SPAIN 2013

  • Upload
    primo

  • View
    20

  • Download
    1

Embed Size (px)

DESCRIPTION

SPAIN 2013. Mineral Exploración Network. Why Spain ?. Prospective geological situation Landscape conditions allow quick prospecting Excellent infrastructure Possibility to work during winter and use MEN Finland human and technical resources all year around. Project Extremadura. - PowerPoint PPT Presentation

Citation preview

  • SPAIN 2013 Mineral Exploracin Network

  • Why Spain?Prospective geological situationLandscape conditions allow quick prospectingExcellent infrastructurePossibility to work during winter and use MEN Finland human and technical resources all year around

  • Project Extremadura Area of interest is located on the intersection of NW striking regional thrust zone and corridor of faults of SW orientation.

  • Pro Mining GovernmentQuick and transparent licence application processEasy available geological informationProject Extremadura

  • Long mining history starting from prehistoric time till the middle of 20th centauryAugustobriga - Talavera la ViejaProject Extremadura

  • Augustobriga - Talavera la ViejaProject ExtremaduraProject licenses123451 Trojillo Logrosan, prospecting license, 945 sq. km.2 Maria exploration license, 78 sq. km.3 Antonio exploration license, 85 sq. km.License Applications:4 Berzocana exploration license, 84 sq. km.5 St. Cristobal exploration license, 63,7 sq. km.Total: 1.255,7 sq.km.

  • Project area is located in inner zone of multistage volcanogenic ring complex active from pre Cambrian till Tertiary period

    Radiometric survey -PotassiumMagnetic survey vertical componentProject Extremadura

  • Project ExtremaduraExploration model

  • Historical mines:

    "El Aguijn. Operational 1850-1950. Zn, Pb, Ag, Au"La Favorita": Cu, Py, P "El Aguijoncillo": Mining stopped in 1904. Sb, Cu, Au."El Piojo": Mining stopped in 1876. Zn, Pb."El Serranillo": Mining stopped in 1970. As, Sn, Mo. La Costanaza: Operational in 1907-1946. Phosphorous.

    6Project Extremadura

  • By 30th of November following work was done:

    Stream sediments sampling- 3014 samples Soil sampling - 17053 samples Magnetic survey - 680 line km Pan concentrates - 69 samples

    MEN Finland had started full scale prospecting in September 2013Project Extremadura

  • Project Extremadura1 mm1 mm1 mm1 mm1 mm1 mm1 mm1 mm

  • Results of soil sampling and ground magnetic survey,Logrosan area.Detailed areaProject Extremadura

  • ABABProject Extremadura

  • Project ExtremaduraOur plansMinimumMaximumFinalize stream sediment sampling on existing licensesCarry out magnetic survey and soil sampling on selected targetsLimited trenching

    Minimum +

    Expand ground holdingIntensive trenchingVerification drillingResource drilling Spring 20142014 - 1 M Euro 25% of the project

    2015 - 2 M Euro 25% of the projectBy own financial resourcesWith JV partner investment

    **