Southeast LRT Information Session

WelcomeWelcome

Downtown to Argyll

November 24, 2010

Page 2: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Tonight's Meeting Purpose

• Present Recommended Concept Plan

– alignment

– station locations

– neighborhood access– neighborhood access

– noise study results

• Build on what we heard in September

• Recommendation is going forward for Committee of Council (TPW) consideration at non-statutory public hearing on December 8

Page 3: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Proposed Agenda

• Welcome and Introductions

• Project Background

• Overall Southeast LRT Recommended • Overall Southeast LRT Recommended

Alignment

• Segment walkthrough of alignment,

stations, and neighborhood access

• Noise Study Results

• Question and Answer

Page 4: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Southeast LRT Information SessionDowntown to Argyll

Project Background

Page 5: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Council Approvals

Council Approvals to Date

• LRT Network Plan (June, 2009)

• Southeast and West LRT Corridor (December, 2009)(December, 2009)

• Downtown Corridor (June, 2010)

Upcoming Council Considerations

• Concept Plan Review (December 8, 2010)

• Council Concept Plan Consideration (January 19, 2011)

Page 6: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

LRT Development

Preliminary DetailedConstruction

1 2 3 4

North LRT

(NAIT)

Northwest

LRT

Concept Engineering

Southeast ,

Downtown &

West LRT

Strategic

Planning

Alignment Definition

PreliminaryEngineering

DetailedEngineering Construction

LEVEL OFDETAIL

Project

Turnover

Corridor Definition

Page 7: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Where we are in the process today

• Presenting information on:– Recommended Alignment

– Recommended Station Location

and Configuration

– Neighbourhood and Pedestrian

Access

– Urban Traffic Noise Policy

and Noise Study Results

Page 8: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Where We Are Going

November

January

December

Page 9: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

LRT Network

Page 10: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Urban Style LRT

10

Charlotte, North CarolinaWillamor Media flicker

Croydon, UKAndrew Grantham, FLicker

San Jose, CA

New Jersey, NYPaul David Gerber

Page 11: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Station Typologies

Mixed Use / Town Centre Stations

11

Employment Centre Stations

Residential Centre Stations

Page 12: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Southeast and West LRT Corridors

AREA WE ARE FOCUSING ON

TONIGHT

Page 13: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Southeast LRT Information SessionDowntown to Argyll

Public Involvement Process & Update

Page 14: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Process

Review and Evaluate Options

� Community/neighbourhood-based workshops

� Stakeholder meetings and presentations

May/June 2010

� Stakeholder meetings and presentations

Present Draft Concept Plan for Feedback

� Open Houses with questionnaireSeptember 2010

Info Sessions with Recommended Plan November 2010

Public Hearing/Council December 2010

Page 15: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Competing Themes:

ensure easy

access into

neighborhoods

reducing travel

lanes

What We Heard

neighborhoodslanes

station locationintersection

operations

pedestrian

access across

the roadways

vehicle travel

times

neighborhood

access

neighborhood

short-cutting

Page 16: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Concept Plan Satisfaction

How satisfied were you with the Draft LRT Concept Plan?

Page 17: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

LRT Alignment

How satisfied are you with the proposed track location within the LRT Corridor?

Page 18: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Station Locations

Agreement that the proposed LRT station locations will

provide convenient access to important destinations?

Page 19: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Access

Satisfaction with efforts to accommodate the following user groups

Page 20: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Southeast LRT Information SessionDowntown to Argyll

RecommendedAlignment

Page 21: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Highlighted Changes Since September

• The Jasper Avenue/95 Street intersection reconfigured as 4

legged intersection

• Right in - right out access at 88 Street/95 Avenue intersection

• New connection for the emergency service building to • New connection for the emergency service building to

intersection at Bonnie Doon traffic circle

• Reduced property requirements around 69A Avenue

• Wagner Road alignment

• Bus access ramps to future transit centre at Whitemud Drive

• New signalized intersection on 66 Street, north of 28 Avenue

• Mill Woods LRT Station and Transit Centre location

21

Page 22: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Legend / Key

Property Requirements

Elevated LRT

Sidewalk

Station

Roadwork

LRT at grade

Bike Trail (not shown)

LRT Below Grade

Page 23: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Alignment / Stations – Quarterssubject to change

LRT Below Grade

Page 24: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Quarterssubject to change

Page 25: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Access – Quarterssubject to change

Page 26: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Alignment / Stations – North Saskatchewan Riversubject to change

Elevated LRT

Page 27: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Pedestrian and LRT River Crossing Examples

Edmonton

Calgaryhttp://lrt.daxack.ca/Cities/Calgary/index.html

Page 28: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

North Saskatchewan River Profile

At grade on service

road west of Muttart

Conservatory

98 Avenue

(under bridge)

Jasper Avenue

(over tunnel)Cameron Avenue

(over tunnel)

PROFILE

river

(under bridge)

Page 29: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Access – North Saskatchewan Riversubject to change

Page 30: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Alignment / Stations – Cloverdalesubject to change

North Running LRT

Page 31: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Cloverdalesubject to change

Page 32: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Access – Cloverdale

NEW

NEW

Page 33: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Alignment / Stations – Strathearnsubject to change

Centre Running LRT

Section 4a Section 4b

Page 34: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Strathearnsubject to change

Page 35: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Access – Strathearnsubject to change

NEWNEW

Page 36: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Alignment / Stations – Holyroodsubject to change

Section 4a Section 4b

East Running LRT

Page 37: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Access – Holyroodsubject to change

NEW

NEW

NEW

Page 38: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Access – Bonnie Doon Traffic Circle

85 Street

NEW

90 A

ven

ue

Page 39: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Alignment / Stations – Bonnie Doonsubject to change

West Running LRT

Page 40: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Access – Bonnie Doonsubject to change

NEW

NEW

Page 41: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Alignment / Stations – Avonmore / King Edward Parksubject to change

Section 7bSection 7a

Centre Running LRT

Page 42: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Avonmore / King Edward Park

Page 43: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Access – Avonmore / King Edward Parksubject to change

NEW

76

Ave

nu

e

Page 44: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Alignment / Stations – Argyllsubject to change

Centre Running LRT

Page 45: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Elevated LRT

Google

Page 46: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Access – Argyllsubject to change

NEW

NEW

Page 47: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Southeast LRT Information SessionDowntown to Argyll

Urban Traffic Noise Policy and Study Results

Page 48: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Urban Traffic Noise Policy (C506)

• City policy determines if noise attenuation is to be built with LRT

• A noise model is built to project future traffic noise • A noise model is built to project future traffic noise with LRT and future traffic growth (20+ years)

• Future traffic noise levels must exceed 65 dBA Leq24

to be considered for attenuation

• Noise attenuation needs through Capital or Retrofit projects

Page 49: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Urban Traffic Noise Policy (C506)

• Applies to backyard of adjacent properties (centre of

backyard)

• Minimum 60% support by adjacent property owners

• Stakeholders are involved in the determining the • Stakeholders are involved in the determining the

appearance of the proposed treatment

• Noise attenuation must be

technically,

administratively and

economically practical

Page 50: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

How is Noise Modeling Done

• Measure existing noise

levels along corridor and

develop model

• Projected 2041 volumes,

proposed lane configuration

and the addition of LRT

• Assess the projected noise

levels against the UTNP

Page 51: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Energy Equivalent Level (Leq)

• Accounts for the fluctuating levels

• Is sensitive to the peak sounds

• Is NOT the average sound level• Is NOT the average sound level

• Is used in the majority of sound

regulations (City of Edmonton UTNP)

Page 52: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Energy Equivalent Level (Leq)

Leq 24

Page 53: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Noise Study Results

• Sound levels ranging from 51.3 to above

65.0 dBA Leq24 (as measured in the rear

outdoor amenity area)

• Noise climate was dominated by either

local traffic on the main or adjacent roads

• Noise climate was generally broadband in

nature, with no tonal components and no

dominant stationary sources

Page 54: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Noise Study Results

Areas exceed

65.0 dBA Leq24

threshold under

the UTNP

Page 55: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Southeast LRT Information SessionDowntown to Argyll

Next Steps

Page 56: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Overall Process

Page 57: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Next Steps

November

January

December

Page 58: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

• Available parking programs– Commercial

(Bylaw 5590 signs, Private Parking Agency

Enforcement)

– Residential

Ongoing Considerations

– Residential

(Residential Parking Programs, localized parking

restrictions)

– Additional engineering and study is required

• Safety/Security

• Traffic circulation within neighbourhoods

• Station Area Planning

Page 59: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Ongoing Considerations

• Funding

• Traffic accommodation during construction

• Geotechnical / Environmental / Utilities

• Community/business impacts

Page 60: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Southeast LRT Information SessionDowntown to Argyll

Question and Answer

Page 61: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Question and Answer Session “Ground Rules”

• 2 minutes for each participant to ask a

question or make a comment

• One follow-up question (1 minute)

• Will recognize 3 people for each round of questions; persons with microphones will go to those persons with microphones will go to those participants to ask their questions

• 3 rounds of questions

• Additional questions from same person not recognized until no new participants are wanting to ask questions

• Questions and responses will be recorded; please use microphones

Page 62: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Conclusion

Presentation

available on

website:website:

Page 63: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Conclusion

• Register to speak at Public Hearing

• Register to speak on

or call the City Clerk’s office at .

• Following the non-statutory public hearing, the LRT Concept

Plan recommendation will be forwarded to City Council for

review and consideration in January 2011

63

Page 64: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

LRT Information Session Schedule

Southeast LRT

November 24, 2010 Downtown to Argyll Road

November 25, 2010 Whyte Avenue to Mill Woods Town Centre

www.edmonton.ca/LRTProjects

November 25, 2010 Whyte Avenue to Mill Woods Town Centre

West LRT

November 29, 2010 Lewis Estates to Stony Plain Road/149 Street

November 30, 2010 Stony Plain Road/149 Street to Downtown

Page 65: Southeast LRT Info Session - Downtown to Argyll - November ......Title Southeast LRT Info Session - Downtown to Argyll - November 2010 Author City of Edmonton Subject Southeast LRT

www.edmonton.ca/LRTProjects

Southeast LRT Information SessionsDowntown to Argyll