Maine Department of Transportation Work Plan for Calendar Years 2014-2015-2016 Work Plan Town Report 1 January 8, 2014 South Portland This report shows the 2014-2016 Work Plan entries for South Portland. The costs listed are the tot al cost of these projects   some of which may ex tend into neighboring towns. It also shows a listing of maintenance work specifically recorded to South Portland in 2013, as well as any 2013 Local Road Assistance payments. Activities that are managed on a larger scale, such as snow & ice control, and maintenance work done by contract are not listed. The maintenance accomplishments may also extend into neighboring towns, but are listed in the first town where the work was reported. Finally, any capital projects that were completed in 2013 are also listed.  Planned Capital and Maintenance Work 2014-2016 Work Plan Year: 2014 Municipalities(s):  South Portland Asset(s): Bill Vachon Drive Description: Beginning at Carver Boulevard and extending 0.05 of a mile to Main Street, and 378' of Ramp towards I-295 - PACTS sponsored.  ID 020242.00 Scope of Work Highway Preservation Paving Highway Corridor Priority 2 Estimated Funding $40,000 Work Plan Year: 2014 Municipalities(s):  South Portland Asset(s): Market Street Description: Beginning at Waterman Drive and extending north 0.19 of a mile to Ocean Street - PACTS sponsored.  ID 020299.00 Scope of Work Highway Preservation Paving Highway Corridor Priority 5 Estimated Funding $113,600 Work Plan Year: 2014 Municipalities(s):  South Portland Asset(s): Cottage Road Description: Beginning at Broadway and extending 0.26 of a mile to Ocean Street - PACTS sponsored.  ID 020257.00 Scope of Work Highway Preservation Paving Highway Corridor Priority 5 Estimated Funding $192,500 Work Plan Year: 2014 Municipalities(s):  South Portland, Portland Asset(s): Route 9 Description: Beginning 0.68 of a mile north of Long Creek Drive extending northerly 0.78 of a mile to Route 22.  ID 020287.00 Scope of Work Highway Preservation Paving Highway Corridor Priority 2 Estimated Funding $257,900 Work Plan Year: 2014 Municipalities(s):  South Portland Asset(s): Stanford Street Description: Beginning at Henley Street and extending 0.06 of a mile to Broadway Street - PACTS sponsored.  ID 020310.00 Scope of Work Highway Preservation Paving Highway Corridor Priority 5 Estimated Funding $43,900 Work Plan Year: 2014 Municipalities(s):  South Portland Asset(s): Broadway Description: Install second traffic control cabinet at Waterman Drive - PACTS sponsored.  ID 020560.00 Scope of Work Highway Safety and Spot Improvements Highway Corridor Priority 3 Estimated Funding $50,000 Work Plan Year: 2014 Municipalities(s):  South Portland, Portland Asset(s): Casco Bay Bridge

South Portland Dot

Embed Size (px)

Citation preview

 

Maine Department of Transportation Work Plan for Calendar Years 2014-2015-2016

Work Plan Town Report 1 January 8, 2014

South Portland 

This report shows the 2014-2016 Work Plan entries for South Portland. The costs listed are the total cost of

these projects  – some of which may extend into neighboring towns. It also shows a listing of maintenance

work specifically recorded to South Portland in 2013, as well as any 2013 Local Road Assistance payments.

Activities that are managed on a larger scale, such as snow & ice control, and maintenance work done by

contract are not listed. The maintenance accomplishments may also extend into neighboring towns, but are

listed in the first town where the work was reported. Finally, any capital projects that were completed in 2013

are also listed. 

Planned Capital and Maintenance Work 2014-2016Work Plan Year: 2014Municipalities(s): South PortlandAsset(s): Bill Vachon Drive

Description: Beginning at Carver Boulevard and extending 0.05 of a mile to Main Street, and 378' of Ramp towards I-295 -PACTS sponsored.

 ID020242.00

Scope of WorkHighway Preservation Paving

Highway Corridor Priority2

Estimated Funding$40,000

Work Plan Year: 2014Municipalities(s): South PortlandAsset(s): Market Street

Description: Beginning at Waterman Drive and extending north 0.19 of a mile to Ocean Street - PACTS sponsored.

 ID020299.00

Scope of WorkHighway Preservation Paving

Highway Corridor Priority5

Estimated Funding$113,600

Work Plan Year: 2014Municipalities(s): South PortlandAsset(s): Cottage Road

Description: Beginning at Broadway and extending 0.26 of a mile to Ocean Street - PACTS sponsored.

 ID020257.00

Scope of WorkHighway Preservation Paving

Highway Corridor Priority5

Estimated Funding$192,500

Work Plan Year: 2014Municipalities(s): South Portland, PortlandAsset(s): Route 9

Description: Beginning 0.68 of a mile north of Long Creek Drive extending northerly 0.78 of a mile to Route 22.

 ID020287.00

Scope of WorkHighway Preservation Paving

Highway Corridor Priority2

Estimated Funding$257,900

Work Plan Year: 2014Municipalities(s): South PortlandAsset(s): Stanford Street

Description: Beginning at Henley Street and extending 0.06 of a mile to Broadway Street - PACTS sponsored.

 ID020310.00

Scope of WorkHighway Preservation Paving

Highway Corridor Priority5

Estimated Funding$43,900

Work Plan Year: 2014Municipalities(s): South PortlandAsset(s): Broadway

Description: Install second traffic control cabinet at Waterman Drive - PACTS sponsored.

 ID020560.00

Scope of WorkHighway Safety and Spot Improvements

Highway Corridor Priority3

Estimated Funding$50,000

Work Plan Year: 2014Municipalities(s): South Portland, PortlandAsset(s): Casco Bay Bridge

 

Maine Department of Transportation Work Plan for Calendar Years 2014-2015-2016

Work Plan Town Report 2 January 8, 2014

Description: Seal sidewalk on Casco Bay Bridge (No.5900) that crosses Fore River.

 ID021127.00

Scope of WorkMaintenance - Bridge/Structures

Highway Corridor Priority3

Estimated Funding$78,000

Work Plan Year: 2015-16Municipalities(s): South PortlandAsset(s): Eastern Trail

Description: Bicycle and Pedestrian Improvements along Old Bog Road. Beginning at Gary L. Maietta Way in SouthPortland and extending to Pond View Drive in Scarborough - PACTS sponsored.

 ID019426.00

Scope of WorkBicycle/Pedestrian

Highway Corridor PriorityN/A

Estimated Funding$189,300

Work Plan Year: 2015-16Municipalities(s): South PortlandAsset(s): Route 1

Description: New multi-use path from Broadway Street and extending 0.7 of a mile to Veterans Memorial Bridge (No. 3945)over Fore River - PACTS sponsored.

 ID020548.00

Scope of WorkBicycle/Pedestrian

Highway Corridor Priority1

Estimated Funding$301,100

Work Plan Year: 2015-16Municipalities(s): South PortlandAsset(s): I-295 Ramp 5/Red Brook Br

Description: Restore Aquatic Organism passage in Red Brook at Interstate-295 Ramp 5/Red Brook Bridge (No. 6284).

 ID020535.00

Scope of WorkBridges Other

Highway Corridor Priority1

Estimated Funding$86,000

Work Plan Year: 2015-16Municipalities(s): South PortlandAsset(s): Route 1

Description: Beginning 0.04 of a mile south of Maine Turnpike On Ramp and extending northerly 0.08 of a mile.

 ID022542.00

Scope of WorkHighway Preservation Paving

Highway Corridor Priority1

Estimated Funding$250,000

Work Plan Year: 2015-16Municipalities(s): South Portland, ScarboroughAsset(s): Cummings Road

Description: Beginning at Payne Road and extending northerly 0.5 of a mile.

 ID022530.00

Scope of WorkHighway Preservation Paving

Highway Corridor Priority3

Estimated Funding$300,000

Work Plan Year: 2015-16Municipalities(s): South PortlandAsset(s): Route 1

Description: Beginning at Broadway and extending northerly 0.06 of a mile.

 ID022547.00

Scope of WorkHighway Preservation Paving

Highway Corridor Priority1

Estimated Funding$145,000

Work Plan Year: 2015-16Municipalities(s): South PortlandAsset(s): Route 1

Description: Beginning 0.03 of a mile south of Memory Lane and extending northerly 1.02 miles.

 ID022534.00

Scope of WorkHighway Preservation Paving

Highway Corridor Priority1

Estimated Funding$664,000

Work Plan Year: 2015-16Municipalities(s): South PortlandAsset(s): Maine Turnpike Approach

Description: Beginning at Payne Road and extending easterly 3.68 miles, includes both eastbound and westbound lanes.

 

Maine Department of Transportation Work Plan for Calendar Years 2014-2015-2016

Work Plan Town Report 3 January 8, 2014

 ID020273.00

Scope of WorkHighway Preservation Paving

Highway Corridor Priority1

Estimated Funding$2,494,000

Work Plan Year: 2015-16Municipalities(s): South PortlandAsset(s): Maine Turnpike Approach

Description: Beginning at Western Avenue and extending westerly 1.90 miles.

 ID022520.00

Scope of WorkHighway Safety and Spot Improvements

Highway Corridor Priority1

Estimated Funding$600,000

Local Road Assistance – Fiscal Year 2013 $356,222

Maintenance Accomplishments – 20131.00 Drainage Structures Repaired

541.00 Linear Feet of Shoulder Rebuilt

32.78 Shoulder Miles of Mowing

33.71 Miles of Striping Applied

16.00 Minor Sign(s) Installed or Maintained

5.20 Ton(s) of Cold Patch Applied

13.90 Shoulder Miles of Sweeping

300.00 Linear Feet of Brush Removed

3.00 Emergency Event Responses

66.17 Shoulder Miles of Litter and Debris Removal16.00 Linear Feet of Bridge Joints Repaired or Replaced

3.00 Bridge(s) Washed

100.00 Linear Feet of Guardrail or Fence Maintained

6.00 Trees Removed

Completed Capital Projects  – 2013  019091.00 SO. PORTLAND, CUMMINGS ROAD Highway Reconstruction: Beginning at Running Hill Road and

extending northerly 0.73 of a mile to the Westbrook town line.  019098.00 SO. PORTLAND, BROADWAY Highway Resurfacing: Beginning at Cottage Road and extending

northeasterly 1.14 miles to Pickett Street.  016788.00 SCARBOROUGH-FALMOUTH, I-295 NB Highway Resurfacing: Beginning approximately 400 feet

northerly of the MTA toll booth and extending northerly 7.82 miles to the Portland - Falmouth town line.  019084.00 SO. PORTLAND, RUMERY ST. Highway Resurfacing: Beginning at Route 1 and extending northerly

0.57 of a mile to Dartmouth Street.  019097.00 SO. PORTLAND, DARTMOUTH ST. Highway Resurfacing: Beginning at Rumery Street and extending

easterly 0.23 of a mile.019117.00 PORTLAND, INTERNAT'L PKY Highway Resurfacing: Beginning at Congress St. and continuing for 0.42

of a mile to .06 miles southerly of Jetport Blvd. Jetport Blvd: Extending 0.05 of a mile to the intersection ofInternational Parkway, for a total of 0.47 of a mile.

  017929.10 PORTLAND 295 BR DECK SEC 2 Continuation of Bridge deck paving, joint work and guardrailattachments in Portland and South Portland on 12 bridges.