Southeast Volusia Road / Bridge & Trail Projects Update Public Works Department Engineering & Construction Division Gerald N. Brinton, P.E., County Engineer August 15, 2016

Southeast Volusia Road / Bridge & Trail Projects Update · 2017-04-09 · Design Plans 95% Complete Construction Estimate $8.1 Million Realignment to South of Gabordy Canal 1000’

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Southeast Volusia Road / Bridge & Trail Projects Update · 2017-04-09 · Design Plans 95% Complete Construction Estimate $8.1 Million Realignment to South of Gabordy Canal 1000’

Southeast VolusiaRoad / Bridge & Trail Projects Update

Public Works Department

Engineering & Construction DivisionGerald N. Brinton, P.E., County Engineer

August 15, 2016

Page 2: Southeast Volusia Road / Bridge & Trail Projects Update · 2017-04-09 · Design Plans 95% Complete Construction Estimate $8.1 Million Realignment to South of Gabordy Canal 1000’

Design/Build Contract Awarded

$16,065,000

12 - Foot Wide Multi-Use Trail

20 - Mile Project

Mostly Follows Former Florida East Coast (FEC) Railway Alignment

Six Bridges Over Creeks (two @ 300’ Long)

Scheduled Completion Mid 2018

East Central Regional Rail TrailGobblers Lodge Road to Brevard County Line to Edgewater

70.5 - Mile Regional Trail System

20-mile project

Page 3: Southeast Volusia Road / Bridge & Trail Projects Update · 2017-04-09 · Design Plans 95% Complete Construction Estimate $8.1 Million Realignment to South of Gabordy Canal 1000’

S. Atlantic Sidewalk, Drainage & Parking Lot Paving Project

Marcelle Ave to Major St

Mar

cell

e A

ve

Toronita Parking Lot Overflow Paving

Maj

or

St

S Atlantic Avenue

Wilbur-by-the-Sea

6’ - 8’ Sidewalk on West Side

Stormwater Exfiltration System

Paving Toronita Overflow Lot

Paving Roadside Parking Areas

Replacement of City Water Lines

Construction Cost $2.9 Million

Construction Completion - Nov

2016

Page 4: Southeast Volusia Road / Bridge & Trail Projects Update · 2017-04-09 · Design Plans 95% Complete Construction Estimate $8.1 Million Realignment to South of Gabordy Canal 1000’

Construction Contract $1,429,000

Safety Improvement

Flattened curvature

5 - Foot Wide Paved Shoulders

Completed July 2016

Pioneer Trail / Turnbull Bay Road Intersection Realignment

Safety Improvement

Previous Alignment

New Alignment

Photo showing construction underway

Page 5: Southeast Volusia Road / Bridge & Trail Projects Update · 2017-04-09 · Design Plans 95% Complete Construction Estimate $8.1 Million Realignment to South of Gabordy Canal 1000’

Turnbull Bay Bridge Replacement

Built in 1967

Closed August 2011 for Emergency Repairs

Two Lanes, 8’ Shoulders & 6’ Sidewalks

To Remain Open During Construction

Two Bids: $8.4 million & $10.9 million ($3 million Over Federal Funding)

Evaluating Bids / Discussing Options w/ FDOT:

- Re-advertise for Construction Bids

- Seek Additional Federal Funding

Expected Completion Mid 2018

Page 6: Southeast Volusia Road / Bridge & Trail Projects Update · 2017-04-09 · Design Plans 95% Complete Construction Estimate $8.1 Million Realignment to South of Gabordy Canal 1000’

4-Laning/Realignment of Tenth St

from S. Myrtle Av to US 1

Design Plans 95% Complete

Construction Estimate $8.1 Million

Realignment to South of GabordyCanal

1000’ of Large Drainage Culverts

New Railroad Crossing w/ Ped Protection

U-Turn Opportunity Provided

Expected Completion Mid 2018

stormwater pond

New Railroad Crossing w/ pedestrian protection

dual 10’x6’ box culverts

dual 10’x6’ box culverts

Gabordy Canal

Construction staging area

Page 7: Southeast Volusia Road / Bridge & Trail Projects Update · 2017-04-09 · Design Plans 95% Complete Construction Estimate $8.1 Million Realignment to South of Gabordy Canal 1000’

Park Avenue 3-LaningOld Mission Rd to Massey Ranch Blvd

Massey Ranch Airpark

Substandard Lane Widths

Engineering Design Underway

Land for Widening / StormwaterPonds To Be Donated

Supports Industrial Development

Project Budget $3 Million

Construction Start - Early 2018

Expected Completion - Spring 2019

Page 8: Southeast Volusia Road / Bridge & Trail Projects Update · 2017-04-09 · Design Plans 95% Complete Construction Estimate $8.1 Million Realignment to South of Gabordy Canal 1000’

Southeast VolusiaRoad / Bridge & Trail Projects Update

QUESTIONS