SOUTHERN AFRICAN POWER POOL1 SOUTHERN AFRICAN POWER POOL1
Southern African Power Pool
SAPP AND ISSUES OF
STANDARDISATION
By Eng. Sydney Zimba
Sandton, RSA
27 March 2017
SOUTHERN AFRICAN POWER POOL2 SOUTHERN AFRICAN POWER POOL2
A.
About SAPP
SOUTHERN AFRICAN POWER POOL3 SOUTHERN AFRICAN POWER POOL3
•DR Congo•Tanzania
•Zambia•Angola •Malawi
•Zimbabwe
•Mozambique•Botswana•Namibia
•South Africa•Lesotho
•Swaziland
12 SADC Member Countries
280 Million people
Average Electricity demand
growth rate 3.2% p.a.
Consumption 321 TWh
Installed Capacity 59539 MW
Available Capacity 52589 MW
Peak Demand 46748 MW
1. SAPP KEY FACTS
SOUTHERN AFRICAN POWER POOL4 SOUTHERN AFRICAN POWER POOL4
2. SAPP DEMAND SUPPLY SITUATION
SOUTHERN AFRICAN POWER POOL5 SOUTHERN AFRICAN POWER POOL5
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0Electricity Access in SADC, %
Electrification Access,% SADC Average Electricity Acess, %
3. ELECTRICITY ACCESS
36% SADC Region Average
•SOUTHERN AFRICAN POWER POOL•6
110 kV
132 kV
220 kV
275 kV
330 kV
400 kV
533 kV DC
765 kV
VOLTAGE LEVELSDRC
(SNEL)
ZAMBIA
(ZESCO)
ZIMBABWE
(ZESA)
MOZAMBIQUE
(EDM/HCB)
SWAZILAND
(SEC)
NAMIBIA
(NamPower)
BOTSWANA
(BPC)
LESOTHO
(LEC)
RSA
(Eskom)
RSA
(Eskom)
RSA
(Eskom)
500 *700 400
550
243
1500
90
554
100
84
1258
1200
171
20
40
* Figures depict 20015 ‘N-1-contingency-criterion’ power transfer capability limits in MW.
NOTE:
There are radial
distribution feeders
among both
operating and non-
operating
members. These
are NOT regarded
as SAPP
interconnectors.
1200
50
1381
610
150
830629
37661
219
2287
1589
4. SAPP GRID
•SOUTHERN AFRICAN POWER POOL•7
5. SAPP COMPETITIVE MARKET
72%
4%5%
2%
17%
Summary of Revenues on the Market for Period April 2016 to January 2017
Total USD68,988,935
Traded Amount [USD 49,995,451]
Wheeling Revenues [USD 2,699,294]
Losses Revenues [USD 3,120,100]
Administration Revenues [USD 1,729,980]
Congestion Income [USD 11,444,109]
2,580,381 MWh was
matched only 865,545
MWh (34%) traded due to
transmission constraints
Market share in MWh
FPM-M 8%, DAM 74%,
FPM-W 11%, IDM 7%
Average prices:
Off-peak: 3-6 USc/kWh
Standard: 4-10 USc/kWh
Peak: 10-14 USc/kWh
SOUTHERN AFRICAN POWER POOL8 SOUTHERN AFRICAN POWER POOL8
6. SAPP TRANSMISSION PROJECTS
SOUTHERN AFRICAN POWER POOL9 SOUTHERN AFRICAN POWER POOL9
B.
SAPP and
Standardisation
SOUTHERN AFRICAN POWER POOL10 SOUTHERN AFRICAN POWER POOL10
TC8: System Aspects of Electricity Supply
TC 57: Power System Data Management
Working Groups of Interest:
TC8 WG2 –HV Transmission Systems
(Designs, PMUs)
TC8 WG6 – Smartgrid Requirements
TC8 PT 62749 - Power quality aspects
TC8 PT 62786 - Distributed Energy
Resources
TC8 SC8A - Interconnection of Large
Renewable Energy Generation.
1. TECH COMMITTEES OF INTEREST
SOUTHERN AFRICAN POWER POOL11 SOUTHERN AFRICAN POWER POOL11
2. IEC Standards of interest
No. IEC Standard Subject
1 IEC TR
62511:2014
Guidelines for the design of
interconnected power systems
2 IEC/ IEEE PAS
63547:2011
Interconnecting distributed
resources with electric power
systems
3 IEC 60038:2009 IEC standard voltages
4 IEC TS 62749 Assessment of power quality -
Characteristics of electricity
supplied by public networks
5 IEC TR
62510:2014
Standardising the characteristics
of electricity
6 IEC 60059:1999 IEC standard current ratings
SOUTHERN AFRICAN POWER POOL12 SOUTHERN AFRICAN POWER POOL12
3. Power Quality in SAPP
SOUTHERN AFRICAN POWER POOL13 SOUTHERN AFRICAN POWER POOL13
Almost all SAPP member countries
have own grid codes
Jurisdiction of Regulators
Interconnection requires harmonisation of
some codes, as was done in EAPP
SAPP Operating Guidelines
Inferior to grid codes, revised in 2014
Has penalties for non-compliance
Includes requirements for connection of
IPPs
4. About Grid Codes
SOUTHERN AFRICAN POWER POOL14 SOUTHERN AFRICAN POWER POOL14
5. CONNECTION OF IPPs
SOUTHERN AFRICAN POWER POOL15 SOUTHERN AFRICAN POWER POOL15
6. EXAMPLES OF DESIGN DIVERSITY
SOUTHERN AFRICAN POWER POOL16 SOUTHERN AFRICAN POWER POOL16
Equipment specification and
procurement
Competitive bids, impact on tariffs
Equipment performance
Failure affects energy interchange
Standardisation, speedy replacement
High voltage switching
Equipment identification
Quest for single African pool
SAPP connecting to EAPP in 2019
7. Standardisation, harmonisation
SOUTHERN AFRICAN POWER POOL17 SOUTHERN AFRICAN POWER POOL17
8. SAPP System Viewer
SOUTHERN AFRICAN POWER POOL18 SOUTHERN AFRICAN POWER POOL18
Thank You
End of Presentation