A: SOUTH PARS DEVELOPMENT PROJECT PHASE 1
B: LAVAN ISLAND CALM MOORING TECHNICAL PROJECT
1 -Total South Pars Project- phase 2&3, coating work PIPE THICKNESS: 20.6mm PIPELENTH: 12m PIPE EXTERNAL DIAMETER. 32" CONCRETE THICKNESS: 88 & 65 mm Total quantity of line pipes to be coated is 213,900 m with the following details:
*The quantity of the bare pipes to be coated : 17824 joints *The quantity of anodes to be installed are:
2 - Future project South Pars Project Phase 1
Concrete thickness Quantity65 mm 171 km 88 mm 43km
AnodeType 1 2 3 4 Thickness 74 51 61 84 Quantity 62 160 952 176
Total 1350
Pipe O.D. 30" Pipe O.D. 32" Pipe O.D. 18"
Total quantity of line pipes to be coated is 3.2 km. Total quantity of line pipes to be coated is 105.5 km. Total quantity of line pipes to be coated is 5.1km .
ROW PIPE SIZE
CONCRETE HICKNESS
(mm)
PIPELINE LENGTH
(km)
ANODE Qty.
1 32 50 50.8 927 2 32 65 51.85
3 32 90 2.5 4 30 90 2.8 44 5 18 50 5.85 100
TOTAL LENGTH 113.035 TOTAL: 1071
ROW PIPE
SIZE CONCRETE
THICKNES(mm) PIPELINE
LENGTH (m) ANODE Qty.
Page 1 of 2Untitled Document
28/03/2011http://www.ioec.ir/Cwcco/project.htm
C: ABOOZAR SUBSEA PIPELINE
1 42 60 4500 75
ROW PIPE
SIZE
CONCRETE
THICKNESS
(mm)
PIPELINE
LENGTH
(km)
ANODE
Qty.
1 10 35 1.2
59 40 2
2 12 35 15.1 285 3 16 35 6.5 120 4 18 35 11.8 214 5 24 54 10.1 104
TOTAL LENGTH 46.7 TOTAL: 772