CIRCUIT BREAKER TESTING - JOB SAFETY ANALYSIS
Check this is the latest Process Zone version before use. Page 1 of 5 Reference SP0509R01 Ver 1Form Owner: Neil Dwyer, Manager Technic al Services
Ergon Energy Corporation Limited ABN 50 087 646 062Ergon Energy Queensland Pty Ltd ABN 11 121 177 802
Title: Circuit Breaker Testing
Purpose and Scope: Provide guidelines for testing of Circuit Breakers.
Staffing Resources: Staff will have the minimum requirement of an Electrical Fitter/Mechanic Licence and be trained in the safe use of the required test equipment. Workwill be carried out with a Safety Observer.
Documentation/References:AS 1931 1996 High Voltage Test Techniques Parts 1 and 2;AS 2006 1986 High Voltage A.C. Switchgear And Controlgear Circuit Breakers For Rated Voltages Above 1,000V;AS 2650 1986 High Voltage A.C. Switchgear And Controlgear Common Requirements;AS 2467 1981 Maintenance of Electrical Switchgear
Circuit breaker Manual / Manufacturers Drawings;Carry Out Field Testing SWP SP0506;Circuit breaker Testing JSA SP0509R01;Circuit Breaker Test Report SP0509C01Circuit Breaker HV Withstand Test Report SP0509C02.Circuit Breaker Testing Competency Assessment SP0509C03
Key Tools and Equipment:HV test equipment5/10kV insulation tester.Variable DC voltage supply as requiredTiming Equipment.Micro-ohmmeter minimum 50 amp capacity
Development Team: Based on recloser testing JSA developed by Paul Blyth, TonyLenz, Dean Maltby from Bowen, Robert Bates and Helena Tholsgard
Date Completed: 5 June 2003
Reviewed By: Robert Bates Date Completed:21 September 2004
Related SWP No.:SP0509 SWP Owner Approval:
Key Stakeholders:
8/12/2019 SP0509R01
2/5
CIRCUIT BREAKER TESTING - JOB SAFETY ANALYSIS
Check this is the latest Process Zone version before use. Page 2 of 5 Reference SP0509R01 Ver 1Form Owner: Neil Dwyer, Manager Technic al Services
Ergon Energy Corporation Limited ABN 50 087 646 062Ergon Energy Queensland Pty Ltd ABN 11 121 177 802
Risk ScoreTask
No.Task Step Hazard
Most Likely Breakdown Event
(Loss Of Control)
Most Likely Outcome (Incident
Outcome) ExistingControls
Additional/
AlternateControls
5.1 Visual Inspection Chipped or broken porcelaininsulators, sharp metal edges
Hazardous substances insulating oil
Failure to inspect circuitbreaker for hazards beforecommencing work
Cuts and lacerations Low Low
5.2 Insulation Resistance High Test Voltages Failure to keep all bystandersclear while testing
Minor shock anddiscomfort
Low
5.3 HiPot Test High Test Voltages Failure to keep all bystandersclear while testing
Failure to isolate, dischargeand earth after testing
Electric Shock, burns Low
5.4 Contact Resistance Heating from high test currents Apply test current forexcessive duration
Minor discomfort Low
5.5 Timing Contact with control and measurementvoltages
Failure to keep clear of livetest voltages
Failure to reduce or removevoltage sources beforeadjusting or moving testleads
Electric Shock, burns Low
8/12/2019 SP0509R01
3/5
CIRCUIT BREAKER TESTING - JOB SAFETY ANALYSIS
Check this is the latest Process Zone version before use. Page 3 of 5 Reference SP0509R01 Ver 1Form Owner: Neil Dwyer, Manager Technic al Services
Ergon Energy Corporation Limited ABN 50 087 646 062Ergon Energy Queensland Pty Ltd ABN 11 121 177 802
Existing Control Measures
Risk Ranking
C = Consequences E = Exposure P = Probabili tyTaskNo. Elimination Substitution Engineering Administration
Personal Protective
EquipmentC E P Risk Score
5.1 1 6 5 Low
5.2 1 4 5 Low
5.3 3 5 5 Low
5.4 1 5 6 Low
5.5
Control measures are in place as described in the JSA Carry Out Field Testing SP0506R01 and its relatedSWP SP0506 as well as the SWP Circuit Breaker Testing SP0509
PPE Longsleeve shirt andlong trousers,safety footwearand protectiveeyewear.
4 6 6 Low
8/12/2019 SP0509R01
4/5
CIRCUIT BREAKER TESTING - JOB SAFETY ANALYSIS
Check this is the latest Process Zone version before use. Page 4 of 5 Reference SP0509R01 Ver 1Form Owner: Neil Dwyer, Manager Technic al Services
Ergon Energy Corporation Limited ABN 50 087 646 062Ergon Energy Queensland Pty Ltd ABN 11 121 177 802
Additional/Alternative Control Measures
Risk Ranking
C = Consequences E = Exposure P = Probabil ityTaskNo. Elimination Substitution Engineering Administration
Personal Protective
EquipmentC E P Risk Score
1 6 5 Low
8/12/2019 SP0509R01