Week 52: SP1
What Where X-Start X-Finish
18-SB-001
(Switchboard)
Complete installation of
Internal/external lights cablesElmo 27-Dec 29-Dec
Await unistrut covers & Termination at
the DB side.
CivilContinue cable rack installation on the
Culvert Elmo 27-Dec 29-Dec
WW cannot install cable rack beyond
roadcrossing .Switchboard ETA - 7thJanuary 2013
CIL PIPERACK
D2Cable Ladder
Continue with rack after Goldroom
towards Cil SwitchroomStuart 27-Dec 29-Dec
Prepare Tx & MCC Gland Plates Elmo 27-Dec 29-Dec
Install 4x3x630mmx1C from Transformer
to MCCAndy 27-Dec 28-Dec
Terminate the 4x3 x 630mm x 1C Andy 27-Dec 28-Dec
Internal ups DB & Control Panel: Fab &
Install Supports for and CPElmo 27-Dec 28-Dec
Walls have a single coat. Confirm if
ready.
Event PondContinue cable rack installation towards
the Event PondsStuart 27-Dec 29-Dec Partial Access
CCD1 & CCD2Resume cable rack installation towards
CCD1 and CCD2 Thickeners
Stuart 27-Dec 29-Dec Partial access available.
Qa/QcTorque Switchgear, Inspection, Punch
Items & Qc PacksMarion 27-Dec 29-Dec On-going
12-MC-001 (MCC)Start Internal Cabling (Marshalling/PLC)
and to L&SP DBAndy 27-Dec 29-Dec
Install SUBSTATION MAIN EARTH BAR 12-
EB-002 (120mm x 1C Cu PVC Gn/Y
0.6/1kV)
Andy 27-Dec 29-Dec Earth/bus-bar not on site
Inspect MCC & Transformer Installations,
Torque the Bus-barMarion 27-Dec 27-Dec
13-MC-001 [MCC]Start Internal Cabling (Marshalling/PLC)
and to L&SP DBAndy 27-Dec 29-Dec
13-TX-001
[Transformer]
Install SUBSTATION MAIN EARTH BAR 13-
EB-001 (120mm x 1C Cu PVC Gn/Y
0.6/1kV)
Phineas 27-Dec 29-Dec Earth/bus-bar not on site
Qa/QcInspect MCC & Transformer Installations,
Torque the Bus-barMarion 27-Dec 29-Dec
Continue Installatio n of Unistrut & Lights Elmo 27-Dec 29-Dec Whenever access is avilable
Install cables for light circuits for Megg44
lights in MillingElmo 27-Dec 29-Dec Lights mounted. Require cabling.
Continue with cable racks on ground
floorElmo 27-Dec 29-Dec Wherever/Wh enever access is avilable
Install cables for light circuits for Megg44
lights in MillingElmo 27-Dec 29-Dec Lights mounted. Require cabling.
Continue with cable racks on ground
floorElmo 27-Dec 29-Dec Wherever/Wh enever access is avilable
Inspect Lights, Unistrut, ladder, MCC &
TransformerMarion 27-Dec 29-Dec
Ground floor under the Mill Area and
inside Rooms
Prepare Punch Items & QC Packs Marion 27-Dec 29-Dec
Continue with Fabrication and
Installation of Supports and Megg44
Lights and 150mm cable rack
Elmo 27-Dec 29-Dec
Fabricate Support brackets to Motors Elmo 27-Dec 29-Dec
CILPipe
Racks(D2&
D5)
D5 Piperacks: Complete Scaffolding &
start Racking from Cooling Towers to the
CIL Switchroom section
Stuart 27-Dec 29-Dec Arrange for scaffold
QaQcQa /Qc Inspection of Installation of
Equipment & CablesMarion 27-Dec 29-Dec
Continue pulling cables to Water / Air
Services, Cooling Towers & Fire Water
Pumps
Sadou
/Leo/Dan27-Dec 29-Dec on-going. Started on Sat 1 Dec
Complete Termination of External lights
including Transformer BaysStuart 27-Dec 29-Dec Transformer Bays Lights outstanding
11KV
SWITCHBOARD
Switchgear[13-
MC-101]
CCD
Main Plant 1 Week LookAhead [27 Dec - 29 Dec 2012]
AREA
Description Whom
When
Remarks/Constraint
SAGMillArea
BALLMill
Area
Qa/Qc
12-TX-002
(Transformer)
MILLING
Pre-Leach
Flocculant
Area
Pre-LeachTank
18-M
C-001/
Water&Air
Services
VICESSWITCHROOM
7/28/2019 SP1 One Week Lookahead 27th Dec-29thDec
2/2
Complete D5 Piperacks from Cooling
Towers/Pebble Crusher MCC to CIL
Switchroom
Stuart 27-Dec 29-Dec Scaffold shortage.
Start pulling supply & control cables for
2xMotors, 6xBlower Fan Motors
Sadou
/Leo/Dan27-Dec 29-Dec
Install GPOs Samson Leo 27-Dec 29-Dec GPOs not on site
17-MC-001 Install Welding Socket Outlet Samson Leo 27-Dec 29-Dec Not on-site
Install Stop/Starts Elmo / Leo 27-Dec 29-Dec Not on-site
Install Pumps: 18-PP-035; 18-PP-036; 18-
PP-037Lyco/Others 27-Dec 29-Dec
Not on-site. Supply & Control cables
are in position.
Terminate the Pump Motors Samson Leo 27-Dec 29-Dec Await pump installation.
Complete Instrumentation cables
reticulation27-Dec 29-Dec
Top of Tank inaccessible. Await access
from Mechanical/Lyco
Install Sump Pump Motor 17-PP-007 Lyco/Others 27-Dec 29-Dec Not onsite
Gland & Terminate cables for :- 17-PP-
006 & 007Samson leo 27-Dec 29-Dec
Can only terminate 17-PP-007 after its
installation. Done at MCC side
Install Sump Pump Motor 17-PP-018 Lyco/Others 27-Dec 29-DecMotor not installed. Cable is in
position.
Terminate 17PP018-P1 and Control
Cables Samson Leo 27-Dec 29-Dec
Await pump installation. Cable is in
position. Terminated MCC side
Terminate Control cables (X3 Nos):
17PP014-C1; 17PP015-C1; 17PP016-C1Samson Leo 27-Dec 29-Dec
IJB not on site. Done at the MCC side.
Cable is on position
Install Stop Start, Terminate Control
cables (17PP019-C1)
Stuart /
Samson Leo27-Dec 29-Dec
Not on site. Cables pulled and near
position.
Install GPOs (x2 Nos) 17DB001-01 AND
17DB001-02Samson Leo 27-Dec 29-Dec GPOs not on si te. Cables on posit ion.
Fabricate cable dropper for sump pump
motors (x2 supply cables)Stuart 27-Dec 29-Dec
Continue Terminations of Lights
(Internal/External Lighting)Samson Leo 27-Dec 29-Dec
Start structural earthing & Finials Samson Leo 27-Dec 29-Dec
QaQc Inspections & Punch Items Marion 27-Dec 29-Dec
ShiftChangeBuilding
24FO010-F1: Splice Fibre in FOBOT 24-FO
010Rashid 27-Dec 29-Dec
Spliced at Shift Change Building. To Do
Admin Building side.
MSA
Workshop/Wareho
24FO031-F1: Splice Fibre in FOBOT 24-FO
003Rashid 27-Dec 29-Dec
Spliced at Shift Change Building. To Do
Admin Building side.
18FO032-F1: Splice cable Rashid 27-Dec 29-Dec
Main SecurityInstall FOBOT [18-FO-025] & Splice Fibre
Optic Cables 18FO025-F1, 18FO025-F2Rashid 27-Dec 29-Dec
Lookout for Access, Will resume when
roof is completed by others
Plant Main Control
Room
Workshop/Wareho
use
1) Install FOBOT [18-FO-003], 2) Start
Fibre Optics Cable Reticulation from
Milling Switchroom (18FO003-F1 &
18FO003-F2), Data Centre (18FO003-F3)
and to Reagents Area (18FO012-F2)
Rashid 27-Dec 29-Dec
Reagents AreaInstall FOBOT: 18-FO-012; 2) Pull cable
18FO012-F1 to Goldroom (near position)Rashid/Leo 27-Dec 29-Dec
Qa/QcInspections, Point-to-Point Tests, Puch
ItemsMarion 27-Dec 29-Dec
DiselFuel
Storage
Area
HydrochloricAcid
Area
AREA1
7-REAGENTS
CyanideArea
Cooling TowersCILSE
MSA
Area2100
-UtilitiesGeneral[MiningInfrastructu
re&
MainPlant]