7
Space and Naval Warfare Systems Center Norfolk Project Status Reporting Presentation Template v1.0 Brief on Jump Start Status for Navy – RSupply 10 April 08

Space and Naval Warfare Systems Center Norfolk Project Status Reporting Presentation Template v1.0 Brief on Jump Start Status for Navy – RSupply 10 April

Embed Size (px)

Citation preview

Page 1: Space and Naval Warfare Systems Center Norfolk Project Status Reporting Presentation Template v1.0 Brief on Jump Start Status for Navy – RSupply 10 April

Space and Naval Warfare Systems Center Norfolk

Project Status Reporting Presentation Template v1.0

Brief on Jump Start Status

for

Navy – RSupply

10 April 08

Page 2: Space and Naval Warfare Systems Center Norfolk Project Status Reporting Presentation Template v1.0 Brief on Jump Start Status for Navy – RSupply 10 April

Space and Naval Warfare Systems Center Norfolk

• Functions– Inventory maintenance

– Onboard allowance maintenance

– Material procurement

– Receipt, custody, stowage, and issue

– Financials (NWCF, End-Use)

• Afloat and Ashore– Ships and Subs (all ship types;

except MCM’s, MHC’s)– NAS, MALS– NSWC Dahlgren (ASP site)– Schools, TYCOMs

• Customers– Sites 400– Users 150,000+

• Supply Officers• SK, Repair Parts Petty Officers• Department Heads, Division

Officers• Marines (MOS 6672)• Civilians and Contractors

Point of Contacts:RSupply Supervisor – Lou Borden, 757-443-0332, [email protected] Leader – Susan Bess, 757-443-0331, [email protected] Lead – Joseph Melendez, 757-0341, [email protected]

Point of Contacts:RSupply Supervisor – Lou Borden, 757-443-0332, [email protected] Leader – Susan Bess, 757-443-0331, [email protected] Lead – Joseph Melendez, 757-0341, [email protected]

Relational Supply (RSupply)

Page 3: Space and Naval Warfare Systems Center Norfolk Project Status Reporting Presentation Template v1.0 Brief on Jump Start Status for Navy – RSupply 10 April

Space and Naval Warfare Systems Center Norfolk

Background:• MILS transaction sets are expected to be migrated to DLMS in

accordance with DoD Directive 8180.1 “DoD Logistics Use of Electronic Data Interchange (EDI) Standards”, as supplemented by USD (AT&L) memorandum dated 22 December 2003 (Migration to the Defense Logistics Standards).

Objectives:• Migration of MILS DOC-ID AS and AU to DLMS 856S.• Accept, Process, and Output XML data from/to DAASC via SALTS.

Transactions being Migrated

Page 4: Space and Naval Warfare Systems Center Norfolk Project Status Reporting Presentation Template v1.0 Brief on Jump Start Status for Navy – RSupply 10 April

Space and Naval Warfare Systems Center Norfolk

Transaction Flow Diagram

Transaction Volume includes all MILS Transactions

Force Unit• 926K 284K• sites 63 190Total: 58M 54M

Transaction Volume includes all MILS Transactions

Force Unit• 926K 284K• sites 63 190Total: 58M 54M

DAAS Server(Windows platform loaded with

WRQ Reflection SSH)or

(UNIX platform loaded with SSH Tectia)

Transfer Incoming Status Data Files

(Download initiated by RSupply using SFTP w/ SSH – Port 22)

Transfer Outgoing Status Data Files

(Upload initiated by RSupply using SFTP w/ SSH – Port 22)

RSupply Server(UNIX platform loaded with

SSH Tectia)

Status Release ProcessRSupplyDatabase

Outgoing Data Files

Incoming Data Files

Batch Update RSupply database with data

Retrieve data from database

Incoming RSupply Status Process

Status ProcessingReferrals/LOGREP Processing

Suspense Processing

Query Update

Trading PartnersNAVICP Army/Air ForceDLA DFESCGSADAASC

Trading PartnersNAVICP Army/Air ForceDLA DFESCGSADAASC

OMMSNGNALCOMIS

Shipment Status Shipment Status

Page 5: Space and Naval Warfare Systems Center Norfolk Project Status Reporting Presentation Template v1.0 Brief on Jump Start Status for Navy – RSupply 10 April

Space and Naval Warfare Systems Center Norfolk

Current Status – 86% Complete

Page 6: Space and Naval Warfare Systems Center Norfolk Project Status Reporting Presentation Template v1.0 Brief on Jump Start Status for Navy – RSupply 10 April

Space and Naval Warfare Systems Center Norfolk

Implementation into Production

This is being worked by SSCN and PMW150 and has yet to be determined.

Page 7: Space and Naval Warfare Systems Center Norfolk Project Status Reporting Presentation Template v1.0 Brief on Jump Start Status for Navy – RSupply 10 April

Space and Naval Warfare Systems Center Norfolk

Lessons Learned

Our process is to conduct a Project Retrospective (includes lessons learned) after the Release Readiness Review (RRR) which is scheduled for 30 Apr 08. The results of the Project Retrospective will be forwarded after that meeting has been conducted.