SOUTHERN REGIONAL POWER COMMITTEE
BANGALORE
Agenda for the 43
rd Meeting of Protection Coordination Sub-Committee of
SRPC to be held on 29.04.2015 Wednesday)
1. Introduction
2. Confirmation of Minutes of last PCSC meeting
Confirmation of minutes of 42nd
Protection Coordination Sub-Committee meeting
held on 26.03.2015.
3. Grid Occurrences (w.r.t. SRLDC)
3.1 Grid Disturbance (GD), Grid Incidences (GI), and trippings due to failure of Auto-
reclosing (A/R), and Mal-operation of PLCC equipment that occurred during the
last one-month period (March-April, 2015) would be discussed in the PCSC meeting [Annexure-I]
Constituents are requested to furnish the following information in respect of the
above grid occurrences to have fruitful discussions in the PCSC forum.
(a) Single line diagram of the station with switching devices, CT, PT and relay
details
(b) Relay settings adopted
(c) Remedial measures/ Action taken
3.2 In compliance of Regulations 5.2 (r) of IEGC – as per the provisions under clause
1.5 of IEGC 2010, the Constituents are requested to furnish the following information in respect of Grid Occurrences (indicated as in Annexure-II) latest
by 20.04.2015:
(a) First Information Report (FIR)
(b) Event Logger (EL) output
(c) Disturbance Recorder (DR) output
(d) Trip event analysis report (with pre and post fault system conditions)
Non-furnishing of Tripping details including Disturbance Recorder/Sequential
Event logger output would be discussed in the meeting.
4. Kudankulam SPS (load relief by the constituents) with 2 Units in operation
A meeting was held with NPCIL/ KKNPP on 07.04.2015 at SRPC, Bengaluru to
discuss the operational and accounting issues in respect of KKNPP Units. In the
meeting, the following issues with respect to Kudankulam SPS were noted:
Presently Trip Signal 1 only was commissioned and would be triggerred when
power loss on account of tripping of Units at Kudankulam is more than 500 MW
Agenda for the 43rd Protection Coordination Sub Committee Meeting to be held on 29.04.2015 Page 2
and would be sent via Kolar to shed loads in Andhra Pradesh, Tamil Nadu,
Karnataka, Kerala.
It was noted that the SPS for two units in operation needed to be configured at
KKNPP. Constituents were to identify additional loads of 700-800 MW for Trip
Signal-2. As per NLDC new feeders are to be identified by the SR-Constituents
for the above quantum of load shedding.
It was agreed that the implementation of SPS (for 2 units in operation) would
be deliberated in the next Protection Sub Committee Meeting as the Unit II was
likely to be synchronized shortly.
5. Submission of reports/compliance by Constituents
5.1 Status of pending Protection Coordination Sub-Committee (PCSC)
Recommendations
Status of the pending PCSC recommendations (from 30th
PCSC to 41st PCSC) as
circulated vide our email dated 01.04.2015 (Annexure-III) may please be sent
latest by 24.04.2015.
5.2 Remedial measures for "Transmission Line under Forced Outage"
The constituents are requested to send the remedial measures/ actions taken by them for the tripping events as circulated vide our emails. (Annexure-IV)
The trip events are based on the daily reports at SRLDC website
http://srldc.in/DailyReport.aspx under the menu: Reports->Daily-> "TL under
Forced Outage")
5.3 Certificate for Healthiness of Batteries
As per the MoP direction given in pursuant to recommendations of the
Enquiry Committee (NEW grid disturbance on 30th
& 31st July, 2012), RPC’s
are required to obtain from their respective Constituents the monthly
certificate for healthiness of batteries, installed at 220 KV and above voltage
level Substations (for power supply to Relays, RTUs and PLCC equipment)
and furnish the same to CEA/ MoP.
With reference to above, the Constituents are requested to submit the
certificate on healthiness of batteries on monthly basis (i.e. on 7th
day of the
month) to SRPC.
The sought status for the month of February, 2015 is still awaited from the
following SR-Constituents:
APTRANSCO, TSGENCO (Hydro), KPTCL, PED, PGCIL (SR-II),
NTPC-Ramagundam, NTECL, GMR, NTPL, CEPL, SEPL.
6. Network Configuration Changes
As per the information furnished by SR-Constituents to the OCC forum in their 105th
Meeting held on 10.03.2015 (Minutes circulated on 28.03.2015), it is observed that no
network configuration changes (additions/ deletions/ modifications of transmission
elements) took place in southern grid during the month of February, 2015.
Agenda for the 43rd Protection Coordination Sub Committee Meeting to be held on 29.04.2015 Page 3
KPTCL vide their mail dated 25.03.2015 informed that the following new transmission
elements had been added in the month of March, 2015.
Sl. No.
Name of the Element
Connected Sub Station
Date and time of Commissioning
Remarks
1 220kV Hiriyur-Gowribidanur
D/C line
Hiriyur PGCIL and
Gowribidanur SS
4.3.2015 at 21.10 and 21.15Hrs
Load taken on 9.3.2015 at 21.22 and 21.26Hrs
2 63MVAR Bus Reactor
400kV SS Guttur 23.03.2015 at 15.57Hrs
7. Dynamic study data submission
In the earlier meetings of PCSC, the forum had decided to collect the Dynamic
study data from the utilities to study the Southern Region system. The dynamic
study format was circulated to the constituents to send the Generator, Excitation
system, Governor, HVDC parameters. The forum opined that the dynamic study
details of the IPPs also are necessary to conduct the study of SR system.
All the SLDCs were requested to direct the embedded IPPs connected at 220 KV
and above voltage level to send the completed dynamic study format to SRPC,
Secretariat.
It is requested that the dynamic study data in the stipulated format may be sent to
SRPC at the earliest by email.
8. Protection Logic checking of Critical Substations
Logic checking of following Critical Substations in the Southern Region had been
approved in the SRPC meeting held on 18.05.2013 at Bangalore.
(i) 400 kV Guttur (vi) 400 kV Kurnool
(ii) 400 kV Ramagundam (vii) 400 kV Almatti
(iii) 400 kV Kalpaka (viii) 220 kV Edamon
(iv) 400 kV Nelamangala (ix) 400 kV VTS
(v) 400 kV Hoody (x) 400 kV Vemagiri
9. Compliance of Hon’ble CERC Orders.
9.1 Petition No. 146/MP/2013 with I.A. 36/2013: Order dated 20.02.2014
Compliance of Regulations 5.2 (r) of the Grid Code: Issue regarding non-
furnishing of FIR / Trip Analysis Report, EL, DR, etc. was also
highlighted. It is pointed out that the above reports are to be submitted /
uploaded on SRLDC web application within 24 hours as mandated under
IEGC / CEA Regulations.
Implementation of Phase-I and Phase-II of Protection Audit
Recommendations: All the constituents are requested to submit the updated
status of the compliance (those who have not completed recommendations
mentioned in the Phase I and Phase II) to SRPC Secretariat at the earliest.
The following constituents are to submit the updated status of filing of
Agenda for the 43rd Protection Coordination Sub Committee Meeting to be held on 29.04.2015 Page 4
petition/affidavit to SRPC Secretariat at the earliest: APTRANSCO.
Compliance of Regulations 5.2 (e) & 5.2 (l) of the Grid Code and Regulation
3(1)(e) of CEA Grid Standards: The constituents are requested to strictly
comply with these provisions by ensuring standard protections systems having
the reliability, selectivity, speed and sensitivity to isolate the faulty equipment
and protect all components from any type of faults, within the specified fault
clearance time and providing protection coordination
Ensuring proper maintenance of transmission lines and adopting best O&M
practices: The constituents are requested to conduct line patrolling regularly
as per the SRPC transmission line patrolling guidelines (available under the
menu item "All Uploads Operation Miscellaneous Transmission Line
Patrolling Protocol / Guidelines for Southern Region" on SRPC website).
(http://www.srpc.kar.nic.in/website/2014/operation/patrolling.pdf).
9.2 Petition No. 167/Suo- Motu/2012: Order dated 22.02.2014
The Constituents are requested to follow approved protection philosophy
ISTS licensees are requested to submit details of updated distance protection relay
setting of all inter-regional lines to POSOCO & RPCs.
All SLDCs are requested to install/activate sound recording system in their control
rooms within three months from the date of issue of this order.
The Constituents are requested to submit the progress of implementation to
SRPC and SRLDC as specified in the Hon'ble CERC Order.
9.3 Petition No. 263/MP/2012: Order dated 19.12.2013
Constituents are requested to implement the quantum of relief by AUFR and df/dt
relays by identifying additional feeders and keep them functional within one month
of issuing this order.
SLDCs are also requested to map these relays on their respective SCADA
system within three months of issuance of this order.
The Constituents are requested to submit the progress of implementation to
SRPC and SRLDC as specified in the Hon'ble CERC Order.
10. Other Protection Issues, if any, with the permission of the Chair
11. Sending Agenda items for the PCSC meetings
As per the Guidelines of CEA/MOP, it has been decided to conduct the PCSC
meetings on monthly basis. It is requested that Agenda Items for the PCSC meetings,
if any, may please be sent latest by 5th
working day of the month to SRPC Secretariat
to compile and circulate the same so as to have fruitful discussions in the PCSC
meetings.
12. Date of next PCSC meeting
The 44th
PCSC meeting would be conducted on 28.05.2015 (Thursday) at SRPC,
Bangalore.
*******
Gird occurrences
1. / - Details of Grid Disturbances:
Sr. No.
. . /
Details of Event
/ Date &
मय /Time / Reason
/Remarks
/ Category
1
Disturbance in
North Kerala
system
02-04-2015
at 00:32 hrs Complete outage of 220kV
Mylatty, 220kV Taliparamba,
220kV Kanhirode and 220kV
Vadakara substations occurred
due to tripping of 220kV
Areakode-Vadakara and 220kV
Areakode-Kanhirode feeders.
220kV Areakode-Nallanam line-
2 also got tripped during the
incident.
Load loss : 313 MW
GD-1
2. / - Details of Grid incidents:
Sr. No.
.
.
/
Details of Event
/ Date &
मय /Time / Reason
/Remarks
/ Category
1
Tripping of
765/400kV ICT-1 at
Thiruvelam
substation
25-03-2015 at 20:25 hrs
AC Supply failed during pump
operation and oil return valve of
ICT-B phase mal operated
2
Multiple tripping at
400/230kV Hosur
substation of
Powergrid
26-03-2015 at 15:40 hrs
230kV Bus-2 at Hosur(PG) got
tripped as spurious initiation got
extended to LBB relay of 230kV
Hosur-Hosur(PG) line at
Hosur(PG) end due to shorting of
contacts in lockout relay.
400/230kV ICT-2, ICT-3, 230kV
Hosur-Vinnamangalam, 230kV
Hosur(PG)-Hosur which were
connected to Bus-2 got tripped
along with bus coupler breaker
GI-2
3
Tripping of 400kV
Kaiga-Guttur line-
1&2
27-03-2015at
14:33 hrs Line-1&2 tripped on operation of
over voltage stage-2 protection at
Guttur end and direc trip was
received at Guttur.
4
Tripping of
400/220kV ICT -2 at
Mahboobnagar
28-03-2015 at 6:40 hrs
ICT tripped on operation of REF
protection
5
Tripping of 400kV
Alamathy-
SVChatram line-
1&2 and 400/230kV
ICT at S.V.Chatram
29-03-2015
at 15:29 hrs Line-2 tripped on R-phase to earth fault. Line autoreclosed at SVChatram end and failed to reclose at Alamathy end. B-phase to earth fault in line-1. Line tried for for A/r but due to permanent fault line did not reclose. ICT tripped on operation of over flux protection
GI-2
Annexure-I
Sr. No.
.
.
/
Details of Event
/ Date &
मय /Time / Reason
/Remarks
/ Category
6
Tripping of VTPS-
Malkaram line-2 30-03-2015
at 11:51 hrs R-phase to earth fault occurred in
line, protection at Malkaram
sensed fault in zone-1 and in
zone-3 at VTPS end.
7
Tripping of HVDC
Talcher-Kolar pole-1 30.03.2015 at
19:30 hrs Pole 1 generated ESOF at Kolar
end on operation of O/C+ E/F
relay of the Converter
Transformer.
GI-2
8
Tripping of
400/220kV ICT-1 at
BTPS
31-03-2015
at 05:06 hrs ICT-1 tripped on operation of
Back up earth fault protection
during R-phase to earth fault in
220kV BTPS-Lingapur line.
9
Tripping of 400kV
Kurnool-Srisailam
01-04-2015
at 12:59 hrs
and 14:59 hrs
Line tripped on operation of
STUB protection at Kurnool end.
From D.R of Kurnool station, I>4
i.e. overcurrent trip was observed.
10
Tripping of 220kV
Sedam-Tandur line
06-04-2015
at 13:55 hrs
Line tripped at Sedam end only on
operation of Over Current and
Master trip relay
11-04-2015
at 18:12 hrs
Tripped at Sedam end only
11
Tripping of Talcher-
Kolar pole -1
09-04-2015
at 12:04 hrs
HVDC Talcher-Kolar Pole-2
tripped due to Converter
transformer R-ph OLTC PRV
micro switch mal operation at
Kolar.
12
Multiple tripping at
400kV Raichur(PG)
and Raichur thermal
power station of
KPCL
11-04-2015
at 18:04 hrs
400kV Raichur(PG)-Gooty line-2,
400kV Raichur TPS-Raichur(PG)
line-1&2, 400kV Raichur-
Mahboobnagar, Unit#5 at RTPS
tripped during the incident
GI-2
13
Tripping of HASSAN
- UPCL 1 12-04-2015
at 12:58 hrs
B-phase to earth fault in line. Line
tripped in zone-2 from Hassan end
14
Tripping of
400/220kV ICT-1 at
BTPS
14-01-2015
at 1:09 hrs
ICT tripped due to operation of
Over current and Earth fault relay
Annexure-I
3. Lines tripping due to PLCC mal-operation/ tripping at one end
Sr. No.
.
.
/
Details of Event
/ Date &
मय /Time / Reason
/Remarks
/ Category
1
400kV Guttur-
Narendra line-1 11-03-2015 at 17:16 hrs
line tripped at Narendra end only
on direct trip receive and line was
holding from Guttur
--
2 Tripping of 400kV
Guttur-Hiryur line-1 16-03-2015
at 14:10 hrs Line tripped at Guttur end only
and was holding from hiryur.
3
Tripping of 220kV
Regulapadu-Alipur
line
11-04-2015
at 18:13 hrs
Tripped at Alipur end only and
line was holding from Ragulapadu
end
4. Failure or non-operation of Auto reclose during transient fault
Sr. No.
Element Date & Time
Reason
1 Tripping of 220kV Chitoor-
Tiruvelam line 19-03-2015 at 15:18 hrs
Line tripped on R-phase to earth fault. Line did not autoreclose. D.R/ E.L not provided
2
Tripping of 220kV Ambewadi-
Ponda line-1 19-03-2015 at 18:55 hrs
Line tripped on operation of B-
phase to earth fault. Line dis not
auto reclose
3
Tripping of 400kV
Krishnapatnam-Nellore line 20-03-2015 at 03:02 hrs
Line tripped on a B-phase to earth
fault. From D.R and E.L of
Nellore end, auto reclose could
not be verified. Data of
Krishnapatnam was not submitted
4
Tripping of 400kV Khammam-
Kalpakka line-1&2 on 22-03-
2015
22-03-2015 at
14:45 hrs Attempt for auto-reclose could not
be established at Khammam end.
Current could not be observed in
current channels of D.R of
Kalpakka. E.L of Kalpakka
Station was not furnished. Time
difference is observed in D.R of
Khamman and Kalpakka. Also
Time sync needs to be checked
for E.L of Khammam.
5
Tripping of 400kV Hyderabad-
Kurnool line
01-04-2015 at
12:59 hrs
Y-phase to earth fault had
occurred in line. At Hyderabad
end line did not try auto-reclose as
there was CB A/R lockout. At
Kurnool end line tried for auto-
reclose after occurrence of fault in
Y phase. Due to persistent fault
line tripped.
6
Tripping of 400 kV NCTPS -
Vallur 2
03-04-2015 at
22:10 hrs
Line tripped on Y-phase to earth
fault. Line auto reclosed at Vallur
end and did not reclose at NCTPS
end
Annexure-I
7
Tripping of 400 kV NCTPS -
Vallur 2
07-04-2015 at
2:41 hrs
Line tripped on Y-phase to earth
fault. Line did not reclose at
NCTPS end. From Vallur end E.L
and D.R A/r start is observed.
Successful A/r at Vallur could not
be established with D.R and E.L
8
Tripping of 400 kV NCTPS -
Vallur 2
07-04-2015 at
23:13 hrs
Line tripped on Y-phase to earth
fault. Line auto reclosed at Vallur
end and did not reclose at NCTPS
end
9
Tripping of 400 kV NCTPS -
Vallur 1
08-04-2015 at
22:28 hrs
Line tripped on R-phase to earth
fault. Line auto reclosed at Vallur
end and did not reclose at NCTPS
end
10
Tripping of 400 kV NCTPS -
Vallur 1
11-04-2015 at
4:29 hrs
Line tripped on R-phase to earth
fault. Line auto reclosed at Vallur
end and did not reclose at NCTPS
end
11
Tripping of 400 kV NCTPS -
Vallur 1
12-04-2015 at
3:47 hrs
Line tripped on Y-phase to earth
fault. Line auto reclosed at Vallur
end and did not reclose at NCTPS
end
12
Tripping of 400 kV DICHIPALLY
- RAMAGUNDAM 05-04-2015 at
13:43 hrs
Line tripped on R-phase to earth
fault. Unsuccessful A/r or attempt
for A/r could not be established
with furnished D.R/ E.L
13 Tripping of 400 kV TALAGUPPA
- NEELAMANGALA 11-04-2015 at 2:22
hrs
Line tripped on Y-N Fault. Na
data available to establish A/r
14
Tripping of 400kV Raichur-
BTPS line
11-04-2015 at
17:52 hrs
Tripped due to B-phase fault.
Status of implementation of A/r
scheme for the line
15
Tripping of 400 kV Nellore –
Sriperambadur line 12-04-2015 at
20:37 hrs
Line tripped on R-phase to earth
fault. Line autoreclosed during 1st
attempt and during 2nd
fault, line
did not trip but R-pole got opened
and remaining poles opened due
to pole discrepancy.
16
Tripping of 220kV Idukki-
Udumalpet line
03-04-2015 at hrs B-phase to earth fault in line. Line
autoreclosed at Udumalpet end
and did not reclose at iddukki
12-04-2015 at 1:43
hrs
R-phase to earth fault in line. Line
autoreclosed at Udumalpet end.
Line tripped in zone-2 from
idukki
12-04-2015 at
15:12 hrs
B-phase to earth fault in line. Line
autoreclosed at Udumalpet end
and did not reclose at iddukki
Annexure-I
Annexure-II
Annexure-II
Annexure-II
Annexure-II
Annexure-II
Annexure-II
Annexure-II
Meeting No /
Index
Details of Event Date Reason PCSC Recommendations Utility Responsible for
implementation
Status of Recommendations
as on 16.04.2015
Remarks
39/III/1 Tripping of 400kv
VTPS-Satenapalli line-
1 &2
10, 11, 13, 14,15
Dec 2014 voltage.
grading in over voltage protection
needs to be verified.
PCSC forum recommended APTRANSCO to check up the
drop off to pick up ratio of the Overvoltage relay and correct
it (if needed).
APTRANSCO/ APGENCO APTRANSCO informed vide their e-mail dated
27.02.15 that the issue pertains to APGENCO.
Pending
40/IV/2 400 kV HYDERABAD -
KURNOOL line
07-01-2015
at 6:17 hrs
Line tripped on Rphase to earth
fault. A/R lock out
observed in E.L of Hyderabad end
APTRANSCO was requested to check up the A/R feature at
both the ends and submit the remedial measures to the PCSC
forum.
APTRANSCO Yet to be informed Pending
41/II/2 Tripping of 400kV
Srisailam-Mamidapalli-2
line and 400kV Srisailam-
Satenapalli-1 line
23-01-2015 at
16:10 hrs
Bus-2 at Srisailam became dead
while converting Srisailam generator
to condenser mode. Direct trip was
received at Mamidapalli and
Satenapalli end.
furnish the reasons for BBP operation at
Srisailam LLB and the remedial action taken to PCSC forum.
TSGENCO Yet to be informed Pending
30/I/A RTPS Tripping incidents
and the Spl meeting held
at RTPS on 13th and
14th March 2014
Mar-14 Spl meeting held at RTPS on 13th
and 14th March 2014
The PCSC forum recommended for replacement of existing
electromechanical relays with Numerical relays.
KPCL 1. e- Tender folated for the retrofit of existing static
relays with Numerical version for lines
M.nagar,M.bad,ICT-1 & 2 -Technical Bid opened
& price bid yet to be opened.
2. Retrofit of existing bus bar (CAG-34) with
numerical version -Budgetetory offers obtained and
is under process.
3. Order placed on M/s Siemens to replace relays.
The work will be Completed by May - 2015.
Pending
33/II/3 400kV
Hiriyur-BTPS line-2
22-05-14 &
23/05/2014
B phase to ground fault had
occurred in line and line auto
reclosed at Hiriyur end but failed to
reclose at BTPS end.
The PCSC forum requested KPCL to enable the A/R feature
at RTPS end before next PCSC meeting (i.e. 31st July, 2014.
KPCL 1. A/R for 220kV lines enabled already.
2. Shtu down of lines availed to commission the
auto reclosing schme fro 400 kV line at BTPS.
3. A/R shall be enabled in next shutdown
Pending
34/III/1 400kV
Raichur-BTPS line
26-06-2014 Transient fault in R-phase.
Line did not auto reclose
A/R at BTPS end to be made operational within one month KPCL 1. A/R for 220kV lines enabled already.
2. Shtu down of lines availed to commission the
auto reclosing schme fro 400 kV line at BTPS.
3. A/R shall be enabled in next shutdown
Pending
Pending Implementation of PCSC Recommendations (30th to 41st)
Andhra Pradesh
Telangana
Karnataka
Annexure-III
38/GD/3.5 GD-1 at Kadra and
Kodasalli hydro power
station
13-11-2014 at
19:31hrs
A fault had occurred in 220 kV
Kadra and
Kodasalli. As A result, de-
energization of
220kV bus occurred at Kadra and
Kodasalli.
1. The PCSC forum requested KPCL to speed up the
installation of Numerical Distance Protection relay in Kadra
–Kaiga and Kodasalli –Kaiga.
2. The PCSC forum requested KPCL to submit the
implementation status of PSAG-10 recommendations within a
week’s time.
KPCL All the recommendations of PSAG - 10 are
completed except the following pending issue:
i)e-NIT floated on 28.07.2014 for procurement of
Numerical distance relays & GPS. Bid evaluation
is under progress. The work will be completed by
December - 2015. Hower, as per the
recommendations of PSAG, Relays were
temporarily rearranged, replaced and wired up.
testing & commissioning shall be completed with
the assistance of KPTCL by March 1st week ,
2015.
Pending
34/I/6 400/220 kV ICT-1 & 2 at
MUNIRABAD
16-07-2014 As reported directional over current
relay of ICT’s operated due to
snapping of line jumper in 220kV
Lingapur line.
1. Bus bar protection shall be provided by asset owner ( i.e
KPTCL) .
2. Settings for main distance protection & Overcurrent
protection shall be examined and reviewed.
3. Time synchronization of the Substation shall be ensured.
4. Correct DR shall be submitted to the SRLDC for trip
analysis.
KPTCL Management approval is obtained for taking up the
work of providing bus bar protection to 220kV
buses at Guddadahally (Munirabad) Sub Station
along with replacement of 3 core/age old CTs of
220kV bays belong to KPTCL.
Under implementation
Mail recieved on 25-03-2015 (KPTCL):
1. KPTCL has taken action to provide bus bar
protection to 220kV buses.
2. Over current relay Settings of ICTs to be
reviewed by PGCIL.
Pending
38/GD/3.1 GD-1 at Mahalingapura
Substation of KPTCL
25-10-2014 Fault had occurred in 220kV
Mahalingapura-Narendra line-2.
Due to the
failure of relay operation at
Mahalingapura,
breakers at remote end tripped
which
resulted in bus dead condition.
1. PCSC forum recommended KPTCL to replace the old static
distance protection relays with numerical relays.
2. PCSC forum also requested KPTCL to provide a broken
conductor alarm indication in Control Room.
3. Standing instruction needed to be given to the all substation
personnel for not changing the relay settings without approval of
RT/MRT wing.
KPTCL Mail received on 25-03-2015 (KPTCL):
1.Existing Back up relays will be replaced by
numerical type distance relays.Procurement is in
tendering stage.
2. Alarm for Broken conductor is in service.
3. Clear instructions have been given to station
staff.
Pending
38/GD/3.2 GD-1 at Guttur
Substation of KPTCL
05-11-2014 at
11:42 hrs
Circuit breaker of 400kV Guttur-
Hiriyur
line-1 failed at Guttur end while
availing
shutdown for replacement of CVT.
The
failure of breaker caused bus fault at
Guttur.
KPTCL was requested to expedite the early implementation of
pending recommendations of:
1. Protection Audit (Phase-I & Phase-II)
2. PSAG-4, PSAG-5, and PSAG-8
KPTCL Mail received on 25-03-2015 (KPTCL):
Replacement of failed breaker of Hiriyur-1 line,
400kV BC and TBC is taken up at Guttur. Work is
entrusted to M/s Alstom.Complaince will be
furnished to SRPC upon completion of these
works.
Pending
39/I/5 Tripping of 400/220kV
ICT-2 at Hoody
substation of KPTCL
01-12-2014 Suspected mal-operation of 220kV
side Rphase
over current relay
1. PCSC forum recommended KPTCL to replace the relay
with a different make.
2. KPTCL was also requested to train the O&M personnel
adequately before performing any maintenance works to avoid
such unwanted trippings.
KPTCL Mail received on 25-03-2015 (KPTCL):
C&R panels of 500MVA ICT 1&2 will be replaced
under scheduled R&M works. O&M personnel are
instructed to take sufficient care in order to avoid
unwarrented trippings.
Pending
Annexure-III
40/I/1 GD-1 at 220kV
Ambewadi Station of
KPTCL
22-12-2014 at
21:22 hrs
Triggering incident was B-phase to
earth fault in 220kV Ambewadi-
Nagzari line-1. B-pole of breaker
did not open at Ambewadi end.
LBB protection not available at
Ambewadi end. All elements tripped
on Zone-2 from remote ends.
1. Till the completion of R&M works for bus bar and LBB
protection, KPTCL shall explore the possibility of having split
bus operation at Ambewadi and submit the details of the same
to PCSC forum.
2. KPTCL shall check up the ICTs protection system for
finding the cause of not tripping for the line fault (through fault)
and submit the remedial measures.
3. KPTCL shall provide the details of the tripping of Supa hydro
station connected downstream from 110 kV bus.
KPTCL Yet to be informed Pending
40/IV/1 220kV Sedam-
Tandur line
20-12-2014
at 22:20 hrs
Line tripped on Yphase to earth
fault from both the ends
KPTCL was requested to explore the possibility of providing
A/R feature to this line and submit the remedial measures to
the PCSC forum.
KPTCL Yet to be informed Pending
41/I/1 GD-1 at 220kV Kadra
power Station of KPCL
16-02-2015 at
12:56 hrs
Triggering incident was B-phase to
earth fault had occurred in 220kV
Kadra-Kodasalli line. Line tripped
from Kodasalli end only. 220kV
Kaiga-Kadra tripped in Zone-3 from
Kaiga end. Tripping of evacuating
lines caused bus shut down at Kadra
hydro station.
1. KPCL to make functional the Main2 (EPAC) relay with
the help of KPTCL at the earliest.
2. KPCL to investigate the reason for DC fuse fail during
transient fault in 220kV Kadra-Kodasalli line including the
testing/ checking of DC supply cables, breaker control cables,
and trip coils.
3. KPCL to ensure supply for Main-1& Main-2 protections,
Trip Coils (TC1, TC2) from separate battery banks.
KPCL Yet to be informed Pending
41/I/3 Complete outage of
Nagjheri Hydro power
station of KPCL (GD-1)
22-02-2015 at
11:09 hrs
During de-synchronization of Unit-
3, the Y-pole of the CB did not
open (was locked-out). This caused
LBB protection to operate resulting
in tripping of the Bus and all
connected 220kV lines and running
units at Nagjheri power station.
1. KPCL to investigate the cause of Y-pole breaker lock-out
of Unit-3, and take suitable remedial measures within a week’s
time
2. KPCL to furnish what caused LBB initiation and furnish
LBB Scheme details to PCSC forum
3. KPCL to furnish detailed tripping report (with DR & EL)
of the incident
KPCL Yet to be informed Pending
41/I/4 Complete outage at
220kV Sedam Substation
of KPTCL (GD-1)
27-01-2015 at
8.00 hrs
R-Phase to ground fault occurred on
220kV Sedam-Shahpur line. Fault
not cleared from Sedam end due to
stuck-breaker condition. While the
Sedam- Sahapur line tripped from
Shahapur end in Zone-1, the other
220 kv lines from Sedam tripped at
remote ends in Zone-2. This caused
complete outage of 220kV Sedam
substation.
1. KPTCL to provide Bus bar and LBB protections for 220
kV bus at Sedam S/s.
2. KPTCL to implement A/R feature on 220 kV Sedam-
Tandur inter-state line.
KPTCL Yet to be informed Pending
41/II/11 Tripping of 400kV BTPS
- Hiriyur line-2
13-02-2015 at
17:07hrs
Line tripped at BTPS end only. furnish remedial measures taken to prevent
recurrence of PLCC mal-operation at BTPS.
KPCL Yet to be informed Pending
Tamil Nadu
Annexure-III
36/II/9 400kV Arasur-Mettur
Line I
29-09-2014 Mettur S/s to Enable A/R Scheme. TANTRANSCO 1. During the 38th PCSC meeting, TANTRANSCO
informed that the Auto Reclosing facility would be
enabled within 15 days.
2 A/R scheme will be implemented after the
commissioning of 400 kV Thiruvalam Line-I & II.
Pending
37/II/3 400kV Mettur-Arasur
line-1
29-09-2014 Line tripped due to Y-Phase to earth
fault.
Line did not auto reclose as Auto
reclose scheme is kept in non-auto
mode.
A/R scheme to be enabled. TANTRANSCO 1. During the 38th PCSC meeting, TANTRANSCO
informed that the Auto Reclosing facility would be
enabled within 15 days.
2. A/R scheme will be implemented after the
commissioning of 400 kV Thiruvalam Line-I & II.
Pending
38/II/3 Tripping of 400kV
Mettur-Arasur line-2
22-10-2014 Line tripped on Rphase
to earth fault.
non-auto mode.
A/R feature to be enabled. TANTRANSCO 1. During the 38th PCSC meeting, TANTRANSCO
informed that the Auto Reclosing facility would be
enabled within 15 days.
2. A/R scheme will be implemented after the
commissioning of 400 kV Thiruvalam Line-I & II.
Pending
34/I/3 Tripping of HVDC
Bhadravati Pole-1 & 2
09-07-2014 As reported, pole-1&2 tripped due
to auxiliary supply failure.
1. The PCSC forum recommended PGCIL, SRTS-I take up the
issue with WRTS to submit the report as per IEGC guidelines.
2. SRLDC is also requested to write a letter to WRLDC to
submit the reports to SR also.
3. Based on the SRTS/SRLDC correspondences, SRPC would
take it up with WR and PGCIL if the issue is not getting
resolved.
4. Complete analysis of the faults and rectification/remedial
action taken to avert similar occurrence in the HVDC Back to
Back station shall be submitted.
PGCIL 1. Implementation of Tertiary Winding of ICT for
the auxilliary power supply is going to come up
which resolves this issue.
2. PGCIL informed that all issues would be
discussed during PSAG-11 visit.
Pending
34/I/7 HVDC
BHADRAVATHI
POLE 2
18-07-2014 As reported pole-2 tripped due on
5th harmonic alarm.
1. Complete analysis of the faults and rectification/remedial
action taken to avert similar occurrence in the HVDC Back to
Back station shall be submitted.
2. The PCSC forum recommended PGCIL, SRTS-I take up the
issue with WRTS to submit the report as per IEGC guidelines.
3. SRLDC is also requested to send a letter to WRLDC to
submit the reports to SR also.
4. Based on the SRTS/SRLDC correspondences, SRPC would
take it up with WR and PGCIL if the issue is not getting
resolved.
PGCIL Yet to be informed Pending
Kerala
PGCIL
Annexure-III
39/I/1 Tripping of 400kV
Gooty-Somanahalli
22-11-2014 Line tripped due to
suspected PLCC
Mal-operation at Gooty
end.
Retrofitting of the relay or installation of Optical Fiber cable is
recommended by PCSC forum to PGCIL.
PGCIL Yet to be informed Pending
40/II/1 Tripping of 400kV
Vijayawada-Gajuwaka
line
18-12-2014 at
18:33 hrs
Line tripped due to operation of
TEED protection at Gajuwaka end
due to opening of jumper of Y phase
CT.
PGCIL shall review the TEED protection at Gajuwaka end
and submit the details to PCSC forum.
PGCIL Yet to be informed Pending
41/II/1 Tripping of 400kV
Vijayawada-Nellore line 1
22-01-2015 at
11:39 hrs
line tripped on operation of TEED
protection at Vijayawada end and
direct trip was received at Nellore
end
review the TEED protection at Vijayawada
end with their OEM group and submit action taken report to
PCSC forum.
PGCIL Yet to be informed Pending
41/II/6 Tripping of 400kV
Coastal Energen (CEPL)--
-NTPL line
07-02-2015 at
01:07 hrs and at
00:08hrs on 08-
02-2015
B-phase to earth fault had occurred
in Line during both instants. As seen
from D.R of Coastal Energen
distance relay sensed fault in zone-2
and earth fault protection had
operated which resulted in tripping
of line.
to carry out hot-line washing regularly as NTPL is
in highly polluted location.
PGCIL Yet to be informed Pending
41/II/8 Tripping of HVDC
Talcher-Kolar pole-2
10-02-2015 at
7:37 hrs
Pole-2 tripped due to ESOF from
Talcher end
test the pumps at Talcher HVDC during pole
shut-down and submit the report to PCSC forum.
PGCIL Yet to be informed Pending
41/II/16 Tripping of 400 kV
NEYVELI TS 2 -
PUGALUR
15-02-2015 at
18:38 hrs
Line tripped at pugalur end due to
direct trip receive
PGCIL to check the protection coupler of PLCC system at
Pugalur end.
PGCIL Yet to be informed Pending
41/III/1 Tripping of 400kV Gooty-
Somanahalli line
20-01-2014 at
11:44 hrs
line tripped at Gooty end only and
was holding from Somanahalli end
line
• PGCIL to furnish remedial measures taken.
• PGCIL to properly tune PLCC panels.
PGCIL Yet to be informed Pending
41/III/2 Tripping of 400kV
Udumalpet-Palakad line-
1& 400 Udumalpet-
Arasur line-2
09-02-2015 at
9:50hrs
PLCC of Udumalpet-Arasur-2 mal-
operated
• PGCIL to furnish remedial measures taken.
• PGCIL to properly tune PLCC panels.
PGCIL Yet to be informed Pending
37/I/9 Tripping of 400/220kV
ICT-1&2 at UPCL
04-10-2014 ICT-1&2 tripped during transient
fault in R-phase in 400kV Hassan-
UPCL line-1
To avoid tripping of ICTs for line fault, UPCL is requested to
review the settings of ICT’s SEF relay and consider IDMT
setting instead of existing Definite Time setting.
UPCL It has been reported by UPCL that, the work of
review of relay coordination and setings for the
entire plant is given to M//s Alstom for entire
plant. UPCL has furnished the settings given by
M/s Alstom for verification. Revised settings will
be issued this week for implementation
Pending
40/II/8 Tripping of Unit-1 at
Kudankulam
14-01-2014 at
19:20 hrs
Y-phase Differential protection of
Generating transformer of Unit-1
got operated which resulted in
tripping of Unit-1.
1. NPCIL, Kudankulam was recommended to submit all the
relevant reports of the above incident.
2. PCSC forum also requested NPCIL, Kudankulam to upload
all the reports (DR/EL/ FIR) of any incident in the SRLDC web
portal within 24 hrs of its occurrence.
NPCIL, Kudankulam Yet to be informed Pending
41/II/10 Tripping of Hassan-
UPCL line-2
12-02-2015 at
15:57 hrs
Line tripped due to high resistance
fault in B-phase. DEF picked up at
hassan end and DT was sent to
UPCL. DEF protection did not pick
up at UPCL
revise their DEF relay settings. UPCL Yet to be informed Pending
Others
Annexure-III
41/II/12 Tripping of 400KV
Coastal-NTPL line
13-02-2015 at
22:54 hrs
Line tripped B-phase to earth fault
and later tripped on R-Y phase fault.
From Coastal end D.R, Y & B poles
of breaker opened first and R-pole
appears to be opened on Pole
discrepancy.
check A/R scheme at their end. CEPL Yet to be informed Pending
41/IV/2 400kV Tuticorin PS-
NTPL line
09-02-2015 at
03:17 hrs
Y-phase to earth fault had occurred
in line. Line auto reclosed at
Tuticorin PS end and failed to
reclose at NTPL end.
NTPL to check A/R scheme at their end. NTPL Yet to be informed Pending
36/II/8 400kV Raichur-
Munirabad line
07-09-2014 B-phase to earth fault had occurred
in line.
Line auto reclosed at Munirabad end
and failed to reclose at Raichur end.
KPTCL:
PD (pole discrepancy) time delay would be changed.
PGCIL /
KPTCL
Yet to be informed Pending
37/I/6 Tripping of 400KV
Hassan-UPCL line-2
25-09-2014 High resistance fault as the fault
ampere was very less i.e., 0.6kA at
Hassan end and nearly 0.9kA at
UPCL end.
Back up earth fault protection had
operated at Hassan.
At UPCL end the high resistance
fault got converted into a R ph-B-ph
fault which resulted in operation of
distance protection Zone-1.
The reason for non-picking up of
Back up earth fault at UPCL needs
investigation.
1. At UPCL end, unused zones of distance protection
(probably zone 5 to 8) shall be disabled.
2. At UPCL end, time synchronization between main-1 and
main-2 relays shall be ensured.
3. UPCL shall ensure time synchronization with Hassan
substation.
4. Reasons for non operation of back up protection at UPCL
for high resistance fault is to be submitted.
5. Reasons for not sending DT to UPCL by Hassan end is to
be submitted.
6. Settings of UPCL are to be reviewed and informed to
PCSC forum.
UPCL /
KPTCL
It has been reported by UPCL that, the work of
review of relay coordination and setings for the
entire plant is given to M//s Alstom for entire
plant. UPCL has furnished the settings given by
M/s Alstom for verification. Revised settings will
be issued this week for implementation.
Pending
38/II/2 Tripping of 400kV
Khammam- Kalpakka line
11-10-2014 Line tripped on Yphase
to earth fault.
reclose at Khammam
end.
APTRANSCO and TSTRANSCO were requested to clear the
corridor jointly at the earliest.
PGCIL/ APTRANSCO/
TSTRANSCO
Yet to be informed. Pending
38/II/5 400kV Ramagundam-
Hyderabad line-4
27-10-2014
to earth fault.
reclose at Hyderabad
end due to
PLCCmal-operation.
Planned to replace the PLCC system within a week's time at
both the ends during the shutdown.
NTPC/ PGCIL Yet to be informed. Pending
39/I/2 Tripping of
400Kv Ghanapur-
Mamidipally
line
22-12-14
at 10:52 hrs,
24-12-14 at 11:32
hrs,
24-12-14 at 16:16
hrs
Due to PLCC Mal-operation at
HYD S/S end, DT received at
MMPLY end and line got tripped.
PGCIL is requested check up with the manufacturer to
resolve the issue and submit remedial measures to PCSC forum.
PGCIL/ TSTRANSCO Yet to be informed. Pending
Miscellaneous
Annexure-III
40/II/3 Tripping of 400
kV TALAGUPPA
– HASSAN line
01-01-2015 at
13:38 hrs
On account of R-phase to earth
fault, line
tripped at Hassan end due to
operation of
distance Zone-2 and non-receipt of
carrier. From D.R of Talaguppa end
it is
observed that fault had occurred in
Yphase.
1. PGCIL and KPTCL to ascertain the reason for the phase
discrepancy in the relay operation and take suitable remedial
measures.
2. KPTCL to check the PLCC operation at Talaguppa end
and submit the report to the PCSC forum.
PGCIL/ KPTCL Yet to be informed Pending
41/I/2 Complete outage at
220kV Bahoor
Substation of Pondicherry
(GD-1)
15-02-2015 at
11:20 hrs
Bus fault occurred in 110kV bus at
230/110kV Bahoor substation due
to failure of Y-phase main bus strain
insulator. 220kV lines connected to
Bahoor (viz., Bahoor- NLC TPS II
and Bahoor – Pondy) tripped from
remote end on operation of back up
protection.
1. PED to investigate the cause of non-operation of ICT’s
protection system (differential protection, back-up
protection) and review the relay settings suitably.
2. PGCIL to check the settings of distance relay and back-
up relays for correctness of operation.
PED/PGCIL Yet to be informed Pending
41/II/3 Tripping of 400kV NLC-
1 EXP- IL&FS line and
400kV IL&FS - Trichy
line
24-01-2015 on
13:15 hrs
400kV NLC-1 EXP- IL&FS line
tripped on a R-phase to earth fault.
Line did not auto-reclose. 400kV
IL&FS - Trichy line tripped at
Trichy due to Direct trip receive
from IF&FS.
action
taken report on the recommendations given by SRPC
Committee in their meeting held at IL&FS on 19-02-2015 to
SRPC.
IL&FS / PGCIL (SR-II)/ NLC-1
Exp
Yet to be informed Pending
41/II/5 Tripping od 400 kV NLC
EXP- ILFS line
05-02-2015 at
06:05 hrs
Line tripped due to direct trip
receipt from IL&FS
action
taken report on the recommendations given by SRPC
Committee in their meeting held at IL&FS on 19-02-2015 to
SRPC.
IL&FS / PGCIL (SR-II)/ NLC-1
Exp
Yet to be informed Pending
Tripping of 400kV NTPL-
Tuticorin pooling station
13-02-2015 at
23:12 hrs
Line tripped on R-phase to earth
fault at 22:53 hrs. Line auto
reclosed at Tuticorin pooling end
and holding. At 23:12 line tripped
on B-phase to earth fault in zone-2
time.
Tripping of 400kV NTPL-
Tuticorin pooling station
14-02-2014 at
1:41 hrs
B-phase to earth fault had occurred
and line auto reclosed at 01.09 Hrs
and holding from Tuticorin PS end
and line was and up hand tripping at
01.44.
Tripping of 400kV NTPL-
Tuticorin pooling station
14-02-2014 at
6:55 hrs
Line tripped on B-phase to earth
fault. Line did not reclose at NTPL
end
41/II/13,
41/II/14,
41/II/15
PGCIL to carry out hot-line washing regularly as NTPL is
in highly polluted location.
NTPL to review A/R scheme at their end.
PGCIL/NTPL Yet to be informed Pending
Annexure-III
S.No. Element Name Outage
date/time
Revival
date/time
Reason for Outage Sender/ Receiver Remedial Measures/ Actions taken
1 400/220 Kv ICT-1 AT SATTENAPLLI 26-02-2015/
10:19:00
26-02-2015/
11:30:00
GROUP - A PROTECTION OPERATED TSTRANSCO To-be-discussed
2 400 Kv SATTENAPALLI - SRISAILAM 2 04-03-2015/
14:25:00
04-03-2015/
15:08:00
R-N FAULT TSTRANSCO/ TSGENCO To-be-discussed
3 220 kV CHITTOR - THIRUVALEM 19-03-2015/
15:18:00
19-03-2015/
15:46:00
TRIPPED ON R-PH FAULT APTRANSCO/ TNEB TANTRANSCO: Temporary line fault.
APTRANSCO:
4 220 kV AMBEWADI - PONDA 1 19-03-2015/
18:55:00
REASON TO BE STATED LATER KPTCL To-be-discussed
5 400 kV GOOTY - NELAMANGALA 19-03-2015/
14:24:00
19-03-2015/
14:44:00
TRIPPED B-PH FAULT PGCIL (SR-I)/ KPTCL To-be-discussed
6 220 kV AMBEWADI - PONDA 1 20-03-2015/
12:40:00
DISTANCE PROTECTION RELAY ACTED KPTCL To-be-discussed
7 400 kV TALAGUPPA - NEELAMANGALA 20-03-2015/
13:37:00
20-03-2015/
14:07:00
DISTANCE PROTECTION ACTED (REASON
AWAITED)
KPTCL To-be-discussed
8 220 kV SABARGIRI - THENI 20-03-2015/
13:08:00
20-03-2015/
13:46:00
TRIPPED ON R-Y-PH FAULT KSEB/ TNEB TNEB: Temporary line fault. AR operated & subsequently
lockout at Theni end. KSEB:
9 400 Kv KRISHNAPATNAM - NELLORE 20-03-2015/
03:02:00
DISTANCE PROTECTION APGENCO/ APTRANSCO To-be-discussed
10 400 Kv KRISHNAPATNAM - CHITTOOR 20-03-2015/
05:05:00
20-03-2015/
05:29:00
DT RECEIVED AT KRSNPTNM APGENCO/ APTRANSCO To-be-discussed
11 400 kV KHAMMAM - MAMIDIPALLY 1 21-03-2015/
13:09:00
21-03-2015/
13:56:00
B -N FAULT PGCIL (SR-I)/ TSTRANSCO PGCIL (SR-I):The feeder Auto reclosed and tripped on B-N
persistent fault in line.
TSTRANSCO:
12 400 kV KAIGA - GUTTUR 1 21-03-2015/
17:44:00
21-03-2015/
18:44:00
DT RECEIVED AT KGA END KAPS/ KPTCL To-be-discussed
13 400 kV KAIGA - GUTTUR 2 21-03-2015/
20:03:00
21-03-2015/
20:30:00
DT RECEIVED AT KGA END KAPS/ KPTCL To-be-discussed
14 400 kV KAIGA - GUTTUR 2 21-03-2015/
17:44:00
21-03-2015/
18:58:00
DT RECEIVED AT KGA END KAPS/ KPTCL To-be-discussed
15 400 kV KHAMMAM - KALPAKKA 1 22-03-2015/
14:05:00
22-03-2015/
20:55:00
B-N FAULT PGCIL (SR-I)/ APTRANSCO PGCIL (SR-I): The feeder Auto reclosed and tripped on B-N
persistent fault in line
APTRANSCO:
16 400 kV KHAMMAM - KALPAKKA 2 22-03-2015/
12:53:00
22-03-2015/
13:28:00
R - N FAULT PGCIL (SR-I)/ APTRANSCO PGCIL (SR-I): The feeder Auto reclosed and tripped on B-N
persistent fault in line
APTRANSCO:
17 400 kV KHAMMAM - KALPAKKA 2 22-03-2015/
14:45:00
22-03-2015/
20:57:00
B-N FAULT PGCIL (SR-I)/ APTRANSCO PGCIL (SR-I): The feeder Auto reclosed and tripped on B-N
persistent fault in line
APTRANSCO:
18 400 kV KHAMMAM - MAMIDIPALLY 1 22-03-2015/
12:01:00
22-03-2015/
20:21:00
B - N FAULT PGCIL (SR-I)/ TSTRANSCO PGCIL (SR-I): The feeder Auto reclosed and tripped on B-N
persistent fault in line
TSTRANSCO:
19 400 kV KHAMMAM - KALPAKKA 1 22-03-2015/
13:36:00
22-03-2015/
13:58:00
B-N FAULT PGCIL (SR-I)/ APTRANSCO PGCIL (SR-I): The feeder Auto reclosed and tripped on B-N
persistent fault in line
APTRANSCO:
Pending Remedial Measures/ Actions taken
for the Critical Tripping Incidents (as on 16.04.2015)
Annexure-IV
20 400 kV KHAMMAM - MAMIDIPALLY 1 25-03-2015/
18:32:00
25-03-2015/
19:15:00
B-N FAULT PGCIL (SR-I)/ TSTRANSCO PGCIL (SR-I): The feeder Auto reclosed and tripped on B-N
persistent fault in line
TSTRANSCO:
21 220 kV AMBEWADI - PONDA 2 25-03-2015/
16:15:00
DISTANCE PROTECTION KPTCL To-be-discussed
22 400 kV KAIGA - GUTTUR 1 27-03-2015/ 13:40:00 27-03-2015/ 15:26:00 TRIPPED WHILE CHECKING RELAY KGS/KPTCL To-be-discussed
23 400 Kv RAICHUR PG - GOOTY 1 28-03-2015/ 19:34:00 28-03-2015/ 19:52:00 TRIPPED DURING RELAY TESTING AT RAICHUR PGCIL (SR-I) To-be-discussed
24 220 kV AMBEWADI - PONDA 1 28-03-2015/ 11:01:00 28-03-2015/ 11:24:00 TRIPPED ON B-N FAULT KPTCL To-be-discussed
25 400/220 kV ICT-2 AT MAHABOOB
NAGAR
28-03-2015/ 06:40:00 RESTRICTED EARTH FAULT TSTRANSCO To-be-discussed
26 400 Kv ALM - SVCTM-II 29-03-2015/ 15:29:00 29-03-2015/ 16:51:00 B -N FAULT TNEB R-N fault at the time of 400 kV Alamathy - Sunguvarchatram - I
Feeder tripping. (Both the feeders in the same tower).
27 400/230 Kv ICT-1 AT
SUNGUVARCHATRAM
29-03-2015/ 15:29:00 29-03-2015/ 16:32:00 OVER FLUX PROTECTION OPERATED TNEB It is 400/110kV ICT-3 at Sunguvarchatram. On 29.03.2015 @
15.29.38Hrs., 400/110KV, 3×66.67MVA, ICT-3 tripped on V/f
trip due to sudden rise in voltage (around Va=321 &
Vc=333KV) and actuation of V/f Trip of ICT-3 occurs few
milliseconds after the fault tripping of 400KV Alamathy-1
Feeder and 400KV Alamathy-2 feeder. ICT-3 was put back into
service at 16:30:18 Hrs
28 400 Kv ALM - SVCTM-I 29-03-2015/ 15:29:00 PHASE TO PHASE FAULT TNEB Line Fault due to jumper cut in B phase. Feeder normalised on
30.03.2015 @ 12:10 hrs. after attending the fault.
29 220 kV AMBEWADI - PONDA 1 30-03-2015/ 13:10:00 30-03-2015/ 20:40:00 B - N FAULT KPTCL To-be-discussed
30 400 Kv VTPS - MALKARAM 2 30-03-2015/ 11:51:00 30-03-2015/ 20:41:00 R -N FAULT APGENCO/ TSTRANSCO To-be-discussed
31 400/220 kV ICT-1 AT BTPS 31-03-2015/ 05:06:00 REASON AWAITED KPCL To-be-discussed
32 400 kV KURNOOL - SRISAILAM 01-04-2015/ 15:01:00 01-04-2015/ 15:30:00 B-N FAULT APTRANSCO/ TSGENCO To-be-discussed
33 400 kV HYDERABAD - KURNOOL 01-04-2015/ 13:01:00 01-04-2015/ 13:45:00 TRIPPED PGCIL(SR-I)/ APTRANSCO To-be-discussed
34 400 kV HYDERABAD - KURNOOL 01-04-2015/ 15:01:00 01-04-2015/ 17:34:00 TRIPPED PGCIL(SR-I)/ APTRANSCO To-be-discussed
35 400 kV KURNOOL - SRISAILAM 01-04-2015/ 13:01:00 01-04-2015/ 13:46:00 B-N FAULT APTRANSCO/ TSGENCO To-be-discussed
36 220 kV IDUKKI - UDUMALPET 03-04-2015/ 16:39:00 03-04-2015/ 17:25:00 TRIPPED ON B-PH FAULT KSEB/ TNEB TNEB: Temporary fault due to heavy rain at Edukki area. AR
operated & Lockout at Udumalpet end.
KSEB:
37 400 Kv NCTPS - VALLUR 2 03-04-2015/ 22:10:00 DIFFERENTIAL PROTECTION OPERATED TNEB/ NTECL TNEB: No visible fault. AR operated & holding at Vallur end.
NTECL:
38 400 kV DICHIPALLY - RAMAGUNDAM 05-04-2015/ 13:43:00 05-04-2015/ 22:23:00 R - N FAULT TSTRANSCO/ NTPC NTPC: The line tripped on R-N fault at 13:43 Hrs on 5/4/2015.
An attempt was made to charge from Dichipally end at 15:40 hrs.
But it tripped on SOTF. APTRANSCO have informed that they
rectified the fault. Subsequently, it was charged from
DICHIPALLY end, but it has tripped on over voltage at
ramagundam end. Finally the line was charged from RDM end at
22:30 hrs and subsequently synchronized at dichipally end.
APTRANSCO:
39 400 kV GUTTUR - NARENDRA 2 06-04-2015/ 17:07:00 06-04-2015/ 17:23:00 H/T BY MISTAKE BY NARENDRA OPERATOR
KPTCL/ PGCIL (SR-II)
To-be-discussed
40 220 kV SEDAM - TANDUR 06-04-2015/ 13:53:00 06-04-2015/ 16:25:00 OCR OPERATED KPTCL/ TSTRANSCO To-be-discussed
41 400 Kv NCTPS - VALLUR 2 07-04-2015/ 02:41:00 DIFFERENTIAL PROTECTION OPERATED TNEB/NTECL To-be-discussed
42 400 Kv NCTPS - VALLUR 2 07-04-2015/ 23:13:00 TRIPPED ON Y-PH FAULT TNEB/NTECL To-be-discussed
43 400 Kv NCTPS - VALLUR 1 08-04-2015/ 22:28:00 TRIPPED ON R-PH FAULT TNEB/NTECL To-be-discussed
44 HVDC TALCHER - KOLAR POLE 09-04-2015/ 12:04:00 09-04-2015/ 14:18:00 CONVERTER TRANSFORMER R PHASE OLTC
PRD OPERATED PGCIL (SR-II)
To-be-discussed
45 765 KV RAICHUR - KURNOOL 10-04-2015/ 18:45:00 10-04-2015/ 21:16:00 Y-B FAULT PGCIL (SR-I) To-be-discussed
46 400 Kv KAYATHAR - KARAIKUDI 1 11-04-2015/ 09:58:00 SF6 LEAKAGE IN REACTOR BREAKER TNEB To-be-discussed
47 400 kV TALAGUPPA - NEELAMANGALA 11-04-2015/ 02:22:00 11-04-2015/ 02:49:00 Y-N FAULT
KPTCL
To-be-discussed
Annexure-IV
48 400 kV MAHABOOB NAGAR - RAICHUR 11-04-2015/ 18:07:00 11-04-2015/ 18:50:00 TRIPPED ON R-PH FAULT
TSTRANSCO /KPCL
To-be-discussed
49 400 Kv NCTPS - VALLUR 1 11-04-2015/ 04:29:00 DIFFER PROTECYION IN R-EARTH DUE TO FOG
& 220 KV LINE TRIPPING DUE TO FOG
TNEB/NTECL
To-be-discussed
50 765 KV RAICHUR - KURNOOL 11-04-2015/ 18:04:00 11-04-2015/ 18:55:00 TRIPPED ON Y-B FAULT PGCIL (SR-I) To-be-discussed
51 220 Kv REGULAPADU- ALIPUR LINE 11-04-2015/ 18:13:00 11-04-2015/ 19:20:00 EFR RELAY ACTED
APTRANSCO/ KPTCL
To-be-discussed
52 220 kV SEDAM - TANDUR 11-04-2015/ 18:12:00 11-04-2015/ 19:36:00 EFR RELAY ACTED KPTCL/ TSTRANSCO To-be-discussed
53 400 kV RAICHUR - BTPS 11-04-2015/ 17:42:00 11-04-2015/ 19:02:00 TRIPPED ON B-PH FAULT KPCL To-be-discussed
54 400/110 kV ICT 2 AT ALAMATHY 11-04-2015/ 11:30:00 11-04-2015/ 17:31:00 SF6 GAS LEAKAGE TNEB To-be-discussed
55 400 Kv RAICHUR PG - GOOTY 2 11-04-2015/ 18:04:00 TRIPPED AT RCR END DUE TO LA FAILURE
PGCIL (SR-I)
To-be-discussed
56 400 Kv NCTPS - VALLUR 1 12-04-2015/ 03:47:00 DISTANCE PROTECTION TNEB/NTECL To-be-discussed
57 220 kV IDUKKI - UDUMALPET 12-04-2015/ 01:43:00 12-04-2015/ 02:18:00 B PHASE DISTANCE PROTECTION KSEB/ TNEB To-be-discussed
58 220 kV IDUKKI - UDUMALPET 12-04-2015/ 15:12:00 12-04-2015/ 16:26:00 B-N FAULT KSEB/ TNEB To-be-discussed
59 400 Kv NELLORE - SPDR 12-04-2015/ 20:37:00 12-04-2015/ 21:11:00 R-N FAULT
PGCIL (SR-I)/ PGCIL (SR-II)
To-be-discussed
60 400 Kv HASSAN - UPCL 1 12-04-2015/ 12:58:00 12-04-2015/ 13:23:00 TRIPPED ON B-PH FAULT PGCIL (SR-II) /KPTCL To-be-discussed
61 220 kV GUMMUDIPUNDI - SULLURPET 13-04-2015/ 17:15:00 13-04-2015/ 17:37:00 DISTANCE PROTECTION
TNEB/ APTRANSCO
To-be-discussed
62 400 kV ALAMATHI - VALLUR 1 13-04-2015/ 19:43:00 DISTANCE PROTECTION
TNEB/NTECL
To-be-discussed
63 400 Kv HASSAN - UPCL 1 14-04-2015/ 11:08:00 14-04-2015/ 11:39:00 TRIPPED ON B-PH FAULT PGCIL (SR-II) /KPTCL To-be-discussed
64 400 kV GHANAPUR - MAMIDIPALLY 14-04-2015/ 03:42:00 TRIPPED AT MDPL END ONLYPGCIL (SR-I) /TSTRANSCO
To-be-discussed
65 400/220 kV ICT-1 AT BTPS 14-04-2015/ 01:09:00 MAIN PROTECTION OPERATED
KPCL
To-be-discussed
66 220 kV YERANDAHALLY - HOSUR 14-04-2015/ 19:12:00 14-04-2015/ 19:37:00 B - N FAULT KPTCL/TNEB To-be-discussed
Annexure-IV