13
SPE Workshop : Well Abandonment featuring Rig Reactivation and Alternatives 27 28 June 2017 Aberdeen , UK SOCIETY OF PETROLEUM ENGINEERS

SPE Workshop : Well Abandonment featuring Rig Reactivation ... · PDF fileSPE Workshop : Well Abandonment featuring Rig Reactivation and Alternatives 27 –28 June 2017 Aberdeen ,

  • Upload
    hanga

  • View
    220

  • Download
    3

Embed Size (px)

Citation preview

Page 1: SPE Workshop : Well Abandonment featuring Rig Reactivation ... · PDF fileSPE Workshop : Well Abandonment featuring Rig Reactivation and Alternatives 27 –28 June 2017 Aberdeen ,

SPE Workshop : Well Abandonment featuring Rig

Reactivation and Alternatives27 – 28 June 2017 ● Aberdeen , UK

SOCIETY OF PETROLEUM ENGINEERS

Page 2: SPE Workshop : Well Abandonment featuring Rig Reactivation ... · PDF fileSPE Workshop : Well Abandonment featuring Rig Reactivation and Alternatives 27 –28 June 2017 Aberdeen ,

Integrated Well Abandonment Solutions – Case Study

and Transferring the Learnings From Asia

Jamie Stewart (Schlumberger – Kuala Lumpur)

Page 3: SPE Workshop : Well Abandonment featuring Rig Reactivation ... · PDF fileSPE Workshop : Well Abandonment featuring Rig Reactivation and Alternatives 27 –28 June 2017 Aberdeen ,

Objective

Share the integration experience in the on-going land P&A campaign executed in Bruneisince December 2014 supported by a 3 pillar arrangement:

• Brunei Shell Petroleum – Operator, owner of the wells and assets

• Schlumberger - Integrated services provider.

• Brunei local rig contractor (HWU).

Service integration through the Execution stage of P&A.

1. Candidate identification & regulatory approval (BSP)

2. Abandonment Maturation (BSP)

3. Abandonment execution (subsurface) (BSP/SLB/HWU)

4. Monitoring & Wellhead Decommissioning (BSP)

DateSPE Workshop : Well Abandonment featuring Rig Reactivation and

Alternatives27 – 28 June 2017 ● Aberdeen , UK

3

Operator

BSP

Rig Contractor

P&A Project

IPS

Schlumberger

Page 4: SPE Workshop : Well Abandonment featuring Rig Reactivation ... · PDF fileSPE Workshop : Well Abandonment featuring Rig Reactivation and Alternatives 27 –28 June 2017 Aberdeen ,

Introduction – BSP Onshore P&A

Mature Land Asset > 85 Years

Wells around Seria town – Western

Brunei

Campaign Approach for onshore well

abandonment

30+ abandonments per year

Date 4SPE Workshop : Well Abandonment featuring Rig Reactivation and

Alternatives27 – 28 June 2017 ● Aberdeen , UK

Page 5: SPE Workshop : Well Abandonment featuring Rig Reactivation ... · PDF fileSPE Workshop : Well Abandonment featuring Rig Reactivation and Alternatives 27 –28 June 2017 Aberdeen ,

The Workflow

Date 5

Candidate Selection

(Internal review)

Regulatory Approval

Abandonment Maturation

Monitoring Wellhead Pressure

(6 months)

Abandonment Execution

(Subsurface)

Wellhead Abandonment

and Site Restoration

SPE Workshop : Well Abandonment featuring Rig Reactivation and Alternatives

27 – 28 June 2017 ● Aberdeen , UK

Page 6: SPE Workshop : Well Abandonment featuring Rig Reactivation ... · PDF fileSPE Workshop : Well Abandonment featuring Rig Reactivation and Alternatives 27 –28 June 2017 Aberdeen ,

Date 6

Technical/Non-Technical Challenges

Rig Moves & Noise levels within

Populated/Residential Areas

Illumination at Night of the Work Site

Well Control Risk – Small but has Potential

Potential H2S & CO2 Risk – Low

WELL

Mitigations

Continuous Review and optimization of

operations

Learning Curve (repetitive jobs)

Single barrier risk based operations

Core Crew continuity

Timely Community engagement

Improved Logistics planning and executionSPE Workshop : Well Abandonment featuring Rig Reactivation and

Alternatives27 – 28 June 2017 ● Aberdeen , UK

Page 7: SPE Workshop : Well Abandonment featuring Rig Reactivation ... · PDF fileSPE Workshop : Well Abandonment featuring Rig Reactivation and Alternatives 27 –28 June 2017 Aberdeen ,

Wellsites

Page 8: SPE Workshop : Well Abandonment featuring Rig Reactivation ... · PDF fileSPE Workshop : Well Abandonment featuring Rig Reactivation and Alternatives 27 –28 June 2017 Aberdeen ,

Service Integration inAabandonment Execution (Downhole)

Date 8

Schlumberger

Fishing & Remedial

UNDER REAMING

STAND BY FISHING TOOLS

TUBING SPEARS

CASING SCRAPERS

CASING CUTTERS

CASING SPEARS

SECTION MILLS

Schlumberger

MI SWACO

HEAVY MUD

WELL KILL CHEMICALS

BRINE CHEMICALS

Schlumberger

Wireline / DSL

LOG 10 ¾” CASING

SET BRIDGE PLUGS

LOG 7” CASING

TUBING CUT / PUNCH

SET & PULL 2WCV / BPV

Schlumberger

Well Services

PUMPING

CEMENTING

Schlumberger Managed

Third Party

SLICK PLUG RUN & PULL

FLUIDS DISPOSAL

BRIDGE PLUGS

Integrated Approach

Model to Improve Performance & reduce Costs

Crew Continuity Initiative

Alignment of project goals

Risk allocation and management

Optimized personnel interface

Integrated Production ServicesSEGMENT

COORDINATION SINGLE INVOICE

DRILLPIPE / COLLARS

CASING & TUBING HANDLING

WELL CONTROL

MUD SYSTEM

WELL SITE PREPARATION

Client Rig Contractor

Learning & Continuous Improvement

Offer Increased Local Employment

Opportunities

Performance Driven

Minimize footprint

Joint planning

24 Hrs Execution

SPE Workshop : Well Abandonment featuring Rig Reactivation and Alternatives

27 – 28 June 2017 ● Aberdeen , UK

Page 9: SPE Workshop : Well Abandonment featuring Rig Reactivation ... · PDF fileSPE Workshop : Well Abandonment featuring Rig Reactivation and Alternatives 27 –28 June 2017 Aberdeen ,

Date 9

Abandonment Execution

P&A Start Well Handover

BSP

OPERATIONS SUPERVISION (WSS)

PROGRAM EXECUTION (WE)

ABA PROGRAM EOWRMOC

WAP

Land Well P&A Lifecycle

RIG

SITE PREPARATION

RIG MOVE RIG UP RIG DOWN

ABANDONMENT EXECUTION

HEAVY MUD

WELL KILL CHEMICALS

BRINE CHEMICALS

MISWACO

INTEGRATED SERVICE PROJECT MANAGEMENT

SINGLE INVOICESLICK PLUG TPS

WASTE DISPOSAL

BRIDGE PLUGS BRIDGE PLUGS

IPS

SET BRIDGE PLUGS

SET & PULL SLICK PLUG

SET BRIDGE PLUGS

LOG SURF. CASING

LOG PROD CASING

TUBING CUT / PUNCH

WIRELINE

UNDER REAMINGSTAND BY FISHING TOOLS

TUBING SPEAR

CASING SCRAPERS

CASING CUTTERS

CASING SPEARS

SECTION MILLS

PUMPING

SURFACE CEMENTING

CASING SCRAPERS

CEMENTING

CASING CUTTERS

CASING SPEARS

CONTIGENCY

DT&R

WCS

SPE Workshop : Well Abandonment featuring Rig Reactivation and Alternatives

27 – 28 June 2017 ● Aberdeen , UK

Page 10: SPE Workshop : Well Abandonment featuring Rig Reactivation ... · PDF fileSPE Workshop : Well Abandonment featuring Rig Reactivation and Alternatives 27 –28 June 2017 Aberdeen ,

Date 10

Performance Results

Initial Pilot project started in January 2015 covered 10 Wells

Project performance exceeded all KPI’s, lead to larger scope. Q1 - 2015 onwards to Q1 2017

Maximized learning curve

Cost effective solution to minimize operator liabilities

Project Resume – Q1 - 2017 63 wells abandoned 2 commercial models succeed All wells within 3 km from Seria Total Operational time: 648 Days Operational KPI achieved:

No HSE Incidents No Call-off delays Zero NPT for Rig Up/Down

equipment Total SLB NPT < 0.81%

SPE Workshop : Well Abandonment featuring Rig Reactivation and Alternatives

27 – 28 June 2017 ● Aberdeen , UK

Page 11: SPE Workshop : Well Abandonment featuring Rig Reactivation ... · PDF fileSPE Workshop : Well Abandonment featuring Rig Reactivation and Alternatives 27 –28 June 2017 Aberdeen ,

Date 11

Performance Results

*Cost info confidential, showing % comparison

Client Main Improvement Triggers: BSP removal of unnecessary operations Repetitive jobs (LC) Single barrier risk based operations Scope reduction SLB integrated contract Rig fit for purpose

SPE Workshop : Well Abandonment featuring Rig Reactivation and Alternatives

27 – 28 June 2017 ● Aberdeen , UK

Page 12: SPE Workshop : Well Abandonment featuring Rig Reactivation ... · PDF fileSPE Workshop : Well Abandonment featuring Rig Reactivation and Alternatives 27 –28 June 2017 Aberdeen ,

Date 12

Summary & Conclusion

The Benefits of Integrating Services

Single Point of Contact for Client

Core Crew – Enhancing Job Familiarity

Distinctive Reduction in NPT

Increased Service Quality

Faster learning curve

Contractual and technical continuity

Challenge after optimization

Bottleneck displaced to maturation & regulatory

approval

Increase on abandonment complexity

Opportunity for new technology trials

Open to different business models

SPE Workshop : Well Abandonment featuring Rig Reactivation and Alternatives

27 – 28 June 2017 ● Aberdeen , UK

Page 13: SPE Workshop : Well Abandonment featuring Rig Reactivation ... · PDF fileSPE Workshop : Well Abandonment featuring Rig Reactivation and Alternatives 27 –28 June 2017 Aberdeen ,

Questions & Answers

Thank you