A: SOUTH PARS DEVELOPMENT PROJECT PHASE 1 B: LAVAN ISLAND CALM MOORING TECHNICAL PROJECT 1 -Total South Pars Project- phase 2&3, coating work PIPE THICKNESS: 20.6mm PIPELENTH: 12m PIPE EXTERNAL DIAMETER. 32" CONCRETE THICKNESS: 88 & 65 mm Total quantity of line pipes to be coated is 213,900 m with the following details: *The quantity of the bare pipes to be coated : 17824 joints *The quantity of anodes to be installed are: 2 - Future project South Pars Project Phase 1 Concrete thickness Quantity 65 mm 171 km 88 mm 43km AnodeType 1 2 3 4 Thickness 74 51 61 84 Quantity 62 160 952 176 Total 1350 Pipe O.D. 30" Pipe O.D. 32" Pipe O.D. 18" Total quantity of line pipes to be coated is 3.2 km. Total quantity of line pipes to be coated is 105.5 km. Total quantity of line pipes to be coated is 5.1km . ROW PIPE SIZE CONCRETE HICKNESS (mm) PIPELINE LENGTH (km) ANODE Qty. 1 32” 50 50.8 927 2 32” 65 51.85 3 32” 90 2.5 4 30” 90 2.8 44 5 18” 50 5.85 100 TOTAL LENGTH 113.035 TOTAL: 1071 ROW PIPE SIZE CONCRETE THICKNES(mm) PIPELINE LENGTH (m) ANODE Qty. Page 1 of 2 Untitled Document 28/03/2011 http://www.ioec.ir/Cwcco/project.htm

South Pars Pipelines 1 2

Embed Size (px)

DESCRIPTION

South Pars Project info

Citation preview

  • A: SOUTH PARS DEVELOPMENT PROJECT PHASE 1

    B: LAVAN ISLAND CALM MOORING TECHNICAL PROJECT

    1 -Total South Pars Project- phase 2&3, coating work PIPE THICKNESS: 20.6mm PIPELENTH: 12m PIPE EXTERNAL DIAMETER. 32" CONCRETE THICKNESS: 88 & 65 mm Total quantity of line pipes to be coated is 213,900 m with the following details:

    *The quantity of the bare pipes to be coated : 17824 joints *The quantity of anodes to be installed are:

    2 - Future project South Pars Project Phase 1

    Concrete thickness Quantity65 mm 171 km 88 mm 43km

    AnodeType 1 2 3 4 Thickness 74 51 61 84 Quantity 62 160 952 176

    Total 1350

    Pipe O.D. 30" Pipe O.D. 32" Pipe O.D. 18"

    Total quantity of line pipes to be coated is 3.2 km. Total quantity of line pipes to be coated is 105.5 km. Total quantity of line pipes to be coated is 5.1km .

    ROW PIPE SIZE

    CONCRETE HICKNESS

    (mm)

    PIPELINE LENGTH

    (km)

    ANODE Qty.

    1 32 50 50.8 927 2 32 65 51.85

    3 32 90 2.5 4 30 90 2.8 44 5 18 50 5.85 100

    TOTAL LENGTH 113.035 TOTAL: 1071

    ROW PIPE

    SIZE CONCRETE

    THICKNES(mm) PIPELINE

    LENGTH (m) ANODE Qty.

    Page 1 of 2Untitled Document

    28/03/2011http://www.ioec.ir/Cwcco/project.htm

  • C: ABOOZAR SUBSEA PIPELINE

    1 42 60 4500 75

    ROW PIPE

    SIZE

    CONCRETE

    THICKNESS

    (mm)

    PIPELINE

    LENGTH

    (km)

    ANODE

    Qty.

    1 10 35 1.2

    59 40 2

    2 12 35 15.1 285 3 16 35 6.5 120 4 18 35 11.8 214 5 24 54 10.1 104

    TOTAL LENGTH 46.7 TOTAL: 772