlL penonnal middotfbe auppliar

ahall aubcdt1 with h1a quotaticm a Mama1 or Me~~~brana

u

tnstallaUon Practicebull tncludtng u a 11fnf11U111 tCIIIpltte drawings

andor sketches and Httrature fndtcatfng the dhttnsfons of each

standarcS-s1zt section of Mtlllbrane type sbe end weight of shipping

container procdure for splicing connecting end anchoring iecbrane

to soil around ptpu and other appurtenances and re-ccxnnended

aethods of h1ndltng llttllbrane by field Personnel during tnelftbrane

fnste11atfon The supplier shall suppiy four-(4) tddfUonal copies

of the bullManual of Membnne lnsUllatton Pr~cUcebull ff bUdtd the

contract bull

52 Field SpllciM

Lap joints shall be used to seal adjacent lengths of factory hbrfctted

pftces of PVC together fn the fteld Joints shill overhp a bullfnf

of sb tnches ) The supplier shall prov1de i ufftc1ent solvent ct~~tnt or adhtlfyen1

to uke fut and tfffctent field splices at tellptratures ranging

rr zortoIOr 53 Tbullchnical An1stanct

The supp11tr shall usfgn a rtpresentatht to i_nspect tht supporting

I surface prior to installation of the ~~t~~brane The represenUthe

shall reufn at thl site to supervise the ~~e~~brane installation for

appro~t1utely one (ll worti ng day and shall be responsible for

tra1n1ng middot1middot 1 R~personnel for the bulle~~~brant installation operation

The supplier shall bur the upense of the rePresentathe for the

duration of the inspection period (one (1) vorking ctayfbull

0 bull

~ The cost to perfoiWI the work outlined in 10 through 40 1h11l bt

provided by the supplier IS pnt of the bid packlge The sttppl1er shall

supply the total cost middot ~ do the above wort u well as 1 cost breakdown

shoVfng unit cost of the PVC 11ner in dollars per square foot (Sft2)

u delivered to the site cost for adhesive 111tertals Ugbullllonl and amiddot

cost for techn1ul supervh1on (Sday) All costs middotu quoted shall hold

for 1 perfod of not hn than 60 days frca the date of quotaUon A

propo sd cost pi)llfnt schedul e shai 1 al so be requt sted by the suppl fer

)

  1. barcode 561515
  2. barcodetext SDMS Doc ID 561515
Page 5: SPECIFICATIONS FOR LANDFILL LINER · 2.0 Scope Tbt work includ• tbe auppl)o tn:! delive17 of an bpeme.able •embnnt tor the Uolation Or vute 111&\.er.ltl.l within a lardf'ill

4 l Fabrication

The aellbran ahall ba ahop fabricated into atanani abed larampbull

aectiorw bullbull deecribed in 44 lldinto odd-abed piecbull u nqdred to middotmiddot auit the tacllit)- to adrdsaa_the llllber of fSeld 1pl1cbullbull shy

After tabrlcati~ tha sembrana aball be packed for eu7 ard smshybampndlinamp in tbe 11eld Shippina ccmtainen capab~l of prenntinamp daaampe

to thl content1 durlnc abipmeat ard 11el4 han111nc bullhall be prcwidcd b7 tha

aupplier The containan ahall be adequatelT bullrtted with piJItl llllllben

correepordinamp to t he panel la)wt dnodnamp prov14ad in aectica 1

44 SUo

lba tctal bull~ to b1 covered b7 the PVC 1-bnne vU1 b1 1 10601000

aquare teat ot llnbull aquare Jlrda pllll 100000 aquare feat tor bull bottaa

11nar1 Nkinc a total or 111601000 aquare teat or 1281889 aquan ~middotmiddot

The area to ba cgvand hu the 4lmens1o- of 100 tett bJ UOO tett1 plu

300 teet a 600 Iaamp includina lllawancbull tor alcpa The botaa 11nar _

1a 200 r- b7 500 r- Sach poMl oball bo bull-liod in JJPIOXiloaolT

83 root victtb 250 teet lq Allrnata panel aisbull alao ba propcraquoad

it thbull v1U aana to alnbdsa the IUiber of f1al4 aUcbull ant bantliDampshy

In bulltibulltlDamp the v1dth ot tha irdhidual panala1 the aQWllar aball pnwida

tor allawancbull tor apllcbull betwaiD panala Maila on apUciq are d1acw1S

1D s2 llota abcut eooooo bullbullr or liner will be Utlllllt oa bull aicpa that

hu a) borisontal run 1rT 1 1 Yertical helamph incrae () ca 1)

middot0 Inat allatioo

S l General

lba PVC membrana v1ll be inatalled bJ t A JlL penonnal middotfbe auppliar

ahall aubcdt1 with h1a quotaticm a Mama1 or Me~~~brana

u

tnstallaUon Practicebull tncludtng u a 11fnf11U111 tCIIIpltte drawings

andor sketches and Httrature fndtcatfng the dhttnsfons of each

standarcS-s1zt section of Mtlllbrane type sbe end weight of shipping

container procdure for splicing connecting end anchoring iecbrane

to soil around ptpu and other appurtenances and re-ccxnnended

aethods of h1ndltng llttllbrane by field Personnel during tnelftbrane

fnste11atfon The supplier shall suppiy four-(4) tddfUonal copies

of the bullManual of Membnne lnsUllatton Pr~cUcebull ff bUdtd the

contract bull

52 Field SpllciM

Lap joints shall be used to seal adjacent lengths of factory hbrfctted

pftces of PVC together fn the fteld Joints shill overhp a bullfnf

of sb tnches ) The supplier shall prov1de i ufftc1ent solvent ct~~tnt or adhtlfyen1

to uke fut and tfffctent field splices at tellptratures ranging

rr zortoIOr 53 Tbullchnical An1stanct

The supp11tr shall usfgn a rtpresentatht to i_nspect tht supporting

I surface prior to installation of the ~~t~~brane The represenUthe

shall reufn at thl site to supervise the ~~e~~brane installation for

appro~t1utely one (ll worti ng day and shall be responsible for

tra1n1ng middot1middot 1 R~personnel for the bulle~~~brant installation operation

The supplier shall bur the upense of the rePresentathe for the

duration of the inspection period (one (1) vorking ctayfbull

0 bull

~ The cost to perfoiWI the work outlined in 10 through 40 1h11l bt

provided by the supplier IS pnt of the bid packlge The sttppl1er shall

supply the total cost middot ~ do the above wort u well as 1 cost breakdown

shoVfng unit cost of the PVC 11ner in dollars per square foot (Sft2)

u delivered to the site cost for adhesive 111tertals Ugbullllonl and amiddot

cost for techn1ul supervh1on (Sday) All costs middotu quoted shall hold

for 1 perfod of not hn than 60 days frca the date of quotaUon A

propo sd cost pi)llfnt schedul e shai 1 al so be requt sted by the suppl fer

)

  1. barcode 561515
  2. barcodetext SDMS Doc ID 561515
Page 6: SPECIFICATIONS FOR LANDFILL LINER · 2.0 Scope Tbt work includ• tbe auppl)o tn:! delive17 of an bpeme.able •embnnt tor the Uolation Or vute 111&\.er.ltl.l within a lardf'ill

u

tnstallaUon Practicebull tncludtng u a 11fnf11U111 tCIIIpltte drawings

andor sketches and Httrature fndtcatfng the dhttnsfons of each

standarcS-s1zt section of Mtlllbrane type sbe end weight of shipping

container procdure for splicing connecting end anchoring iecbrane

to soil around ptpu and other appurtenances and re-ccxnnended

aethods of h1ndltng llttllbrane by field Personnel during tnelftbrane

fnste11atfon The supplier shall suppiy four-(4) tddfUonal copies

of the bullManual of Membnne lnsUllatton Pr~cUcebull ff bUdtd the

contract bull

52 Field SpllciM

Lap joints shall be used to seal adjacent lengths of factory hbrfctted

pftces of PVC together fn the fteld Joints shill overhp a bullfnf

of sb tnches ) The supplier shall prov1de i ufftc1ent solvent ct~~tnt or adhtlfyen1

to uke fut and tfffctent field splices at tellptratures ranging

rr zortoIOr 53 Tbullchnical An1stanct

The supp11tr shall usfgn a rtpresentatht to i_nspect tht supporting

I surface prior to installation of the ~~t~~brane The represenUthe

shall reufn at thl site to supervise the ~~e~~brane installation for

appro~t1utely one (ll worti ng day and shall be responsible for

tra1n1ng middot1middot 1 R~personnel for the bulle~~~brant installation operation

The supplier shall bur the upense of the rePresentathe for the

duration of the inspection period (one (1) vorking ctayfbull

0 bull

~ The cost to perfoiWI the work outlined in 10 through 40 1h11l bt

provided by the supplier IS pnt of the bid packlge The sttppl1er shall

supply the total cost middot ~ do the above wort u well as 1 cost breakdown

shoVfng unit cost of the PVC 11ner in dollars per square foot (Sft2)

u delivered to the site cost for adhesive 111tertals Ugbullllonl and amiddot

cost for techn1ul supervh1on (Sday) All costs middotu quoted shall hold

for 1 perfod of not hn than 60 days frca the date of quotaUon A

propo sd cost pi)llfnt schedul e shai 1 al so be requt sted by the suppl fer

)

  1. barcode 561515
  2. barcodetext SDMS Doc ID 561515
Page 7: SPECIFICATIONS FOR LANDFILL LINER · 2.0 Scope Tbt work includ• tbe auppl)o tn:! delive17 of an bpeme.able •embnnt tor the Uolation Or vute 111&\.er.ltl.l within a lardf'ill

0 bull

~ The cost to perfoiWI the work outlined in 10 through 40 1h11l bt

provided by the supplier IS pnt of the bid packlge The sttppl1er shall

supply the total cost middot ~ do the above wort u well as 1 cost breakdown

shoVfng unit cost of the PVC 11ner in dollars per square foot (Sft2)

u delivered to the site cost for adhesive 111tertals Ugbullllonl and amiddot

cost for techn1ul supervh1on (Sday) All costs middotu quoted shall hold

for 1 perfod of not hn than 60 days frca the date of quotaUon A

propo sd cost pi)llfnt schedul e shai 1 al so be requt sted by the suppl fer

)

  1. barcode 561515
  2. barcodetext SDMS Doc ID 561515