Page 1: SpaceInn  WP3-Meeting-1  21-22/10/13 Observatoire de Paris

SpaceInn WP3-Meeting-1 21-22/10/13 Observatoire de Paris

E. Michel/ SPACEINN-WP3-meeting-1 21-22/10/2013 Observatoire de Paris

Page 2: SpaceInn  WP3-Meeting-1  21-22/10/13 Observatoire de Paris

WP3-meeting-1 Introduction

✓ Improve visibility, access and use for the (space/ ground based) seismic (astero/helio) data sources and to the ‘complementary’ data sources.

✓ Within a growing asteroseismic community and beyond, toward other scientific communities (stellar, galactic, planetary,…) and public.

• SPACEINN main line objective particularly relevant for WP3:

E. Michel/ SPACEINN-WP3-meeting-1 21-22/10/2013 Observatoire de Paris

Page 3: SpaceInn  WP3-Meeting-1  21-22/10/13 Observatoire de Paris

WP3-meeting-1 Introduction

• SPACEINN/WP3 objective:

✓ develop/upgrade several seismic data sources within WP3: WP3-2) Seismic indexes Data Base (OBSPARIS); WP3-3) CoRoT Ground-based complementary archive (INAF); WP3-4) KASOC (AU); WP3-5) HMI-SDO Data Handling and Distribution (MPG); specific case of GRID models will be investigated (CSIC and CAUP)

✓ In a dedicated well identified place (Portal ‘The Seismic Plus’), coordinated and documented access to the large variety of data sources available WP3-1) Coordinated data access and handling tools (OBSPARIS)

E. Michel/ SPACEINN-WP3-meeting-1 21-22/10/2013 Observatoire de Paris

Page 4: SpaceInn  WP3-Meeting-1  21-22/10/13 Observatoire de Paris

WP3-meeting-1 Introduction

• SPACEINN/WP3 manpower involved at Observatoire de Paris:

PI: Eric Michel Project manager WP3: Christian Renié VO expertise WP3: OVPARIS/Pierre Le Sidaner

The Seismic Plus: PI: Eric Michel (Kevin Belkacem) Project manager: Christian Renié Portal development: Mahfoudh Abed (CDD SpaceInn)

SSI (Stellar Seismic Indices) data base: PI: Reza Samadi Project manager: Christian Renié SSI development: Mahfoudh Abed (CDD SpaceInn) SSI Pipeline algo: Raphael Peralta (PhD Paris/Porto, SpaceInn)

E. Michel/ SPACEINN-WP3-meeting-1 21-22/10/2013 Observatoire de Paris

Page 5: SpaceInn  WP3-Meeting-1  21-22/10/13 Observatoire de Paris

WP3-meeting-1 Introduction

• SPACEINN/WP3-meeting-1 objective:

✓ WP3-1/Part1: The various WP3 contributions: Presentation of the Portal and data sources to be developed/upgraded within WP3 (Objective/content/planning/needs…)

✓ WP3-1/Part2: Coordination scheme: coordination between the various data sources and the asteroseismic portal The Seismic Plus. - Coordination within the project and outside the project (VO, Astroinformatics,...) - coordination on technical options.

E. Michel/ SPACEINN-WP3-meeting-1 21-22/10/2013 Observatoire de Paris

Page 6: SpaceInn  WP3-Meeting-1  21-22/10/13 Observatoire de Paris

WP3-meeting-1 Introduction

• SPACEINN/WP3-meeting-1 objective:

✓ WP3-1/Part3: planning practical aspects: Expertise, man power available/missing at the various participants Institutes.- checking the planning for objectives and deliverables

E. Michel/ SPACEINN-WP3-meeting-1 21-22/10/2013 Observatoire de Paris