SOUTH MONTEREY COUNTY JOINT UNION HIGH SCHOOL DISTRICT
2018 DISTRICT FACILITIES MASTER PLAN
ADMINISTRATIONDr. Brian Walker, Superintendent
Sherrie Castellanos, Chief Business Official
Jonathan Sison, Director of Educational Services
Robert Silveira, Operations Supervisor
Christina Jimenez, Director of Technology
Damon Felice, Felice Consulting Services
PRINCIPALS / SITE REPRESENTATIVESFrank Lynch, Principal of Greenfield High School
Janet Sanchez Matos, Principal of King City High School
Michael Gray, Assistant Principal of King City High school
John Ratcliff, Athletic Director of Greenfield High School
Tige Minoz, Economics Teacher
BOARD OF TRUSTEESPaulette Bumbalough, Board President
David Gaboni
Paul Dake
Leslie Girard
Joe Santibanez
2018FACILITIES MASTER PLAN
SOUTH MONTEREY COUNTY JOINT UNION HIGH SCHOOL DISTRICT
T A B L E O F
C O N T E N T S01 INTRODUCTION
Introduction ............................................ 4
SMCJUHSD Guiding Principles ............... 5
Facilities Master Plan Purpose ............... 6
Facilities Master Plan Process. ............... 7
02 FACILITIESASSESSMENT / PLANNING
Greenfield HS Intro .................................. 8 Facility Assessment ............................. 9 - 10 Project List ........................................... 11 Concept Site Plan ................................ 12 Concept Enlargements ....................... 13 - 16
King City HS Intro .................................... 17 Facility Assessment ............................. 18 - 19 Project List ........................................... 20 Concept Site Plan ................................ 21 Concept Enlargements ....................... 22 - 25
03 APPENDIX
Greenfield HS Survey Results................... 26 - 37
King City HS Survey Results ..................... 38 - 69
Pinnacle Academy Charter Survey Results ....................................................... 70 - 81
Portola-Butler Continuation HS Survey Results ....................................................... 82 - 93
Greenfield HS Facility Assessment Additional Field Notes ................................................ 94
King City HS Facility Assessment Additional Field Notes ................................................ 95 - 96
Meeting Notes / Planning Workshops .... 97 - 101
SOUTH MONTEREY COUNTY JOINT UNION HIGH SCHOOL DISTRICT
0 1 | I N T R O D U C T I O N
This Facilities Master Plan was created over the 2017-2018 school year. It is meant to be used as a tool for the future planning and development of the South Monterey County High School District. It is important for the pride and development of young people to have a school facility that they can be proud of and that they feel is given value by their School District. Both of these campuses serve as a social gathering place and it is important to maintain the hometown feel. The reality of modern security concerns should be met while still giving a welcoming feel.
“Nothing is more important to success than proper planning. In the case of school districts, this includes not only planning projects, but also developing district wide facility master plans. If developed appropriately, a facility master plan can significantly impact the quality of education in a school district and build a better vision for the community. A master plan serves as a comprehensive road map, spanning 5-15
years, which a district uses to guide facility planning.” Dr. William DeJong ‘Building a Vision: developing an educational facility master plan can have a positive impact on the quality of education, January 2006. Journal of School Planning & Management.
SMCJUHSD is encouraged to use this document as a tool to guide project priority, project scope and to be used as a living document which can change given current conditions. Input from the district and the stakeholders is encouraged to continuously provide insight so that this document may be updated and refined as the District grows.
Stakeholders at both schools are committed to maintaining academic standings and to building a foundation for every student’s success in their life during and after high school.
“Nothing is more important to success than proper planning.”Dr. William DeJong
4P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
INTRODUCTION
SOUTH MONTEREY COUNTY JOINT UNION HIGH SCHOOL DISTRICT
GUIDING PRINCIPLESVISION: South Monterey County Joint Union High School District is a progressive academic learning community that is committed to life-long educational success.
MISSION: South Monterey County Joint Union High School District inspires and empowers all students with the knowledge and skills necessary to achieve their full potential as responsible, productive citizens.
5P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
SOUTH MONTEREY COUNTY JOINT UNION HIGH SCHOOL DISTRICT
FACILITIES MASTER PLAN PURPOSEThe Facilities Master Plan provides macro-level information about the buildings, grounds, existing conditions, and enrollment at each school site within the South Monterey County Joint Union High School District.
South Monterey County Joint Union High School District (SMCJUHSD) authorized the 2018 Facilities Master Plan to consider the District’s long term goals considering the needs at each campus. The initial phase involved determining the Districts facility needs and included building assessments, community meetings, and an on-line survey. From this information concept plans and project lists were generated. The final phase involved preparing budgets and prioritizing the projects. This ultimately lead to a project list broken into three categories: 1.) Short Term, possible bond projects, 2.) Mid Term Projects that could be possibly be implemented with adding local funds, such as State reimbursement and 3.) Long Term Needs.
This document will aid SMCJUHSD in making long-range facilities planning decisions about future new construction, modernization, and deferred maintenance projects.
6P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
SOUTH MONTEREY COUNTY JOINT UNION HIGH SCHOOL DISTRICT
FACILITIES MASTER PLAN PROCESS
7P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
PMSM Architects met with District representatives to strategize the process and then visited each of the sites with groups of stakeholders, including campus administrators, and maintenance personnel. Each building on each campus was evaluated for condition and campus-specific strengths. Issues and challenges were discussed with the teams. Sites were evaluated considering parking, traffic flow for drop off and pick up, adequacy of hard court and turf play areas, site drainage, adequacy of shade, and site accessibility. The District also provided archive information and facilities evaluations by staff for the Architect’s use.
FACILITIES ASSESSMENT
Based upon the results of the Facilities Assessment and discussions with project stakeholders regarding campus goals, the Architect developed Conceptual Site Plans. In the Facilities Assessment phase the team identified buildings which required little or no work, buildings which required minor modernization, buildings which required major modernization, and buildings recommended for demolition. These were identified on the Preliminary Site Plans and any new structures or other improvements incorporated into the proposed ultimate design. Refined Schematic Site Plans and related Preliminary Project Budgets related to the proposed scope were prepared and brought to the Steering Committee for review and discussion.
EVALUATION & PLANNING
Initial planning was performed to identify all needs and from a broad perspective consider goals and strategies with the unconstrained mindset of “What if we could do everything needed or wanted?” Then considering the estimated budgets associated with the resulting ideas, the team began a process of determining which projects and proposals were most important and what levels of funding were reasonable and attainable. The goal was to create a prioritized list, overall and by campus, and separate the list into a first tier of anticipated funding, middle tier that could be funded from mid-term state reimbursement, and finally a third tier that are desirable if additional or future funds became available.
PRIORITIZATION
SOUTH MONTEREY COUNTY JOINT UNION HIGH SCHOOL DISTRICT
0 2 | F A C I L I T I E S A S S E S S M E N T& P L A N N I N G
SOUTH MONTEREY COUNTY JOINT UNION HIGH SCHOOL DISTRICT
GREENFIELD HIGH SCHOOLYear Built: 1999
Acreage :43.8 acres (Gross)41.61 acres (Usable)
Current Enrollment: 1210
Projected Enrollment 2021: 1386
School Size Capacity: 1200
Class Size Average: 28
Classroom Space:Total Classrooms = 39 - Greenfield HS Classrooms - 35 - Pinnacle Academy Charter Classrooms - 4
Relocatable:Existing Classrooms - 20Permanent Classrooms - 4
8P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
SOUTH MONTEREY COUNTY JOINT UNIFIED HIGH SCHOOL DISTRICTGREENFIELD HIGH SCHOOL
Rating Key1= no repair necessary 1-52= cosmetic repair necessary 6-103= preventative maintenance necessary 11-154= repair necessary 16-205= repair necessary for use past 2 years 21-256= major repair needed for immediate continued use 26+
BUILDING RELO (Y/N)
MODULAR (Y/N) ROOM USE DSA# YEAR
BUILT AGEAGE
SINCE MOD
HAZ STRUCT. FLS BLDG ADA ROOF ENVL. GLAZING ACOUS. DAYLITE HVAC SITE
ADA SITE UTIL SECRTY AESTH. SUM PRIORITY FACTOR
A N N ADMIN. BLDG. RECEPTION 66238, 114886 1997 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8OFFICES OFFICES 20 20 1 1 1 1 1 3 1 1 1 6 1 1 1 1 24 4.8
CONF. RM. CONF. RM. 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8LOUNGE LOUNGE 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8
RESTROOMS RESTROOMS 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8B N N LIBRARY RECP./CIRC. 66238, 114886 1997 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8
READING READING 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8COMP. LAB COMP. LAB 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8
RESTROOMS RESTROOMS 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8C N N MPR MPR 66238, 114886 1997 20 20 1 1 1 1 1 3 1 1 1 3 1 1 1 1 21 4.2
STAGE STAGE 20 20 1 1 1 1 1 3 1 1 1 3 1 1 1 1 21 4.2BAND BAND 20 20 1 1 1 1 1 3 1 1 1 3 1 1 1 1 21 4.2
CHORAL CHORAL 20 20 1 1 1 1 1 3 1 1 1 3 1 1 1 1 21 4.2CLASSROOM LIFE/SKILLS 20 20 1 1 1 1 1 3 1 1 1 3 1 1 1 1 21 4.2RESTROOMS RESTROOMS 20 20 1 1 1 1 1 3 1 1 1 3 1 1 1 1 21 4.2
D N N CLASSROOM (1) CLASSROOM 66238, 114886 1997 20 20 1 1 1 1 1 3 1 1 1 3 1 1 1 1 21 4.2CLASSROOM ART 20 20 1 1 1 1 1 3 1 1 1 3 1 1 1 1 21 4.2CLASSROOM GRAPHIC ARTS 20 20 1 1 1 1 1 3 1 1 1 3 1 1 1 1 21 4.2
SHOP VEHICLE 20 20 1 1 1 1 1 3 1 1 1 3 1 1 1 1 21 4.2SHOP AGRICULTURE 20 20 1 1 1 1 1 3 1 1 1 3 1 1 1 1 21 4.2
RESTROOMS RESTROOMS 20 20 1 1 1 1 1 3 1 1 1 3 1 1 1 1 21 4.2E N N GYMNASIUM GYMNASIUM 66238, 114886 1997 20 20 1 1 1 3 1 3 1 1 1 5 1 1 1 1 25 5.0
LOBBY LOBBY 20 20 1 1 1 1 1 3 1 1 1 5 1 1 1 1 23 4.6RESTROOMS RESTROOMS 20 20 1 1 1 1 1 3 1 1 1 5 1 1 1 1 23 4.6
WT. RM. WT. RM. 20 20 1 1 1 1 1 3 1 1 1 5 1 1 1 1 23 4.6WREST/DANCE WREST/DANCE 20 20 1 1 1 1 1 3 1 1 1 5 1 1 1 1 23 4.6
F N N CLASSROOMS (3) CLASSROOMS 66238, 114886 1997 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1CLASSROOMS (2) SCIENCE LABS 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8
CONF. RM. CONF. RM. 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8OFFICES STAFF 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8
RESTROOMS STAFF 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8G N N CLASSROOMS (4) SCIENCE LABS 66238, 114886 1997 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8
CLASSROOMS (2) COMP. LABS 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8CONF. RM. CONF. RM. 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8
OFFICES STAFF 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8RESTROOMS STAFF 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8
This worksheet establishes data for determination of priority projects across a campus or district wide level. Please note that the findings in this spreadsheet are based on the architect's field observations only. In the event any hazardous, structural, or fire and life safety discrepancies are witnessed by the architect, the district may be required to conduct additional testing or research to ensure the safety of the students, staff, and community. The architect will report any findings of this nature to the district.
FACILITY ASSESSMENT
9P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
BUILDING RELO (Y/N)
MODULAR (Y/N) ROOM USE DSA# YEAR
BUILT AGEAGE
SINCE MOD
HAZ STRUCT. FLS BLDG ADA ROOF ENVL. GLAZING ACOUS. DAYLITE HVAC SITE
ADA SITE UTIL SECRTY AESTH. SUM PRIORITY FACTOR
H Y N CLASSROOMS (8) CLASSROOMS 66238, 114886 1997 20 20 1 1 1 1 1 1 1 1 1 6 1 1 1 1 22 4.4RESTROOMS RESTROOMS 1997 20 20 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 3.4
I Y N RELO. BLDG. MAINTENANCE 66338 1997 20 20 1 1 1 4 1 3 1 1 1 1 4 1 1 1 25 5.0J Y N RELO. BLDG. CHILD CARE 103440 2001 16 16 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 2.72K Y N CLASSROOMS (4) CLASSROOMS 108448 2007 10 10 1 1 1 1 1 1 1 1 1 5 1 1 1 1 21 2.1
CLASSROOMS (4) CLASSROOMS 104762 2002 15 15 1 1 1 1 1 1 1 1 1 5 1 1 1 1 21 3.2L Y N CLASSROOMS (2) CLASSROOMS 115700 2017 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 0.2M Y N SPEC.. ED. (4) CLASSROOMS 2001 16 16 1 1 1 1 1 1 1 1 1 6 4 1 1 1 25 4.0
RESTROOMS RESTROOMS 16 16 1 1 1 1 1 1 1 1 1 1 4 1 1 1 20 3.2N Y N CLASSROOMS (2) CLASSROOMS 116633 2017 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 0.2
PLAY N N FIELD #1 BB DIA./SB FIELD 66238 1997 20 20 1 1 1 4 1 1 1 1 1 0 4 1 1 1 22 4.4FIELDS FIELD #2 BB DIA./SB-SOCCER 20 20 1 1 1 4 1 1 1 1 1 0 4 1 1 1 22 4.4
FIELD #3 FOOTBALL/TRACK 20 20 1 1 1 4 1 1 1 1 1 0 1 1 1 1 19 3.8HARD COURTS BASKETBALL 20 20 1 1 1 1 1 1 1 1 1 0 1 1 1 1 16 3.2
10P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
SOUTH MONTEREY COUNTY JOINT UNIFIED HIGH SCHOOL DISTRICTGREENFIELD HIGH SCHOOL
Rating Key1= no repair necessary 1-52= cosmetic repair necessary 6-103= preventative maintenance necessary 11-154= repair necessary 16-205= repair necessary for use past 2 years 21-256= major repair needed for immediate continued use 26+
BUILDING RELO (Y/N)
MODULAR (Y/N) ROOM USE DSA# YEAR
BUILT AGEAGE
SINCE MOD
HAZ STRUCT. FLS BLDG ADA ROOF ENVL. GLAZING ACOUS. DAYLITE HVAC SITE
ADA SITE UTIL SECRTY AESTH. SUM PRIORITY FACTOR
A N N ADMIN. BLDG. RECEPTION 66238, 114886 1997 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8OFFICES OFFICES 20 20 1 1 1 1 1 3 1 1 1 6 1 1 1 1 24 4.8
CONF. RM. CONF. RM. 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8LOUNGE LOUNGE 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8
RESTROOMS RESTROOMS 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8B N N LIBRARY RECP./CIRC. 66238, 114886 1997 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8
READING READING 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8COMP. LAB COMP. LAB 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8
RESTROOMS RESTROOMS 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8C N N MPR MPR 66238, 114886 1997 20 20 1 1 1 1 1 3 1 1 1 3 1 1 1 1 21 4.2
STAGE STAGE 20 20 1 1 1 1 1 3 1 1 1 3 1 1 1 1 21 4.2BAND BAND 20 20 1 1 1 1 1 3 1 1 1 3 1 1 1 1 21 4.2
CHORAL CHORAL 20 20 1 1 1 1 1 3 1 1 1 3 1 1 1 1 21 4.2CLASSROOM LIFE/SKILLS 20 20 1 1 1 1 1 3 1 1 1 3 1 1 1 1 21 4.2RESTROOMS RESTROOMS 20 20 1 1 1 1 1 3 1 1 1 3 1 1 1 1 21 4.2
D N N CLASSROOM (1) CLASSROOM 66238, 114886 1997 20 20 1 1 1 1 1 3 1 1 1 3 1 1 1 1 21 4.2CLASSROOM ART 20 20 1 1 1 1 1 3 1 1 1 3 1 1 1 1 21 4.2CLASSROOM GRAPHIC ARTS 20 20 1 1 1 1 1 3 1 1 1 3 1 1 1 1 21 4.2
SHOP VEHICLE 20 20 1 1 1 1 1 3 1 1 1 3 1 1 1 1 21 4.2SHOP AGRICULTURE 20 20 1 1 1 1 1 3 1 1 1 3 1 1 1 1 21 4.2
RESTROOMS RESTROOMS 20 20 1 1 1 1 1 3 1 1 1 3 1 1 1 1 21 4.2E N N GYMNASIUM GYMNASIUM 66238, 114886 1997 20 20 1 1 1 3 1 3 1 1 1 5 1 1 1 1 25 5.0
LOBBY LOBBY 20 20 1 1 1 1 1 3 1 1 1 5 1 1 1 1 23 4.6RESTROOMS RESTROOMS 20 20 1 1 1 1 1 3 1 1 1 5 1 1 1 1 23 4.6
WT. RM. WT. RM. 20 20 1 1 1 1 1 3 1 1 1 5 1 1 1 1 23 4.6WREST/DANCE WREST/DANCE 20 20 1 1 1 1 1 3 1 1 1 5 1 1 1 1 23 4.6
F N N CLASSROOMS (3) CLASSROOMS 66238, 114886 1997 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1CLASSROOMS (2) SCIENCE LABS 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8
CONF. RM. CONF. RM. 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8OFFICES STAFF 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8
RESTROOMS STAFF 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8G N N CLASSROOMS (4) SCIENCE LABS 66238, 114886 1997 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8
CLASSROOMS (2) COMP. LABS 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8CONF. RM. CONF. RM. 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8
OFFICES STAFF 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8RESTROOMS STAFF 20 20 1 1 1 1 1 3 1 1 1 1 1 1 1 1 19 3.8
This worksheet establishes data for determination of priority projects across a campus or district wide level. Please note that the findings in this spreadsheet are based on the architect's field observations only. In the event any hazardous, structural, or fire and life safety discrepancies are witnessed by the architect, the district may be required to conduct additional testing or research to ensure the safety of the students, staff, and community. The architect will report any findings of this nature to the district.
FACILITY ASSESSMENT
GREENFIELD HIGH SCHOOL
In early April of 2018 the South Monterey County Joint Union High School District met to review the FMP project list and rank them in order of priority. This ranking will be used as a guide for any funds retained from bonds, donations, and or grants obtained by the South Monterey County Joint Union High School District to maintain and improve the educational and recreational environment for students, staff, and the community.
11P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
1. Campus Safety 2. Parking Lots / Drop-Offs
3. New Shade Structures and Landscaping at Quad4. Minor Work at Unit B - Library5. New Classroom Building - 20
6. Stadium Concessions & Restrooms
7. New Auxiliary Gym & Relocate Facilities Yard8. New Classroom Building - 16
9. Accessible Bleachers, Press Box, Field, & Stadium10. Minor Modernization of Unit E - Gymnasium
SECOND TIER FACILITY NEEDS PROJECTS
FIRST TIER FACILITY NEEDS PROJECTSGREENFIELD HIGH SCHOOL
THIRD TIER FACILITY NEEDS PROJECTS11. Minor Modernization of Unit C - Multi-Purpose12. Minor Modernization of Unit D - Unified Arts
13. Minor Work at Unit G - Classrooms14. Minor Work at Unit F - Classrooms
15. Minor Modernization of Unit A - Administration and Entry Plaza16. Updates to Restrooms & Classrooms (Pinnacle Academy Charter)
L E G E N D
1. Campus Safety 2. Parking Lots / Drop-Offs3. New Shade Structures and Landscaping at Quad4. Minor Work at Unit B - Library5. New Classroom Building - 206. Stadium Concessions & Restrooms
FIRST TIER FACILITY NEEDS PROJECTS SECOND TIER FACILITY NEEDS PROJECTS
7. New Auxiliary Gym & Relocate Facilities Yard8. New Classroom Building - 169. Accessible Bleachers, Press Box, Field, & Stadium10. Minor Modernization of Unit E - Gymnasium
12P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
GREENFIELD HIGH SCHOOL
CONCEPT SITE PLAN
LITTLE / NO WORK NECESSARYMINOR MODERNIZATION NO WORKNEW CONSTRUCTION IMPROVED SITE WORK
11. Minor Modernization of Unit C - Multi-Purpose12. Minor Modernization of Unit D - Unified Arts13. Minor Work at Unit G - Classrooms14. Minor Work at Unit F - Classrooms15. Minor Modernization of Unit A - Administration and Entry Plaza16. Updates to Restrooms & Classrooms (Pinnacle Academy Charter)
THIRD TIER FACILITY NEEDS PROJECTS
9
11
4
15
13
58
14
3
12
7
10
2
2
2
6
16
9
NEW SHADE STRUCTURES
7
13P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
>
2. a. New Drop-Off Longer & Wider
b. New Parking Area/Exiting
c. Enhanced Pedestrian Access without Encountering Cars or Pedestrians Access Separate from Vehicles for Safe Routes to School. Landscaping @ Planter, Updated w/Native Trees & Grasses.
d. New Driveway
15. a. Entry Flagpole Plaza & Walkway to Administration
b. Landscape Updated with Native Trees and Grasses
2d
GREENFIELD HIGH SCHOOL
CONCEPT ENLARGEMENT 1 | SITE IMPROVEMENTS
2c
2a2b
15a
15b
L E G E N D
LITTLE / NO WORK NECESSARY
MINOR MODERNIZATION
NO WORK
NEW CONSTRUCTION
IMPROVED SITE WORK
NEW SHADE STRUCTURES
2d
2d
>
3. a. New Shade Structures for Quad, Utilizing (E) Tree Wells for Column Placement
b. New Native Trees & Landscaping
3b
GREENFIELD HIGH SCHOOL
CONCEPT ENLARGEMENT 2 | QUAD IMPROVEMENTS
3b
3a
3b3b
14P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
L E G E N D
LITTLE / NO WORK NECESSARY
MINOR MODERNIZATION
NO WORK
NEW CONSTRUCTION
IMPROVED SITE WORK
NEW SHADE STRUCTURES
15P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
GREENFIELD HIGH SCHOOL
CONCEPT ENLARGEMENT 3 | CLASSROOMS
5. New Two-Story 20 Classroom Building with Restrooms, Stairs, Elevator Lobby
8. New Two-Story 16 Classroom Building
>
L E G E N D
LITTLE / NO WORK NECESSARY
MINOR MODERNIZATION
NO WORK
NEW CONSTRUCTION
IMPROVED SITE WORK
NEW SHADE STRUCTURES
8 55
GREENFIELD HIGH SCHOOL
CONCEPT ENLARGEMENT 4 | ACCESSIBILITY IMPROVEMENTS
16
16P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
6a6b
9b9b
9a
>
6. a. New Accessible Concessions b. New Accessible Restrooms
9. a. New Press/Announcer Box b. Accessible Path of Travel to all Playing Fields & Bleachers
16. Update Restrooms (Pinnacle Academy Charter)
L E G E N D
LITTLE / NO WORK NECESSARY
MINOR MODERNIZATION
NO WORK
NEW CONSTRUCTION
IMPROVED SITE WORK
NEW SHADE STRUCTURES
SOUTH MONTEREY COUNTY JOINT UNION HIGH SCHOOL DISTRICT
KING CITY HIGH SCHOOLYear Built:
1911 - Site1939 - Auditorium
Acreage :38.2 acres Gross Total36.29 acres Usable (2.25 acres District or Special Use)
Current Enrollment: 950
Projected Enrollment 2021: 1156
School Size Capacity: 1,000
Class Size Average: 28
Classroom Space:Total Classrooms = 54 - King City HS - 50 - Portola Butler - 4
Relocatable:6 (Existing) Classrooms - 2 King City - 4 Portola-Butler
17P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
18P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
SOUTH MONTEREY COUNTY JOINT UNIFIED HIGH SCHOOL DISTRICTKING CITY HIGH SCHOOL
Rating Key1= no repair necessary 1-52= cosmetic repair necessary 6-103= preventative maintenance necessary 11-154= repair necessary 16-205= repair necessary for use past 2 years 21-256= major repair needed for immediate continued use 26+
BUILDING RELO (Y/N)
MODULAR (Y/N) ROOM USE DSA# YEAR
BUILT AGEAGE
SINCE MOD
HAZ STRUCT. FLS BLDG ADA ROOF ENVL. GLAZING ACOUS. DAYLITE HVAC SITE
ADA SITE UTIL SECRTY AESTH. SUM PRIORITY FACTOR
A N N CLASSROOMS (4) CLASSROOMS 9883, 19924, 11 1 5 1 1 1 4 1 1 1 1 1 1 1 4 31 3.4STORAGE 63162 ,104114 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 1.9
B N N CLASSROOMS (4) CLASSROOMS 9883, 104114 11 1 1 1 1 1 4 1 1 1 4 1 1 1 1 23 2.5STORAGE STORAGE 11 1 1 1 1 1 1 1 1 1 4 1 1 1 1 20 2.2
C N N CLASSROOMS (5) CLASSROOMS 25283, 65089 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 1.9RESTROOMS RESTROOMS 104114 11 1 1 1 5 1 1 1 1 1 1 1 1 1 1 21 2.3
D N N CLASSROOMS (2) CLASSROOMS 28294, 63162 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 1.9OFFICE OFFICE 104114 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 1.9
STORAGE STORAGE 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 1.9E N N CLASSROOMS (4) CLASSROOMS 28294, 104114 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 1.9
WORKROOM WORKROOM 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 1.9F N N CLASSROOMS (10) CLASSROOMS 28294, 104114 11 1 1 1 5 1 1 1 1 1 1 . 1 1 1 20 2.2
WORKROOM WORKROOM 11 1 1 1 5 1 1 1 1 1 3 5 1 1 1 27 3.0G N N CLASSROOM DRAMA 35858, 65089 22 1 1 1 1 3 1 1 1 1 1 1 1 1 4 22 4.8
CLASSROOM MUSIC 22 1 1 1 1 3 1 1 1 1 1 1 1 1 4 22 4.8RESTROOMS RESTROOMS 116555 22 1 1 1 1 3 1 1 1 1 1 1 1 1 1 19 4.2
H N N CLASSROOMS (3) CLASSROOMS 23416, 104114 11 1 1 1 5 1 1 1 1 1 1 5 1 1 4 28 3.1WORKROOM WORKROOM 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 1.9
STORAGE STORAGE 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 1.9J N N CLASSROOMS (4) CLASSROOMS 32935 22 1 1 1 4 3 2 1 1 1 1 4 1 1 1 26 5.7
SHOPS (2) SHOPS 22 1 1 1 4 3 2 1 1 1 6 4 1 1 1 31 6.8K N N CLASSROOMS (6) CLASSROOMS 28294, 63162 11 1 1 1 1 3 1 1 1 1 1 1 1 1 1 19 2.1L N N CAFETERIA CAFETERIA 28294, 65089 11 1 5 1 5 4 4 1 1 1 1 1 1 1 3 37 4.1
RESTROOMS RESTROOMS 104114 11 1 1 1 1 4 1 1 1 1 1 1 1 1 1 20 2.2KITCHEN KITCHEN 11 1 1 1 5 4 1 1 1 1 1 1 1 1 1 24 2.6
O.D. SERVING O.D. SERVING 11 1 1 1 5 4 1 1 1 1 1 5 1 1 1 28 3.1STAFF/DINING STAFF/DINING 11 1 1 1 5 4 1 1 1 1 6 1 1 1 1 29 3.2
OFFICES OFFICES 11 1 1 1 1 4 1 1 1 1 1 1 1 1 1 20 2.2M N N CLASSROOM CLASSROOM 3478, 65089 22 1 1 1 4 3 1 1 1 1 1 4 1 1 1 25 5.5
SHOPS (2) SHOPS 22 1 1 1 4 3 1 1 1 1 1 1 1 1 1 22 4.8LOCKER RM. LOCKER RM. 22 1 4 1 4 3 1 1 1 1 1 1 1 1 1 28 6.2
N N N CLASSROOMS (3) CLASROOMS 28294, 104114 11 1 1 1 4 3 1 1 1 1 1 4 1 1 1 25 2.8RESTROOMS RESTROOMS 11 1 1 1 1 3 1 1 1 1 1 1 1 1 1 19 2.1WORKROOM WORKROOM 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 1.9
STORAGE STORAGE 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 1.9
FACILITY ASSESSMENT
This worksheet establishes data for determination of priority projects across a campus or district wide level. Please note that the findings in this spreadsheet are based on the architect's field observations only. In the event any hazardous, structural, or fire and life safety discrepancies are witnessed by the architect, the district may be required to conduct additional testing or research to ensure the safety of the students, staff, and community. The architect will report any findings of this nature to the district.
19P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
BUILDING RELO (Y/N)
MODULAR (Y/N) ROOM USE DSA# YEAR
BUILT AGEAGE
SINCE MOD
HAZ STRUCT. FLS BLDG ADA ROOF ENVL. GLAZING ACOUS. DAYLITE HVAC SITE
ADA SITE UTIL SECRTY AESTH. SUM PRIORITY FACTOR
O N N RECEPTION OPEN-OFFICE 28294, 65089 11 1 1 1 1 3 1 1 1 1 1 1 1 1 1 19 2.1OFFICES OFFICES 104114 11 1 1 1 1 3 1 1 1 1 1 1 1 1 1 19 2.1
RESTROOMS RESTROOMS 11 1 1 1 1 3 1 1 1 1 1 1 1 1 1 19 2.1STORAGE STORAGE 11 1 1 1 1 3 1 1 1 1 1 1 1 1 1 19 2.1
P N N LIBRARY LIBRARY 28294, 63612 11 1 1 1 4 3 1 1 1 1 1 4 1 1 1 25 2.8OFFICE OFFICE 65089, 104114 11 1 1 1 1 3 1 1 1 1 1 1 1 1 1 19 2.1
RESTROOMS RESTROOMS 116555 11 1 1 1 1 3 1 1 1 1 1 1 1 1 1 19 2.1Q N N AUDITORIUM AUDITORIUM 2143, 65089 1939 22 1 1 1 5 1 1 1 1 1 1 5 1 1 1 25 5.5
RESTROOMS RESTROOMS 22 1 1 1 5 1 1 1 1 1 1 1 1 1 1 21 4.6R N N GYMNASIUM GYMNASIUM 9883, 23617 22 1 1 1 4 1 1 1 1 1 1 1 1 1 1 20 4.4
LOCKER RMS. LOCKER RMS. 28294, 65089 22 1 1 1 3 1 1 1 1 1 1 1 1 1 1 19 4.2WT. ROOM WT. ROOM 22 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 3.7
RESTROOMS RESTROOMS 22 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 3.7OFFICE OFFICE 22 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 3.7
S Y N CONT. ED. H.S. (4) CLASSROOMS 65142 1996 22 22 1 1 1 1 1 1 1 1 1 4 1 1 1 1 20 4.4RESTROOMS RESTROOMS 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 0.0
T Y N CONT. ED. OFFICE OFFICES 103333 2000 17 17 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 2.9U N N MOT MAINT. OP./STOR. 1996 1 1 1 1 1 3 1 1 1 1 1 1 1 1 1 1 19 0.2V Y N CLASSROOMS (2) CLASSROOMS 116555 2017 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 0.2
DO N Y OFFICES DIST. OFFICE 2010 7 7 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 1.2MTG. RM. MTG. RM. 7 7 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 1.2
RESTROOMS RESTROOMS 7 7 1 1 1 1 1 1 1 1 1 0 1 1 1 1 16 1.1PLAY N N BB DIA. (2) SOFTBALL 22 1 1 1 4 1 1 1 1 1 0 4 1 1 2 23 5.1
FIELDS SB FIELDS (2) SOFTBALL 22 1 1 1 4 1 1 1 1 1 0 4 1 1 2 23 5.1HARD COURTS BASKETBALL 22 1 1 1 1 1 1 1 1 1 0 4 1 1 4 22 4.8
FB FIELD/TRACK FOOTBALL/TRACK 22 1 1 1 5 1 1 1 1 1 0 5 1 1 1 24 5.3CONCESSION SNACK BAR 22 1 1 1 5 1 1 1 1 1 1 5 1 1 1 25 5.5RESTROOMS RESTROOMS 22 1 1 1 5 1 1 1 1 1 1 5 1 1 1 25 5.5
NOTES:
BUILDING G/Music-Drama:Interior fabric wall finish at instrument storage doors is worn, torn and requires replacement. Access door above window to attic space is damaged and requires replacement and repair of adjacent trim/finishes.The roof is the original BUR with gravel ballast and requires preventive maintenance; possibly replacement with a single ply membrane in the near future.
BUILDING H/Classrooms:Non-accessible elevation differential (3/4”+) at (3) classroom and (2) workroom entry door thresholds.
BUILDING J/Shops-Classrooms:Non-accessible elevation differential (3/4”+) at (4) classroom and (2) shop entry door thresholds. Concrete tile roof requires preventive maintenance including downspout/gutter repair or replacement as required.Mechanical units in either the shops or classrooms do not function at all or adequately to support the teaching environment and require replacement to do so.
BUILDING K:Composition shingle roof at pitched portion, BUR with composition top layer at flat roof portion; flat roof
BUILDING A/Classrooms:Delamination, cracking and beam end damage on covered walk canopy supporting beams adjacent to South exterior elevation on West side. Areas of cracked-blistered paint causing breakdown of existing masonry wall surface at North exterior elevation. South interior elevation has cracked-blistered paint area similar to exterior wall surface.
BUILDING B/Classrooms:Areas of cracked-blistered paint causing breakdown of existing masonry wall surface at North exterior elevation. Mechanical units require repair on a regular basis, perform poorly and create a noise level when operating that impact’s the classroom teaching environment.
BUILDING E/Classrooms:Mechanical units require preventative maintenance to address mechanical operation as well as system control components.
BUILDING F/Classrooms:Non-accessible elevation differential (3/4”+) on path of travel at the double-door threshold to building complex entry. Non-accessible elevation differential (3/4”+) at (10) classroom and (2) workroom entry door thresholds.
SOUTH MONTEREY COUNTY JOINT UNIFIED HIGH SCHOOL DISTRICTKING CITY HIGH SCHOOL
Rating Key1= no repair necessary 1-52= cosmetic repair necessary 6-103= preventative maintenance necessary 11-154= repair necessary 16-205= repair necessary for use past 2 years 21-256= major repair needed for immediate continued use 26+
BUILDING RELO (Y/N)
MODULAR (Y/N) ROOM USE DSA# YEAR
BUILT AGEAGE
SINCE MOD
HAZ STRUCT. FLS BLDG ADA ROOF ENVL. GLAZING ACOUS. DAYLITE HVAC SITE
ADA SITE UTIL SECRTY AESTH. SUM PRIORITY FACTOR
A N N CLASSROOMS (4) CLASSROOMS 9883, 19924, 11 1 5 1 1 1 4 1 1 1 1 1 1 1 4 31 3.4STORAGE 63162 ,104114 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 1.9
B N N CLASSROOMS (4) CLASSROOMS 9883, 104114 11 1 1 1 1 1 4 1 1 1 4 1 1 1 1 23 2.5STORAGE STORAGE 11 1 1 1 1 1 1 1 1 1 4 1 1 1 1 20 2.2
C N N CLASSROOMS (5) CLASSROOMS 25283, 65089 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 1.9RESTROOMS RESTROOMS 104114 11 1 1 1 5 1 1 1 1 1 1 1 1 1 1 21 2.3
D N N CLASSROOMS (2) CLASSROOMS 28294, 63162 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 1.9OFFICE OFFICE 104114 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 1.9
STORAGE STORAGE 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 1.9E N N CLASSROOMS (4) CLASSROOMS 28294, 104114 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 1.9
WORKROOM WORKROOM 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 1.9F N N CLASSROOMS (10) CLASSROOMS 28294, 104114 11 1 1 1 5 1 1 1 1 1 1 . 1 1 1 20 2.2
WORKROOM WORKROOM 11 1 1 1 5 1 1 1 1 1 3 5 1 1 1 27 3.0G N N CLASSROOM DRAMA 35858, 65089 22 1 1 1 1 3 1 1 1 1 1 1 1 1 4 22 4.8
CLASSROOM MUSIC 22 1 1 1 1 3 1 1 1 1 1 1 1 1 4 22 4.8RESTROOMS RESTROOMS 116555 22 1 1 1 1 3 1 1 1 1 1 1 1 1 1 19 4.2
H N N CLASSROOMS (3) CLASSROOMS 23416, 104114 11 1 1 1 5 1 1 1 1 1 1 5 1 1 4 28 3.1WORKROOM WORKROOM 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 1.9
STORAGE STORAGE 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 1.9J N N CLASSROOMS (4) CLASSROOMS 32935 22 1 1 1 4 3 2 1 1 1 1 4 1 1 1 26 5.7
SHOPS (2) SHOPS 22 1 1 1 4 3 2 1 1 1 6 4 1 1 1 31 6.8K N N CLASSROOMS (6) CLASSROOMS 28294, 63162 11 1 1 1 1 3 1 1 1 1 1 1 1 1 1 19 2.1L N N CAFETERIA CAFETERIA 28294, 65089 11 1 5 1 5 4 4 1 1 1 1 1 1 1 3 37 4.1
RESTROOMS RESTROOMS 104114 11 1 1 1 1 4 1 1 1 1 1 1 1 1 1 20 2.2KITCHEN KITCHEN 11 1 1 1 5 4 1 1 1 1 1 1 1 1 1 24 2.6
O.D. SERVING O.D. SERVING 11 1 1 1 5 4 1 1 1 1 1 5 1 1 1 28 3.1STAFF/DINING STAFF/DINING 11 1 1 1 5 4 1 1 1 1 6 1 1 1 1 29 3.2
OFFICES OFFICES 11 1 1 1 1 4 1 1 1 1 1 1 1 1 1 20 2.2M N N CLASSROOM CLASSROOM 3478, 65089 22 1 1 1 4 3 1 1 1 1 1 4 1 1 1 25 5.5
SHOPS (2) SHOPS 22 1 1 1 4 3 1 1 1 1 1 1 1 1 1 22 4.8LOCKER RM. LOCKER RM. 22 1 4 1 4 3 1 1 1 1 1 1 1 1 1 28 6.2
N N N CLASSROOMS (3) CLASROOMS 28294, 104114 11 1 1 1 4 3 1 1 1 1 1 4 1 1 1 25 2.8RESTROOMS RESTROOMS 11 1 1 1 1 3 1 1 1 1 1 1 1 1 1 19 2.1WORKROOM WORKROOM 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 1.9
STORAGE STORAGE 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 1.9
FACILITY ASSESSMENT
This worksheet establishes data for determination of priority projects across a campus or district wide level. Please note that the findings in this spreadsheet are based on the architect's field observations only. In the event any hazardous, structural, or fire and life safety discrepancies are witnessed by the architect, the district may be required to conduct additional testing or research to ensure the safety of the students, staff, and community. The architect will report any findings of this nature to the district.
KING CITY HIGH SCHOOL
In early April of 2018 the South Monterey County Joint Union High School District met to review the FMP project list and rank them in order of priority. This ranking will be used as a guide for any funds retained from bonds, donations, and or grants obtained by the South Monterey County Joint Union High School District to maintain and improve the educational and recreational environment for students, staff, and the community.
20P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
1. Campus Safety - Site Infrastructure2. Major Modernization - Building M - AG Shop3. Major Modernization - Building J - Classrooms (Ag)4. Broadway Parking Entry and Lot Extension5. (N) Auxiliary Gymnasium6. Minor Modernization - Building A - STEM Classrooms
7. Minor Work - Building P - Library - Modernization to Media Center8. Minor Modernization - Building G - Classrooms9. Minor Modernization - Building F - Classrooms10. Major Modernization - Building L - Kitchen Portion11. Mildred to Broadway (N) Drop-Off and Parking Loop
SECOND TIER FACILITY NEEDS PROJECTS
FIRST TIER FACILITY NEEDS PROJECTS THIRD TIER FACILITY NEEDS PROJECTS12. Minor Modernization - Building H - Classrooms13. Minor Modernization - Building B - Classrooms (Std & STEM)14. Stadium Accessibility Improvements / Access to Bleachers: Baseball & Football15. Modernize RR & Concessions16. Major Modernization - Building Q - Auditorium Restrooms17. Minor Work - Building K - Classrooms18. Minor Work - Building E - Classrooms19. Minor Work - Building R - Gymnasium20. Minor Modernization - Building L - Cafeteria21. (N) Classroom Building (10)22. Minor Work - Building D - Classrooms23. Minor Work - Building C - Classrooms24. Minor Work - Building N - Classrooms25. Minor Modernization - Building C - Restrooms Portion26. Minor Modernization - Building Q - Auditorium27. Minor Work - Building O - Admin.28. Hard-Court Resurface & Accessibility 29. Updates to Portola-Butler
21
21P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
1. Campus Safety - Site Infrastructure2. Major Modernization - Building M - AG Shop3. Major Modernization - Building J - Classrooms (Ag)4. Broadway Parking Entry and Lot Extension5. (N) Auxiliary Gymnasium6. Minor Modernization - Building A - STEM Classrooms
FIRST TIER FACILITY NEEDS PROJECTS
SECOND TIER FACILITY NEEDS PROJECTS
7. Minor Work - Building P - Library - Modernization to Media Center8. Minor Modernization - Building G - Classrooms9. Minor Modernization - Building F - Classrooms10. Major Modernization - Building L - Kitchen Portion11. Mildred to Broadway (N) Drop-Off and Parking Loop
KING CITY HIGH SCHOOL
CONCEPT SITE PLAN
THIRD TIER FACILITY NEEDS PROJECTS
12. Minor Modernization - Building H - Classrooms13. Minor Modernization - Building B - Classrooms (Std & STEM)14. Stadium Accessibility Improvements / Access to Bleachers: Baseball & Football15. Modernize RR & Concessions and ADA Path of Travel16. Major Modernization - Building Q - Auditorium Restrooms17. Minor Work - Building K - Classrooms18. Minor Work - Building E - Classrooms19. Minor Work - Building R - Gymnasium20. Minor Modernization - Building L - Cafeteria21. (N) Classroom Building (10)22. Minor Work - Building D - Classrooms23. Minor Work - Building C - Classrooms24. Minor Work - Building N - Classrooms25. Minor Modernization - Building C - Restrooms Portion26. Minor Modernization - Building Q - Auditorium27. Minor Work - Building O - Admin.28. Hard-Court Resurface & Accessibility 29. Updates to Portola-Butler
10
20
519
2
24 3
14
6
22 13
2325
18 12
9
15
8
26 16
711
27
17
4
LITTLE/NO WORK NECESSARY
MINOR MODERNIZATION
NEW CONSTRUCTION
IMPROVED SITE WORK
MAJOR MODERNIZATION
L E G E N D
4
14
28
29
NO WORK
KING CITY HIGH SCHOOL
CONCEPT ENLARGEMENT 1 | SITE IMPROVEMENTS
4
22P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
>
4. Broadway parking entry revised to allow two way traffic to enter and drop off safely. Extension of drop-off length
LITTLE/NO WORK NECESSARY
MINOR MODERNIZATION
NEW CONSTRUCTION
IMPROVED SITE WORK
MAJOR MODERNIZATION
L E G E N D
NO WORK
11
>11. Mildred Avenue to Broadway Street - Proposed parking loop and drop-off at entry preserving public entry park, existing trees and Memorial. New parking provided on loop.
4
23P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
>10
5. New Auxiliary Gym & Site Updates.
(E) Shade Structure
10. Major Modernization Kitchen & Restrooms
20. Minor Modernization of Cafeteria
21. Future Location of 10 Classroom Building Site Updates for Accessibility Relocate District office & (E) Portables
Current Relocatables Project
29. Updates to Portola-Butler School
29
21
5
20
KING CITY HIGH SCHOOL
CONCEPT ENLARGEMENT 2 | GYM & CAFETERIA IMPROVEMENTS
LITTLE/NO WORK NECESSARY
MINOR MODERNIZATION
NEW CONSTRUCTION
IMPROVED SITE WORK
MAJOR MODERNIZATION
L E G E N D
NO WORK
24P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
2. Building M: Major Modernization, including: update site ADA accessibility, HVAC Replacement, Structural Concerns, Overall Roof Repairs, Building Envelope & Interior Renovation & Repairs
3. Building J: Major Modernization, including: update site ADA accessibility, HVAC Replacement, Structural Concerns, Overall Roof Repairs, Building Envelope & Interior Renovation & Repairs
AG Shop Modernization: Wet Lab, Updates to
Shop Yard Surfacing, Shading
24. Building N: Update Site & Classroom ADA Accessibility, Exterior Building Envelope & Roof Repair
24
3
2
KING CITY HIGH SCHOOL
CONCEPT ENLARGEMENT 3 | AG SHOP MODERNIZATION>LITTLE/NO WORK NECESSARY
MINOR MODERNIZATION
NEW CONSTRUCTION
IMPROVED SITE WORK
MAJOR MODERNIZATION
L E G E N D
NO WORK
25P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
14. Stadium Accessibility & Improvements
Access Ramps & Accessible Seating
Accessible Path of Travel & Seating to Playing Fields
15. Modernize Restrooms & Concessions
28. Resurface Hard Courts Accessible Path
28
14
15
14
KING CITY HIGH SCHOOL
CONCEPT ENLARGEMENT 4 | STADIUM & FIELD IMPROVEMENTS>LITTLE/NO WORK NECESSARY
MINOR MODERNIZATION
NEW CONSTRUCTION
IMPROVED SITE WORK
MAJOR MODERNIZATION
L E G E N D
NO WORK
SOUTH MONTEREY COUNTY JOINT UNION HIGH SCHOOL DISTRICT
0 3 | A P P E N D I X
26P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
4.76% 2
7.14% 3
2.38% 1
2.38% 1
80.95% 34
2.38% 1
Q1 My role is:
Answered: 42 Skipped: 1
TOTAL 42
# OTHER (PLEASE SPECIFY) DATE
1 Operations Supervisor 11/15/2017 9:47 AM
Site Administration District Administration Parent Student Faculty
Member of the Community
4.76%
4.76%
4.76%
4.76%
4.76%
4.76%
4.76%
(2)
(2)
(2)
(2)
(2)
(2)
(2)
7.14%
7.14%
7.14%
7.14%
7.14%
7.14%
7.14%
(3)
(3)
(3)
(3)
(3)
(3)
(3)
2.38%
2.38%
2.38%
2.38%
2.38%
2.38%
2.38%
(1)
(1)
(1)
(1)
(1)
(1)
(1)
2.38%
2.38%
2.38%
2.38%
2.38%
2.38%
2.38%
(1)
(1)
(1)
(1)
(1)
(1)
(1)
80.95%
80.95%
80.95%
80.95%
80.95%
80.95%
80.95%
(34)
(34)
(34)
(34)
(34)
(34)
(34)
2.38%
2.38%
2.38%
2.38%
2.38%
2.38%
2.38%
(1)
(1)
(1)
(1)
(1)
(1)
(1)
ANSWER CHOICES RESPONSES
Site Administration
District Administration
Parent
Student
Faculty
Member of the Community
1 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
GREENFIELD HIGH SCHOOL SURVEY RESULTS
100.00% 43
13.95% 6
9.30% 4
2.33% 1
Q2 I primarily use the:
Answered: 43 Skipped: 0
Total Respondents: 43
# BUILDING OR ROOM NUMBERS MOST USED: DATE
1 99 1/26/2018 12:32 PM
2 403 1/15/2018 9:49 AM
3 Office 1/12/2018 2:05 PM
4 Room 614 1/12/2018 11:14 AM
5 607 1/10/2018 7:46 PM
6 Room 602 1/9/2018 4:00 PM
7 Student Union or Library 1/9/2018 2:40 PM
8 603 1/9/2018 2:17 PM
9 613, gym 1/9/2018 2:12 PM
10 617 1/9/2018 12:43 PM
11 100 / Room 106 1/9/2018 12:37 PM
12 Administration 1/9/2018 12:12 PM
13 Administration, All 1/9/2018 11:49 AM
14 District building. MOT building 11/15/2017 9:47 AM
Greenfield High
Shcool
King City High
School
Portola-Butler
Continuation
High School
Pinnacle
Academy Charter
0
10
20
30
40
50
ANSWER CHOICES RESPONSES
Greenfield High Shcool
King City High School
Portola-Butler Continuation High School
Pinnacle Academy Charter
2 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
27P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q3 Acoustics In Learning Spaces
Answered: 42 Skipped: 1
4.76%
2
16.67%
7
28.57%
12
33.33%
14
11.90%
5
4.76%
2
42
3.45
Minimum1.00
Maximum6.00
Median3.50
Mean3.45
Standard Deviation1.18
# COMMENTS: DATE
1 The restrooms in the Student Union are very bad 1/9/2018 2:40 PM
2 n/a 11/15/2017 9:47 AM
Acoustics In
Learning Spaces
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERYGOOD (5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Acoustics In Learning
Spaces
BASIC STATISTICS
3 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q4 Accessibility
Answered: 42 Skipped: 1
2.38%
1
14.29%
6
33.33%
14
30.95%
13
9.52%
4
9.52%
4
42
3.60
Minimum1.00
Maximum6.00
Median3.50
Mean3.60
Standard Deviation1.20
# COMMENTS: DATE
1 Some ADA issues. Student union/cafeteria too small, not efficient servicing for lunch. 11/15/2017 9:47 AM
Accessibility
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Accessibility
BASIC STATISTICS
4 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
GREENFIELD HIGH SCHOOL SURVEY RESULTS
28P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q5 Thermal Comfort
Answered: 43 Skipped: 0
23.26%
10
20.93%
9
20.93%
9
16.28%
7
9.30%
4
9.30%
4
43
2.95
Minimum1.00
Maximum6.00
Median3.00
Mean2.95
Standard Deviation1.58
# COMMENTS: DATE
1 The office space is usually too cold. 2/5/2018 11:41 AM
2 heating and air conditioning systems need improvement 1/12/2018 2:05 PM
3 Help desk filed before break. 1/9/2018 2:17 PM
4 You can not adjust the temperature in your class rooms. Sometimes the heat is running when you
dont need it to and sometimes you need it warmer but can not turn it up.
1/9/2018 12:28 PM
5 Its a pain in the ass to have to turn the air back on every two hours. It'd be nice if it could be
programed for the day.
1/9/2018 11:57 AM
6 We often have to move classes due to malfunctions in HVAC. 1/9/2018 11:49 AM
7 Heat works well. Air conditioning starts at 70 so too hot with 35 students in the classroom. 1/9/2018 11:48 AM
8 Problems with HVAC units throughout the district. especially during hot spells in summer. we have
a contractor on sites constantly
11/15/2017 9:47 AM
9 Not all rooms have a heater or AC. When the temperatures are too cold or too hot, students are
not able to focus on learning.
11/7/2017 3:34 PM
Thermal
Comfort
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Thermal
Comfort
BASIC STATISTICS
5 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q6 Electrical Lighting
Answered: 43 Skipped: 0
4.65%
2
11.63%
5
34.88%
15
16.28%
7
23.26%
10
9.30%
4
43
3.70
Minimum1.00
Maximum6.00
Median3.00
Mean3.70
Standard Deviation1.32
# COMMENTS: DATE
1 it depends on the facility-the classrooms are excellent-the gym needs improvement and some
outside areas after hours need improvement
1/11/2018 9:38 AM
2 All new lights in most areas, Gym lights are scheduled to be updated in the coming days. We also
have skylights in many classrooms, but no way to dim/block them and this may need to be
addressed.
1/9/2018 11:49 AM
3 Lighting is not working in all the rooms or is very dim 11/7/2017 3:34 PM
Electrical
Lighting
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Electrical
Lighting
BASIC STATISTICS
6 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
GREENFIELD HIGH SCHOOL SURVEY RESULTS
29P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q7 Electrical Power (Outlets, etc.)
Answered: 42 Skipped: 1
7.14%
3
11.90%
5
33.33%
14
28.57%
12
14.29%
6
4.76%
2
42
3.45
Minimum1.00
Maximum6.00
Median3.00
Mean3.45
Standard Deviation1.22
# COMMENTS: DATE
1 Not enough outlets 2/5/2018 11:42 AM
2 It would be nice to have a master on/off switch for all the electrical outlets in the 100 building
science labs. i use them for labs but when we're not doing labs it's impossible to monitor what they
are plugging in the outlets.
1/9/2018 1:48 PM
3 I do not have enough outlets.. Most of them are used up by all the technology gadgets and the
wireless box.
1/9/2018 12:30 PM
4 Extra outlet needed for computer equipment. 1/9/2018 11:50 AM
5 some wings in King city have old power set ups. 11/15/2017 9:54 AM
6 All outlets need to be checked, several are broken or damaged. In addition, several rooms do not
have an adequate number of outlets and have to use surge protectors.
11/7/2017 3:36 PM
Electrical
Power (Outle...
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERYGOOD (5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Electrical Power
(Outlets, etc.)
BASIC STATISTICS
7 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q8 Exterior/Site Lighting
Answered: 42 Skipped: 1
9.52%
4
23.81%
10
19.05%
8
28.57%
12
14.29%
6
4.76%
2
42
3.29
Minimum1.00
Maximum6.00
Median3.00
Mean3.29
Standard Deviation1.35
# COMMENTS: DATE
1 more lighting in the evening would be ideal 1/12/2018 2:07 PM
2 restructure survey- 1/11/2018 9:40 AM
3 We need to have better control of the light in the open areas so that they can be adjusted to come
on when it is dark or adjusted to address time changes.
1/9/2018 11:54 AM
4 new LED project through whole district underway right now 11/15/2017 9:54 AM
5 Very difficult to see in some areas at night 11/7/2017 3:36 PM
Exterior/Site
Lighting
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Exterior/Site
Lighting
BASIC STATISTICS
8 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
GREENFIELD HIGH SCHOOL SURVEY RESULTS
30P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q9 Daylighting (adequate natural light, too much natural light, glare?)
Answered: 42 Skipped: 1
7.14%
3
7.14%
3
26.19%
11
33.33%
14
16.67%
7
9.52%
4
42
3.74
Minimum1.00
Maximum6.00
Median4.00
Mean3.74
Standard Deviation1.29
# COMMENTS: DATE
There are no responses.
Daylighting
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Daylighting
BASIC STATISTICS
9 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q10 Technology
Answered: 41 Skipped: 2
12.20%
5
14.63%
6
24.39%
10
29.27%
12
12.20%
5
7.32%
3
41
3.37
Minimum1.00
Maximum6.00
Median3.00
Mean3.37
Standard Deviation1.39
# COMMENTS: DATE
1 wireless needs more bandwidth to have students on surfaces. 2/2/2018 2:03 PM
2 WiFi sucks takes all period to get all students on it 1/15/2018 9:50 AM
3 students should have access to technology on a regular basis surfaces assigned to all students 1/12/2018 2:07 PM
4 I would appreciate a smart board or a smart tv, as well as the training to use the technology
appropriately to get the maximum use out of it.
1/9/2018 4:03 PM
5 Slow internet, takes student laptops up to 10 minutes to log in 1/9/2018 12:03 PM
6 Internet is sometimes a problem, especially when students are trying to login to surface laptops. 1/9/2018 11:50 AM
7 Why is King City high equipped with tablets / laptops & greenfield has nothing. So far behind in
technology it's embarrassing
12/21/2017 10:31 PM
8 Food service department I want to upgrade- screens, marketing etc. 11/15/2017 9:54 AM
Technology
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Technology
BASIC STATISTICS
10 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
GREENFIELD HIGH SCHOOL SURVEY RESULTS
31P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q11 Interior Finishes & Furnishings (including tack wall and whiteboards)
Answered: 40 Skipped: 3
10.00%
4
27.50%
11
17.50%
7
22.50%
9
17.50%
7
5.00%
2
40
3.25
Minimum1.00
Maximum6.00
Median3.00
Mean3.25
Standard Deviation1.41
# COMMENTS: DATE
1 Use of adjustable standing desks needed in the office 1/12/2018 2:07 PM
2 Parts of the wall covering were torn off prior to my use. 1/9/2018 2:18 PM
3 We were promised a drop down screen for the gym over a year ago and still have not seen one. 1/9/2018 12:30 PM
4 white boards too high in some rooms 1/9/2018 12:03 PM
5 More effort in wall maintenance is needed. Portables need serious painting/updating. Window
frames busted, etc.
1/9/2018 11:53 AM
6 some rooms need new interior wall coverings. Cafeterias need updates on design and spacing 11/15/2017 9:54 AM
7 There is a lot of new furniture, but also a lot of old one that needs to be replaced. 11/7/2017 3:36 PM
Interior
Finishes &...
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERYGOOD (5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Interior Finishes &
Furnishings
BASIC STATISTICS
11 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q12 Restrooms and Drinking Fountains
Answered: 42 Skipped: 1
19.05%
8
30.95%
13
19.05%
8
19.05%
8
7.14%
3
4.76%
2
42
2.79
Minimum1.00
Maximum6.00
Median2.50
Mean2.79
Standard Deviation1.39
# COMMENTS: DATE
1 The student bathrooms at PBHS are in terrible condition. The teacher bathrooms at KCHS are in
poor condition.
2/5/2018 11:42 AM
2 Building 100 restroom needs paper towel dispenser 2/2/2018 2:03 PM
3 need to utilize all restrooms at ghs 1/11/2018 9:40 AM
4 Water fountains needs a little help 1/9/2018 11:58 AM
5 Could use some more drinking fountains/bottle fill stations - specifically in the gym, possibly at the
confluence of the athletic fields.
1/9/2018 11:54 AM
6 Why don't Greenfield High have restrooms for football games. Porta poties really. I should of taken
picture when visiting team came and lined up to use. King City High has restrooms.
12/21/2017 10:31 PM
7 few fountains. Probably need some larger restroom space. 11/15/2017 9:54 AM
Restrooms &
Drinking...
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERYGOOD (5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Restrooms & Drinking
Foundatains
BASIC STATISTICS
12 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
GREENFIELD HIGH SCHOOL SURVEY RESULTS
32P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q13 Sustainability
Answered: 37 Skipped: 6
13.51%
5
18.92%
7
24.32%
9
29.73%
11
10.81%
4
2.70%
1
37
3.14
Minimum1.00
Maximum6.00
Median3.00
Mean3.14
Standard Deviation1.30
# COMMENTS: DATE
1 move to led lights good-food waste and amount of trash generated poor 1/11/2018 9:40 AM
2 Too vague to answer 1/9/2018 12:26 PM
3 We need new buildings to house students, we have grown 33% in the last three years and will
continue to grow for another 8 years. I need to add 6 portable buildings for the coming year and
that is just to get caught up and handle our current enrollment.
1/9/2018 11:54 AM
Sustainability
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Sustainability
BASIC STATISTICS
13 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q14 Aesthetics of Buildings and Campus
Answered: 42 Skipped: 1
7.14%
3
26.19%
11
28.57%
12
19.05%
8
14.29%
6
4.76%
2
42
3.21
Minimum1.00
Maximum6.00
Median3.00
Mean3.21
Standard Deviation1.30
# COMMENTS: DATE
1 buildings need paint and repair and classrooms should have visible numbers. 1/12/2018 2:07 PM
2 we are not a new school- maintenance needs to be done and grounds can be improved to
eradicate rodents so grass is grass not weeds
1/11/2018 9:40 AM
3 The school could use a more cheerful paint job, but other than that, I think it's a decent looking
school.
1/9/2018 4:03 PM
4 Too much open dirt and dead or half dead plants. Replace with drought tolerant plants or water
effectively. Also fix broken cement, paint exterior buildings.
1/9/2018 12:15 PM
5 We could use some trees or an arbor/pergola for shade. 1/9/2018 11:54 AM
6 King City is much older. exterior walls need quite a bit of work. 11/15/2017 9:54 AM
Aesthetics of
Building &...
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERYGOOD (5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Aesthetics of Building &
Campus
BASIC STATISTICS
14 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
GREENFIELD HIGH SCHOOL SURVEY RESULTS
33P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q15 Wayfinding (Signage; Navigating around campus; orientation)
Answered: 39 Skipped: 4
15.38%
6
17.95%
7
28.21%
11
23.08%
9
10.26%
4
5.13%
2
39
3.10
Minimum1.00
Maximum6.00
Median3.00
Mean3.10
Standard Deviation1.37
# COMMENTS: DATE
1 The office at GHS should be clearly marked. It is difficult for a new person to know which building
the office is located.
2/5/2018 11:51 AM
2 Buildings should be labeled ie. Administration, Library, Student Union, Gym Campus maps 1/12/2018 2:08 PM
3 Confusing and/or missing. 1/9/2018 12:17 PM
4 We could use more navigational info available on campus. 1/9/2018 11:58 AM
5 No wayfinding. GHS front parking is very uncoordinated. 11/15/2017 9:58 AM
Wayfinding
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Wayfinding
BASIC STATISTICS
15 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q16 Outdoor Public Space
Answered: 40 Skipped: 3
2.50%
1
25.00%
10
40.00%
16
15.00%
6
12.50%
5
5.00%
2
40
3.25
Minimum1.00
Maximum6.00
Median3.00
Mean3.25
Standard Deviation1.18
# COMMENTS: DATE
1 add greenery and student art work 1/12/2018 2:08 PM
2 We need more room, perhaps more tables for the students around the school 1/9/2018 12:16 PM
3 GHS traffic in the morning is out of control. The way traffic is guided around front parking spaces
is bad. Would like to see the front grass area changed around to provide for better traffic flow and
additional staff parking. Would also like to see lot in front of portables made into official parking lot.
Traffic on rainy days out in the front is insane!
1/9/2018 11:52 AM
4 Not a lot of room for activities during lunch. more covered eating and sitting areas needed at both
campuses.
11/15/2017 9:58 AM
Outdoor Public
Space
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Outdoor Public
Space
BASIC STATISTICS
16 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
GREENFIELD HIGH SCHOOL SURVEY RESULTS
34P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q17 Collegiate (Scholarly) Atmosphere
Answered: 39 Skipped: 4
7.69%
3
33.33%
13
17.95%
7
20.51%
8
10.26%
4
10.26%
4
39
3.23
Minimum1.00
Maximum6.00
Median3.00
Mean3.23
Standard Deviation1.46
# COMMENTS: DATE
1 discipline issues continue- 1/11/2018 9:44 AM
2 I don't really perceive a significant number of intellectual conversations going on outside of the
classroom, but it's hard enough to get them going within the classroom as it is.
1/9/2018 4:13 PM
Collegiate
Atmosphere
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Collegiate
Atmosphere
BASIC STATISTICS
17 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q18 Bus Drop-off
Answered: 37 Skipped: 6
21.62%
8
27.03%
10
24.32%
9
10.81%
4
10.81%
4
5.41%
2
37
2.78
Minimum1.00
Maximum6.00
Median3.00
Mean2.78
Standard Deviation1.45
# COMMENTS: DATE
1 We do not have school buses for the students? 1/9/2018 12:16 PM
2 We don't rally have any buses at GHS, only one for the SpEd students and that area has a
turnabout/drop off area.
1/9/2018 11:58 AM
3 Poor for the fact South County Monterey School District Will Not provide transportation to all kids
in the district
12/21/2017 10:43 PM
4 congestion in morning at KCHS drop offs. 11/15/2017 9:58 AM
Bus Drop-Off
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Bus Drop-
Off
BASIC STATISTICS
18 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
GREENFIELD HIGH SCHOOL SURVEY RESULTS
35P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q19 Student Drop-off
Answered: 38 Skipped: 5
60.53%
23
15.79%
6
13.16%
5
2.63%
1
5.26%
2
2.63%
1
38
1.84
Minimum1.00
Maximum6.00
Median1.00
Mean1.84
Standard Deviation1.31
# COMMENTS: DATE
1 Getting in or out of the parking lots during drop off/pick up times is very difficult. 2/5/2018 11:51 AM
2 the drop off in the morning is very congested with only one exit 1/12/2018 2:08 PM
3 the layout of the front of the school is very poor-there needs to be a no stopping zone installed
where the sidewalk bottlenecks the drive through-parents stop here to drop off kids which back up
the entire drive through as nobody can get around the vehicle stopped
1/11/2018 9:44 AM
4 The traffic can get really bad some days, but I suppose it could be worse. I've been through worse
school traffic.
1/9/2018 4:13 PM
5 It is ridiculous that on a rainy day it will take you 20 minutes to get into the parking lot from the
freeway. The parking lot was not designed for more than 2 cars dropping off students. It is a mess
1/9/2018 12:51 PM
6 Too crowded, we need more space or remodel the front of the school. 1/9/2018 12:16 PM
7 Parents have a hard time or refuse to follow direction given by staff 1/9/2018 12:00 PM
8 This is a perennial issue for us. We need to take a serious look at ingress/egress for vehicles and
student drop off/pick up.
1/9/2018 11:58 AM
9 Not enough space for drop off 12/21/2017 10:43 PM
10 congestions in morning at KCHS drop offs. 11/15/2017 9:58 AM
11 Greenfield's drop-off needs to be re-designed. It is a hazard. 11/7/2017 3:37 PM
Student
Drop-Off
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Student Drop-
Off
BASIC STATISTICS
19 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q20 Parking
Answered: 39 Skipped: 4
25.64%
10
35.90%
14
15.38%
6
15.38%
6
5.13%
2
2.56%
1
39
2.46
Minimum1.00
Maximum6.00
Median2.00
Mean2.46
Standard Deviation1.30
# COMMENTS: DATE
1 It can be difficult to find a parking space at KCHS or the DO during school hours. Student and staff
parking should be designated. Parking permits should be required for students and only issued if
they have proof of license and insurance.
2/5/2018 11:51 AM
2 very limited parking for staff and visitors 1/12/2018 2:08 PM
3 the back parking lot excellent-the front parking lot has created many problems 1/11/2018 9:44 AM
4 I like being able to park on the dirt lot closer to my classroom, but it'd be great if that area became
an official parking with gravel. I know that there are more important things to invest in so I'm not
complaining.
1/9/2018 4:13 PM
5 Better teacher parking. 1/9/2018 12:16 PM
6 See the above response. 1/9/2018 11:58 AM
7 Not enough parking for teachers let alone visitors. Redo front less grass better student drop off &
more parking
12/21/2017 10:43 PM
8 insufficient front parking for District office/King city. Greenfield has an abundance of unused
parking in back of school. can be used to expand the campus in future.
11/15/2017 9:58 AM
9 Not enough parking at all locations 11/7/2017 3:37 PM
Parking
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Parking
BASIC STATISTICS
20 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
GREENFIELD HIGH SCHOOL SURVEY RESULTS
36P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q21 Amenities (cafeteria, library, break rooms, work rooms, shops, studyareas, etc.)
Answered: 39 Skipped: 4
10.26%
4
17.95%
7
30.77%
12
25.64%
10
12.82%
5
2.56%
1
39
3.21
Minimum1.00
Maximum6.00
Median3.00
Mean3.21
Standard Deviation1.24
# COMMENTS: DATE
1 PBHS has no area out of the elements to eat lunch. The shade over the lunch tables does not
keep water or wind out.
2/5/2018 11:51 AM
2 Students have few comfortable spaces to study. 1/9/2018 12:30 PM
3 As we grow, we may need to add cafeteria space or a second speed-serve line to accommodate
all of our students.
1/9/2018 11:58 AM
4 cafeterias too small. I would like to get something going for operations team breakroom/work shop
at Greenfield. the King city crew uses the MOT building, so it works fine for them. Shops at KCHS
need updates.
11/15/2017 9:58 AM
Amenities
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Amenities
BASIC STATISTICS
21 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q22 What do you believe are the Districts' greatest facility needs at thistime?
Answered: 40 Skipped: 3
Renovate
Existing...
Additional
Classrooms
Additional Lab
Spaces...
Additional
Offices
HVAC (heating,
ventilation,...
Parking
Drop-off
Area(s)
Audio/Visual
Technology
Wi/Fi
Library
Facilities
Athletic
Facilities
Student
Services...
Student
Gathering Areas
Faculty &
Staff Gather...
Dining
(cafeteria)
Other /
Additional...
0 10 20 30 40 50
11
11
11
11
11
11
11
31
31
31
31
31
31
31
14
14
14
14
14
14
14
4
4
4
4
4
4
4
11
11
11
11
11
11
11
18
18
18
18
18
18
18
18
18
18
18
18
18
18
13
13
13
13
13
13
13
13
13
13
13
13
13
13
3
3
3
3
3
3
3
8
8
8
8
8
8
8
6
6
6
6
6
6
6
7
7
7
7
7
7
7
6
6
6
6
6
6
6
5
5
5
5
5
5
5
11
11
11
11
11
11
11
ANSWER CHOICES RESPONSES
22 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
GREENFIELD HIGH SCHOOL SURVEY RESULTS
37P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
28% 11
78% 31
35% 14
10% 4
28% 11
45% 18
45% 18
33% 13
33% 13
8% 3
20% 8
15% 6
18% 7
15% 6
13% 5
28% 11
Total Respondents: 40
Minimum1.00
Maximum16.00
Median7.00
Mean7.02
Standard Deviation4.50
# OTHER / ADDITIONAL COMMENTS: DATE
1 The bathrooms at PBHS need immediate attention. 2/5/2018 11:51 AM
2 Ag department and shops 1/25/2018 8:14 PM
3 Computer carts for all classrooms or for at least those who want one 1/10/2018 8:40 AM
4 We need more trees on campus and seating areas for students to eat during lunch. We also need
more water fountains so students can drink water on hot days. More shade (protection ) for rainy
days.
1/9/2018 2:42 PM
5 Real bathrooms at athletic fields. Students need delicious nutritious food. Most students throw half
the food away. I think hunger is a huge contributor to the increase in after lunch behavior issues.
1/9/2018 1:18 PM
6 An auxilary gym is needed since PE classes are being displaced due to blood drives, AP testing
and rallies, to name a few.
1/9/2018 12:51 PM
7 Improve campus aesthetics at Greenfield High School. 1/9/2018 12:30 PM
8 GHS has great, unrealized potential to be an outstanding learning facility. 1/9/2018 12:17 PM
9 More classrooms are needed so teachers are able to properly prepare for classes during their prep
period
1/9/2018 12:00 PM
10 Update football stadium with permanent restrooms 12/21/2017 10:43 PM
11 There are buildings that have been converted to classrooms that do not have heating or cooling,
which is unacceptable for students.
11/9/2017 10:24 AM
Renovate Existing Facilities (1)
Additional Classrooms (2)
Additional Lab Spaces (science, shop, robotics, etc.) (3)
Additional Offices (4)
HVAC (heating, ventilation, air conditioning) (5)
Parking (6)
Drop-off Area(s) (7)
Audio/Visual Technology (8)
Wi/Fi (9)
Library Facilities (10)
Athletic Facilities (11)
Student Services Facilities (12)
Student Gathering Areas (13)
Faculty & Staff Gathering Areas (14)
Dining (cafeteria) (15)
Other / Additional Comments: (16)
BASIC STATISTICS
23 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q23 Do you have any other comments, questions, or concerns?
Answered: 2 Skipped: 41
# RESPONSES DATE
1 The parking lot and driveway area at GHS is a mess during drop off/pick up, lunch time and
inclement weather!!!!!
1/9/2018 1:18 PM
2 Please pave the teacher's parking lot at Greenfield High School. Other than that I could not be
happier with the school's facilities and resources.
1/9/2018 1:12 PM
24 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
GREENFIELD HIGH SCHOOL SURVEY RESULTS
38P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
1.88% 5
1.50% 4
4.14% 11
74.44% 198
15.04% 40
3.01% 8
Q1 My role is:
Answered: 266 Skipped: 5
TOTAL 266
# OTHER (PLEASE SPECIFY) DATE
1 Classified 1/29/2018 9:00 AM
2 honest student 1/26/2018 12:33 PM
3 Member of the Ag Advisory Board 1/26/2018 9:37 AM
4 Semi-retired and supporter of Ag Dept. 1/26/2018 8:38 AM
5 English teacher 1/11/2018 2:43 PM
6 Staff 1/10/2018 8:39 AM
7 Librarian Clerk 1/9/2018 1:19 PM
8 Operations Supervisor 11/15/2017 9:47 AM
Site Administration District Administration Parent Student Faculty
Member of the Community
1.88%
1.88%
1.88%
1.88%
1.88%
1.88%
1.88%
(5)
(5)
(5)
(5)
(5)
(5)
(5)
1.50%
1.50%
1.50%
1.50%
1.50%
1.50%
1.50%
(4)
(4)
(4)
(4)
(4)
(4)
(4)
4.14%
4.14%
4.14%
4.14%
4.14%
4.14%
4.14%
(11)
(11)
(11)
(11)
(11)
(11)
(11)
74.44%
74.44%
74.44%
74.44%
74.44%
74.44%
74.44%
(198)
(198)
(198)
(198)
(198)
(198)
(198)
15.04%
15.04%
15.04%
15.04%
15.04%
15.04%
15.04%
(40)
(40)
(40)
(40)
(40)
(40)
(40)
3.01%
3.01%
3.01%
3.01%
3.01%
3.01%
3.01%
(8)
(8)
(8)
(8)
(8)
(8)
(8)
ANSWER CHOICES RESPONSES
Site Administration
District Administration
Parent
Student
Faculty
Member of the Community
1 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
2.21% 6
100.00% 271
1.85% 5
1.11% 3
Q2 I primarily use the:
Answered: 271 Skipped: 0
Total Respondents: 271
# BUILDING OR ROOM NUMBERS MOST USED: DATE
1 Library, classrooms, computer labs 2/1/2018 8:13 AM
2 Tech Office, AG Buildings, 1/29/2018 9:00 AM
3 Ag Dept 1/27/2018 1:18 AM
4 Cafeteria 1/26/2018 1:27 PM
5 class rooms and lunch bar 1/26/2018 12:33 PM
6 Ag 1/26/2018 12:32 PM
7 99 1/26/2018 12:32 PM
8 agriculture department 1/26/2018 12:28 PM
9 shops 1/26/2018 12:28 PM
10 Ag department, Rm. 183 1/26/2018 10:25 AM
11 room 199 and 196 1/26/2018 10:01 AM
12 196 1/26/2018 10:00 AM
13 196 1/26/2018 10:00 AM
14 199 1/26/2018 10:00 AM
15 The ag department 1/26/2018 8:33 AM
16 Ag. Department 1/26/2018 8:25 AM
17 the Ag department work shop 1/26/2018 8:13 AM
18 ag. department 1/26/2018 8:11 AM
Greenfield High
Shcool
King City High
School
Portola-Butler
Continuation
High School
Pinnacle
Academy Charter
0
100
200
300
400
500
ANSWER CHOICES RESPONSES
Greenfield High Shcool
King City High School
Portola-Butler Continuation High School
Pinnacle Academy Charter
2 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
39P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
19 Ag Department,F wing 1/26/2018 8:10 AM
20 Ag Department 1/26/2018 8:09 AM
21 196 1/26/2018 8:07 AM
22 Ag Department 1/25/2018 7:26 PM
23 Cafeteria ag department. 1/25/2018 3:13 PM
24 122, bathrooms the same building. 1/10/2018 1:48 PM
25 Main Office 1/10/2018 8:39 AM
26 161, Auditorium 1/9/2018 3:08 PM
27 131 1/9/2018 1:45 PM
28 121 1/9/2018 1:35 PM
29 Cafeteria and Admin Buildings 1/9/2018 1:02 PM
30 Front Office 1/9/2018 12:59 PM
31 District building. MOT building 11/15/2017 9:47 AM
32 199 11/9/2017 10:51 AM
3 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q3 Acoustics In Learning Spaces
Answered: 268 Skipped: 3
16.42%
44
24.25%
65
22.76%
61
26.49%
71
9.70%
26
0.37%
1
268
2.90
Minimum1.00
Maximum6.00
Median3.00
Mean2.90
Standard Deviation1.26
# COMMENTS: DATE
1 Noisy AC system in/near room 114. 1/29/2018 9:00 AM
2 Ag Mech room is difficult to hear in 1/27/2018 9:29 AM
3 Very old bldg 1/27/2018 1:18 AM
4 I have a classroom and textbook. that's all i need. 1/26/2018 2:47 PM
5 Un often to ever at all do I have to ask the teacher to repeat, and there's also little noise that's in
other classes.
1/26/2018 2:45 PM
6 For the most of my time in school, I focus on myself and my work. Not anyone else, simply
because the fact that I am a Junior at King City High School and I don't have time for anyone's
nonsense. But, don't get me wrong there are those moments where a certain individual can
interfere with my work environment and might get on my nerves, but I manage to focus on myself
and prepare for my Senior year at King City High School.
1/26/2018 2:38 PM
7 In comp app I could hear Mr. Reeanda yelling to his students, giving instructions. In my history
class I could hear machines even with the door closed.
1/26/2018 2:36 PM
8 I don't mind 1/26/2018 2:34 PM
9 I could some times hear the other teacher next door and that's very annoying at times when we
are taking tests or just quiet
1/26/2018 2:30 PM
10 I can rarely hear other teachers teach their classes, but last year I could Woodruff teach his class
when I was in Cavanagh's class due to his wood slide door.
1/26/2018 2:29 PM
11 Some teachers are very loud therefor I can't hear my own teacher talk. For example the teacher
behind Mr.Schwab is very loud.
1/26/2018 2:29 PM
12 In some classes when we are learning we can here people talking in the other room or when we
are having a test when can here what they are saying other rooms and its distracting.
1/26/2018 2:28 PM
Acoustics In
Learning Spaces
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERYGOOD (5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Acoustics In Learning
Spaces
BASIC STATISTICS
4 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
40P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
13 When I am in history I can hear the other teachers and sometimes when we are testing they are a
distraction. you can hear the teachers next door screaming.
1/26/2018 2:28 PM
14 I feel like this area is poor because the wall between Mr. Cavanaugh and Mr. Woodruff's room i
could her both teachers and same goes with Mr. Schwab and Mr. Munoz's
1/26/2018 2:28 PM
15 In some classes you can hear what they are talking about. 1/26/2018 2:28 PM
16 You can hear what the other teacher is teaching from the room next door 1/26/2018 2:28 PM
17 some class rooms have a acordin type of divider to make it into two 1/26/2018 2:27 PM
18 In classes your able to her the other teacher. 1/26/2018 2:27 PM
19 I can hear voices and sounds from other rooms sometimes but I doesn't bother me. 1/26/2018 2:26 PM
20 I can't listen to my teacher while the next door teacher is speaking. 1/26/2018 2:26 PM
21 The folding wall between Mr. Cavanaughs room and Mr. Woodruff rooms is very thin and doesn't
hold noise.
1/26/2018 2:25 PM
22 I can hear other teachers from another room while my teacher is teaching. 1/26/2018 2:25 PM
23 for the FFA classes i think the students are given alot of supplies that we can learn from. 1/26/2018 2:25 PM
24 i don't mind 1/26/2018 2:25 PM
25 I can hear other teachers while I am trying to focus in class or taking a test. 1/26/2018 2:24 PM
26 In my history class, I can easily hear the lectures from the other class behind me. 1/26/2018 2:24 PM
27 We need a bigger door in the entrance for the Ag. The Ag classes need to be remodeled specially
Zopulas.
1/26/2018 2:22 PM
28 I can hear other teachers talk when I'm in the room next door. 1/26/2018 2:21 PM
29 HORRIBLE.. 1/26/2018 2:16 PM
30 The acoustics in the classrooms are very good. 1/26/2018 1:27 PM
31 I can always hear other teachers teaching and movies playing. 1/26/2018 12:35 PM
32 Almost every class I go to I can hear the classes to the sides. 1/26/2018 12:35 PM
33 Can hear other teachers teaching from another room. This can be very distracting to me and my
classmates.
1/26/2018 12:34 PM
34 its fair but at times it can get crowded 1/26/2018 12:33 PM
35 I can sometimes hear other teachers talking in classroom when they 1/26/2018 12:32 PM
36 1/26/2018 12:32 PM
37 loud enough to hear from the back of the room 1/26/2018 12:32 PM
38 Not often, but under certain circumstances, I am able to hear teachers through the walls 1/26/2018 12:31 PM
39 Sometimes we can here the lessons from the classroom next door. 1/26/2018 12:31 PM
40 Sounds from other classrooms and outside 1/26/2018 12:30 PM
41 The classrooms are a bit dirty but not like dirty to the point where I don't want to be with them
that's why I put satisfactory.
1/26/2018 12:30 PM
42 I can sometimes hear other teachers and tv's in the neighboring classrooms. 1/26/2018 12:30 PM
43 Sounds from other classrooms 1/26/2018 12:29 PM
44 I could hear the classes next to me really loud 1/26/2018 12:29 PM
45 the building are not safe the need to be upgrade 1/26/2018 12:29 PM
46 I can hear the learning of other people 1/26/2018 12:29 PM
47 too crowded 1/26/2018 12:29 PM
48 I can hear the class next to mine yelling while lecturing 1/26/2018 12:28 PM
49 we can really use some sound proof walls 1/26/2018 12:27 PM
5 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
50 I could hear the other teachers from the other classes. 1/26/2018 12:27 PM
51 idc about acoustics 1/26/2018 12:23 PM
52 Lots of echoes in many rooms. 1/26/2018 10:25 AM
53 they are mostly good except in some of the Ag classes where it is hard to hear what the teach are
saying.
1/26/2018 10:13 AM
54 Could be better, decent but poor quality 1/26/2018 10:10 AM
55 Room 199 and 200 have bad sound that we can barley hear when watching a learning video 1/26/2018 10:06 AM
56 The work shops and room 199 have bad acoustics. 1/26/2018 10:05 AM
57 In some of the room they are bad 1/26/2018 10:03 AM
58 Some of the classes are really good but some of the bigger classrooms you cant really hear whats
going on especially if your are seated in the back of the room.
1/26/2018 10:02 AM
59 In classroom 199 the Acoustics are really bad you can't really hear when Mr. Zappula puts a video. 1/26/2018 10:00 AM
60 King City High is just an old facility 1/26/2018 9:37 AM
61 The Drama/English and Band room should have sound proof walls. 1/26/2018 9:20 AM
62 Could never pay attention in my classes because im always getting distracted by the noises in the
class room next door.
1/26/2018 9:19 AM
63 Many classrooms don't have enough space for 40 students and makes things really hard to move
around in the classroom. The desk are really close to where someone has to turn sideways to fit.
1/26/2018 9:18 AM
64 you can hear everything the other room is doing in rooms 199 and 200 1/26/2018 9:17 AM
65 You can hear everything going on in these classrooms. Room 200 and 199 1/26/2018 9:16 AM
66 The older buildings (such as some of the Ag. Department and the classrooms near the entrance of
the school) have very thin walls.
1/26/2018 9:16 AM
67 Sometimes I could hear the other teachers in certain classes. 1/26/2018 9:13 AM
68 In rooms 199 and 200 you can hear both classes. 1/26/2018 9:04 AM
69 one in AG Department satisfactory 1/26/2018 8:07 AM
70 The heating and air conditioning in some classrooms is so noisy it is a distraction . Example room
111
1/10/2018 11:34 AM
71 n/a 11/15/2017 9:47 AM
72 Mr. Zappulla teaches out of the old auto shop. The sound in that room is terrible, along with the
floral cooler running and the sound of maintenance mowers running outside. These factors make
teaching for him difficult.
11/9/2017 11:25 AM
73 My classroom is an old autoshop, that has major noise, insulation, and electrical issues. 11/9/2017 10:51 AM
74 Classrooms for the most part encourage a positive environment for student learning. There are
some that don't have heating/air or their units are super old and loud. There are many classrooms
that don't have access to sinks or electrical outlets that provide enhanced student learning.
11/9/2017 10:03 AM
6 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
41P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q4 Accessibility
Answered: 263 Skipped: 8
15.59%
41
25.86%
68
24.71%
65
23.95%
63
6.46%
17
3.42%
9
263
2.90
Minimum1.00
Maximum6.00
Median3.00
Mean2.90
Standard Deviation1.30
# COMMENTS: DATE
1 Slow computers, often not enough space/working computers for my classes. 2/1/2018 8:13 AM
2 several pathways impede path of travel for those in a wheelchair or other physical impairments. 1/28/2018 11:21 PM
3 When we have projects and stuff, we kind of do have some problem finding things and we have to
spend out own money on stuff., but other than that, it's fine.
1/26/2018 2:47 PM
4 A little bit crowded, sometimes have to alternate my route to class, but its tolerable. 1/26/2018 2:45 PM
5 To walk around class to class is absolutely not a problem because I don't worry about the people
who talk or get in my way. I don't talk to anyone on my way to class because my destination is to
get to my class. Sure, if I'm walking with my friends ill talk to them on the way there to my class,
but if they stop to something that is stupid, I don't worry about it because they should NOT be
worrying about standing and talking to their friends or texting on their phones. You're destination is
your next class, so go to you're next class. That's what my opinion would be on.
1/26/2018 2:38 PM
6 The f wing gets packed as well as the ag compound the doors are too small for everyone to go at
once. I know the school is small but, take down the wall going to the ag compound!!!!!
1/26/2018 2:36 PM
7 its okay to me 1/26/2018 2:34 PM
8 it bad at times because kids are always crowded trying to leave and come into class its sometimes
hard to just get to class at times
1/26/2018 2:30 PM
9 I always struggle to get through to the ag. compound because the door way is so small and a lot of
kids come out while we are trying to get through. Also the hall and the doorways into F wing.
1/26/2018 2:29 PM
10 The Ag compound gate is very narrow it "needs" to be enlarged. 1/26/2018 2:29 PM
11 In the F wing when the bell rings it get really crowded and there is no room to move. 1/26/2018 2:28 PM
12 The f wing and the ffa department it is hard getting in and out of both door ways. The ffa entrence
is like for one person at a time so yeah.
1/26/2018 2:28 PM
Accessibility
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Accessibility
BASIC STATISTICS
7 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
13 This area is poor because in F-Wing it takes forever to get out and to get in because there isnt
much room and this also goes for the entrance to the Ag Department
1/26/2018 2:28 PM
14 Some people get injured and they don't have enough space to walk around the other persons and
also going into classrooms the door is not wide enough.
1/26/2018 2:28 PM
15 It is to crowded to get in and out of the AG compound door and also to go to the f wing 1/26/2018 2:28 PM
16 we have one hall way which is extremely crowded all the time 1/26/2018 2:27 PM
17 some entry ways are very reduced and when it is passing period it is difficult to get form point A to
point B because it is really crowded
1/26/2018 2:27 PM
18 it is hard to pass through when disabled because the door paths are way to small. 1/26/2018 2:27 PM
19 It gets really difficult walking in and out of F-Wing during passing period so the halls are crowded. 1/26/2018 2:27 PM
20 Hallways get very packed between classes and it becomes hard to pass. 1/26/2018 2:26 PM
21 The hallways get very pack during passing periods. 1/26/2018 2:26 PM
22 the hallways are very packed and grass is often to muddy to walk on. 1/26/2018 2:25 PM
23 the ag ffa entrance is a regular doorway and all those hundreds of kids cant get to the class on
time so i think they should widen the gate.
1/26/2018 2:25 PM
24 I dnat mind 1/26/2018 2:25 PM
25 I get crowded during passing period. 1/26/2018 2:24 PM
26 The two worst places on the campus to get to are F-wing and the Ag compound. 1/26/2018 2:24 PM
27 It gets crowded when walking from class to class. 1/26/2018 2:21 PM
28 there are too much kids during passing period in the f wing and walking into the ag compound 1/26/2018 2:21 PM
29 The f-wing hall is too small. It's always crowded and it gets hard to get through. 1/26/2018 2:19 PM
30 NEEDS TO BE LARGER 1/26/2018 2:16 PM
31 The Ag department isn't as accessible as it could be. 1/26/2018 2:12 PM
32 Its hard to get through the Ag doorway 1/26/2018 1:35 PM
33 gate going into ag department needs to be bigger because everyone tries to fit through it at the
same time.
1/26/2018 1:35 PM
34 The accessibility in the school is also good . 1/26/2018 1:27 PM
35 Struggle getting into and out of F-wing and Ag Department. 1/26/2018 1:26 PM
36 it is always crowded in the f wing 1/26/2018 1:25 PM
37 The agriculture department entrance is very hard to get through. 1/26/2018 1:24 PM
38 Expand hallways 1/26/2018 1:24 PM
39 Expand hallways 1/26/2018 1:23 PM
40 Its is hard to find some classes. 1/26/2018 12:55 PM
41 I can never get through the doors to leave the hallway. 1/26/2018 12:35 PM
42 i am able to make it to class in time 1/26/2018 12:35 PM
43 We are able to get to one classroom to another just fine. We are easily able to reach all of our
classroom.
1/26/2018 12:34 PM
44 its satisfactory, because its centered in the middle of the city 1/26/2018 12:33 PM
45 The F wing gets really crowded once the bell rings. 1/26/2018 12:32 PM
46 Getting to F-wing is crammed 1/26/2018 12:32 PM
47 The hall ways are to crowded , need to new restrooms on the track field with mirrors , also the
shops in the Ag department needs to be cleaned and get new tools
1/26/2018 12:32 PM
48 there is time when the hallway gets crowed and you go to the classroom late. 1/26/2018 12:32 PM
8 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
42P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
49 It's easy to be able to get from one class to another without any hazards 1/26/2018 12:31 PM
50 crowded hallways during passing period 1/26/2018 12:30 PM
51 The haulways are crowded during passing period 1/26/2018 12:29 PM
52 hallways are always crowded 1/26/2018 12:29 PM
53 I can get to school easy. 1/26/2018 12:29 PM
54 too crowded 1/26/2018 12:29 PM
55 The hallways are so crowded. we have to push to get to our next class 1/26/2018 12:28 PM
56 feels to crowded with the doors too small 1/26/2018 12:27 PM
57 steps are not highlighted. 1/26/2018 12:27 PM
58 It gets to crowded walking to our classes. 1/26/2018 12:26 PM
59 Accessible because the Ag department is a very open space where anyone can go. 1/26/2018 10:25 AM
60 The accessibility in room 134 is fair because in that room there is not enough space to walk
around the classroom. I would suggest to move ms. Russ to another classroom because many
students will be taking her class and she will need more space.
1/26/2018 10:13 AM
61 Going in or out of F wing is horrible, it is very crowded and you get pushed around all the time. 1/26/2018 10:06 AM
62 The F wing is very hard to get in and out of, you get pushed around and stepped on. 1/26/2018 10:05 AM
63 The F wing is a struggle to get through because there are people are going in and people going
out.
1/26/2018 10:02 AM
64 all classes are pretty good but going into and out of F wing its really hard to get through and its
very crowded with people bouncing off each other
1/26/2018 10:02 AM
65 Wifi / logging in to computers are slow. 1/26/2018 10:02 AM
66 Going into the Ag department is very hard because there is just a small space to walk through. 1/26/2018 10:01 AM
67 Its difficult to get through the F wing doors since there's a lot of students jamming through. 1/26/2018 9:20 AM
68 The gates are closed half of the time. The guards that open them are late to open them which
makes students late to class. We don't have a student drop off students get dropped off in the
middle of the street. The classroom doors are hard to open at times and they lock by themselves at
times.
1/26/2018 9:18 AM
69 F wing gets really crowded during passing periods. especially when we have FOUR MINUTES to
get to our class
1/26/2018 9:17 AM
70 F wing at our school is not accessible because it is hard to walk in and walk out because people
suck
1/26/2018 9:16 AM
71 The F-Wing is always jampacked. 1/26/2018 9:16 AM
72 going from class to class I don't have enough time use the restroom 1/26/2018 9:11 AM
73 Going from class to class i do not have enough time to go use the restroom across campus since
we only have 1 restroom that no more then 2 students can use.
1/26/2018 9:10 AM
74 It's hard to pass through the F-wings when we try to walk to our other classes in there. 1/26/2018 8:11 AM
75 Uneven concrete, narrow doorways. ALL bathrooms need upgrades. 1/11/2018 2:43 PM
76 The drama room has a threshold that is difficult to get over in a wheelchair or with the computer
cart. The stage is not wheelchair accessible, even though the audience seating is accessible.
1/9/2018 3:08 PM
77 Some ADA issues. Student union/cafeteria too small, not efficient servicing for lunch. 11/15/2017 9:47 AM
9 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q5 Thermal Comfort
Answered: 267 Skipped: 4
33.71%
90
19.10%
51
19.85%
53
17.98%
48
6.74%
18
2.62%
7
267
2.53
Minimum1.00
Maximum6.00
Median2.00
Mean2.53
Standard Deviation1.41
# COMMENTS: DATE
1 The office space is usually too cold. 2/5/2018 11:41 AM
2 Ridiculous HVAC systems. They run all weekend, teachers have zero control 2/1/2018 8:13 AM
3 199 No AC unit/ Heather. 1/29/2018 9:00 AM
4 Some rooms are colder or warmer than is comfortable for learning. 1/27/2018 9:29 AM
5 Heating is below poor. Rooms do not have A/C. They don't even have fans 1/27/2018 1:18 AM
6 one class is either the Bahamas and another is the arctic. 1/26/2018 2:47 PM
7 There are several classrooms that do not posses proper conditioning or heating, but a few non the
less.
1/26/2018 2:45 PM
8 I'm going to be honest, for the most part, heating and AC hasn't really been a problem, until these
past couple of weeks arrived. Our classrooms are so cold, that I feel like I'm in Alaska or
something. It's not a pleasant feeling when you can barely feel your own toes because it's too
flipping cold in most of the classrooms. However, before the gas shut off on us, the AC was
working perfect. Just a small mistake the school needs to fix and I think they are capable of doing
it.
1/26/2018 2:38 PM
9 Supposedly there was a gas leak and the A/C doesn't work. Students get very cold in the morning
and why layer on clothes if we ain't going to need them in the afternoon.
1/26/2018 2:36 PM
10 its always very cold because majority of teachers don't use their heaters in their classroom 1/26/2018 2:34 PM
11 right now we don't have a heater at school and its very cold in class at the moment 1/26/2018 2:30 PM
12 It gets cold and the teachers were not able to or did not want to turn the heater on because of the
gas leak, ya'll should check that more often so we don't freeze man.
1/26/2018 2:29 PM
13 Everyone just whining that is to cold but in reality they need to man up in isn't our fault that their
hormone don't warm them up fast enough.
1/26/2018 2:29 PM
Thermal
Comfort
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Thermal
Comfort
BASIC STATISTICS
10 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
43P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
14 In some class rooms there is no heaters and when there is it either dose not work or it dose not
reach the whole class room
1/26/2018 2:28 PM
15 In some classes it is too hot and the teacher says it doesn't work to change it so they need to be
changed or fixed and sometimes its also cold and the heaters don't work.
1/26/2018 2:28 PM
16 It is poor because right now in the situation we are because of the gas leeks it is really cold and in
some classes the heater does not work and during summer the ac does not work in other
classrooms.
1/26/2018 2:28 PM
17 Its always cold in the classroom during winter time 1/26/2018 2:28 PM
18 Everyone teacher is hot on campus and the kids are always freezing. 1/26/2018 2:28 PM
19 we don't have heaters running in class rooms during the winter which is unacceptable especial
becoue the school cant even put in a potable heater
1/26/2018 2:27 PM
20 it gets really hot in king city and most of the classrooms don't have air conditioners but the ones
that do have they don't really work, and when it is really cold almost all of the classrooms don't
have heaters and there is even some that don't have either
1/26/2018 2:27 PM
21 during hot days their is always something going on with the air conditioning as well as in the cold
weathers the heaters are always shut down according to the school because of gas leaks.
1/26/2018 2:27 PM
22 Its all good except for when the gas starts to leak. 1/26/2018 2:26 PM
23 Our heaters don't work and its very cold. 1/26/2018 2:26 PM
24 good except for when gas is leaking 1/26/2018 2:25 PM
25 The teachers don't turn on the heater when its freezing cold cause they don't work or because they
are hot.
1/26/2018 2:25 PM
26 in the shops it can get very cold 1/26/2018 2:25 PM
27 I don't mind 1/26/2018 2:25 PM
28 Sometimes it is way to cold and other times it is way to hot. 1/26/2018 2:24 PM
29 Its really cold and I want to be warm. 1/26/2018 2:24 PM
30 We have no heater at this moment and some classes don't have Air conditioning during the
summer.
1/26/2018 2:22 PM
31 All the classrooms are always cold 1/26/2018 2:21 PM
32 Recently, the classrooms have been very cold. 1/26/2018 2:19 PM
33 ITS HELLA COLD BRUH 1/26/2018 2:16 PM
34 It is super cold in the classes. 1/26/2018 2:12 PM
35 The thermal comfort is very good at our school 1/26/2018 1:27 PM
36 There is no heater in the class rooms. 1/26/2018 1:24 PM
37 It is never warm in classrooms when it is cold outside. 1/26/2018 12:55 PM
38 Our ac and heat is currently turned off. 1/26/2018 12:35 PM
39 currently there is no heat in most of the classed so in the mornings it is extremely cold, to a point
some teachers bring there own heaters
1/26/2018 12:35 PM
40 Currently the heating in the room are not good at all. There are some classrooms that have no
heat this can be bad in the mourning; when it is cold.
1/26/2018 12:34 PM
41 heaters weren't working for a little period of time, and sometimes the AC doesn't work 1/26/2018 12:33 PM
42 Need heaters for classrooms and cafeteria because it gets really cold. 1/26/2018 12:32 PM
43 The heat in almost all the classrooms doesn't work and its cold in the morning. 1/26/2018 12:32 PM
44 needs to fix the heater on every day room and cafeteria. 1/26/2018 12:32 PM
11 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
45 heater aren't working 1/26/2018 12:32 PM
46 Classrooms often times get too cold for comfort 1/26/2018 12:31 PM
47 Most of my classes are so cold, the heater do not work. 1/26/2018 12:31 PM
48 ITS REALLY COLD 1/26/2018 12:30 PM
49 no heaters in classrooms 1/26/2018 12:30 PM
50 It is very cold in the morning all the time now in all my classes because the heaters are messed up
or something so some of the teachers bring their own heaters at times.
1/26/2018 12:30 PM
51 The heat almost all the classrooms doesn't work and it is cold in the morning. 1/26/2018 12:30 PM
52 We need more heaters!!!! 1/26/2018 12:29 PM
53 Fix the heating system in certain classrooms. 1/26/2018 12:29 PM
54 every classes room is cold 1/26/2018 12:29 PM
55 we need new gas lines for heat 1/26/2018 12:29 PM
56 theirs is no heater 1/26/2018 12:29 PM
57 I don't even feel the heat. 1/26/2018 12:28 PM
58 there is no current heater in the majority of the class rooms, Its so cold to the point where teachers
are bringing their own heaters...
1/26/2018 12:28 PM
59 Our heater is currently down and without it makes learning a whole lot harder 1/26/2018 12:27 PM
60 not most classes have the heater on in the morning 1/26/2018 12:27 PM
61 FIX THE HEATERS 1/26/2018 12:23 PM
62 In some classrooms, especially Room 199, it can be very cold and needs an upgrade for a heater.
In the winter, I would like to stay warm, and not have to wear multiple layers of schools.
1/26/2018 12:22 PM
63 The Ag department is outside, so it is always very cold. Room 183 also has problems with the
heater and air conditioning, it is supposed to be fixed, but it never happens and the AC is always
turning on and off at random times.
1/26/2018 10:25 AM
64 goodd for right now they had a gas pron=blem so there is no heaters. 1/26/2018 10:13 AM
65 Munoz said that before, they had control over the heat and ac, and now they don't to save "money"
or something but literally, the ac turns on randomly when it is already cold.
1/26/2018 10:04 AM
66 The mechanics shop only has like 2 working outlets, and it doesn't feel comfortable 1/26/2018 10:00 AM
67 In the Drama/English room and band room, can be really hot in hot days and really cold in cold
days and the heater and ACs dont work. The teacher have had to bring heaters or fans from their
homes.
1/26/2018 9:20 AM
68 Some class room have heating and cooling problems. 1/26/2018 9:20 AM
69 All my class rooms are freezing cold!!!!! Can't even pay attention because im so cold. 1/26/2018 9:19 AM
70 During the winter it gets really cold and the classrooms don't even have a heater which makes it
really cold in the classroom. When it gets close to the summer time it gets really hot and the a/c
barely works as well and it gets really humid because of all the 40 students cramped inside a small
classroom.
1/26/2018 9:18 AM
71 the ac in most classrooms doesn't work or isn't even installed 1/26/2018 9:17 AM
72 Classrooms 162 and 161 during the heat are really bad because we have no air conditioning that
works.
1/26/2018 9:16 AM
73 super cold or super hot depending on the season. 1/26/2018 9:11 AM
74 FREEEZZEEEEEIIIIIINNNNGGGGGGGGGG, most of my classes are either super cold or super
hot depending on the season.
1/26/2018 9:10 AM
75 the heaters don't work only a few classes have heaters 1/26/2018 8:35 AM
76 Sometimes the heater and air conditioning breaks down in majority of the classrooms mostly in the
ag compound
1/26/2018 8:33 AM
12 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
44P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
77 needs air conditioner in band 1/26/2018 8:17 AM
78 In King City the heaters have been off during the whole month of January. 1/26/2018 8:16 AM
79 Ag department 1/26/2018 8:10 AM
80 Rooms are large and cold or hot.....depending on the time of year. 1/25/2018 7:26 PM
81 Good for my room but no good in the room next door. We share a thermostat. Neighbo needs
control of their own.
1/15/2018 5:20 PM
82 My room, heating and air work. I want windows that open. 1/11/2018 2:43 PM
83 Apparently, AC was installed over winter break. We haven't had call to use it yet. It was very hot in
the afternoon at the start and end of school in the past. The auditorium is sometimes quite cold in
the winter for rehearsals.
1/9/2018 3:08 PM
84 I am not able to adjust the thermal comfort in my room. My students are either freezing or
uncomfortably hot.
1/9/2018 1:51 PM
85 I cant control the temperature inside the room. It is centralized. Sometimes the AC is very cold. 1/9/2018 1:45 PM
86 Because most of the time the heating or A/C doesn’t work. Ron said the heater for one of the
shops has been on order for 2 years. He said he is still waiting...
1/9/2018 1:39 PM
87 Don’t have a thermostat in my room. 1/9/2018 1:09 PM
88 Thermostat too hot in winter and no AC during hot days. 1/9/2018 1:02 PM
89 We struggle with heat and cooling on this campus. 1/9/2018 12:59 PM
90 There are rooms that were converted to classrooms where there is no heat or cooling system.
That is a violation of ed code.
1/9/2018 12:58 PM
91 Problems with HVAC units throughout the district. especially during hot spells in summer. we have
a contractor on sites constantly
11/15/2017 9:47 AM
92 Most rooms have heating and A/C but they rarely work in accordance with the temperature
outside.
11/9/2017 11:25 AM
93 I have no insulation or air conditoning 11/9/2017 10:51 AM
94 There are some that don't have heating/air or their units are super old and loud. While some
classroom's have these units they may not work or they don't heat/cool the entire room efficiently.
11/9/2017 10:03 AM
95 Not all rooms have a heater or AC. When the temperatures are too cold or too hot, students are
not able to focus on learning.
11/7/2017 3:34 PM
13 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q6 Electrical Lighting
Answered: 266 Skipped: 5
9.77%
26
21.43%
57
21.43%
57
29.32%
78
11.28%
30
6.77%
18
266
3.31
Minimum1.00
Maximum6.00
Median3.00
Mean3.31
Standard Deviation1.36
# COMMENTS: DATE
1 My room is dim since "energy saving" lights were installed. This has been documented but NEVER
fixed. Why?
2/1/2018 8:13 AM
2 could be brighter 1/27/2018 9:29 AM
3 Some rooms have no windows 1/27/2018 1:18 AM
4 the light are good. 1/26/2018 2:47 PM
5 A few classrooms lighting is faulty, mainly a few lightbulbs not working when the rest do, or the
light is weak. Its tolerable to me, though.
1/26/2018 2:45 PM
6 Electrical lighting isn't really a problem on our campus, but others have different opinions of
course. So I really don't mind going to a football game or basketball game and not being able to
see where I'm walking leaving the parking lot to the stadium.
1/26/2018 2:38 PM
7 The woodshop needs huge improvement in the storage room and in the whole room. we don't
want anyone to get hurt that would suck.
1/26/2018 2:36 PM
8 its okay 1/26/2018 2:34 PM
9 should be a little darker in class 1/26/2018 2:30 PM
10 It's pretty good in all classes kind of to bright though. 1/26/2018 2:29 PM
11 Its not bad students just need better glasses. 1/26/2018 2:29 PM
12 When there are games in the night it is hard to see. 1/26/2018 2:28 PM
13 The wood shop has light in the middle of the room but not so much on the sides and in the storage
room in there you cant really see when you are trying to get your project.
1/26/2018 2:28 PM
14 I just feel like we should put little street light on campus because at home games for sports its hard
to see going through the campus
1/26/2018 2:28 PM
Electrical
Lighting
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Electrical
Lighting
BASIC STATISTICS
14 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
45P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
15 There's some classes were the lights don't work and its a little dark. 1/26/2018 2:28 PM
16 most class rooms have one or two lights which are not working 1/26/2018 2:27 PM
17 The electrical is some what good but we definitely need better lighting 1/26/2018 2:27 PM
18 Its decent to see at night while still on campus. 1/26/2018 2:26 PM
19 I wish their were more lights around the football stadium at night. 1/26/2018 2:25 PM
20 i think the lights in the shop and classes are good 1/26/2018 2:25 PM
21 I don't mind 1/26/2018 2:25 PM
22 Its fine. 1/26/2018 2:24 PM
23 We have some flickering lights. 1/26/2018 2:22 PM
24 ITS IGHT 1/26/2018 2:16 PM
25 The electrical lighting is very good at our school 1/26/2018 1:27 PM
26 \ 1/26/2018 1:26 PM
27 Lighting is okay, its hard to see. 1/26/2018 12:35 PM
28 no comment 1/26/2018 12:35 PM
29 There are some places that could use better lighting. Such as the baseball field. 1/26/2018 12:34 PM
30 lighting is good 1/26/2018 12:33 PM
31 we need more lighting at night for when there is games late at night 1/26/2018 12:32 PM
32 There are the exceptions of one classroom that I know that has flickering lights 1/26/2018 12:31 PM
33 really dark at night 1/26/2018 12:30 PM
34 It would be nice if there is more lights everywhere 1/26/2018 12:29 PM
35 classes aren't well lit 1/26/2018 12:29 PM
36 no lights in a metal shop 1/26/2018 12:29 PM
37 During the night time the lighting is poor because we need more lights 1/26/2018 12:29 PM
38 There isn't many light at night for night events which should change. 1/26/2018 12:28 PM
39 Some flickering here and there seems like where in a horror movie 1/26/2018 12:27 PM
40 classes and campus aren't well lit. 1/26/2018 12:27 PM
41 The lights could be upgraded to have a brighter setting. 1/26/2018 12:22 PM
42 Lots of lighting sometimes out goes out, and when its all on it doesn't have the brightest setting 1/26/2018 10:00 AM
43 There isn't many lighting ports in any classroom. If there is any they are behind a shelf or
something which makes them useless.
1/26/2018 9:18 AM
44 Some of the Ag classrooms only have 2 outlets. While other classes have 5 to 6 1/26/2018 8:10 AM
45 Florescent lights are not all lit and it's hard to adjust level or sides of light. For an art room it is
beneficial to be able to turn on only one row of lights to create a shadow from one direction.
1/12/2018 8:14 AM
46 Natural light over artificial light. 1/11/2018 2:43 PM
47 Work orders have been put in for lights that are out, but they have not been replaced--my ceilings
are too high to change lights without a lift.
1/9/2018 3:08 PM
48 Fluorescent lights are hard on the eyes and make concentration/productivity decrease. 1/9/2018 12:59 PM
49 Most of my outlets do no work. My projector is on a rolling cart. 11/9/2017 10:51 AM
50 Campus at night is fairly dark. Some classrooms have really bright lights while others have dim
lights.
11/9/2017 10:03 AM
51 Lighting is not working in all the rooms or is very dim 11/7/2017 3:34 PM
15 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q7 Electrical Power (Outlets, etc.)
Answered: 259 Skipped: 12
21.62%
56
22.39%
58
21.62%
56
21.62%
56
7.72%
20
5.02%
13
259
2.86
Minimum1.00
Maximum6.00
Median3.00
Mean2.86
Standard Deviation1.43
# COMMENTS: DATE
1 Not enough outlets 2/5/2018 11:42 AM
2 I need more outlets all around my room for equipment. I asked for this prior to the last renovation.
Nothing changed. WHY?
2/1/2018 8:18 AM
3 I have spotted and reported many power outlets around campus, they have been replaced as
needed. Electrical cover plates replacement as needed.
1/29/2018 9:00 AM
4 Ag Mech room has few working outlets? Of all classes, that room needs outlets! 1/27/2018 9:32 AM
5 Bldg was hilt many many years ago and not designed to sustain today's computer era 1/27/2018 1:27 AM
6 old and looks like a safety hazard. 1/26/2018 2:54 PM
7 some are very old and look like they are a safety hazard. 1/26/2018 2:54 PM
8 Never really met with any problems. 1/26/2018 2:53 PM
9 they good. 1/26/2018 2:52 PM
10 As far as I know, I haven't occurred any Electrical outlet problems. 1/26/2018 2:48 PM
11 I feel like a blind man when I am on campus at night. 1/26/2018 2:47 PM
12 some electrical outlets look very old that could even be a safety hazzard 1/26/2018 2:41 PM
13 in some buildings not all the outlets work in the school 1/26/2018 2:39 PM
14 there good but they are to high to reach sometimes to plug in power tool or to charge a laptob 1/26/2018 2:38 PM
15 it works fine 1/26/2018 2:37 PM
16 there needs to be more outlets for students to charge there phones 1/26/2018 2:37 PM
17 It's alright although I don't really use them soooo. 1/26/2018 2:35 PM
Electrical
Power (Outle...
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERYGOOD (5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Electrical Power
(Outlets, etc.)
BASIC STATISTICS
16 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
46P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
18 haven't had electrical problems. 1/26/2018 2:35 PM
19 Some classes don't have plugs or they do but only a small amount. 1/26/2018 2:33 PM
20 Some of them don't work when I try to charge my phone. 1/26/2018 2:33 PM
21 i think they work fine i haven't had a problem. 1/26/2018 2:32 PM
22 Sometimes the lights tend to flash. 1/26/2018 2:31 PM
23 Don't use them. 1/26/2018 2:28 PM
24 I don't mind 1/26/2018 2:26 PM
25 ION KNOW 1/26/2018 2:17 PM
26 The outlets are very good. 1/26/2018 1:31 PM
27 not all classes have outlets 1/26/2018 1:29 PM
28 needs outlets in classrooms. 1/26/2018 1:28 PM
29 Not enough outlets and the ones that are there do not work. Need more and working outlets. 1/26/2018 12:55 PM
30 There are outlets were they are most needed. And everything that needs electrical power is just
fine.
1/26/2018 12:44 PM
31 in some classes the outlets don't work no longer and some classes don't have nun 1/26/2018 12:43 PM
32 There is a decent amount of power for the student 1/26/2018 12:41 PM
33 i do not use the outlets 1/26/2018 12:38 PM
34 Not all the Outlets work 1/26/2018 12:38 PM
35 some dont work 1/26/2018 12:35 PM
36 some outlets are pretty old and not all outlets work 1/26/2018 12:35 PM
37 phone dead in class need more outlets 1/26/2018 12:35 PM
38 I would like to charge my phone more 1/26/2018 12:35 PM
39 we need more power outlets. 1/26/2018 12:33 PM
40 sometimes the computers are down the whole day and its tuff to get stuff done when the electrical
power grid for our school keeps shutting down
1/26/2018 12:32 PM
41 not enough. 1/26/2018 12:32 PM
42 I noticed that in the Ag. Mechanics 1 room, Room 199, needs an update for outlets since there are
only two outlets working in the entire room/shop.
1/26/2018 12:25 PM
43 most of the classes need more outlets especially the Ag classes 1/26/2018 10:21 AM
44 Room 199 has a lot of outlets out. 1/26/2018 10:15 AM
45 Some don't work 1/26/2018 10:13 AM
46 Zapullas room. 1/26/2018 10:08 AM
47 poor in Ag departments. 1/26/2018 10:07 AM
48 room 199 only has 2 working outlets. 1/26/2018 10:07 AM
49 some classes have very accessible ones and others have very few 1/26/2018 10:05 AM
50 there are some that do not work 1/26/2018 10:04 AM
51 Room 199 there aren't enough power outlets. 1/26/2018 10:04 AM
52 in room199 1/26/2018 10:03 AM
53 the shop needs new working outlets 1/26/2018 10:02 AM
54 Zapullas room only has two outlets and should have more. 1/26/2018 9:36 AM
55 Many classrooms need electrical outlets that work because there are teachers with only two
outlets that works.
1/26/2018 9:33 AM
17 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
56 in room 199 only 2 outlet only work. 1/26/2018 9:28 AM
57 Many outlets don't work and many are behind a shelf. 1/26/2018 9:26 AM
58 In room 199 & 200 there are 2 outlets that work in their whole class room. 1/26/2018 9:21 AM
59 Some class room have outlets that don't work or you cant plug anything in there cause they are
either old or broken.
1/26/2018 9:21 AM
60 Many of the older buildings that have outlets don't work!! 1/26/2018 9:20 AM
61 In class 196, 199 & 200 there is only about 2 outlets that work. 1/26/2018 9:20 AM
62 In room 199 needs a lot of new outlets because many of the outlets do not work. Us student and
teacher don't have the right accessibility to construct certain project because of the poor outlet
situation.
1/26/2018 9:19 AM
63 Not all of the oulets work in all classrooms 1/26/2018 9:09 AM
64 room 199 only 2 outlets work 1/26/2018 9:08 AM
65 Room 199 only has 2 working outlets 1/26/2018 9:08 AM
66 some classrooms don't have enough outlets. 1/26/2018 8:34 AM
67 There are some outlets around the school that do not work at all. 1/26/2018 8:25 AM
68 however some classes have two outlet like 199 1/26/2018 8:23 AM
69 Needs work in Ag department 1/26/2018 8:23 AM
70 Needs work in Agriculture department. 1/26/2018 8:13 AM
71 Ag shops lack enough power outlets. 1/26/2018 8:13 AM
72 Too many issues with wiring. Gym and snack bar specifically. 1/25/2018 3:18 PM
73 There could be more outlets at the front of the room. 1/12/2018 8:29 AM
74 More outlets so that cords are not snaking along the floor and up the wall. 1/11/2018 2:46 PM
75 Some outlets do not work in the gym. The snack bar when in use will flip breakers. In the weight
room there are not enough to run the treadmills
1/10/2018 11:37 AM
76 I have one outlet for the entire room. 1/9/2018 1:53 PM
77 Kids have been electrocuted in the Ag shops 1/9/2018 1:43 PM
78 Some outlets do not have power 1/9/2018 1:04 PM
79 some wings in King city have old power set ups. 11/15/2017 9:54 AM
80 many of the electrical outlets in the wood and metal shops are old and beat up. Theyt short
frequently and sometimes shock students and teachers. Much need for renovation in the
Agriculture area. It is also the oldest part of campus and some of the original buildings on campus.
11/9/2017 11:35 AM
81 I have had multiple circuits break and not working in my room 11/9/2017 10:54 AM
82 There is limited power outlets, and these outlets are not clearly marked in breaker boxes so it is
hard to fix those that don't work.
11/9/2017 10:08 AM
83 All outlets need to be checked, several are broken or damaged. In addition, several rooms do not
have an adequate number of outlets and have to use surge protectors.
11/7/2017 3:36 PM
18 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
47P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q8 Exterior/Site Lighting
Answered: 256 Skipped: 15
14.45%
37
23.83%
61
21.48%
55
26.17%
67
8.59%
22
5.47%
14
256
3.07
Minimum1.00
Maximum6.00
Median3.00
Mean3.07
Standard Deviation1.38
# COMMENTS: DATE
1 Recently the Outside lighting was updated. 1/29/2018 9:00 AM
2 No lighting which would enhance security 1/27/2018 1:27 AM
3 Lighting is bad at the games mostly when u are leaving from school. 1/26/2018 2:54 PM
4 When leaving basketball and football games its dark and you can't see. we need more lights! 1/26/2018 2:54 PM
5 Its fine as it is, as there aren't many to any students on campus near times where it would be dark
outside.
1/26/2018 2:53 PM
6 pretty creepy at night but it's good. 1/26/2018 2:52 PM
7 No problems as far as I know. 1/26/2018 2:48 PM
8 Their should be better lighting at night so it feels safe. 1/26/2018 2:47 PM
9 need more lights around school ground because after school it get dark 1/26/2018 2:41 PM
10 There should be more lights on campus 1/26/2018 2:39 PM
11 there is enough 1/26/2018 2:39 PM
12 it doesn't bother me 1/26/2018 2:37 PM
13 we sometimes at night its really scary because its very dark and u cant really see anything until u
get close to the cafeteria because then u could see the lights on the street and stores
1/26/2018 2:37 PM
14 good lightning, its bright enough. 1/26/2018 2:35 PM
15 Everything looks good. 1/26/2018 2:34 PM
16 they are good 1/26/2018 2:32 PM
Exterior/Site
Lighting
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Exterior/Site
Lighting
BASIC STATISTICS
19 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
17 After soccer games or football games and even baseball games there is hardly any light to be able
to see and the campus is really dark.
1/26/2018 2:31 PM
18 We need more because I don't want to have to walk to practice in the dark at night. 1/26/2018 2:28 PM
19 I don't mind 1/26/2018 2:26 PM
20 ITS KOO 1/26/2018 2:17 PM
21 The exterior of the school needs to be updated by planting trees outside the school. 1/26/2018 1:31 PM
22 Not enough outside lighting in grass areas to see ditches or puddles. Need more lights around
grass areas.
1/26/2018 12:55 PM
23 There are a good amount of lighting around the exterior of the building. But there could be a little
more lighting where there are walkways.
1/26/2018 12:44 PM
24 We need lights outside because once it gets really dark you cant see where your going or if your
gunna trip.
1/26/2018 12:43 PM
25 The campus could use some light post here and there, when I come out of practice the campus is
dark.
1/26/2018 12:43 PM
26 their should be lighting in places like dark places 1/26/2018 12:43 PM
27 Needs to be brighter for students that travel for games and get here really late, not bright enough. 1/26/2018 12:42 PM
28 The baseball field has no lighting 1/26/2018 12:41 PM
29 the lighting is good, as sometimes i am a mascot the lights are good enough to navigate through
during a game
1/26/2018 12:38 PM
30 the peeling off the classroom it looks ugly. 1/26/2018 12:38 PM
31 idk ask jesus 1/26/2018 12:35 PM
32 It needs to stand out more. 1/26/2018 12:35 PM
33 poor lighting during the night 1/26/2018 12:33 PM
34 Campus is pretty dark at sun fall. 1/26/2018 12:32 PM
35 Add more lights around the campus 1/26/2018 12:28 PM
36 probably a little more light around the main office and in the Ag department 1/26/2018 10:21 AM
37 Could be better, some parts it gets really dark 1/26/2018 10:13 AM
38 Its extremely hard to see in the evening in the center of the ag. department 1/26/2018 10:02 AM
39 Many lights to light the school don't even work. When you come to a game at night you can barely
see where you go.
1/26/2018 9:26 AM
40 Could use an new paint job. 1/26/2018 9:21 AM
41 Rooms are not as lit as possible. Especially during evening meetings. 1/25/2018 7:28 PM
42 Definitely need to upgrade night lighting. 1/25/2018 3:18 PM
43 We just got an LED porch light on a timer. 1/9/2018 3:14 PM
44 Better from the newly installed lights 1/9/2018 1:43 PM
45 at night there are some areas of the school that need lighting 1/9/2018 12:08 PM
46 new LED project through whole district underway right now 11/15/2017 9:54 AM
47 much better with the new LED's installed 11/9/2017 11:35 AM
48 Very limited outside lighting especially on the exterior of the school or on walking paths to vehicles
or the outside of school.
11/9/2017 10:08 AM
49 Very difficult to see in some areas at night 11/7/2017 3:36 PM
20 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
48P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q9 Daylighting (adequate natural light, too much natural light, glare?)
Answered: 261 Skipped: 10
9.96%
26
17.62%
46
22.22%
58
29.50%
77
12.26%
32
8.43%
22
261
3.42
Minimum1.00
Maximum6.00
Median4.00
Mean3.42
Standard Deviation1.39
# COMMENTS: DATE
1 My room would be dark without lighting 2/1/2018 8:18 AM
2 There is no natural light in my classroom. We have one window in the back corner and it is shaded
most of the day. It does not cast enough natural light to light the room at any time of the day or
during any season.
2/1/2018 7:44 AM
3 Some natural light piercing threw windows in room 186 1/29/2018 9:00 AM
4 Hardly any natural lighting 1/27/2018 1:27 AM
5 Too much lighting the white board has glares and I can't take notes. 1/26/2018 2:54 PM
6 yess there is so much glare when we are taking notes we can't really see the board because of
too much glare.
1/26/2018 2:54 PM
7 Its fine as it is, just that some of the time there's both indoor lighting and daylighting. 1/26/2018 2:53 PM
8 i love the natural lighting in class, it relaxes me. 1/26/2018 2:52 PM
9 No problems so far. 1/26/2018 2:48 PM
10 Its good. 1/26/2018 2:47 PM
11 not all class rooms have enough windos 1/26/2018 2:39 PM
12 it usually doesn't happen but it does now 1/26/2018 2:37 PM
13 they should tint there windows because sometimes the sunlight comes into the class and at times
we cant read what is on the white bored
1/26/2018 2:37 PM
14 in most class rooms teacher put desk where the sun your face 1/26/2018 2:37 PM
15 already nice and open. 1/26/2018 2:35 PM
16 Everything looks good. 1/26/2018 2:34 PM
Daylighting
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Daylighting
BASIC STATISTICS
21 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
17 i think the natural light is fine 1/26/2018 2:32 PM
18 There is a lot of space to get natural light only thing is when it is too hot our shade area, cafeteria
get crowded and not all teachers leave their classes open to go inside so sometimes it's hard to
find some shade.
1/26/2018 2:31 PM
19 When trying to watch an educational movie during class the outside light tends to make it hard to
see.
1/26/2018 2:31 PM
20 I don't mind 1/26/2018 2:26 PM
21 IDK 1/26/2018 2:17 PM
22 Not too much daylight 1/26/2018 1:31 PM
23 a lot of classes don't have windows 1/26/2018 1:29 PM
24 too much light in some classes and some don't have enough 1/26/2018 1:27 PM
25 Some classrooms have bad glares. 1/26/2018 12:55 PM
26 There is a good balance of natural light in the classrooms. But there are still some class rooms
that may need some more natural lighting.
1/26/2018 12:44 PM
27 There is enough natural light 1/26/2018 12:41 PM
28 too much glare 1/26/2018 12:38 PM
29 Its okay. 1/26/2018 12:38 PM
30 little to much glare 1/26/2018 12:35 PM
31 Idk I don't stare at the sun 1/26/2018 12:35 PM
32 I like the daylight is good 1/26/2018 12:34 PM
33 the natural light is actually fine until its too hot or cold 1/26/2018 12:32 PM
34 good day lighting in most classes. 1/26/2018 12:32 PM
35 Many windows, a good thing. 1/26/2018 10:25 AM
36 NO natural lighting in f wing 1/26/2018 10:13 AM
37 To much light gets into classrooms in the morning. You can barely see anything because of all the
reflecting objects in the classroom.
1/26/2018 9:26 AM
38 most class rooms have natural light but most of the teachers block the sunlight from coming in. 1/26/2018 8:34 AM
39 some class rooms like the bathroom don't have natural light and some class rooms. 1/26/2018 8:23 AM
40 Most of our classes don't even have windows. 1/26/2018 8:15 AM
41 For as often as in there. 1/25/2018 3:18 PM
42 Adequate lighting 1/15/2018 6:28 PM
43 I have lots of windows and great natural light in the classroom! 1/12/2018 8:29 AM
44 Need more natural light with window coverings that are blinds so that natural light/glare can be
adjusted for.
1/11/2018 2:46 PM
45 NA 1/10/2018 11:37 AM
46 We only have one window, so the room is very dark without electric lights, which is fine most of the
time. There is no light switch by the main entrance to the classroom. I have to walk across the
room to turn them on each day, so if the emergency lights are out, it is crossing the room in total
darkness hoping not to trip on desks, etc.
1/9/2018 3:14 PM
47 I have a line of tiny windows at the top of my classroom and barely any light gets in. 1/9/2018 1:10 PM
48 I need more daylight, then the overhead lights could be turned off. 1/9/2018 1:04 PM
22 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
49P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q10 Technology
Answered: 258 Skipped: 13
20.16%
52
24.03%
62
20.93%
54
22.09%
57
8.53%
22
4.26%
11
258
2.88
Minimum1.00
Maximum6.00
Median3.00
Mean2.88
Standard Deviation1.41
# COMMENTS: DATE
1 I need a 35 tablet cart with printer in my room. 2/1/2018 8:18 AM
2 Conduct Individual inspection of the projectors in the classrooms. Network port availability.
Wireless access on campus/ Sport areas. ( Response as if the beginning of the years, may have
already been addressed)
1/29/2018 9:00 AM
3 I saw barely any technology when I visited my son's classrooms. 1/27/2018 9:32 AM
4 Building not equiped to house or support modern equiptment. 1/27/2018 1:27 AM
5 The computers take long to login in and they freeze/glitch frequently. 1/26/2018 2:54 PM
6 The computers we use don't all work and freeze all the time and are really really slow. 1/26/2018 2:54 PM
7 Never met with problems other than lag with the Technology. 1/26/2018 2:53 PM
8 we have more than other schools have, and it works. so its fine. 1/26/2018 2:52 PM
9 King City High School has good computers, Promethean boards, and Library Tablets work
perfectly fine. However, some classes do have ware and tares on those computers.
1/26/2018 2:48 PM
10 We need to use our phones. 1/26/2018 2:47 PM
11 need better wifi because it runs really slow 1/26/2018 2:41 PM
12 most tech needs to be updated 1/26/2018 2:39 PM
13 horrible 1/26/2018 2:37 PM
14 They should provide students with a tablet or so for school purposes 1/26/2018 2:37 PM
15 students should be able to use more technology 1/26/2018 2:37 PM
16 We should have more labs because some teachers have to postpone some work due to them not
being able to get the lab and students fall behind.
1/26/2018 2:35 PM
Technology
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Technology
BASIC STATISTICS
23 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
17 I wish we had better equipment/newer tools in the wood and metal shops. As well as some better
technologies in the classroom.
1/26/2018 2:35 PM
18 I see that other schools get to have ebooks but not us 1/26/2018 2:35 PM
19 I wish there was better equipment in the metal/wood shop. 1/26/2018 2:34 PM
20 We have many computers but it takes so long to log into the computer. 1/26/2018 2:33 PM
21 Every class needs to have computers so we can learn and in the school set some are cracked. 1/26/2018 2:33 PM
22 the computers are fine but it can take awhile to log in or log out but tech knows why but there
computers so that's to be expected.
1/26/2018 2:32 PM
23 internet system always slow 1/26/2018 2:31 PM
24 Sometime it tends to lag. 1/26/2018 2:31 PM
25 Every other school besides King City in the district is given IPads to use as a source for the
interent.
1/26/2018 2:28 PM
26 The technology isn't the best, it's to slow. 1/26/2018 2:27 PM
27 I don't mind 1/26/2018 2:26 PM
28 most of our technology takes forever to sign in which wastes educational time. 1/26/2018 2:24 PM
29 slow to log on 1/26/2018 2:23 PM
30 computers always take forever to log on or load 1/26/2018 2:22 PM
31 computers login slow 1/26/2018 2:19 PM
32 EASY TO ROB 1/26/2018 2:17 PM
33 Should improve the computers in the labs. 1/26/2018 1:35 PM
34 The technology at the school is good. 1/26/2018 1:31 PM
35 We get to use computer/laptops to help us do research 1/26/2018 1:29 PM
36 needs newer tech 1/26/2018 1:29 PM
37 The school wifi is slow 1/26/2018 1:25 PM
38 Not enough computer carts or computer access and poor internet connection in most parts of the
school.
1/26/2018 12:55 PM
39 We got what we need and that all we need. The technology works fine and does what it is
supposed to do. But some computers could be replaced.
1/26/2018 12:44 PM
40 Our weight room could us some. 1/26/2018 12:43 PM
41 their should be computer carts for at least all classes 1/26/2018 12:43 PM
42 calculators 1/26/2018 12:41 PM
43 We need our own laptops. 1/26/2018 12:39 PM
44 gets the job done 1/26/2018 12:38 PM
45 We need new technology the internet lags sometime. The computers need to be fixed frequently. 1/26/2018 12:38 PM
46 The technology is a little bit old we need to get like some sort of newer technology and sometimes
the computers are a bit slow or laggy at times.
1/26/2018 12:36 PM
47 the wifi lags 1/26/2018 12:35 PM
48 better computers and wifi 1/26/2018 12:35 PM
49 The computers at school are a bit outdated some computers need more space to save files and
projects.
1/26/2018 12:35 PM
50 the computers are really slow and always have problems for example sometimes the a window
from the computer would always close by its self
1/26/2018 12:34 PM
51 Working Wifi and ipads 1/26/2018 12:33 PM
52 we need tablets for all students 1/26/2018 12:33 PM
24 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
50P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
53 could use some upgrades but were financial not the richest school 1/26/2018 12:32 PM
54 computers are to slow and messy. 1/26/2018 12:32 PM
55 computers are slow. 1/26/2018 12:30 PM
56 computers are slow at times 1/26/2018 12:29 PM
57 The internet could be updated to be faster, especially in the computer labs when many students
are on the school wifi.
1/26/2018 12:25 PM
58 Many many technology problems, computers are never charged and some stop working. 1/26/2018 10:25 AM
59 the internet is slow and it is also not reachable to the locker, the football field and the band room. 1/26/2018 10:21 AM
60 Slow wifi Decent laptops Old Desktops 1/26/2018 10:13 AM
61 It takes a long time logging on to the computers. 1/26/2018 10:09 AM
62 The wifi sucks, it constantly goes off. Takes forever to sign in on the surfaces in Souzas class, and
same in riandas.
1/26/2018 10:08 AM
63 slow wifi/ logging into computers 1/26/2018 10:07 AM
64 When some students and I login into the computers, the computers sometimes take a long while
to log in.
1/26/2018 10:05 AM
65 Wi-Fi is slow. 1/26/2018 10:04 AM
66 The log in on computers is slow and the wifi lacks. 1/26/2018 10:03 AM
67 The Ag department does the best it can do with what it has to work with 1/26/2018 9:38 AM
68 I think that many classrooms can get their internet updated because it is very slow. 1/26/2018 9:33 AM
69 we have access to technology but the internet sucks 1/26/2018 9:28 AM
70 Our internet takes forever to load certain websites . Also our surfaces take almost a class period
to get our work done and some of us barely have internet access at home.
1/26/2018 9:28 AM
71 Our technology is really bad. We can barely have an use of it for school work. We can check out
laptops if we need them but there is barely ever any because they barely have any.
1/26/2018 9:26 AM
72 Wifi is super slow, we taking longer trying to log in then actually doing our work. 1/26/2018 9:21 AM
73 Some laptop/computers take a long time to log in and the internet speed is slow. 1/26/2018 9:21 AM
74 There are some times where it just doesn't want to work. 1/26/2018 9:20 AM
75 I think our internet is sooooo slow i take half of my class period logging in then being able to do my
work.
1/26/2018 9:20 AM
76 The technology is really slow in all the facilities. 1/26/2018 9:19 AM
77 When we use the laptops the wifi is very slow at times so when we have an assignment it
sometimes take half of the period to log on.
1/26/2018 9:17 AM
78 restrict use on phone, take away phones at beginning of class 1/26/2018 9:15 AM
79 Technology takes a long time to work 1/26/2018 9:09 AM
80 needs work networks are slow hard to work with no network or lost connection 1/26/2018 8:36 AM
81 the technology is very very slow it need to improve. you cant even sing in to sing out. 1/26/2018 8:34 AM
82 We need wifi that can function properly and fast because sometimes it takes more than half an
hour to log in leaving us a little bit of time to work during class.
1/26/2018 8:25 AM
83 way to slow to login and log out. 1/26/2018 8:23 AM
84 too slow 1/26/2018 8:23 AM
85 Sometimes the computers load and take half the class time to finish loading. The smart board also
sometimes blacks out when we do presentation.
1/26/2018 8:19 AM
86 Takes a lot of time to logon. 1/26/2018 8:16 AM
87 Takes a long time to log on 1/26/2018 8:15 AM
25 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
88 Wireless needs to be updated 1/26/2018 8:15 AM
89 Most of the time the computers in our our school take forever to load something and when working
on a project some websites well not even load until you reload the page.
1/26/2018 8:15 AM
90 It takes a long time to get into the computer. 1/26/2018 8:14 AM
91 We have access to computers but it takes a long time to log in 1/26/2018 8:14 AM
92 A little slow. 1/26/2018 8:13 AM
93 I'm sure the technology is fine. That's not something I use or have access to. 1/25/2018 3:18 PM
94 Since the beginning of the semester the technology situation has improved greatly. I now have a
cart available for my Graphic Design class and have been able to get into a lab pretty consistently.
It's imperative to have access to computers on a daily basis for Graphic Design. Tablets are great
for back up, but to work on the Adobe apps, a mouse and larger monitor that come with the
regular computers greatly enhance the student's ability to create and learn.
1/12/2018 8:29 AM
95 Need to remove TV monitors with VHS tape access. 1/11/2018 2:46 PM
96 NA 1/10/2018 11:37 AM
97 I have two students computers in my class. I would like to have a surface cart for my classroom,
but I can usually check the cart out from the library with little delay.
1/9/2018 3:14 PM
98 Students have a hard time logging on to the computers MOST of the time. I have two classes that
need to be on the internet at all times and am losing many hours to the lack of access...
1/9/2018 2:41 PM
99 Seems like there is always an issue. 1/9/2018 1:43 PM
100 The computers are old/overused. Issues saving/processor. The copy machine in the office is not
maintained well (streaks/dirty screen) and there is no workspace for cutting/collating.
1/9/2018 1:04 PM
101 Food service department I want to upgrade- screens, marketing etc. 11/15/2017 9:54 AM
102 Been getting better with the addition of the surface carts. Still the labs could use some step up. 11/9/2017 11:35 AM
103 I have a rolling projecto 11/9/2017 10:54 AM
104 I feel like our technology department is ran too thin and they have too much of a work load. There
are times when work orders are marked complete but they are not fully finished.
11/9/2017 10:08 AM
26 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
51P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q11 Interior Finishes & Furnishings (including tack wall and whiteboards)
Answered: 252 Skipped: 19
18.65%
47
21.83%
55
29.76%
75
19.44%
49
7.14%
18
3.17%
8
252
2.84
Minimum1.00
Maximum6.00
Median3.00
Mean2.84
Standard Deviation1.31
# COMMENTS: DATE
1 I can't get tape to stick to the brick. Limited white board space that is easily assessable. 2/1/2018 8:18 AM
2 Inspection of room 281 Whiteboard. Chairs inception on campus mussing leg ends. Lose screws
on student tables inspection.
1/29/2018 9:00 AM
3 Old bldg 1/27/2018 1:27 AM
4 The classrooms are too small, not enough space to move around, desks are to small when we
have an earthquake drill students are to big to get under them, and lunch tables are dirty not
enough.
1/26/2018 2:54 PM
5 We should get better desk when we have earthquake drills we don't even fit under them, maybe
we should have tables but they are small we are in high school and we are getting bigger. And the
tables outside for lunch are very dirty and we need more there is people that eat standing so we
need more tables and the janitors should actually do their job and clean them.
1/26/2018 2:54 PM
6 Few to several desks and seats have missing bits or corners and gum/trash and cuts in them. 1/26/2018 2:53 PM
7 there is some graffiti in some places. 1/26/2018 2:52 PM
8 No problems to a concern. 1/26/2018 2:48 PM
9 I feel like its going to be falling. 1/26/2018 2:47 PM
10 need better desk some are rusty and old use tables instead of desks and need major improvement
on interior and outside of school definitely need more tables around the school for lunch and
definitely need way more lockers there is only like 100 lockers
1/26/2018 2:41 PM
11 we need some bigger desks and some desks are too worn out 1/26/2018 2:39 PM
12 bad 1/26/2018 2:37 PM
13 we have about enough desks and stuff I think. 1/26/2018 2:35 PM
Interior
Finishes &...
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERYGOOD (5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Interior Finishes &
Furnishings
BASIC STATISTICS
27 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
14 The walls everywhere are drawn on, scratched, paint is peeling. all furniture and walls are in poor
condition.
1/26/2018 2:35 PM
15 Walls are drawn on and peeling. 1/26/2018 2:34 PM
16 i think the whiteboards are in good shape. 1/26/2018 2:32 PM
17 The markings of the previous class still show on our white boards. 1/26/2018 2:31 PM
18 I don't mind 1/26/2018 2:26 PM
19 Some classrooms have broken desks 1/26/2018 2:24 PM
20 KOO 1/26/2018 2:17 PM
21 The interior of the classrooms is okay. 1/26/2018 1:31 PM
22 needs new desks 1/26/2018 1:29 PM
23 needs electrical outlets in classrooms and sinks. 1/26/2018 1:28 PM
24 Many furnishings are broken down and in poor condition. Need new whiteboards and promethean
boards.
1/26/2018 12:55 PM
25 The interior in some of the classrooms could be updated. There were some instances were chairs
are cracked for have broken.
1/26/2018 12:44 PM
26 Some classrooms are just "eh" for example some of the Ag classrooms. 1/26/2018 12:43 PM
27 The walls in classes are really worn out 1/26/2018 12:43 PM
28 Boards are falling apart 1/26/2018 12:41 PM
29 needs a repaint 1/26/2018 12:38 PM
30 Some of the whiteboards are stained and the desks are very old. The paint is peeling off of the
walls. Some of the doors get stuck.
1/26/2018 12:38 PM
31 The walls and whiteboards are a little bit dirty but no to dirty so I would say satisfactory for that im
in the middle there not to good but not to bad.
1/26/2018 12:36 PM
32 add door in the showers of the girls locker room 1/26/2018 12:35 PM
33 cleaner rooms 1/26/2018 12:35 PM
34 it would be nice if the rooms were cleaned more 1/26/2018 12:35 PM
35 I believe some of these class rooms are a bit outdated and should be refurnished as its been more
than a few decades since this school has been updated.
1/26/2018 12:35 PM
36 we need new every thing. 1/26/2018 12:33 PM
37 were set 1/26/2018 12:32 PM
38 They are in good conditions. 1/26/2018 12:32 PM
39 They look like jail cells. 1/26/2018 12:29 PM
40 Add doors in the locker room showers 1/26/2018 12:28 PM
41 Lots of walls are peeling off and need to be refurbished, but are satisfactory. 1/26/2018 10:25 AM
42 The classrooms are always very cold 1/26/2018 10:02 AM
43 Paint job, 1/26/2018 9:36 AM
44 All the whiteboards are dirty and smudged that can't be cleaned. They aren't even whiteboards
anymore due to all the dirt in them.
1/26/2018 9:26 AM
45 Definitely need to fix some walls and whiteboards. 1/26/2018 9:20 AM
46 some classes need more whiteboards 1/26/2018 9:20 AM
47 Not all classrooms have a lot front whiteboards 1/26/2018 9:09 AM
48 The chairs, especially the tools can be uncomfortable and it's sometimes loose like the seat is
going to come off.
1/26/2018 8:19 AM
49 Need better tables. 1/26/2018 8:16 AM
28 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
52P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
50 Ag classrooms need some interior work. Specifically rooms 200 and 192. 1/26/2018 8:13 AM
51 The rooms definitely need updating. 1/25/2018 7:28 PM
52 For my purposes. 1/25/2018 3:18 PM
53 I have one really good white board and another one that is not good. My smart screen is too low on
the wall. It's difficult for students to see who sit in the back. There are lots of great drawers,
cupboards and counters and sinks. However, some of the door hinges are broken, a couple
drawers don't pull out easily and one of the sinks doesn't work and another is very loose.
1/12/2018 8:29 AM
54 I just got a new wall this year. 1/11/2018 2:46 PM
55 Rooms aren't always large enough to place as many desks in the classrooms that we have as well
as have enough board space and map space as necessary for some disciplines.
1/10/2018 12:04 PM
56 Because of the unusual shape of the room, there was really no great place to put the smartboard.
Students are either close to a whiteboard or close to the smartboard, but not both.
1/9/2018 3:14 PM
57 Need more new shelving units 1/9/2018 1:43 PM
58 Needs some TLC. Walls old and faded. Old wallpaper boarder. Tile ceiling is spotty. 1/9/2018 1:04 PM
59 Desk was raided at some point, so I am missing drawers. Also there is no whiteboard/bulletin
board, no locking cabinet for confidential files.
1/9/2018 1:04 PM
60 some rooms need new interior wall coverings. Cafeterias need updates on design and spacing 11/15/2017 9:54 AM
61 The shops in the Agriculture department could use a good cleaning and painting. The ceiling and
walls... again the oldest and original buildings on campus in the most need of renovation.
11/9/2017 11:35 AM
62 I have one white board, most of my walls are covered with electrical conduit 11/9/2017 10:54 AM
63 White boards are old and need to get replaced. You can see everything that has been written on
them.
11/9/2017 10:08 AM
64 There is a lot of new furniture, but also a lot of old one that needs to be replaced. 11/7/2017 3:36 PM
29 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q12 Restrooms and Drinking Fountains
Answered: 255 Skipped: 16
45.49%
116
26.67%
68
13.73%
35
10.59%
27
1.96%
5
1.57%
4
255
2.02
Minimum1.00
Maximum6.00
Median2.00
Mean2.02
Standard Deviation1.20
# COMMENTS: DATE
1 The student bathrooms at PBHS are in terrible condition. The teacher bathrooms at KCHS are in
poor condition.
2/5/2018 11:42 AM
2 Why isn't here a bottle filler on campus? 2/1/2018 8:18 AM
3 I believe the lack of drinking fountains contributes to the amount of disposable water bottles found
around campus daily.
2/1/2018 7:44 AM
4 Restrooms are dirty. 1/27/2018 9:32 AM
5 Built in the 60's..... 1/27/2018 1:27 AM
6 water fountains have gum and spit on them and why would someone want to drink out of it.
Restrooms need better mirrors by f wing and they are small.
1/26/2018 2:54 PM
7 They are disgusting water fountains have gum and all kinds of other stuff in them it makes you not
want to drink water. The restrooms are too small the one next to f wing is too small and needs a
better mirror.
1/26/2018 2:54 PM
8 Problems are that people end up leaving gum or trash in the fountains and messes in the
restrooms.
1/26/2018 2:53 PM
9 there are some leaks i the restroom and it drips a lot of water when we flush. 1/26/2018 2:52 PM
10 Restrooms are the important thing to a school and when I enter the restroom and see 6 students
in there talking or smoking their weed, it's not what a school needs to have.
1/26/2018 2:48 PM
11 Its not poor it is far from poor I feels like WWI in the restroom. Its like the trenches. 1/26/2018 2:47 PM
12 need to add more restrooms because it gets really crowded during passing periods and we only
have 2 drinking fountains
1/26/2018 2:41 PM
13 THIS IS A ABSOLUTE DISASTER!!!!!!!! Kids throw stuff on the walls, people take sh*ts in the
urinals, clog the toilets and the sinks. Its bad, this needs to be fixed
1/26/2018 2:39 PM
Restrooms &
Drinking...
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERYGOOD (5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Restrooms & Drinking
Foundatains
BASIC STATISTICS
30 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
53P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
14 our bath rooms are not allways working and they are far away from class rooms 1/26/2018 2:39 PM
15 There are disgusting during lunch there is writing in the wall. The drinking0 fountains have food in
it and they look rusty
1/26/2018 2:38 PM
16 horrible 1/26/2018 2:37 PM
17 it get very crowded going in and out the bathroom sometimes have to wait in line and for the water
fountains its sometimes hard to drink from just because of how much water comes out and
because how dirty it is
1/26/2018 2:37 PM
18 there are far away from most classrooms 1/26/2018 2:37 PM
19 WE SHOULD HAVE MORE RESTROOMS AND VENDING MACHINES. 1/26/2018 2:35 PM
20 terrible. I mean just horrific. other kids trash the bathrooms and the men's bathroom doesn't even
have mirrors...
1/26/2018 2:35 PM
21 I feel as if they restrooms are far from some classes . The fountains are old and rusty, some
schools have water bottle fountains which I think are better because most people have water
bottles on a daily basis
1/26/2018 2:35 PM
22 Students need to stop messing up the restrooms with toilet paper. Also mens restroom needs a
mirror.
1/26/2018 2:34 PM
23 In my opinion I feel we should have more restrooms because there is many girls who go to the
restroom during lunch and we have to get in line and we only have 3 water fountains and some
people do not like drinking fountain water.
1/26/2018 2:33 PM
24 The boys restroom is super disgusting and the urines are always over flooding. 1/26/2018 2:33 PM
25 in the shop i think there should be remodeled theres only one toliet in the shop and it cant lock so
you have to have someone stand outside the door so no one can come in.
1/26/2018 2:32 PM
26 need restrooms to be bigger and not enough water fountains 1/26/2018 2:31 PM
27 The drinking fountains are always full of food and look dirty and unsanitary, and the boys restroom
is just disgusting.
1/26/2018 2:31 PM
28 The water sometimes smells bad. 1/26/2018 2:31 PM
29 toilets leak when you flush 1/26/2018 2:29 PM
30 Toilets leak when you flush 1/26/2018 2:28 PM
31 There gross and I'm afraid I'm going to get a disease by drinking out of it. Get the water bottle
filling stations.
1/26/2018 2:28 PM
32 Some of the drinking fountains are rusty and half of the time the restrooms are gross or full. 1/26/2018 2:27 PM
33 I don't mind 1/26/2018 2:26 PM
34 The floors in the boys restrooms are always wet without a caution sign and the water fountains are
dirty most of the time.
1/26/2018 2:24 PM
35 we need seat covers and freehand sinks 1/26/2018 2:24 PM
36 in need of seat covers and touch free sinks to turn on 1/26/2018 2:23 PM
37 restrooms are always crowded 1/26/2018 2:22 PM
38 There are only two restrooms on campus for students and they are very far from each other.
During lunch time, students are limited to one restroom, which overcrowds it. There should be
another restroom available to students in the middle of campus so it is not too far from some
classrooms.
1/26/2018 2:22 PM
39 EWW. 1/26/2018 2:17 PM
40 Need a lot of improvement. 1/26/2018 1:35 PM
41 bathrooms need to be cleaned more often 1/26/2018 1:31 PM
42 need better water 1/26/2018 1:29 PM
31 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
43 they are always dirty and have a lot of vandalism on them 1/26/2018 1:29 PM
44 needs more restrooms 1/26/2018 1:29 PM
45 needs more restrooms and fountains 1/26/2018 1:28 PM
46 Drinking Fountains are dirty 1/26/2018 1:27 PM
47 We need more stalls 1/26/2018 1:25 PM
48 A lot of them are disgusting and need to be cleaned and watched over so know one makes them
dirty and some just need to be fixed.
1/26/2018 1:23 PM
49 Drinking fountains need to be upgrade like with water bottle accessibility. Need more bathrooms. 1/26/2018 12:55 PM
50 The Drinking Fountains could be cleaned to prevent it from molding. And the Restrooms are very
far apart.
1/26/2018 12:44 PM
51 The restrooms at the football field need to be bigger with mirrors, because it gets to crowded and
the restroom doors don't really close that good. We need better drinking fountains. We need
restrooms out on the baseball field.
1/26/2018 12:43 PM
52 We only have 2 restrooms in the entire school, drinking fountains with bottle refill would be great. 1/26/2018 12:43 PM
53 we should at least have other bathrooms and more fountains 1/26/2018 12:43 PM
54 the track field restrooms needs to be bigger with mirrors, so not as many people could be waiting
for their turn. We need better drinking fountains because the one we have are dirty and nasty to be
drinking out of. Also need more bathrooms so we don't have to waste a lot of time walking cross
the school just to use the bathroom.
1/26/2018 12:42 PM
55 More restrooms, or more space in the restrooms 1/26/2018 12:41 PM
56 Very outdated 1/26/2018 12:39 PM
57 We need more bathrooms because there is only one accessible bathroom and they need to have
covers next to the urinals because i don't want anyone looking at my privates.
1/26/2018 12:38 PM
58 i don't use the restrooms 1/26/2018 12:38 PM
59 The restroom are pretty nasty they need to be updated. There's only 1 bathroom that we can use
during lunch. The drinking fountains need to be updated. they need to add a part where it can fill
up a water bottle .
1/26/2018 12:38 PM
60 The restrooms have bad odor all the time and are some what dirty and the drinking fountains
should have like a water bottle filler incase people want to refill their water bottles.
1/26/2018 12:36 PM
61 they are not up to standards 1/26/2018 12:35 PM
62 we need drinking water and water fountains that are able to fill up our water bottles 1/26/2018 12:35 PM
63 the bathrooms should have warm water when you wash your hands. 1/26/2018 12:35 PM
64 no mirrors and privacy 1/26/2018 12:35 PM
65 they don't even have mirrors and there is writing on walls and there is never soap. 1/26/2018 12:35 PM
66 I consider these to be very dirty and very unsantized 1/26/2018 12:35 PM
67 the restrooms are always nasty 1/26/2018 12:34 PM
68 The restrooms are bad we should add a drinking fountain that fills water bottle 1/26/2018 12:34 PM
69 we need more bathrooms 1/26/2018 12:33 PM
70 we only have one. 1/26/2018 12:33 PM
71 there is only 1 bathroom throughout the whole school that is accessible throughout the entire day 1/26/2018 12:32 PM
72 restrooms are always clogged there terrible and the drinking fountains don't even work half the
time
1/26/2018 12:32 PM
73 Bathrooms and fountains are dirty and gross. 1/26/2018 12:32 PM
74 we need new drinking fountains. 1/26/2018 12:29 PM
75 Add more water fountains around campus and fountains to fill up water bottles. 1/26/2018 12:28 PM
32 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
54P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
76 There is only one good restroom throughout the entire school that is accessible all day 1/26/2018 12:25 PM
77 they could be better, but as is will do fine 1/26/2018 12:24 PM
78 Restrooms and drinking fountains both are pretty dirty and could be a little cleaner. 1/26/2018 10:25 AM
79 bathrooms and drinking fountains need more hyigene one of them has mold and the bathroom are
always dirty. they also need more stalls.
1/26/2018 10:21 AM
80 We don't have a lot of drinking fountains and we only have two bathrooms and one of them only
has two stalls, by the F wing.
1/26/2018 10:18 AM
81 Drinking Fountain water doesn't taste the best. We need more restrooms around the school. 1/26/2018 10:09 AM
82 half the restrooms are closed and drinking fountains don't work. 1/26/2018 10:08 AM
83 some water fountains dont work or are dirty. 1/26/2018 10:07 AM
84 Not enough restrooms and water sucks 1/26/2018 10:07 AM
85 at certain times of the day the bathroom is very crowded 1/26/2018 10:05 AM
86 Always a mess. 1/26/2018 10:04 AM
87 The restrooms by the drama class should be remodeled and the water fountain by f wing hasnt
been repaired.
1/26/2018 9:36 AM
88 I think that they should bring the water fountains with the bottle filler. We also need our water at
our fountain not to taste like metal. Restrooms need to be more sanitary because it is not private
and everything is out in the open because you can see sanitary item from the trash can like
ewwwww can you not.
1/26/2018 9:33 AM
89 we need new drinking fountains where we can refill our water bottles on a vertical way (bottle filler) 1/26/2018 9:29 AM
90 the womens restrooms need help. there needs to be toilet seat covers!! that's gross! we literally
have plastic boxes(with no lids) on the floor of the stalls where everyone can see girls bloody pads
and used tampons. not only is that disgusting to look at, its unsanitary. we need to have metal
containers with lids designated for sanitary items. also air hand dryers are very unsanitary, they
spread bacteria(look it up). we should have paper towel dispensers. the water fountains are gross
too! we should have standing ones where we can fill our water bottles without having to worry
about getting peoples germs all over the lip of our containers.
1/26/2018 9:28 AM
91 We have to walk across the school to used the restroom because the restroom by the bandroom is
always closed after lunch sometimes.
1/26/2018 9:28 AM
92 we should have toilet covers, and a machine that gives girls sanitary items. We should have a
fountain with a water bottle filter.
1/26/2018 9:27 AM
93 The restrooms are disgusting they rarely get cleaned. There is always pee on the stalls and on the
floor. When you walk inside you get the smell of pee from the floor. The drinking fountains are dirty
also they all have gum on them and has been there for years because its all dry.
1/26/2018 9:26 AM
94 Not enough restrooms !! 1/26/2018 9:21 AM
95 The girls restroom by the Band room has a mirror in there and you can see into the stales in the
bathroom. We can also you more bathroom and water fountains.
1/26/2018 9:21 AM
96 The restrooms near the football field needs to be fixed. 1/26/2018 9:20 AM
97 WE NEED MORE RESTROOMS!!!! i have to run across campus to use the restroom and then run
back to my class to still be late, i have slipped and fell running to my classes from the restrooms....
1/26/2018 9:20 AM
98 The restrooms in the stadium are horrible. 1/26/2018 9:19 AM
99 The restrooms in the stadium are in very bad condition. When I went to the restrooms during a
game I heard some people say that the restrooms were disgusting and looked like the ones in
Mexico.
1/26/2018 9:17 AM
100 The restrooms at the stadium are in very bad condition. 1/26/2018 9:16 AM
101 need more restrooms and need cleaner fountains. 1/26/2018 9:15 AM
102 More drinking fountains and restrooms. 1/26/2018 9:15 AM
103 Restrooms need better trashcans and better cleanliness 1/26/2018 9:09 AM
33 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
104 have more bathrooms around campus and more drinking fountains around campus 1/26/2018 9:08 AM
105 More restrooms on campus and more drinking fountains 1/26/2018 9:08 AM
106 we have only two drinking fountains and the one in the hall way dose not work 1/26/2018 8:37 AM
107 Restroom should be cleaned more then one time during school it really get dirty. In the other hand
water fountains are very disgusting they have mold and in bad condition.
1/26/2018 8:34 AM
108 Needs more stalls in bathroom near band and drama class. Needs drinking fountains that have
clean water and are in places that are accessible and wont crowd places. The restrooms also
need trash cans because there are stalls that don't have them.
1/26/2018 8:25 AM
109 its dirty it has some green ,mole and more bathrooms 1/26/2018 8:23 AM
110 we need better fountain water and y pad/tampon dispenser 1/26/2018 8:23 AM
111 we more water fountains because we only have one sadly enough. 1/26/2018 8:19 AM
112 Only one drinking fountain that is available for the students to access. 1/26/2018 8:19 AM
113 The water fountains are very old the do not work very well, ans the only one accessible to students
is dirty and is filled with gum
1/26/2018 8:18 AM
114 Need to add more Restrooms and Drinking Fountains throughout the school. 1/26/2018 8:16 AM
115 Clean restrooms frequently 1/26/2018 8:15 AM
116 Sometimes the bathrooms don't even have soap or even toilet paper until the next days. There
should be someone that checks to see if they are stocked during the day and at the end out the
day.
1/26/2018 8:15 AM
117 Girl's bathroom floor is always wet. Need more stalls by the music and drama area. Need cleaner
fountains and more accessible ones also. Need more trash cans in the bathrooms.
1/26/2018 8:14 AM
118 Better drinking fountains. 1/26/2018 8:13 AM
119 Too many students congregate and too easy to trap someone for a fight. 1/25/2018 3:18 PM
120 The restrooms are dirty. The tile floor is disgusting. There is no real mirror in the women's
restroom. There doesn't appear to be enough drinking fountains. The girl's restroom is nice and big
and has a great mirror and the floor appears cleaner than the women's restroom.
1/12/2018 8:29 AM
121 Need serious upgrades aesthetically and functionally. 1/11/2018 2:46 PM
122 Need additional drinking fountains in stadium 1/10/2018 11:37 AM
123 Restrooms are fine, but we need drinkable/filtered water fountains throughout campus. 1/9/2018 3:14 PM
124 We need more restrooms and maybe fix the restrooms by the football field. 1/9/2018 1:53 PM
125 I think restroom needs something to hang the bags, etc. 1/9/2018 1:47 PM
126 No restroom in the front office. Closest restroom closed for months only to reopen without added
space/stalls. It is ridiculous that a large office staff, parents, and some teachers must all share one
stall.
1/9/2018 1:04 PM
127 we need to replace the drinking fountains with hydration systems where students go and they are
able to refill their water bottles
1/9/2018 12:08 PM
128 we need new water fountains with ability to refill bottle waters with filtered water 11/16/2017 2:27 PM
129 few fountains. Probably need some larger restroom space. 11/15/2017 9:54 AM
130 need better ventilation 11/14/2017 8:54 AM
131 Both could be replaced with newer more efficient appliances. Some schools have the water bottle
filler drinking fountains. Sinks also need to be updated.
11/9/2017 11:35 AM
132 I think we need more drinking fountains around the school 11/9/2017 10:54 AM
34 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
55P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q13 Sustainability
Answered: 253 Skipped: 18
19.37%
49
24.90%
63
28.85%
73
18.97%
48
5.93%
15
1.98%
5
253
2.73
Minimum1.00
Maximum6.00
Median3.00
Mean2.73
Standard Deviation1.25
# COMMENTS: DATE
1 Stupidly "designed" landscape. Grounds crews don't care where they drive, what they destroy.
Just look at the tree they girdled and killed in front of Rm. 172 or the dead stump behind Rm. 101.
2/1/2018 8:18 AM
2 I don't think our classroom recycling bins are actually emptied into a large recycling bin. Trash and
recycling are both emptied into the trash.
2/1/2018 7:44 AM
3 I saw no indications of sustainability practices when I visited. 1/27/2018 9:32 AM
4 Teachers do an amazing job with the very out dated building/physical plant they have. They could
do so much more with upgraded building
1/27/2018 1:27 AM
5 The class rooms look very old and some of them are way to small for a whole class. I could extend
my arm and I could reach many of my classmates.
1/26/2018 2:54 PM
6 the classrooms look very old some are too small like 130s and 180s and f wing classes are where
some of my classes are and there is no space in the class desk are too close to each other for
trying to make all the students fit. And it makes it hard get to your desk.
1/26/2018 2:54 PM
7 Although a few systems may seem faulty and wont last, the majority, as I see it, can last longer
without change.
1/26/2018 2:53 PM
8 No problems. 1/26/2018 2:48 PM
9 We need larger and more classes. 1/26/2018 2:47 PM
10 its goanna fall apart 1/26/2018 2:39 PM
11 most of the classes are small and there isn't to much room to move around 1/26/2018 2:38 PM
12 some are sustainable 1/26/2018 2:37 PM
13 most classes are small 1/26/2018 2:37 PM
14 nope. 1/26/2018 2:35 PM
Sustainability
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Sustainability
BASIC STATISTICS
35 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
15 I think most classes are really small, for example the AG chemistry class holds 34 students and it
gets crowded.
1/26/2018 2:35 PM
16 We probably need more stronger desk some are wiggly. 1/26/2018 2:33 PM
17 i think it is alrihght 1/26/2018 2:32 PM
18 Many buildings have cracks on the ceiling. 1/26/2018 2:31 PM
19 I don't mind 1/26/2018 2:26 PM
20 it is ok. 1/26/2018 1:31 PM
21 Most buildings are broken, cracked, very old, warped down, etc. Need to upgrade and rebuild
many buildings.
1/26/2018 12:55 PM
22 The building structure is quite old and be given some attention. It looks little unstable. 1/26/2018 12:44 PM
23 I don't the wood shop and welding shop kind of seem like they're not sustainable. 1/26/2018 12:43 PM
24 some classes are in bad shape 1/26/2018 12:43 PM
25 Buildings need to be modernized 1/26/2018 12:41 PM
26 the building will last 1/26/2018 12:38 PM
27 These buildings feel and look like there antique. 1/26/2018 12:38 PM
28 better classrooms 1/26/2018 12:35 PM
29 better classroom 1/26/2018 12:35 PM
30 the building is really poor 1/26/2018 12:34 PM
31 The rooms need to be updated because some rooms haven't been updated since 1990's 1/26/2018 12:34 PM
32 will fall apart 1/26/2018 12:33 PM
33 the rooms are old like betty white old 1/26/2018 12:32 PM
34 Campus is fairly clean. 1/26/2018 12:32 PM
35 The ag compound could use an upgrade for the settings and classrooms. 1/26/2018 12:25 PM
36 What are you asking me is sustainable 1/26/2018 12:24 PM
37 we don't have it 1/26/2018 10:18 AM
38 We don't even have this. 1/26/2018 9:26 AM
39 we don't have it 1/26/2018 9:21 AM
40 The rooms look like they have not been updated in quite some time. 1/25/2018 7:28 PM
41 All contents of classroom recycle containers are thrown into garbage. 1/9/2018 3:30 PM
36 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
56P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q14 Aesthetics of Buildings and Campus
Answered: 258 Skipped: 13
25.19%
65
29.46%
76
23.64%
61
14.34%
37
5.43%
14
1.94%
5
258
2.51
Minimum1.00
Maximum6.00
Median2.00
Mean2.51
Standard Deviation1.26
# COMMENTS: DATE
1 Filthy, termite riddled, need paint, nasty 2/1/2018 8:18 AM
2 Continue to maintain regular leaf cleanup near walkways. 1/29/2018 9:00 AM
3 Beautiful theater (although some of the rows need to be repaired and the restrooms should be
renovated).
1/27/2018 9:32 AM
4 Old and worn. Paint kept fresh but the school is old. 1/27/2018 1:27 AM
5 This looks worse than a middle school at Salinas(Washington Middle School). Same colors for p.e
it feels that I am back at middle school literally. It needs a huge glow up to happen
1/26/2018 2:54 PM
6 the gym and the f wing classes look extremely old and look like they need to be redone. 1/26/2018 2:54 PM
7 Not many problems at all, except for chips in the paint or the walls and a bit of unused space
around campus.
1/26/2018 2:53 PM
8 Buildings on campus, for the majority of them do have tares and just make the school look ugly
and do interfere with our working environment in class.
1/26/2018 2:48 PM
9 It feels like the pentagon. It also feels like maximum security prisons. 1/26/2018 2:47 PM
10 need a major renovation on building they look very old and rusty 1/26/2018 2:41 PM
11 there is construction always going on and there is always trash 1/26/2018 2:39 PM
12 not good 1/26/2018 2:39 PM
13 The buildings are old the halls are always dirty there is always mud grass areas and there is
always trash around the school the people who clean up do there best just there a lot more kids
who dirty around
1/26/2018 2:38 PM
14 concrete breaks into little pieces 1/26/2018 2:37 PM
Aesthetics of
Building &...
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERYGOOD (5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Aesthetics of Building &
Campus
BASIC STATISTICS
37 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
15 its not that it looks bad its just we would prefer something much more better than what they are
offering us do you understand what im trying to say
1/26/2018 2:37 PM
16 The all look very old and should be painted. 1/26/2018 2:35 PM
17 there is constant construction going on and trash everywhere. 1/26/2018 2:35 PM
18 The building are so ugly they need to be painted 1/26/2018 2:35 PM
19 Constant construction going on and there is always trash on the floor. 1/26/2018 2:34 PM
20 I feel it looks good but some classes need to be upgraded because the wood is either to old or
falling apart we need bigger classrooms so we can have more space.
1/26/2018 2:33 PM
21 Some classes are way to small for 35 students and everyone's tight together. 1/26/2018 2:33 PM
22 Are campus is pretty old and it would be nice to add bigger better rooms to the school. 1/26/2018 2:31 PM
23 The classes don't have enough room for all the students during every period. 1/26/2018 2:31 PM
24 The buildings and campus overall are old and not in the best condition. 1/26/2018 2:27 PM
25 I don't mind 1/26/2018 2:26 PM
26 the buildings are okay. 1/26/2018 1:31 PM
27 build a better softball area 1/26/2018 1:27 PM
28 school needs paint job 1/26/2018 1:26 PM
29 Doesn't look good. Needs an upgrade. 1/26/2018 12:55 PM
30 The walls sometimes look really old and need a new look; it is not really pleasing to the eye. 1/26/2018 12:44 PM
31 Need to replace the windows because some don't open or their too hard to open. 1/26/2018 12:43 PM
32 replace the windows 1/26/2018 12:42 PM
33 buildings are fine 1/26/2018 12:41 PM
34 the building are ok 1/26/2018 12:38 PM
35 There poor 1/26/2018 12:38 PM
36 needs to stand out more 1/26/2018 12:35 PM
37 Needs more color 1/26/2018 12:35 PM
38 They need new paint maybe using the school colors 1/26/2018 12:34 PM
39 horrible 1/26/2018 12:33 PM
40 could use some work on the high school but then again its a 100 years ago 1/26/2018 12:32 PM
41 poorly painted needs new paint in and out of classes. 1/26/2018 12:32 PM
42 could be nicer 1/26/2018 10:08 AM
43 The Ag department has two old buildings that should be remodeled and Gear Up (that's in the
library) should have their own classroom. the one they had was perfect and the class occupying it
right now is like 6 students and the teacher.
1/26/2018 9:36 AM
44 The buildings are dirty and are full of spider webs. Some look like they are gonna break anytime
soon.
1/26/2018 9:26 AM
45 Upgrade the looks to the building 1/26/2018 9:21 AM
46 The oldest Ag classes. 1/26/2018 9:17 AM
47 Ag department 1/26/2018 8:36 AM
48 the Ag building are in very bad shape they should be remodel. 1/26/2018 8:34 AM
49 needs to he repainted during summer. The labs for chemistry and Physics should have heat
detectors.
1/26/2018 8:23 AM
50 they need to make the buildings better 1/26/2018 8:19 AM
51 The Ag Department needs much updating. 1/26/2018 8:16 AM
38 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
57P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
52 AG Department needs some renovation 1/26/2018 8:08 AM
53 Old. 1/25/2018 3:18 PM
54 I love the trees and grass and the roses around the performance hall. But there are areas that are
not well maintained and the buildings could use a coat of paint. It would greatly improve the
aesthetics of the whole campus and I believe would make kids feel more respect and pride
towards their school, which could inspire them to keep the school cleaner and to take school more
seriously.
1/12/2018 8:29 AM
55 The outside of the school is dirty and in need of a paint job. Weeds are growing through cracks
and spaces on campus (including the area outside of history/math) are a waste of space and full of
trash. The area in the history/math building should be landscaped OR cemented over and picnic
tables placed there. From the street, the school is attractive.
1/11/2018 2:46 PM
56 Needs renovation, clean up. Need to give the students a motivating reason to keep the campus
clean and full of pride.
1/9/2018 1:43 PM
57 Exterior painting and refreshing needed 1/9/2018 1:04 PM
58 We need a paint job. Office is designed without safety or efficiency in mind. 1/9/2018 1:04 PM
59 school needs a new paint job. Murals need to be redone they are peeling. Track needs to be
redone
1/9/2018 12:08 PM
60 King City is much older. exterior walls need quite a bit of work. 11/15/2017 9:54 AM
61 King City could use a major clean up of the buildings and some landscaping. I feel Greenfield does
NOT need a renovation as they have a new school. King City is clearly in a greater need for
improvement.
11/9/2017 11:35 AM
62 My room is very old and has not been update, as well as the metal and the wood shop 11/9/2017 10:54 AM
39 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q15 Wayfinding (Signage; Navigating around campus; orientation)
Answered: 252 Skipped: 19
11.51%
29
28.97%
73
23.41%
59
24.21%
61
7.14%
18
4.76%
12
252
3.01
Minimum1.00
Maximum6.00
Median3.00
Mean3.01
Standard Deviation1.31
# COMMENTS: DATE
1 The office at GHS should be clearly marked. It is difficult for a new person to know which building
the office is located.
2/5/2018 11:51 AM
2 We're given a map before the beginning of the year, so it was never really a problem, besides
getting to classrooms that someone doesn't know the location to and don't have a map
1/26/2018 2:57 PM
3 when i cant find a room, i look for maps and i cant find any. 1/26/2018 2:55 PM
4 when I was a freshmen I didn't know where to go I was lost and it casused me to be late to classes 1/26/2018 2:55 PM
5 I am very well know from room numbers to others. 1/26/2018 2:54 PM
6 We got Juise. 1/26/2018 2:48 PM
7 not realy the easiest lay out to get aruond 1/26/2018 2:47 PM
8 its hard sometimes if they don't help you 1/26/2018 2:44 PM
9 campus is not organized it is really hard to find were you need to go, need improvement in
organizing the classroom better by number
1/26/2018 2:44 PM
10 its okay 1/26/2018 2:43 PM
11 My freshman year I went into the wrong class 3 times there isn't really a specific order were the
class are and it just a mess
1/26/2018 2:43 PM
12 classes are very scattered and some seem hidden 1/26/2018 2:42 PM
13 the layout is kind of weird 1/26/2018 2:42 PM
14 the classes are far away from each other and are hard to find 1/26/2018 2:41 PM
15 The security guards come in clutch when you're lost on campus or if you have an older sibling that
will guide you around campus.
1/26/2018 2:41 PM
Wayfinding
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Wayfinding
BASIC STATISTICS
40 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
58P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
16 I believe freshmen struggle the most and should have someone to help them find their classes. 1/26/2018 2:39 PM
17 Everything is good. 1/26/2018 2:38 PM
18 It was hard to find my classes on the first day. 1/26/2018 2:36 PM
19 i think they give you a good explation on where to go 1/26/2018 2:34 PM
20 I don't mind 1/26/2018 2:30 PM
21 Pretty easy to find your classes, but a sign of the numbers would be nice. 1/26/2018 12:55 PM
22 There is nothing that indicates where the weight room, lockers, and wrestling room. 1/26/2018 12:52 PM
23 Everything is fine and we are able to find our way around the campus. 1/26/2018 12:50 PM
24 Good but I would say 1/26/2018 12:50 PM
25 small campuses 1/26/2018 12:47 PM
26 We are directed on where to go and are given a map at the beginning of the year 1/26/2018 12:46 PM
27 I get confused the f wing isn't even an f 1/26/2018 12:43 PM
28 i don't get lost or am i late to class 1/26/2018 12:43 PM
29 Its hard to navigate sometimes 1/26/2018 12:41 PM
30 the space is wide based but I still manage to step on someone's shoe 1/26/2018 12:38 PM
31 We need to have a 1/26/2018 12:37 PM
32 we don't have any signs 1/26/2018 12:33 PM
33 campus isnt that hard to navigate once you know room number orientation 1/26/2018 12:26 PM
34 It's difficult to get into the F wing because there are always so many people and not that much
space in the halls.
1/26/2018 10:29 AM
35 theres always construction blocking the paths 1/26/2018 10:16 AM
36 It can be kind of difficult finding a class when inside F-Wingd 1/26/2018 10:04 AM
37 we should have a map, just exactly the way they have it at the mall, to show freshmans or new
students entering our campus.
1/26/2018 9:44 AM
38 Can have hard time find where class room are where 1/26/2018 9:44 AM
39 there should be maps for freshman that actually help them. as a freshman I remember getting lost
a lot. also we should have a longer passing period because it takes more than 4 minutes to pack
up all your stuff from callarmans, go all the way to the locker rooms and get changed for pe.
1/26/2018 9:39 AM
40 There is nobody that helps you find any classroom and they get you in trouble for looking for the
right one. The guards don't even know where all classrooms are.
1/26/2018 9:35 AM
41 The F wing is really tight and not that much space to walk through during passing periods. Also
through the guys locker room going to the F wing, we need a concrete ground to walk through
especially during rainy days. It gets really muddy and slippery.
1/26/2018 9:29 AM
42 they need more class signs. 1/26/2018 9:25 AM
43 it is super hard to get into the f wing since it gets super crowed and they push to get in and out of
the hall ways and around campus
1/26/2018 8:41 AM
44 we have to look around y little to find the classrooms. 1/26/2018 8:33 AM
45 Classroom numbers are all mixed up over campus 1/26/2018 8:22 AM
46 There should definitely be some signage in the quad. 1/25/2018 7:31 PM
47 There could be more signage on sides of buildings with building numbers and directions towards
other buildings.
1/12/2018 8:56 AM
48 We need to not refer to groups of buildings as wings if we are not going to put a sign for the wing,
or designate it as such.The library and office are not well marked from on campus.
1/11/2018 2:51 PM
49 Still don’t know where all the classrooms are. 1/9/2018 1:48 PM
41 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
50 No wayfinding. GHS front parking is very uncoordinated. 11/15/2017 9:58 AM
51 Room signs are very small. 11/9/2017 10:12 AM
42 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
59P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q16 Outdoor Public Space
Answered: 244 Skipped: 27
18.03%
44
27.05%
66
20.08%
49
22.54%
55
8.61%
21
3.69%
9
244
2.88
Minimum1.00
Maximum6.00
Median3.00
Mean2.88
Standard Deviation1.37
# COMMENTS: DATE
1 Not much to say, plenty of space. 1/26/2018 2:57 PM
2 again graffiti and gang places 1/26/2018 2:55 PM
3 There needs to be tables all around campus and not just in one spot 1/26/2018 2:55 PM
4 There is pretty much nothing to help this, but it all comes down to having the patience in those
crowds.
1/26/2018 2:54 PM
5 Its al good. 1/26/2018 2:48 PM
6 good space but we need shades to protect students from rain and the sun 1/26/2018 2:47 PM
7 outside does not look appealing it 1/26/2018 2:44 PM
8 it could be better but its okay 1/26/2018 2:43 PM
9 not a lot of places to sit around at outside. 1/26/2018 2:42 PM
10 I think that they should let us hang out anywhere around campus during lunch because there isn't
any classes in session and most teachers go out for lunch. there are securities walking around all
the time and cameras so there shouldn't be a problem.
1/26/2018 2:42 PM
11 it is a very small campus. 1/26/2018 2:39 PM
12 Everyone has a place where they hang out. 1/26/2018 2:38 PM
13 Its okay 1/26/2018 2:36 PM
14 i think the outdoor space is good 1/26/2018 2:34 PM
15 There isn't a lot of space to sit usually people stand so they should add more tables or benches. 1/26/2018 2:33 PM
16 I don't really mind 1/26/2018 2:30 PM
Outdoor Public
Space
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Outdoor Public
Space
BASIC STATISTICS
43 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
17 There should be more benches/table available for students during lunch that are not restricted to a
single area.
1/26/2018 2:24 PM
18 needs more tables and benches 1/26/2018 1:33 PM
19 Too crowded and not enough places to be. Need to increase school accessibility for lunch time. 1/26/2018 12:55 PM
20 We could use some benches around school and a spot behind the classrooms that is really nice
need to be renewed.
1/26/2018 12:52 PM
21 passing periods are always crowded , not enough tables for lunch 1/26/2018 12:51 PM
22 The campus could be more accommodating to the students there is little room during lunch. Better
WiFi.
1/26/2018 12:50 PM
23 more space for trafficking. 1/26/2018 12:47 PM
24 off campus helps us get otu 1/26/2018 12:46 PM
25 its like a jail with no visitation or yard time ''solitary'' 1/26/2018 12:43 PM
26 i can last out there 1/26/2018 12:43 PM
27 The F wing is always crowded after school and during passing periods. 1/26/2018 12:41 PM
28 We are able to leave the campuss 1/26/2018 12:41 PM
29 need more trees or benches by trees. 1/26/2018 12:40 PM
30 The F wing part of the school is crowded always after every period. 1/26/2018 12:38 PM
31 the space is surprisingly good 1/26/2018 12:38 PM
32 we need more tables and more areas for students to hang out 1/26/2018 12:37 PM
33 Parking is bad. 1/26/2018 12:33 PM
34 The lunch tables outside can be crowded, especially on Wednesdays. 1/26/2018 12:29 PM
35 Lots of outdoor public space. 1/26/2018 10:29 AM
36 We need more parking! 1/26/2018 10:22 AM
37 theres not enough benches 1/26/2018 10:16 AM
38 Could be more benches/tables. 1/26/2018 10:11 AM
39 we need more space out door. there are kids eating on the ground by the restrooms because the
cafeteria is too small and full all the time and outside there's not enough space to hang out on
lunch time.
1/26/2018 9:47 AM
40 the tables outside at the cafeteria should spread the tables more its hard to get through 1/26/2018 9:44 AM
41 Could use more tables and chairs around the schools and not just at one locations. 1/26/2018 9:44 AM
42 There is space outside but its all dirty and full of trash. Everywhere you walk there is bags of chips
or cookies or food just left there and not picked up.
1/26/2018 9:35 AM
43 not enough grass 1/26/2018 9:27 AM
44 The space in the parking lot in very small. There needs to be a specific are where students can be
dropped off.
1/26/2018 9:22 AM
45 More trees 1/26/2018 9:13 AM
46 BRING BACK TREES 1/26/2018 9:13 AM
47 needs better grass in the fields 1/26/2018 8:40 AM
48 we need to have some more benches because the cafeteria is sometimes gets over crowded and
sometimes around campus you well see students that are standing and are trying to eat.
1/26/2018 8:28 AM
49 It would be nice to have more benches and tables to sit on during our lunch time. And also maybe
we could landscape the school more.
1/26/2018 8:23 AM
50 There is never enough space to sit during lunch half of our students are either standing up or in a
class room. I believe that more tables should be put in.
1/26/2018 8:21 AM
44 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
60P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
51 Parking lots are very close to each other and very unorganized 1/26/2018 8:19 AM
52 N/A 1/25/2018 3:24 PM
53 Again, lots of great grass and trees, but unkempt areas as well and a need for paint. Also, there
aren't covered areas to get from one building to the next in many areas when it rains.
1/12/2018 8:56 AM
54 I would like to see more tables and improved landscaping. Trash is a problem, too. 1/9/2018 3:18 PM
55 Should be more student friendly. 1/9/2018 1:48 PM
56 Not a lot of room for activities during lunch. more covered eating and sitting areas needed at both
campuses.
11/15/2017 9:58 AM
57 Could use more landscaping. 11/9/2017 10:12 AM
45 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q17 Collegiate (Scholarly) Atmosphere
Answered: 247 Skipped: 24
17.00%
42
29.96%
74
25.51%
63
19.03%
47
6.48%
16
2.02%
5
247
2.74
Minimum1.00
Maximum6.00
Median3.00
Mean2.74
Standard Deviation1.24
# COMMENTS: DATE
1 I do not know. I haven't been there with students around to see the whole picture. 1/27/2018 9:34 AM
2 This rating does not apply to all departments. There are departments in dire need of help. Some of
the teachers in the math department and English department perform well below standard. The
disciplinary process is not utilized appropriately.
1/27/2018 1:38 AM
3 Also not much to say, theyre lots of posters suggesting a class for next year. 1/26/2018 2:57 PM
4 there are a lot of smart people that we can turn to 1/26/2018 2:55 PM
5 No, this school is known to be "ghetto" or "shi**ty" 1/26/2018 2:55 PM
6 No problems or concerns at all. 1/26/2018 2:54 PM
7 you don't realy feel like your surrounded by the smartest teachers 1/26/2018 2:47 PM
8 its aight 1/26/2018 2:43 PM
9 There are kids where its hard to learn around its gets sad when a kid who trys to do good is
influenced by another kids who doesn't care
1/26/2018 2:43 PM
10 oh god no lol this school is known as a very ghetto highschool everywhere. I've meet people in LA
who have heard stories/rumors of King City and the were not good...
1/26/2018 2:42 PM
11 I guess. 1/26/2018 2:38 PM
12 it does 1/26/2018 2:36 PM
13 its ok really 1/26/2018 2:30 PM
14 Some teachers 1/26/2018 2:30 PM
15 The atmosphere is really scholarly and fits the learning curriculum. 1/26/2018 12:50 PM
16 I have never took the bus 1/26/2018 12:47 PM
Collegiate
Atmosphere
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Collegiate
Atmosphere
BASIC STATISTICS
46 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
61P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
17 Trash everywhere 1/26/2018 12:46 PM
18 My teachers aren't clear 1/26/2018 12:43 PM
19 many of the students here do not care about there education and distract other students 1/26/2018 12:43 PM
20 My teachers rude 1/26/2018 12:42 PM
21 Most of these kids don't succeed 1/26/2018 12:41 PM
22 its good. 1/26/2018 12:40 PM
23 its half and half 1/26/2018 12:38 PM
24 ETS helps me 1/26/2018 12:33 PM
25 Atmosphere is not scholarly at all, many students care about school or success. 1/26/2018 10:29 AM
26 lots of students who do not care about their grades and supporting their community. 1/26/2018 10:26 AM
27 The use of phones at school has become a serious problem and is interfering and contributing to
students' having a priority of socializing and playing games instead of taking learning seriously.
There is a lack of seriousness and effort towards academics.
1/12/2018 8:56 AM
28 We are not as collegial as other campuses, including GF. I think there is room for improvement in
order to retain new staff.
1/11/2018 2:51 PM
29 A campus renovation would give a sense of professionalism and perhaps give some school spirit
to the staff and students
1/9/2018 1:48 PM
47 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q18 Bus Drop-off
Answered: 246 Skipped: 25
19.51%
48
19.92%
49
25.61%
63
23.98%
59
6.10%
15
4.88%
12
246
2.92
Minimum1.00
Maximum6.00
Median3.00
Mean2.92
Standard Deviation1.38
# COMMENTS: DATE
1 The bus schedual had changed a few times only for one stop to be extended. 1/26/2018 2:57 PM
2 i dont know i dont take the bus. 1/26/2018 2:55 PM
3 idk i dont take the bus 1/26/2018 2:55 PM
4 I don't ride the bus, but there is nothing wrong with our school bus. 1/26/2018 2:54 PM
5 At least its not Greenfield. 1/26/2018 2:48 PM
6 more time to get in the bus because some teachers hold you in 1/26/2018 2:44 PM
7 its okay 1/26/2018 2:43 PM
8 I don't know since I don't get dropped off 1/26/2018 2:43 PM
9 idk I don't take it. 1/26/2018 2:42 PM
10 They should atleast offer rides to those who live across town. Not just out of town. 1/26/2018 2:39 PM
11 I do not take the bus. 1/26/2018 2:38 PM
12 It is poor because the students from San Lucas and San Ardo barely get to King City on time and
they don't have time to get a snack or something.
1/26/2018 2:36 PM
13 There isn't enough space 1/26/2018 2:36 PM
14 a lil too ealry or a lil late 1/26/2018 2:34 PM
15 I really don't mind 1/26/2018 2:30 PM
16 always late or leave right after school 1/26/2018 2:23 PM
17 Need new busses !!! 1/26/2018 1:36 PM
18 some of the buses leak water 1/26/2018 1:31 PM
Bus Drop-Off
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Bus Drop-
Off
BASIC STATISTICS
48 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
62P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
19 My friend complains that it comes to early and he has to walk far. Jeovani Santoyo 1/26/2018 1:30 PM
20 i don't take the bus 1/26/2018 1:28 PM
21 I don't take the bus. 1/26/2018 12:52 PM
22 We get picked up and drop off that is all good. 1/26/2018 12:50 PM
23 we don't have on in king city 1/26/2018 12:47 PM
24 N/A 1/26/2018 12:46 PM
25 I don't ride the bus but there Is a lot of kids 1/26/2018 12:43 PM
26 i don't use the bus 1/26/2018 12:43 PM
27 they come to late 1/26/2018 12:42 PM
28 I don't ride the bus. 1/26/2018 12:40 PM
29 I honestly don't know don't use the bus 1/26/2018 12:38 PM
30 They make us walk a lot. 1/26/2018 12:33 PM
31 The Lockwood bus could be faster when dropping kids off after school because it takes about an
hour to an hour and fifteen minutes for the kids to get dropped off at only Lockwood store, and
that's not even counting the stops even further than the Lockwood store.
1/26/2018 12:29 PM
32 I don't take the bus 1/26/2018 10:22 AM
33 cars always in bus way 1/26/2018 10:06 AM
34 Almost got hit by a bus. LOL 1/26/2018 10:05 AM
35 there needs to be a bigger space for bus drop 1/26/2018 9:47 AM
36 Have a bigger parking lot so the buses have enough space to get though 1/26/2018 9:44 AM
37 I think that they need to create a designated area for bus drop-off because it is just a mess when
parents try to drop off their kids and they get in front of the busses and then the busses get irritated
but it is not the parents fault because they are doing what a parent should do but then it interferes
with the buses.
1/26/2018 9:43 AM
38 theres not enough room for the buses to park and still let cars go around/pull out 1/26/2018 9:39 AM
39 We don't even have any buses which makes it pointless to have a bus drop-off. 1/26/2018 9:35 AM
40 Very tiny. 1/26/2018 9:22 AM
41 Picks up late.... want to arrive at 745 to have time to eat breakfeast 1/26/2018 9:16 AM
42 buses that have students from kc should be on time . most of the kids don't have time to eat
breakfast or go to the restroom . we need to improve that .
1/26/2018 8:38 AM
43 San Ardo and San Lucas bus always gets to school late and doesn't give students the time to buy
snacks before school.
1/26/2018 8:23 AM
44 San Ardo and San Lucas bus always bearly makes it on time to school. 1/26/2018 8:22 AM
45 I don't really know. It seems like it is working well. Students who ride the bus get here on time for
the most part.
1/12/2018 8:56 AM
46 Parking lot is small and all students enter from two small lots. Gets congested quickly. 1/9/2018 1:48 PM
47 Same as student drop off 1/9/2018 1:06 PM
48 congestion in morning at KCHS drop offs. 11/15/2017 9:58 AM
49 Could be moved away from student parking, parent drop off, and student entrance to campus. Too
many things happening at once
11/9/2017 11:44 AM
49 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q19 Student Drop-off
Answered: 249 Skipped: 22
23.69%
59
22.09%
55
24.10%
60
20.08%
50
6.43%
16
3.61%
9
249
2.74
Minimum1.00
Maximum6.00
Median3.00
Mean2.74
Standard Deviation1.37
# COMMENTS: DATE
1 Getting in or out of the parking lots during drop off/pick up times is very difficult. 2/5/2018 11:51 AM
2 i come at 7:30 because my mom works here. 1/26/2018 2:55 PM
3 This is poor because i feel like it is always packed and its cause to much traffic 1/26/2018 2:55 PM
4 No problems or concerns. 1/26/2018 2:54 PM
5 Good 1/26/2018 2:48 PM
6 the drop off here at school is fine 1/26/2018 2:47 PM
7 need some to manage the cars out side because some parents do not respect your turn 1/26/2018 2:44 PM
8 random pedestrians were close to hitting me 1/26/2018 2:43 PM
9 I don't know since I don't get dropped off 1/26/2018 2:43 PM
10 packed. 1/26/2018 2:42 PM
11 the parking lot is small 1/26/2018 2:42 PM
12 I walk here. 1/26/2018 2:38 PM
13 Too far from my home. 1/26/2018 2:36 PM
14 I don't care 1/26/2018 2:30 PM
15 There is always traffic in the parking lots after and before school 1/26/2018 2:30 PM
16 too much traffic. 1/26/2018 1:33 PM
17 Fast faster drop off areas. 1/26/2018 12:55 PM
18 cars get crowded when they drop their kids off 1/26/2018 12:51 PM
Student
Drop-Off
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Student Drop-
Off
BASIC STATISTICS
50 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
63P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
19 We get home safe and it is all good. 1/26/2018 12:50 PM
20 we don't drop off students in king city 1/26/2018 12:47 PM
21 N/A 1/26/2018 12:46 PM
22 moves fast 1/26/2018 12:43 PM
23 i don't understand the question 1/26/2018 12:43 PM
24 to many kids 1/26/2018 12:42 PM
25 ehh there needs to be more space 1/26/2018 12:41 PM
26 gets to crowded. 1/26/2018 12:40 PM
27 idk 1/26/2018 12:39 PM
28 its Armageddon trying to drive or drop of kids 1/26/2018 12:38 PM
29 horrible 1/26/2018 12:36 PM
30 We dont even have one. 1/26/2018 12:34 PM
31 its bad we need to get a bigger parking lot. 1/26/2018 12:33 PM
32 Parents are droping off their children in the middle of the street 1/26/2018 10:26 AM
33 there could be more room 1/26/2018 10:16 AM
34 We need a better drop off for kids because parents are having trouble dropping off kids. 1/26/2018 10:16 AM
35 It could be more organized 1/26/2018 10:11 AM
36 cars always in bus way 1/26/2018 10:06 AM
37 we don't have one 1/26/2018 9:47 AM
38 We need at least a safe place to drop kids off cause kids can easily get hit by a car if a driver
wasn't pay attentions.
1/26/2018 9:44 AM
39 Parents leave their kids in like the middle of the road or just park somewhere random. 1/26/2018 9:43 AM
40 theres no real designated area for parents to drop off their kids, a lot of the time they have to go
where the buses go and the buses don't have room to park.
1/26/2018 9:39 AM
41 We don't even have one everyone pretty much drops off their kids in the streets anywhere. 1/26/2018 9:37 AM
42 We don't even have a student drop-off station. Students are dropped off in the middle of the street. 1/26/2018 9:35 AM
43 ITS A MESSSSSSSSS, PARENTS NEED TO LEAVE WHEN THEY DROP THEIR KIDS OFF
NOT STAY IN THE PARKING LOT FOREVER !!!!! FIX THIS !!!!
1/26/2018 9:27 AM
44 There is not a student drop off 1/26/2018 9:25 AM
45 Very poor. 1/26/2018 9:22 AM
46 We don't even have one! 1/26/2018 9:12 AM
47 the drop off should not be mixed up with the bus drop-off because we are endangered off getting
into an accident.
1/26/2018 8:28 AM
48 We do not have one. 1/26/2018 8:21 AM
49 Would love some security on the street in the morning, and after school 1/25/2018 3:24 PM
50 It seems like it is pretty easy to drop kids off at the front or back of the school. 1/12/2018 8:56 AM
51 Too small, gets crowded. 1/9/2018 1:48 PM
52 Same as bus drop off 1/9/2018 1:06 PM
53 congestions in morning at KCHS drop offs. 11/15/2017 9:58 AM
54 Parents are dropping kids off at the cross walk and in the middle of the road away from the cross
walk making driving dangerous for everyone.
11/9/2017 11:44 AM
55 Greenfield's drop-off needs to be re-designed. It is a hazard. 11/7/2017 3:37 PM
51 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q20 Parking
Answered: 246 Skipped: 25
24.39%
60
21.14%
52
22.76%
56
21.14%
52
8.54%
21
2.03%
5
246
2.74
Minimum1.00
Maximum6.00
Median3.00
Mean2.74
Standard Deviation1.36
# COMMENTS: DATE
1 It can be difficult to find a parking space at KCHS or the DO during school hours. Student and staff
parking should be designated. Parking permits should be required for students and only issued if
they have proof of license and insurance.
2/5/2018 11:51 AM
2 Parking lot at times may be full. 1/29/2018 9:05 AM
3 some people park bad 1/26/2018 2:55 PM
4 There are those moments where parking can get annoying, but that's why I arrive at school on a
early time to find that parking.
1/26/2018 2:54 PM
5 I need bigger parking for my truck. 1/26/2018 2:48 PM
6 we need more space 1/26/2018 2:47 PM
7 parking isn't horrible but leaving the are is such a pain it takes a good while to leave due to the
trafic
1/26/2018 2:44 PM
8 definitely need more parking spaces 1/26/2018 2:44 PM
9 I usually never find parking 1/26/2018 2:43 PM
10 not enough space for everyone 1/26/2018 2:43 PM
11 packed and awkward. 1/26/2018 2:42 PM
12 its always crowded before and after school 1/26/2018 2:42 PM
13 more parking spaces 1/26/2018 2:41 PM
14 When there's home games for soccer and basketball parents have to park across the street. Also,
sometimes there's no parking for the students who are already driving.
1/26/2018 2:41 PM
15 I don't drive. 1/26/2018 2:38 PM
Parking
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Parking
BASIC STATISTICS
52 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
64P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
16 We need more parking lots because some students don't even get an opportunity to park in the
school parking lot.
1/26/2018 2:36 PM
17 needs to be bigger 1/26/2018 2:35 PM
18 alot of cars i think there shoul be more parking 1/26/2018 2:34 PM
19 Are parking lots aren't very big they could add more. 1/26/2018 2:33 PM
20 yea its ok 1/26/2018 2:30 PM
21 Always full. Leaving is terrible. 1/26/2018 2:30 PM
22 need more parking places 1/26/2018 2:23 PM
23 need more parking 1/26/2018 2:21 PM
24 to small 1/26/2018 1:36 PM
25 NEED MORE PARKING SPOTS ! 1/26/2018 1:30 PM
26 needs to be bigger 1/26/2018 1:29 PM
27 Not enough parking space. 1/26/2018 1:29 PM
28 Decent amount of spacing but can use a few more spaces. 1/26/2018 12:55 PM
29 Its small especially when there is events at the school. 1/26/2018 12:52 PM
30 There is enough for now But there can be more. 1/26/2018 12:50 PM
31 needs to be bigger 1/26/2018 12:48 PM
32 too crowded 1/26/2018 12:47 PM
33 Not enough parking space 1/26/2018 12:46 PM
34 small lot birds poop on the best dmax in the lot 1/26/2018 12:43 PM
35 i don't drive 1/26/2018 12:43 PM
36 Birds poop on the nicest truck in the parking lot 1/26/2018 12:42 PM
37 The parking lot is always crowded at times and sometimes there is not parking space. 1/26/2018 12:41 PM
38 Bigger theres no space 1/26/2018 12:41 PM
39 to many lines that are not supposed to be there. 1/26/2018 12:40 PM
40 no can park besides me 1/26/2018 12:38 PM
41 I don't have a car 1/26/2018 12:37 PM
42 horrible 1/26/2018 12:36 PM
43 The parking lot is very crammed 1/26/2018 12:34 PM
44 We need better parking 1/26/2018 12:33 PM
45 Make bigger parking lots 1/26/2018 12:30 PM
46 There could be more room, especially when a sports game is going around. 1/26/2018 12:29 PM
47 more parking in front if the school 1/26/2018 10:26 AM
48 We need more parking! 1/26/2018 10:22 AM
49 not a lot 1/26/2018 10:16 AM
50 Need more parking spaces. 1/26/2018 10:16 AM
51 Bus Drop-off, Student Drop-off, and parking are all in the same spot and its too crowded. 1/26/2018 10:08 AM
52 we need more parking spaces! theres times where we cant find parking spaces and we have to go
park across the street. and have a seprate parking spaces for teacher and students
1/26/2018 9:47 AM
53 bigger parking lot 1/26/2018 9:44 AM
54 we should have more parking spaces because some of the students have to park across the street
and or in the teachers parking lot just to be on time
1/26/2018 9:44 AM
53 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
55 I think that the students and the teachers would greatly appreciate and bigger parking lot. 1/26/2018 9:43 AM
56 theres not enough parking spaces for all the students, a lot of the time they have to park across the
street or in the district office parking lot. along with admin parking there (teachers, faculty, subs).
aren't the teachers supposed to use the back parking lot?
1/26/2018 9:39 AM
57 There is very little parking. The lines are all faded and can barely see them when you park. Its
hard to get into the parking lot with all the students walking in the middle of it.
1/26/2018 9:35 AM
58 PARENTS TAKE UP PARKING JUST TO DROP OFF THEIR KIDS AND THIS NOT FAIR FOR
THE KIDS WHO DRIVE TO SCHOOL AND ARE FORCED TO PARK ON THE STREET
1/26/2018 9:27 AM
59 The parking lots are good. 1/26/2018 9:22 AM
60 need more parking spaces. 1/26/2018 8:38 AM
61 we need more space for parking. 1/26/2018 8:33 AM
62 not enough space is available and so it takes a little bit longer to park. sometimes students feel like
they are in a competition to find a parking first.
1/26/2018 8:28 AM
63 we need MORE Parking SPACE. 1/26/2018 8:27 AM
64 More student parking 1/26/2018 8:22 AM
65 The back parking lot of the school is better organized than the front one by the auditorium. 1/26/2018 8:19 AM
66 Not enough spots for staff. Teachers park on broadway. 1/9/2018 1:48 PM
67 There is no parking for the front office. Staff and parents must park on main street or in far off
parking lot to access building.
1/9/2018 1:08 PM
68 Plenty of space 1/9/2018 1:06 PM
69 insufficient front parking for District office/King city. Greenfield has an abundance of unused
parking in back of school. can be used to expand the campus in future.
11/15/2017 9:58 AM
70 More parking options are needed for both students and parents. Both are parking on Broadway a
very busy street making turns onto Broadway dangerous.
11/9/2017 11:44 AM
71 Not enough parking at all locations 11/7/2017 3:37 PM
54 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
65P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q21 Amenities (cafeteria, library, break rooms, work rooms, shops, studyareas, etc.)
Answered: 244 Skipped: 27
27.05%
66
29.92%
73
20.08%
49
15.16%
37
4.92%
12
2.87%
7
244
2.50
Minimum1.00
Maximum6.00
Median2.00
Mean2.50
Standard Deviation1.32
# COMMENTS: DATE
1 PBHS has no area out of the elements to eat lunch. The shade over the lunch tables does not
keep water or wind out.
2/5/2018 11:51 AM
2 I do not know anything about these areas. 1/27/2018 9:34 AM
3 Closed campus but no place for students to sit out of the weather. Some teachers open their class
rooms for students to go. But not all teachers do this. Campus needs areas for students to be
outside but sheltered from the weather. Students need area for study hall other than cafeteria or
the small library.
1/27/2018 1:38 AM
4 its a bit cramped 1/26/2018 2:55 PM
5 the cafeteria needs to be bigger, the shops need to better tools and better roof structure for the
metal shop
1/26/2018 2:55 PM
6 No concerns. 1/26/2018 2:54 PM
7 Its discusting. 1/26/2018 2:48 PM
8 we need major improvements 1/26/2018 2:47 PM
9 they could work on hooking us up with a something a bit better and nicer like in class rooms and
bathrooms
1/26/2018 2:44 PM
10 major renovation last year we were not able to go inside out welding shop because there was a
whole in the roof
1/26/2018 2:44 PM
11 its okay 1/26/2018 2:43 PM
12 the lunch are is small compared to other and the outside one gets packed 1/26/2018 2:43 PM
13 the areas are often very trashed and in bad condition. 1/26/2018 2:42 PM
Amenities
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Amenities
BASIC STATISTICS
55 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
14 the ag shops are really dirty with unnecessary things and the school has no benches to sit on 1/26/2018 2:42 PM
15 there needs to be more space in the library and be able to eat in there 1/26/2018 2:41 PM
16 The Ag department is somewhat good. Need better shop tools because it shouldn't be coming out
of the teachers pockets.
1/26/2018 2:41 PM
17 Shops need better materials. 1/26/2018 2:38 PM
18 Our cafeteria is too crowded. 1/26/2018 2:36 PM
19 I don't mind 1/26/2018 2:30 PM
20 I need more than 35 minutes for lunch. 1/26/2018 2:30 PM
21 During lunch it is always packed at the snack bar. 1/26/2018 2:30 PM
22 Our mechanical shops should be remodeled. 1/26/2018 2:27 PM
23 lunch line for snack bars need to be more quick and less crowded and more organized. 1/26/2018 2:26 PM
24 not enough space to sit and the cafeteria food is disgusting 1/26/2018 2:23 PM
25 Sports facilities are bad... really bad. (softball fields and baseball fields) 1/26/2018 1:36 PM
26 It should be a lot bigger. 1/26/2018 1:33 PM
27 the cafeteria needs to maintain order better 1/26/2018 1:25 PM
28 Not enough areas to study. Need more places to work. 1/26/2018 12:55 PM
29 The cafeteria could be bigger, library could use some updating, the shops in the Ag compound
could use some work, the weight room needs a scale because the one there does not work
properly, and the band room could use some updating.
1/26/2018 12:52 PM
30 not enough rooms for people to study and gear up takes up half of the library and gear up needs
its own place
1/26/2018 12:51 PM
31 There are good but there can be a bit more of a clean up. They can be dirty sometimes. 1/26/2018 12:50 PM
32 Needs vending machines and better food in the cafeteria. 1/26/2018 12:50 PM
33 Need to put vending machine!!! 1/26/2018 12:48 PM
34 it falling apart 1/26/2018 12:47 PM
35 Not appropriate to be able to do work in 1/26/2018 12:46 PM
36 need an auto shop 1/26/2018 12:43 PM
37 no comment 1/26/2018 12:43 PM
38 need more auto shops for ag mech 1/26/2018 12:42 PM
39 The wood shop and metal shop are always dirty and never really that clean at all. 1/26/2018 12:41 PM
40 There all ancient there needs to be upgrades. They bricks are rotting the walls are peeling. Some
of the tools in the work shop doesn't work.
1/26/2018 12:41 PM
41 need better lighting and better materials. 1/26/2018 12:40 PM
42 all the areas are small cold not really enjoyable 1/26/2018 12:38 PM
43 can we get mexican food 1/26/2018 12:37 PM
44 We need to fix the wood shops and replace some sanders 1/26/2018 12:37 PM
45 Make the weight room bigger and add more equipment into it. Make our ag department bigger and
inovated.
1/26/2018 12:30 PM
46 Cafeteria is always packed and dirty. 1/26/2018 10:29 AM
47 the library is always noisy except during class time. 1/26/2018 10:26 AM
48 More space in library. Cafeteria needs more space when coming in to get food. 1/26/2018 10:16 AM
49 the cafeteria needs more room and a better organization. 1/26/2018 9:44 AM
50 Need a place were kids can go and study that's isn't the library or a teacher class room. 1/26/2018 9:44 AM
56 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
66P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
51 the library is always loud and Maggie does a terrible job of keeping everyone quiet so theres not
really a point to having a library. the Ag dept. shops desperately need to be redone, theyre old and
probably unsafe and have rats.
1/26/2018 9:39 AM
52 Our breaks aren't enough especially for the restroom either packed or you have to walk. 1/26/2018 9:37 AM
53 The cafeteria is gross. It smells really bad and the food is disgusting they give tortillas that aren't
even cooked. The library has no help to find a book you may want and you can't even breath
without someone telling you to be quiet.
1/26/2018 9:35 AM
54 the library and 2 offices are put in 1 big room when there is students, i cant even read quitely.. 1/26/2018 9:25 AM
55 The cafeteria needs to be bigger and the library as well!! 1/26/2018 9:24 AM
56 A suggestion would be not having the same food every year for lunch. 1/26/2018 9:12 AM
57 Cafeteria food far from appetizing. 1/26/2018 9:12 AM
58 but we don't have a break room. 1/26/2018 8:38 AM
59 We need to fix the Ag department. Make librarian's space bigger. 1/26/2018 8:33 AM
60 Cafeteria should have enough food because there are students who sometimes do not end up
eating. The library should have more space because recently gear up switched into the library and
there is no space.
1/26/2018 8:28 AM
61 change yalls food 1/26/2018 8:24 AM
62 The Ag Department Workshops need updating and classrooms need new paint. 1/26/2018 8:23 AM
63 The cafeteria doesn't have enough tables or space for students who would like to sit down and
have lunch in there.
1/26/2018 8:19 AM
64 Shops outdated, need renovation, ag department 1/26/2018 8:10 AM
65 The Ag Shop definitely needs updating. A very cold work space. 1/25/2018 7:31 PM
66 Everything is old and antiquated 1/25/2018 2:46 PM
67 There hasn't been a teacher break room, just a little alcove. The library was closed a lot last year
and there aren't a lot of book sets. Gear up has a nice study area. The cafeteria looks good, but
they could serve students better more nutritious food.
1/12/2018 8:56 AM
68 The office should have a bathroom. The teacher lounge needs to remain in one place. Every year
it moves. We should have access to work supplies in the copy room. Library is outdated in terms
of its use.
1/11/2018 2:51 PM
69 We should offer healthier, fresher foods in the cafeteria. 1/9/2018 3:18 PM
70 teacher lounge is non-existent... 1/9/2018 2:43 PM
71 Should be updated. More modern. 1/9/2018 1:48 PM
72 we do not have an adequate break room, the library needs to be updated. 1/9/2018 1:32 PM
73 There should always be accessible break and work rooms. 1/9/2018 1:08 PM
74 Upgrades needed 1/9/2018 1:06 PM
75 both cafeteria and library need to be redone brought up to modern day student needs. 1/9/2018 12:10 PM
76 cafeterias too small. I would like to get something going for operations team breakroom/work shop
at Greenfield. the King city crew uses the MOT building, so it works fine for them. Shops at KCHS
need updates.
11/15/2017 9:58 AM
77 The library at King City High School is closed too many times throughout the school year. This is
not what O have seem bit also what I have heard from students.
11/9/2017 11:29 AM
78 There needs to be more trash cans and more places for the students to get out the the elements. 11/9/2017 10:12 AM
57 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q22 What do you believe are the Districts' greatest facility needs at thistime?
Answered: 251 Skipped: 20
Renovate
Existing...
Additional
Classrooms
Additional Lab
Spaces...
Additional
Offices
HVAC (heating,
ventilation,...
Parking
Drop-off
Area(s)
Audio/Visual
Technology
Wi/Fi
Library
Facilities
Athletic
Facilities
Student
Services...
Student
Gathering Areas
Faculty &
Staff Gather...
Dining
(cafeteria)
Other /
Additional...
0 20 40 60 80 100 120 140 160 180 200
123
123
123
123
123
123
123
77
77
77
77
77
77
77
97
97
97
97
97
97
97
20
20
20
20
20
20
20
114
114
114
114
114
114
114
93
93
93
93
93
93
93
62
62
62
62
62
62
62
55
55
55
55
55
55
55
141
141
141
141
141
141
141
48
48
48
48
48
48
48
90
90
90
90
90
90
90
65
65
65
65
65
65
65
82
82
82
82
82
82
82
27
27
27
27
27
27
27
127
127
127
127
127
127
127
63
63
63
63
63
63
63
ANSWER CHOICES RESPONSES
58 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
67P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
49% 123
31% 77
39% 97
8% 20
45% 114
37% 93
25% 62
22% 55
56% 141
19% 48
36% 90
26% 65
33% 82
11% 27
51% 127
25% 63
Total Respondents: 251
Minimum1.00
Maximum16.00
Median9.00
Mean8.20
Standard Deviation4.70
# OTHER / ADDITIONAL COMMENTS: DATE
1 The bathrooms at PBHS need immediate attention. 2/5/2018 11:51 AM
2 The Ag department facility needs upgrades. As important as the Ag department is they need a
renovation. We have one of the best Ag programs but it would be nice to have a nice area for the
children.
1/29/2018 7:23 AM
3 The weight room is the same as when I was in school...in the late 70's. These students deserve a
modern weight room
1/27/2018 1:38 AM
4 Better WiFi and better equipment for sports like for football and cross country and for wrestling 1/26/2018 2:55 PM
5 Better Restrooms. 1/26/2018 2:48 PM
6 they should have vending machines and a water bottle water fountain type of thing so like that
could some what be cleaner and we should have good security not dumb ones that can tell the
difference between what drugs smells like and skunk
1/26/2018 2:44 PM
7 SPORTS EQUIPMENT! 1/26/2018 2:42 PM
8 I believe that the district is asking about the school itself but they should also ask about how the
teachers treat the students. the ag teachers favorite other students which isn't fair . some teachers
also "joke" around with students to an extended level where its rude & make students feel bad.
1/26/2018 2:42 PM
9 Idk 1/26/2018 2:38 PM
10 I believe our school needs to focus on the teachers just as much as they focus on the campus
itself. Our campus isn't in the best conditions and the f wing always gets extremely crowded.
1/26/2018 2:33 PM
11 the wifi here is slow. 1/26/2018 2:30 PM
Renovate Existing Facilities (1)
Additional Classrooms (2)
Additional Lab Spaces (science, shop, robotics, etc.) (3)
Additional Offices (4)
HVAC (heating, ventilation, air conditioning) (5)
Parking (6)
Drop-off Area(s) (7)
Audio/Visual Technology (8)
Wi/Fi (9)
Library Facilities (10)
Athletic Facilities (11)
Student Services Facilities (12)
Student Gathering Areas (13)
Faculty & Staff Gathering Areas (14)
Dining (cafeteria) (15)
Other / Additional Comments: (16)
BASIC STATISTICS
59 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
12 we need a large locker room for everyone to use when they need to change for sports and not use
the rest rooms it gets way to crowded in there
1/26/2018 2:27 PM
13 The ag compound is too crowed. 1/26/2018 1:29 PM
14 better ag classrooms 1/26/2018 1:25 PM
15 Ag wood and metal shop need better intercom for announcements due to the miss of emergency
messages such as the lock down from the previous year.
1/26/2018 12:55 PM
16 For rallies and such other they need better ideas on making the school fun and music is horrible
#update the whole school
1/26/2018 12:51 PM
17 An extra gymnasium for the cheerleaders and wrestling team with a/c because during the summer
it gets to hot and we need another gym with a/c because theirs always the basketball team or
football team in the gym.
1/26/2018 12:50 PM
18 An extra gymnasium for the cheerleaders and wrestling team. 1/26/2018 12:48 PM
19 vending machines 1/26/2018 12:43 PM
20 The stadium grass should be turf instead of normal grass because we don't have to struggle with
cutting and watering the grass to be even over and over again.
1/26/2018 12:41 PM
21 no. 1/26/2018 12:40 PM
22 Heater!!! 1/26/2018 12:38 PM
23 More bathrooms 1/26/2018 12:37 PM
24 Better food for fairer prices. 1/26/2018 12:34 PM
25 You 1/26/2018 12:32 PM
26 Agriculture Department-Shops/Classrooms 1/26/2018 12:29 PM
27 Ag Facilitites 1/26/2018 12:29 PM
28 The ag compound needs work. The softball fields need work. We need more space to sit and go at
lunch.
1/26/2018 10:22 AM
29 Room 199 only 2 outlets work in the whole room. 1/26/2018 10:16 AM
30 Ag department needs a lot of renovation. 1/26/2018 10:11 AM
31 updates to the ag department shops and classrooms. 1/26/2018 10:07 AM
32 shops need renovation 1/26/2018 10:06 AM
33 AG department 1/26/2018 10:05 AM
34 Our food especially sometimes are food are too stale. 1/26/2018 9:37 AM
35 The fields need to be in good condition during the games and not just during football season. Also
for soccer season and for other sports.
1/26/2018 9:29 AM
36 Almost all of the Ag. Department needs to be renovated. It's falling apart and being infested with
rats. There needs to be another way to get to the F-Wing without struggling to be late to class. The
cafeteria definitely needs to be bigger and there should be a bigger outdoor space for students to
eat and hang out during lunch.
1/26/2018 9:24 AM
37 room 196 had rat problems, room 200 is a science room that has no sink and you can hear the
class next door
1/26/2018 9:13 AM
38 Rat problems in room 196, no sink in room 200 (biology and animal science room) 1/26/2018 9:13 AM
39 no additional comments. 1/26/2018 9:12 AM
40 Entire Ag Dept. is ancient. It was old when I attended High School there in the 60's 1/26/2018 8:42 AM
41 some of the ag class rooms are super old and need renovations done to them 1/26/2018 8:41 AM
42 KCHS has an award winning FFA chapter and very poor outdated facilities. Some of the
classrooms dont have basic things such as heating and sinks. The chapter works very hard to
secure grants and rely on donations from the community and Ag. boosters for supplemental
materials but the facility itself and the classrooms need to be renovated to accomadate the needs
of this great award winning program that the teachers have built.
1/26/2018 8:31 AM
60 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
68P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
43 have heater that works. 1/26/2018 8:27 AM
44 Our cafeteria food is horrific, it in no way gives students the nutrition they need to pursue a healthy
lifestyle. Plus it's way too expensive.
1/26/2018 8:16 AM
45 Ag department needs work. 1/26/2018 8:15 AM
46 Some parts of the AG Department need renovation 1/26/2018 8:10 AM
47 Ag department and shops 1/25/2018 8:14 PM
48 Greenhouses and lab areas for AG classes need up grading 1/25/2018 5:59 PM
49 The AG department is in need of updating. The facilities are cold and less than functional with the
new technology.
1/25/2018 3:24 PM
50 The Ag department is a very successful department in spite of the antiquated space and
educatioinal tools they have to work with, In order to keep them successful into the future the
facilities need to be upgraded.
1/25/2018 2:46 PM
51 A health class 1/19/2018 2:25 PM
52 Restrooms 1/11/2018 8:42 AM
53 Some of the classes need a major over-haul as they are very dated both aesthetically and
technologically speaking. There are wires hanging from everywhere in order to get power to the
computer based classrooms.
1/10/2018 2:24 PM
54 Add restrooms in the Main Office (there are no restrooms in the main office) 1/10/2018 8:42 AM
55 Mobile Surface Carts 1/9/2018 3:18 PM
56 Student Restrooms and faculty restrooms 1/9/2018 1:56 PM
57 kitchen facilities for vocational class 1/9/2018 1:51 PM
58 We obviously have outgrown our current space and need more classrooms. There also needs to
be adequate heating/cooling in ALL classrooms at all times.
1/9/2018 1:08 PM
59 The agriculture department is in need of the most renovation. They have grown by another teacher
this year and more than a 100 students. In addition to having to work from the oldest buildings on
campus, they are in the biggest need of renovations.
11/9/2017 11:44 AM
60 Adult restrooms 11/9/2017 11:29 AM
61 Agriculture Department was never renovated in the modernization 13 years ago. This is the oldest
building on campus and is in need of major repairs. The ag department houses 5 classrooms in
rooms that are not suitable for learning some without heating and air. The shops are in great need
for repairs in electrically and plumbing. The agriculture science classrooms need proper science
storage and capabilities of a science lab. The department is one of the strongest in the state but
has one of the inadequate facilities. The school farm is also a need for renovation. Many of the
outbuildings that are used for storage of equipment and livestock are falling over and need
attention. This is what the community sees and with some help this facility and learning laboratory
for students could be state of the art just like the program.
11/9/2017 10:40 AM
62 There are buildings that have been converted to classrooms that do not have heating or cooling,
which is unacceptable for students.
11/9/2017 10:24 AM
63 The school has gone through a modernization/update a few years ago, but there where a few
area's left out of that modernization. Those classrooms need to be updated to allow for even more
student success.
11/9/2017 10:12 AM
61 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q23 Do you have any other comments, questions, or concerns?
Answered: 66 Skipped: 205
# RESPONSES DATE
1 Your FFA program is your flagship, yet the ag rooms do not look like they belong to a nationally
ranked program.
1/27/2018 9:34 AM
2 I feel like there needs to be more time in between classes and just better facility structure 1/26/2018 2:55 PM
3 When is our drinking fountain going to be fixed? 1/26/2018 2:54 PM
4 No, Not at all. 1/26/2018 2:48 PM
5 yes when will the fucking heater get working 1/26/2018 2:47 PM
6 if you guys are getting all our feedbacks u guys need to do them so kids could actually be excited
to come to school because they wake up on Mondays and some kids don't even come
1/26/2018 2:44 PM
7 bullying 1/26/2018 2:43 PM
8 nah g I'm Gucci. 1/26/2018 2:42 PM
9 I don't understand why the district made this survey if they never improve anything. 1/26/2018 2:42 PM
10 Just think about the athletes who get hurt due to there being holes on the fields. 1/26/2018 2:41 PM
11 Nope im Gucci... Gang Gang 1/26/2018 2:38 PM
12 no 1/26/2018 2:36 PM
13 no 1/26/2018 2:34 PM
14 No. 1/26/2018 2:33 PM
15 Why don't we improvise on our school and campus? each time we do these questions nothing
changes.
1/26/2018 2:33 PM
16 Haganlo lo mas pronto possible, por favor. 1/26/2018 2:30 PM
17 nah im good 1/26/2018 2:30 PM
18 no 1/26/2018 2:27 PM
19 no 1/26/2018 1:37 PM
20 no 1/26/2018 1:33 PM
21 WHY DO WE HAVE TO DO THIS? 1/26/2018 1:30 PM
22 need to make cafeteria bigger 1/26/2018 1:29 PM
23 Need more room in the cafeteria 1/26/2018 1:29 PM
24 The ag compound is too crowded. 1/26/2018 1:29 PM
25 build a better softball place or renewed such as painting etc. 1/26/2018 1:28 PM
26 no 1/26/2018 1:24 PM
27 Thank you for your hard work. ^_^ 1/26/2018 12:52 PM
28 The farm where the pigs and animals are they should fix the lighting, and For the wood shop they
should get new sanders good materials ..and have the school clean
1/26/2018 12:51 PM
29 No. 1/26/2018 12:50 PM
30 fix the hole school and get new teachers. 1/26/2018 12:47 PM
31 no. 1/26/2018 12:46 PM
32 no fords in parking lot plzz 1/26/2018 12:43 PM
62 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
69P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
33 i feel like the new policys on electronic devices and talking are a bit too much. 1/26/2018 12:43 PM
34 we need vending machines 1/26/2018 12:42 PM
35 no. 1/26/2018 12:40 PM
36 Heater!! 1/26/2018 12:38 PM
37 thank you for the opportunity to take your survey 1/26/2018 12:37 PM
38 nah 1/26/2018 12:35 PM
39 have a good day 1/26/2018 12:26 PM
40 AG department should be updated or renovated and The WiFi is very poor 1/26/2018 12:24 PM
41 None 1/26/2018 10:29 AM
42 no 1/26/2018 10:05 AM
43 no 1/26/2018 10:03 AM
44 Have vegetarian meals too!!!!!!!!! 1/26/2018 9:44 AM
45 passing periods need to be longer 1/26/2018 9:39 AM
46 A better solution would be to shut down the school. 1/26/2018 9:35 AM
47 This school sucks ! 1/26/2018 9:27 AM
48 This school is the worst school in the county.. 1/26/2018 9:25 AM
49 We need the restrooms in the stadium remodeled with more stalls and cleaner. 1/26/2018 9:24 AM
50 no 1/26/2018 9:12 AM
51 Ag Dept. is the only remaining part of the school that needs updating. Badly! 1/26/2018 8:42 AM
52 No 1/26/2018 8:33 AM
53 need to have some heaters 1/26/2018 8:27 AM
54 We should be able to be everywhere on campus. 1/26/2018 8:23 AM
55 yes we need better Ag department buildings and faster Wi-fi and a better gym room thank you 1/26/2018 8:22 AM
56 no 1/26/2018 8:22 AM
57 hand dryers are terrible 1/26/2018 8:17 AM
58 I was wondering, when was the last time that the school received any type of facelift? Meaning,
King City High School.
1/25/2018 7:31 PM
59 No. 1/22/2018 9:18 AM
60 More quiet places to study or do work. 1/15/2018 5:27 PM
61 Re-do the older classrooms. 1/10/2018 2:24 PM
62 No Comment 1/10/2018 1:49 PM
63 no 1/9/2018 3:33 PM
64 No comment and concern 1/9/2018 1:37 PM
65 Additional computers for Study Skills Class 1/9/2018 1:14 PM
66 Lets try to keep the library open for some students it is the only place to go 11/9/2017 11:29 AM
63 / 63
South Monterey County Joint Union High School District Facilities Master Plan Survey
KING CITY HIGH SCHOOL SURVEY RESULTS
70P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
0.00% 0
0.00% 0
0.00% 0
100.00% 3
0.00% 0
0.00% 0
Q1 My role is:
Answered: 3 Skipped: 0
TOTAL 3
# OTHER (PLEASE SPECIFY) DATE
There are no responses.
Site Administration District Administration Parent Student Faculty
Member of the Community
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
(3)
(3)
(3)
(3)
(3)
(3)
(3)
ANSWER CHOICES RESPONSES
Site Administration
District Administration
Parent
Student
Faculty
Member of the Community
1 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
33.33% 1
100.00% 3
33.33% 1
100.00% 3
Q2 I primarily use the:
Answered: 3 Skipped: 0
Total Respondents: 3
# BUILDING OR ROOM NUMBERS MOST USED: DATE
1 99 1/26/2018 12:32 PM
Greenfield High
Shcool
King City High
School
Portola-Butler
Continuation
High School
Pinnacle
Academy Charter
0
2
4
6
8
10
ANSWER CHOICES RESPONSES
Greenfield High Shcool
King City High School
Portola-Butler Continuation High School
Pinnacle Academy Charter
2 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
PINNACLE ACADEMY CHARTER SURVEY RESULTS
71P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q3 Acoustics In Learning Spaces
Answered: 3 Skipped: 0
33.33%
1
33.33%
1
0.00%
0
0.00%
0
0.00%
0
33.33%
1
3
3.00
Minimum1.00
Maximum6.00
Median2.00
Mean3.00
Standard Deviation2.16
# COMMENTS: DATE
1 the building are not safe the need to be upgrade 1/26/2018 12:29 PM
2 In classroom 199 the Acoustics are really bad you can't really hear when Mr. Zappula puts a video. 1/26/2018 10:00 AM
Acoustics In
Learning Spaces
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERYGOOD (5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Acoustics In Learning
Spaces
BASIC STATISTICS
3 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q4 Accessibility
Answered: 3 Skipped: 0
0.00%
0
0.00%
0
33.33%
1
0.00%
0
33.33%
1
33.33%
1
3
4.67
Minimum3.00
Maximum6.00
Median5.00
Mean4.67
Standard Deviation1.25
# COMMENTS: DATE
There are no responses.
Accessibility
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Accessibility
BASIC STATISTICS
4 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
PINNACLE ACADEMY CHARTER SURVEY RESULTS
72P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q5 Thermal Comfort
Answered: 3 Skipped: 0
0.00%
0
0.00%
0
66.67%
2
0.00%
0
0.00%
0
33.33%
1
3
4.00
Minimum3.00
Maximum6.00
Median3.00
Mean4.00
Standard Deviation1.41
# COMMENTS: DATE
There are no responses.
Thermal
Comfort
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Thermal
Comfort
BASIC STATISTICS
5 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q6 Electrical Lighting
Answered: 3 Skipped: 0
33.33%
1
0.00%
0
0.00%
0
33.33%
1
0.00%
0
33.33%
1
3
3.67
Minimum1.00
Maximum6.00
Median4.00
Mean3.67
Standard Deviation2.05
# COMMENTS: DATE
1 no lights in a metal shop 1/26/2018 12:29 PM
Electrical
Lighting
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Electrical
Lighting
BASIC STATISTICS
6 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
PINNACLE ACADEMY CHARTER SURVEY RESULTS
73P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q7 Electrical Power (Outlets, etc.)
Answered: 3 Skipped: 0
33.33%
1
0.00%
0
33.33%
1
0.00%
0
0.00%
0
33.33%
1
3
3.33
Minimum1.00
Maximum6.00
Median3.00
Mean3.33
Standard Deviation2.05
# COMMENTS: DATE
1 room 199 only has 2 working outlets. 1/26/2018 10:07 AM
Electrical
Power (Outle...
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERYGOOD (5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Electrical Power
(Outlets, etc.)
BASIC STATISTICS
7 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q8 Exterior/Site Lighting
Answered: 3 Skipped: 0
0.00%
0
33.33%
1
33.33%
1
0.00%
0
0.00%
0
33.33%
1
3
3.67
Minimum2.00
Maximum6.00
Median3.00
Mean3.67
Standard Deviation1.70
# COMMENTS: DATE
There are no responses.
Exterior/Site
Lighting
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Exterior/Site
Lighting
BASIC STATISTICS
8 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
PINNACLE ACADEMY CHARTER SURVEY RESULTS
74P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q9 Daylighting (adequate natural light, too much natural light, glare?)
Answered: 3 Skipped: 0
0.00%
0
0.00%
0
33.33%
1
33.33%
1
0.00%
0
33.33%
1
3
4.33
Minimum3.00
Maximum6.00
Median4.00
Mean4.33
Standard Deviation1.25
# COMMENTS: DATE
There are no responses.
Daylighting
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Daylighting
BASIC STATISTICS
9 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q10 Technology
Answered: 3 Skipped: 0
0.00%
0
0.00%
0
0.00%
0
66.67%
2
0.00%
0
33.33%
1
3
4.67
Minimum4.00
Maximum6.00
Median4.00
Mean4.67
Standard Deviation0.94
# COMMENTS: DATE
There are no responses.
Technology
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Technology
BASIC STATISTICS
10 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
PINNACLE ACADEMY CHARTER SURVEY RESULTS
75P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q11 Interior Finishes & Furnishings (including tack wall and whiteboards)
Answered: 3 Skipped: 0
0.00%
0
0.00%
0
66.67%
2
0.00%
0
0.00%
0
33.33%
1
3
4.00
Minimum3.00
Maximum6.00
Median3.00
Mean4.00
Standard Deviation1.41
# COMMENTS: DATE
There are no responses.
Interior
Finishes &...
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERYGOOD (5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Interior Finishes &
Furnishings
BASIC STATISTICS
11 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q12 Restrooms and Drinking Fountains
Answered: 3 Skipped: 0
33.33%
1
0.00%
0
33.33%
1
0.00%
0
0.00%
0
33.33%
1
3
3.33
Minimum1.00
Maximum6.00
Median3.00
Mean3.33
Standard Deviation2.05
# COMMENTS: DATE
1 Not enough restrooms and water sucks 1/26/2018 10:07 AM
Restrooms &
Drinking...
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERYGOOD (5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Restrooms & Drinking
Foundatains
BASIC STATISTICS
12 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
PINNACLE ACADEMY CHARTER SURVEY RESULTS
76P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q13 Sustainability
Answered: 3 Skipped: 0
0.00%
0
33.33%
1
0.00%
0
33.33%
1
0.00%
0
33.33%
1
3
4.00
Minimum2.00
Maximum6.00
Median4.00
Mean4.00
Standard Deviation1.63
# COMMENTS: DATE
There are no responses.
Sustainability
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Sustainability
BASIC STATISTICS
13 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q14 Aesthetics of Buildings and Campus
Answered: 3 Skipped: 0
0.00%
0
0.00%
0
66.67%
2
0.00%
0
0.00%
0
33.33%
1
3
4.00
Minimum3.00
Maximum6.00
Median3.00
Mean4.00
Standard Deviation1.41
# COMMENTS: DATE
There are no responses.
Aesthetics of
Building &...
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERYGOOD (5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Aesthetics of Building &
Campus
BASIC STATISTICS
14 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
PINNACLE ACADEMY CHARTER SURVEY RESULTS
77P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q15 Wayfinding (Signage; Navigating around campus; orientation)
Answered: 3 Skipped: 0
0.00%
0
33.33%
1
0.00%
0
33.33%
1
0.00%
0
33.33%
1
3
4.00
Minimum2.00
Maximum6.00
Median4.00
Mean4.00
Standard Deviation1.63
# COMMENTS: DATE
There are no responses.
Wayfinding
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Wayfinding
BASIC STATISTICS
15 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q16 Outdoor Public Space
Answered: 3 Skipped: 0
0.00%
0
33.33%
1
33.33%
1
0.00%
0
0.00%
0
33.33%
1
3
3.67
Minimum2.00
Maximum6.00
Median3.00
Mean3.67
Standard Deviation1.70
# COMMENTS: DATE
There are no responses.
Outdoor Public
Space
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Outdoor Public
Space
BASIC STATISTICS
16 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
PINNACLE ACADEMY CHARTER SURVEY RESULTS
78P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q17 Collegiate (Scholarly) Atmosphere
Answered: 3 Skipped: 0
0.00%
0
66.67%
2
0.00%
0
0.00%
0
0.00%
0
33.33%
1
3
3.33
Minimum2.00
Maximum6.00
Median2.00
Mean3.33
Standard Deviation1.89
# COMMENTS: DATE
There are no responses.
Collegiate
Atmosphere
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Collegiate
Atmosphere
BASIC STATISTICS
17 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q18 Bus Drop-off
Answered: 3 Skipped: 0
33.33%
1
33.33%
1
0.00%
0
0.00%
0
0.00%
0
33.33%
1
3
3.00
Minimum1.00
Maximum6.00
Median2.00
Mean3.00
Standard Deviation2.16
# COMMENTS: DATE
There are no responses.
Bus Drop-Off
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Bus Drop-
Off
BASIC STATISTICS
18 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
PINNACLE ACADEMY CHARTER SURVEY RESULTS
79P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q19 Student Drop-off
Answered: 3 Skipped: 0
33.33%
1
33.33%
1
0.00%
0
0.00%
0
0.00%
0
33.33%
1
3
3.00
Minimum1.00
Maximum6.00
Median2.00
Mean3.00
Standard Deviation2.16
# COMMENTS: DATE
There are no responses.
Student
Drop-Off
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Student Drop-
Off
BASIC STATISTICS
19 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q20 Parking
Answered: 3 Skipped: 0
33.33%
1
0.00%
0
33.33%
1
0.00%
0
0.00%
0
33.33%
1
3
3.33
Minimum1.00
Maximum6.00
Median3.00
Mean3.33
Standard Deviation2.05
# COMMENTS: DATE
There are no responses.
Parking
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Parking
BASIC STATISTICS
20 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
PINNACLE ACADEMY CHARTER SURVEY RESULTS
80P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q21 Amenities (cafeteria, library, break rooms, work rooms, shops, studyareas, etc.)
Answered: 3 Skipped: 0
0.00%
0
33.33%
1
33.33%
1
0.00%
0
0.00%
0
33.33%
1
3
3.67
Minimum2.00
Maximum6.00
Median3.00
Mean3.67
Standard Deviation1.70
# COMMENTS: DATE
There are no responses.
Amenities
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Amenities
BASIC STATISTICS
21 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q22 What do you believe are the Districts' greatest facility needs at thistime?
Answered: 3 Skipped: 0
Renovate
Existing...
Additional
Classrooms
Additional Lab
Spaces...
Additional
Offices
HVAC (heating,
ventilation,...
Parking
Drop-off
Area(s)
Audio/Visual
Technology
Wi/Fi
Library
Facilities
Athletic
Facilities
Student
Services...
Student
Gathering Areas
Faculty &
Staff Gather...
Dining
(cafeteria)
Other /
Additional...
0 1 2 3 4 5 6 7 8 9 10
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
1
1
1
1
1
1
1
2
2
2
2
2
2
2
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
3
3
3
3
3
3
3
2
2
2
2
2
2
2
3
3
3
3
3
3
3
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
ANSWER CHOICES RESPONSES
22 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
PINNACLE ACADEMY CHARTER SURVEY RESULTS
81P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
33% 1
67% 2
67% 2
33% 1
67% 2
33% 1
67% 2
67% 2
100% 3
67% 2
100% 3
33% 1
33% 1
33% 1
67% 2
0% 0
Total Respondents: 3
Minimum1.00
Maximum15.00
Median8.50
Mean8.08
Standard Deviation4.04
# OTHER / ADDITIONAL COMMENTS: DATE
There are no responses.
Renovate Existing Facilities (1)
Additional Classrooms (2)
Additional Lab Spaces (science, shop, robotics, etc.) (3)
Additional Offices (4)
HVAC (heating, ventilation, air conditioning) (5)
Parking (6)
Drop-off Area(s) (7)
Audio/Visual Technology (8)
Wi/Fi (9)
Library Facilities (10)
Athletic Facilities (11)
Student Services Facilities (12)
Student Gathering Areas (13)
Faculty & Staff Gathering Areas (14)
Dining (cafeteria) (15)
Other / Additional Comments: (16)
BASIC STATISTICS
23 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q23 Do you have any other comments, questions, or concerns?
Answered: 0 Skipped: 3
# RESPONSES DATE
There are no responses.
24 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
PINNACLE ACADEMY CHARTER SURVEY RESULTS
82P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
0.00% 0
75.00% 3
0.00% 0
25.00% 1
0.00% 0
0.00% 0
Q1 My role is:
Answered: 4 Skipped: 1
TOTAL 4
# OTHER (PLEASE SPECIFY) DATE
1 Classified 1/29/2018 9:00 AM
2 Operations Supervisor 11/15/2017 9:47 AM
Site Administration District Administration Parent Student Faculty
Member of the Community
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
75.00%
(3)
(3)
(3)
(3)
(3)
(3)
(3)
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
(1)
(1)
(1)
(1)
(1)
(1)
(1)
ANSWER CHOICES RESPONSES
Site Administration
District Administration
Parent
Student
Faculty
Member of the Community
1 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
80.00% 4
100.00% 5
100.00% 5
20.00% 1
Q2 I primarily use the:
Answered: 5 Skipped: 0
Total Respondents: 5
# BUILDING OR ROOM NUMBERS MOST USED: DATE
1 Tech Office, AG Buildings, 1/29/2018 9:00 AM
2 99 1/26/2018 12:32 PM
3 District building. MOT building 11/15/2017 9:47 AM
Greenfield High
Shcool
King City High
School
Portola-Butler
Continuation
High School
Pinnacle
Academy Charter
0
2
4
6
8
10
ANSWER CHOICES RESPONSES
Greenfield High Shcool
King City High School
Portola-Butler Continuation High School
Pinnacle Academy Charter
2 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
PORTOLA-BUTLER CONTINUATION HIGH SCHOOL SURVEY RESULTS
83P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q3 Acoustics In Learning Spaces
Answered: 4 Skipped: 1
0.00%
0
0.00%
0
25.00%
1
50.00%
2
0.00%
0
25.00%
1
4
4.25
Minimum3.00
Maximum6.00
Median4.00
Mean4.25
Standard Deviation1.09
# COMMENTS: DATE
1 Noisy AC system in/near room 114. 1/29/2018 9:00 AM
2 n/a 11/15/2017 9:47 AM
Acoustics In
Learning Spaces
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERYGOOD (5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Acoustics In Learning
Spaces
BASIC STATISTICS
3 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q4 Accessibility
Answered: 4 Skipped: 1
0.00%
0
0.00%
0
25.00%
1
25.00%
1
0.00%
0
50.00%
2
4
4.75
Minimum3.00
Maximum6.00
Median5.00
Mean4.75
Standard Deviation1.30
# COMMENTS: DATE
1 Some ADA issues. Student union/cafeteria too small, not efficient servicing for lunch. 11/15/2017 9:47 AM
Accessibility
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Accessibility
BASIC STATISTICS
4 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
PORTOLA-BUTLER CONTINUATION HIGH SCHOOL SURVEY RESULTS
84P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q5 Thermal Comfort
Answered: 5 Skipped: 0
20.00%
1
40.00%
2
0.00%
0
0.00%
0
0.00%
0
40.00%
2
5
3.40
Minimum1.00
Maximum6.00
Median2.00
Mean3.40
Standard Deviation2.15
# COMMENTS: DATE
1 The office space is usually too cold. 2/5/2018 11:41 AM
2 199 No AC unit/ Heather. 1/29/2018 9:00 AM
3 Problems with HVAC units throughout the district. especially during hot spells in summer. we have
a contractor on sites constantly
11/15/2017 9:47 AM
4 Not all rooms have a heater or AC. When the temperatures are too cold or too hot, students are
not able to focus on learning.
11/7/2017 3:34 PM
Thermal
Comfort
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Thermal
Comfort
BASIC STATISTICS
5 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q6 Electrical Lighting
Answered: 5 Skipped: 0
0.00%
0
20.00%
1
20.00%
1
20.00%
1
0.00%
0
40.00%
2
5
4.20
Minimum2.00
Maximum6.00
Median4.00
Mean4.20
Standard Deviation1.60
# COMMENTS: DATE
1 Lighting is not working in all the rooms or is very dim 11/7/2017 3:34 PM
Electrical
Lighting
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Electrical
Lighting
BASIC STATISTICS
6 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
PORTOLA-BUTLER CONTINUATION HIGH SCHOOL SURVEY RESULTS
85P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q7 Electrical Power (Outlets, etc.)
Answered: 5 Skipped: 0
0.00%
0
20.00%
1
40.00%
2
20.00%
1
0.00%
0
20.00%
1
5
3.60
Minimum2.00
Maximum6.00
Median3.00
Mean3.60
Standard Deviation1.36
# COMMENTS: DATE
1 Not enough outlets 2/5/2018 11:42 AM
2 I have spotted and reported many power outlets around campus, they have been replaced as
needed. Electrical cover plates replacement as needed.
1/29/2018 9:00 AM
3 some wings in King city have old power set ups. 11/15/2017 9:54 AM
4 All outlets need to be checked, several are broken or damaged. In addition, several rooms do not
have an adequate number of outlets and have to use surge protectors.
11/7/2017 3:36 PM
Electrical
Power (Outle...
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERYGOOD (5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Electrical Power
(Outlets, etc.)
BASIC STATISTICS
7 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q8 Exterior/Site Lighting
Answered: 5 Skipped: 0
0.00%
0
20.00%
1
0.00%
0
20.00%
1
20.00%
1
40.00%
2
5
4.60
Minimum2.00
Maximum6.00
Median5.00
Mean4.60
Standard Deviation1.50
# COMMENTS: DATE
1 Recently the Outside lighting was updated. 1/29/2018 9:00 AM
2 new LED project through whole district underway right now 11/15/2017 9:54 AM
3 Very difficult to see in some areas at night 11/7/2017 3:36 PM
Exterior/Site
Lighting
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Exterior/Site
Lighting
BASIC STATISTICS
8 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
PORTOLA-BUTLER CONTINUATION HIGH SCHOOL SURVEY RESULTS
86P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q9 Daylighting (adequate natural light, too much natural light, glare?)
Answered: 5 Skipped: 0
0.00%
0
0.00%
0
0.00%
0
60.00%
3
20.00%
1
20.00%
1
5
4.60
Minimum4.00
Maximum6.00
Median4.00
Mean4.60
Standard Deviation0.80
# COMMENTS: DATE
1 Some natural light piercing threw windows in room 186 1/29/2018 9:00 AM
Daylighting
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Daylighting
BASIC STATISTICS
9 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q10 Technology
Answered: 5 Skipped: 0
0.00%
0
0.00%
0
20.00%
1
40.00%
2
20.00%
1
20.00%
1
5
4.40
Minimum3.00
Maximum6.00
Median4.00
Mean4.40
Standard Deviation1.02
# COMMENTS: DATE
1 Conduct Individual inspection of the projectors in the classrooms. Network port availability.
Wireless access on campus/ Sport areas. ( Response as if the beginning of the years, may have
already been addressed)
1/29/2018 9:00 AM
2 Food service department I want to upgrade- screens, marketing etc. 11/15/2017 9:54 AM
Technology
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Technology
BASIC STATISTICS
10 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
PORTOLA-BUTLER CONTINUATION HIGH SCHOOL SURVEY RESULTS
87P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q11 Interior Finishes & Furnishings (including tack wall and whiteboards)
Answered: 4 Skipped: 1
0.00%
0
0.00%
0
50.00%
2
0.00%
0
25.00%
1
25.00%
1
4
4.25
Minimum3.00
Maximum6.00
Median4.00
Mean4.25
Standard Deviation1.30
# COMMENTS: DATE
1 Inspection of room 281 Whiteboard. Chairs inception on campus mussing leg ends. Lose screws
on student tables inspection.
1/29/2018 9:00 AM
2 some rooms need new interior wall coverings. Cafeterias need updates on design and spacing 11/15/2017 9:54 AM
3 There is a lot of new furniture, but also a lot of old one that needs to be replaced. 11/7/2017 3:36 PM
Interior
Finishes &...
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERYGOOD (5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Interior Finishes &
Furnishings
BASIC STATISTICS
11 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q12 Restrooms and Drinking Fountains
Answered: 5 Skipped: 0
20.00%
1
20.00%
1
20.00%
1
0.00%
0
0.00%
0
40.00%
2
5
3.60
Minimum1.00
Maximum6.00
Median3.00
Mean3.60
Standard Deviation2.06
# COMMENTS: DATE
1 The student bathrooms at PBHS are in terrible condition. The teacher bathrooms at KCHS are in
poor condition.
2/5/2018 11:42 AM
2 few fountains. Probably need some larger restroom space. 11/15/2017 9:54 AM
Restrooms &
Drinking...
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERYGOOD (5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Restrooms & Drinking
Foundatains
BASIC STATISTICS
12 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
PORTOLA-BUTLER CONTINUATION HIGH SCHOOL SURVEY RESULTS
88P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q13 Sustainability
Answered: 4 Skipped: 1
0.00%
0
0.00%
0
25.00%
1
25.00%
1
0.00%
0
50.00%
2
4
4.75
Minimum3.00
Maximum6.00
Median5.00
Mean4.75
Standard Deviation1.30
# COMMENTS: DATE
There are no responses.
Sustainability
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Sustainability
BASIC STATISTICS
13 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q14 Aesthetics of Buildings and Campus
Answered: 5 Skipped: 0
0.00%
0
40.00%
2
0.00%
0
20.00%
1
20.00%
1
20.00%
1
5
3.80
Minimum2.00
Maximum6.00
Median4.00
Mean3.80
Standard Deviation1.60
# COMMENTS: DATE
1 Continue to maintain regular leaf cleanup near walkways. 1/29/2018 9:00 AM
2 King City is much older. exterior walls need quite a bit of work. 11/15/2017 9:54 AM
Aesthetics of
Building &...
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERYGOOD (5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Aesthetics of Building &
Campus
BASIC STATISTICS
14 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
PORTOLA-BUTLER CONTINUATION HIGH SCHOOL SURVEY RESULTS
89P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q15 Wayfinding (Signage; Navigating around campus; orientation)
Answered: 5 Skipped: 0
20.00%
1
0.00%
0
40.00%
2
0.00%
0
0.00%
0
40.00%
2
5
3.80
Minimum1.00
Maximum6.00
Median3.00
Mean3.80
Standard Deviation1.94
# COMMENTS: DATE
1 The office at GHS should be clearly marked. It is difficult for a new person to know which building
the office is located.
2/5/2018 11:51 AM
2 No wayfinding. GHS front parking is very uncoordinated. 11/15/2017 9:58 AM
Wayfinding
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Wayfinding
BASIC STATISTICS
15 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q16 Outdoor Public Space
Answered: 5 Skipped: 0
20.00%
1
0.00%
0
20.00%
1
20.00%
1
0.00%
0
40.00%
2
5
4.00
Minimum1.00
Maximum6.00
Median4.00
Mean4.00
Standard Deviation1.90
# COMMENTS: DATE
1 Not a lot of room for activities during lunch. more covered eating and sitting areas needed at both
campuses.
11/15/2017 9:58 AM
Outdoor Public
Space
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Outdoor Public
Space
BASIC STATISTICS
16 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
PORTOLA-BUTLER CONTINUATION HIGH SCHOOL SURVEY RESULTS
90P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q17 Collegiate (Scholarly) Atmosphere
Answered: 4 Skipped: 1
0.00%
0
25.00%
1
0.00%
0
25.00%
1
0.00%
0
50.00%
2
4
4.50
Minimum2.00
Maximum6.00
Median5.00
Mean4.50
Standard Deviation1.66
# COMMENTS: DATE
There are no responses.
Collegiate
Atmosphere
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Collegiate
Atmosphere
BASIC STATISTICS
17 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q18 Bus Drop-off
Answered: 5 Skipped: 0
0.00%
0
40.00%
2
0.00%
0
20.00%
1
0.00%
0
40.00%
2
5
4.00
Minimum2.00
Maximum6.00
Median4.00
Mean4.00
Standard Deviation1.79
# COMMENTS: DATE
1 congestion in morning at KCHS drop offs. 11/15/2017 9:58 AM
Bus Drop-Off
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Bus Drop-
Off
BASIC STATISTICS
18 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
PORTOLA-BUTLER CONTINUATION HIGH SCHOOL SURVEY RESULTS
91P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q19 Student Drop-off
Answered: 5 Skipped: 0
40.00%
2
20.00%
1
0.00%
0
0.00%
0
0.00%
0
40.00%
2
5
3.20
Minimum1.00
Maximum6.00
Median2.00
Mean3.20
Standard Deviation2.32
# COMMENTS: DATE
1 Getting in or out of the parking lots during drop off/pick up times is very difficult. 2/5/2018 11:51 AM
2 congestions in morning at KCHS drop offs. 11/15/2017 9:58 AM
3 Greenfield's drop-off needs to be re-designed. It is a hazard. 11/7/2017 3:37 PM
Student
Drop-Off
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Student Drop-
Off
BASIC STATISTICS
19 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q20 Parking
Answered: 4 Skipped: 1
50.00%
2
0.00%
0
0.00%
0
0.00%
0
25.00%
1
25.00%
1
4
3.25
Minimum1.00
Maximum6.00
Median3.00
Mean3.25
Standard Deviation2.28
# COMMENTS: DATE
1 It can be difficult to find a parking space at KCHS or the DO during school hours. Student and staff
parking should be designated. Parking permits should be required for students and only issued if
they have proof of license and insurance.
2/5/2018 11:51 AM
2 Parking lot at times may be full. 1/29/2018 9:05 AM
3 insufficient front parking for District office/King city. Greenfield has an abundance of unused
parking in back of school. can be used to expand the campus in future.
11/15/2017 9:58 AM
4 Not enough parking at all locations 11/7/2017 3:37 PM
Parking
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Parking
BASIC STATISTICS
20 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
PORTOLA-BUTLER CONTINUATION HIGH SCHOOL SURVEY RESULTS
92P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Q21 Amenities (cafeteria, library, break rooms, work rooms, shops, studyareas, etc.)
Answered: 5 Skipped: 0
0.00%
0
20.00%
1
40.00%
2
0.00%
0
0.00%
0
40.00%
2
5
4.00
Minimum2.00
Maximum6.00
Median3.00
Mean4.00
Standard Deviation1.67
# COMMENTS: DATE
1 PBHS has no area out of the elements to eat lunch. The shade over the lunch tables does not
keep water or wind out.
2/5/2018 11:51 AM
2 cafeterias too small. I would like to get something going for operations team breakroom/work shop
at Greenfield. the King city crew uses the MOT building, so it works fine for them. Shops at KCHS
need updates.
11/15/2017 9:58 AM
Amenities
1 2 3 4 5 6
POOR(1)
FAIR(2)
SATISFACTORY(3)
GOOD(4)
VERY GOOD(5)
EXCELLENT(6)
TOTAL WEIGHTEDAVERAGE
Amenities
BASIC STATISTICS
21 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q22 What do you believe are the Districts' greatest facility needs at thistime?
Answered: 5 Skipped: 0
Renovate
Existing...
Additional
Classrooms
Additional Lab
Spaces...
Additional
Offices
HVAC (heating,
ventilation,...
Parking
Drop-off
Area(s)
Audio/Visual
Technology
Wi/Fi
Library
Facilities
Athletic
Facilities
Student
Services...
Student
Gathering Areas
Faculty &
Staff Gather...
Dining
(cafeteria)
Other /
Additional...
0 1 2 3 4 5 6 7 8 9 10
3
3
3
3
3
3
3
4
4
4
4
4
4
4
3
3
3
3
3
3
3
1
1
1
1
1
1
1
4
4
4
4
4
4
4
3
3
3
3
3
3
3
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
1
1
1
1
1
1
1
ANSWER CHOICES RESPONSES
22 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
PORTOLA-BUTLER CONTINUATION HIGH SCHOOL SURVEY RESULTS
93P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
60% 3
80% 4
60% 3
20% 1
80% 4
60% 3
20% 1
20% 1
20% 1
20% 1
20% 1
40% 2
40% 2
40% 2
40% 2
20% 1
Total Respondents: 5
Minimum1.00
Maximum16.00
Median6.00
Mean7.22
Standard Deviation4.81
# OTHER / ADDITIONAL COMMENTS: DATE
1 The bathrooms at PBHS need immediate attention. 2/5/2018 11:51 AM
Renovate Existing Facilities (1)
Additional Classrooms (2)
Additional Lab Spaces (science, shop, robotics, etc.) (3)
Additional Offices (4)
HVAC (heating, ventilation, air conditioning) (5)
Parking (6)
Drop-off Area(s) (7)
Audio/Visual Technology (8)
Wi/Fi (9)
Library Facilities (10)
Athletic Facilities (11)
Student Services Facilities (12)
Student Gathering Areas (13)
Faculty & Staff Gathering Areas (14)
Dining (cafeteria) (15)
Other / Additional Comments: (16)
BASIC STATISTICS
23 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
Q23 Do you have any other comments, questions, or concerns?
Answered: 0 Skipped: 5
# RESPONSES DATE
There are no responses.
24 / 24
South Monterey County Joint Union High School District Facilities Master Plan Survey
PORTOLA-BUTLER CONTINUATION HIGH SCHOOL SURVEY RESULTS
94P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
UNIT A/Administration:The (9) wall mount ductless cooling/heating units in individual work spaces/offices do not function at all or adequately and require replacement to provide adequately conditioned spaces.
UNIT C/Multi-Purpose Building:The mechanical units supporting the building do not function adequately and require preventive maintenance to provide adequately conditioned spaces.
UNIT D/Arts Building: The mechanical units supporting the building do not function adequately and require preventive maintenance to provide adequately conditioned spaces.
UNIT E/Gymnasium:The mechanical units supporting the gymnasium do not function adequately and require repair to provide adequately conditioned spaces.
UNITS A-E:Surface preparation and repainting of the existing fascia and metal gutter/downspout assembly is required in order to address the appropriate maintenance of these building com-ponents.
UNIT H/ (8) Relocatable Classrooms:The mechanical units supporting the classrooms are 30+ years old and do not function at all or adequately and require replacement to provide adequately conditioned spaces.
UNIT K/ (8) Relocatable Classrooms:The mechanical units supporting the classrooms do not function adequately and require repair to provide adequately conditioned spaces.
UNIT M/ (4) Relocatable Classrooms:The accessible ramp for the relocatable restroom building currently has a built-up asphalt surfaced extension which does not comply with current accessibility requirements. Fur-ther evaluation for modification or removal/replacement for compliance is required.The mechanical units supporting the classrooms are 30+ years old and do not function at all or adequately and require replacement to provide adequately conditioned spaces.
PARKING LOT:The current parking lot configuration provides (9) accessible spaces. However, the existing design configuration with raised asphalt curb ramps in the access aisle does not comply with current accessibility requirements. Further evaluation for modification or removal/replacement for compliance is required. Note: Two accessible parking spaces with a similar non-compliant design located at the front of the campus, adjacent to S. El Camino Real are being revised for compliance as part of A-#116633, Relocatable Classrooms.
PLAY FIELDS:An accessible path of travel to either the softball fields or baseball diamonds is not provided. The constructed elements supporting these fields i.e., dug-outs, bleachers, do not address current accessibility requirements.
FOOTBALL/TRACK:The Press Box/Announcer’s Booth is a C-train container. The current constructed condition requires further evaluation for safety, structural and accessibility compliance.
GREENFIELD HIGH SCHOOL - FACILITY ASSESSMENT ADDITIONAL FIELD NOTES
95P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
BUILDING A/Classrooms:Delamination, cracking and beam end damage on covered walk canopy supporting beams adjacent to South exterior elevation on West side. Areas of cracked-blistered paint caus-ing breakdown of existing masonry wall surface at North exterior elevation. South interior elevation has cracked-blistered paint area similar to exterior wall surface.
BUILDING B/Classrooms:Areas of cracked-blistered paint causing breakdown of existing masonry wall surface at North exterior elevation. Mechanical units require repair on a regular basis, perform poorly and create a noise level when operating that impact’s the classroom teaching environment.
BUILDING C/ Classrooms:Areas of cracked-blistered paint causing breakdown of existing masonry wall surfaces. Interior elevations have cracked-blistered paint. Generally run-down finishes inside and out. Non-compliant restrooms in terms of accessibility standards at West end of building.
BUILDING E/Classrooms:Mechanical units require preventative maintenance to address mechanical operation as well as system control components.
BUILDING F/Classrooms:Non-accessible elevation differential (3/4”+) on path of travel at the double-door threshold to building complex entry. Non-accessible elevation differential (3/4”+) at (10) classroom and (2) workroom entry door thresholds.
BUILDING G/Music-Drama:Interior fabric wall finish at instrument storage doors is worn, torn and requires replacement. Access door above window to attic space is damaged and requires replacement and repair of adjacent trim/finishes.The roof is the original BUR with gravel ballast and requires preventive maintenance; possibly replacement with a single ply membrane in the near future.
BUILDING H/Classrooms:Non-accessible elevation differential (3/4”+) at (3) classroom and (2) workroom entry door thresholds.
BUILDING J/Shops-Classrooms:Non-accessible elevation differential (3/4”+) at (4) classroom and (2) shop entry door thresholds. Concrete tile roof requires preventive maintenance including downspout/gutter repair or replacement as required.Mechanical units in either the shops or classrooms do not function at all or adequately to support the teaching environment and require replacement to do so.
BUILDING K/Classrooms:Composition shingle roof at pitched portion, BUR with composition top layer at flat roof portion; flat roof has patching at edges and requires preventive maintenance-possibly re-placement with a single ply membrane in the near future.
BUILDING L/Cafeteria:Non-accessible elevation differential at multiple entry door thresholds. An accessible service window at exterior serving (Snack Bar) is not provided. The exterior drinking fountain adjacent to the Snack Bar is not compliant. The Kitchen Staff restroom is undersize and not accessible.Composition shingle roof at pitched portion, BUR with composition top layer at flat roof portion; flat roof has substantial raised bubbled areas (moisture intrusion-expansion/con-traction of fabric) and requires repair-possibly replacement with a single ply roof as soon as possible. Water intrusion at the composition shingle roof has deteriorated the roof sheathing, including the exposed T&G eave on East side. Water leakage from the built-in perimeter gutter and scuppers is impacting/damaging exposed wood framing members, wood fascia and glue-lam beam tails. The mechanical unit supporting the Staff Lounge/Dining does not function at all and requires replacement to provide an adequately conditioned space.
KING CITY HIGH SCHOOL - FACILITY ASSESSMENT ADDITIONAL FIELD NOTES
96P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
BUILDING M/Shops-Classrooms:Non-accessible elevation differential at multiple entry door thresholds. Structural, dry-rot concerns in locker room area; potential water intrusion at existing roof condition, further investigation for appropriate preventive maintenance required.
BUILDING N/Classrooms:Non-accessible elevation differential at multiple entry door thresholds.
BUILDING O/Administration:Composition shingle roof at pitched portion, BUR with composition top layer at flat roof portion; flat roof has raised bubbled areas and requires preventive maintenance-possibly replacement with a single ply membrane in the near future.
BUILDING P/Library:Non-accessible elevation differential at double-entry door threshold. Existing concrete ramp at Northeast building elevation is not accessible. Further evaluation for modification or removal/replacement for compliance is required.
BUILDING Q/Auditorium:Primary entrance to the auditorium is not accessible. The restrooms at the interior of the building are not accessible. Compliant provisions for accessible audience seating is not provided.
BUILDING S/Classrooms-Cont. Ed.: The mechanical units supporting each of (4) relocatable units are old, do not function at all or adequately and require replacement to provide adequately conditioned classrooms.
PLAY FIELDS:An accessible path of travel to either the softball fields or baseball diamonds is not provided. The constructed elements supporting these fields i.e., dug-outs, bleachers, restrooms (currently portable toilet) do not address current accessibility requirements.
HARDCOURTSThe hard-courts asphalt surface finish is rough, cracked, eroded and needs resurfacing.
FOOTBALL/TRACKThe student access to the track/football field is through a large diameter corrugated pipe, traversing through approximately an eight foot earthen bank on the Southeast side of the field. The current constructed condition requires further evaluation for safety, structural and accessibility compliance.The path of travel components, concrete ramp and stairs for the bleachers do not address current accessibility requirements. Further evaluation for modification or removal/re-placement for compliance is required.
CONCESSIONS/RESTROOMSThe path of travel at the West end of the track/football field providing access to the concessions and restrooms has cross-slopes and gradients which are not compliant. Further evaluation for modification or removal/replacement for compliance is required.The restrooms are not accessible. Further evaluation for modification or removal/replacement for compliance is required.An accessible service window at concessions is not provided. Further evaluation for modification or removal/replacement for compliance is required.
KING CITY HIGH SCHOOL - FACILITY ASSESSMENT ADDITIONAL FIELD NOTES
97P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Page 1 of 4
⚫
GREENFIELD COMMUNITY MEETING NOTES III. Education Specifications Career Pathways -Availability of whiteboards, too low, too high. Boards rolling cabinets, desks are not working. Not enough space for students. -Need classrooms with open space for robotics, aerospace and engineering -Smartboards needed and new smart TV’s or screens. Spaces are not supporting new technology. Can we blow out walls? Or have portable walls for flexibility? -Try not to make things permanent…more ‘resettable’ or movable. Need more flexibility. Need more boards for teaching to separate small groups. WIFI -Just received $1 million proposal for infrastructure upgrade. Moving ahead for summer. One to one devices for students needed. Multiple devices as needed. Classroom need sets of devices that stay and not go home. -Web based log ins are useful. Future: -Fewer printed books in classrooms and libraries thus important to have devices to read on. -Classroom Alignments, Site Flow Layout. -Site Blind spots solved with use of camera -Protection of Teacher and Student’s important IV. Instructional Space Needs A. Classrooms -difference between 24 x 40 or 30 x 32 -All have skylights which can be problematic in some classes bec. Not dark enough. Controls on blinds no longer working -Power blinds ok -2001 forward 20 years…infrastructure is more modern than KCHS itself C. Technology/Math -increased use of carts -need technology that works D. Music -Large Band Room that functions well -Program is growing and they need more room -recording rooms works well and has auxiliary practice room -Band room acoustics good E. Student Union/Drama space
PMSM March 8 2018 Page 2 -Goal is improved permanent stage and lighting -goal is not share spaces but have own drama classroom/stage F. Physical Education: -Reconfigure lockers -new 8’ height lockers for improved visibility across room -portapotty restroom needs serious help -need permanent building for restroom and concessions -lockers too tall G. Science: -equipment doesn’t work well -chemistry has changed and we are less than well prepared -students mess with equipment thus need storage cabinets -Hazardous storage is good now H. AG/Shop - convenience vs smell ??? -AG shop is small and is also used as a classroom -Used to be auto and AG together -Parnell college uses lifts for its classes as well -needs expansion and infrastructure support because an important component of education at GF V. SUPPORT SERVICES -A sense of entry or ‘front door’ is needed. It is not clear or welcoming -need offices!!! -Many offices shared and not enough -Principal needs office support -10 new spaces would support various needs with some dedicated and some shared -Privacy issues with offices now -large conference room important function to have -Nurse? SRO? C. Library -Many students have nowhere else to go so a very important space to have -Needs to stay open longer -Needs technology for research and reading D./E. Cafeteria/Food Services -New future one that is permanent -needs serving speed line as a satellite to cafeteria -kitchen is stretched to its maximum and can’t serve future growth -1200 now and growing rapidly to 1400. Facility is not large enough to service the population F. Gymnasium: -Gym seems to be functioning OK now but when school grows it will be too small to hold all students for pep rallies and events -accommodating all students for meetings and events is important
MEETING NOTES | GREENFIELD HIGH SCHOOL COMMUNITY WORKSHOP
98P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
PMSM March 8 2018 Page 3 -need new benches in weight room -fix or upgrade machines -need larger space -wrestling room insufficient in space and equipment -tumbling not enough mat areas -wrestling gets used for storage which damages mats G. Stadium and Parking: -Works well now -Add walking to top gate area would be helpful for graduation and band events H. Restrooms: -sufficient -need security upgrades -one currently not used and can be activated for future -ADA upgrades n-Need bottle filling stations and drinking fountains needed I.Maintenance and Operations -Future relocate away from campus core to far parking area or beyond. -Closets work but custodial hub office needed -office needed VI Site/General Needs A. Entry/Vehicle Circulation/Parking -sense of front door needs to be stronger -car egress confusing drivers and visitor parking -convert existing grass to parking -cars block other cars in -drop-off unsafe for kids -some teachers use dirt lot having to go left at no left zone to get there -City Planner could work better with school regarding median and no left. B. Security -many said dark at night -needs site lighting at night -need cameras and lights at restrooms -need field lighting -need parking lot lighting D. Sustainability Recycling -signage needed for recycling -almost all rooms have separate trash and recycling -annual presentation from waster management -Water Conservation: Working on it -some green to DG conversions to save water -new DG has been helpful to reduce mud around t rack -composting?? Cafeteria and AG program work together?
MEETING NOTES | GREENFIELD HIGH SCHOOL COMMUNITY WORKSHOP
PMSM March 8 2018 Page 4 -Need trees!! Many old trees lost in storms. Need native trees and landscaping -Mature trees preferred to survive winds -Need shade structures and need shade from trees. G. Bus -No Buses other than special ed so no issue here H. Pedestrian -walking and pedestrians are plentiful -pedestrians crossing vehicular traffic creates problem as in the current configuration. -need pedestrian bridge within campus side -need a permanent fix to protect pedestrians from cars -string of pedestrians without controls or way to get across traffic -currently campus security directs traffic -plan needs to accommodate seating and benches around campus -Need trees…native…site landscaping VII Closing -Need trees!! Many old trees lost in storms. Need native trees and landscaping -Mature trees preferred to survive winds -Need shade structures and need shade from trees.. evergreen varieties -24 were donated, one remains -Garden Club started to bring planting color -students have researched best tree types for campus….try to spearhead this!!
99P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
Page 1 of 5
⚫
KING CITY Community Meeting Notes III. Education Specifications A. Class Size trends are now large, 30-35 students. -Art classes are even larger B. lecture vs learn by doing -prefer small group instruction, learn by doing and project based learning -Buildings are old Physical Education -needs auxiliary gym -765 student into 17 section…too many….up to 135 students in a class -weight room is really a multi use room -needs during inclement weather -some teachers in smaller spaces have difficulty in reconfiguring space -no physical additions since 1981 or before!! -CR’s in old shops because there are no classrooms -gym has been unchanged and needs more space and modern technology C. Drop-off -drivers behavior complicates -running stop signs -no crossing guards -all this leads to a very dangerous situation -pedestrians enter from all directions -enter from Mildred and from Broadway -have sidewalks but pathways at campus not safe from cars E. In general technology is far behind current standards. Wifi doesn’t work Science/Engineering -storage issues for equipment -no work stations -inadequate space for labs IV. Instructional Space Needs A. Regular Classrooms Social Studies -dimming lights, no current capability to do this -hiss in wall speakers is very annoying -sound intrusions from adjacent wall speakers -individual classroom control of thermal comfort needed -shared use of theatre leads to inadequate rehearsal spaces -too many programs share this spaced
MEETING NOTES | KING CITY HIGH SCHOOL COMMUNITY WORKSHOP
PMSM March 8 2018 Page 2 -electrical, ventilation, shops, sawdust, fumes -grading and site drainage a problem -water intrusion in ships and on shop equipment which ruins equipment. -whiteboards, smart boards needed -Utility infrastructure-gas, water, etc is aging -electrical outlet have insufficient capacity -some classrooms are ok, some not B. ART -would like kiln -one CR has sinks, one does not, both classrooms need art sinks -graphic design is in regular CR but need s computer lab -inadequate facility to support any kind of current graphic design -mobile carts are needed more to increase access to technology C. Technology -IT needs support spaces -small group meeting places needed -Band needs stereo system, sound system and space for digital recording -Wifi upgrade needed D. MUSIC -acoustics are inadequate -need practice rooms Current rooms have storage -need music laboratory -need storage for uniforms -need larger storage lockers E. DRAMA -also teaches English and teaches drama in the same space -performance platform needed F. PE see attached list by Department head G. Science -need separate engineering room -infrastructure lacking -gas jets on -need deeper work sinks -fuses flip, -elec outlets insufficient -no smoke detector -lighting inadequate -casework blocks windows, egress? -need eyewash station -poor ventilation -one fume hood for demos of questionable performance -parents are alarmed with safety issues which need to be urgently addressed. NOW
100P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
PMSM March 8 2018 Page 3 -not to wait for modernization -why haven’t they been done already? -health and safety items should be of highest priority H. AG Shops -Daylighting -AG teacher classroom in the shop…needs more space -failed outlets, insufficient outlets -no natural light -no insulation -sound of yard maintenance interferes with glasses -floor not level and tripping hazards in AG Shop -AG -1930’s facility, oldest building and it is aging -work needed was beyond scope of previous remodels so walked away. -this is also true at gym -AIC discussed state funding history and process -10 million in need -3.5 million applied for, so there is a big gap I. SPECIAL ED -small group -computer lab needed -not enough outlets V. SUPPORT SERVICES A. Administration -Administration lacks meeting spaces and overflows into instructional spaces and classrooms -technical difficulties in conference rooms C. Library -always full -lacks storage for supplies or textbooks -copy room is really a storage room D/E. Cafeteria -acoustics are terrible. Loud and very hard to hear -flow is constricted and too tight -seating is too tight -seating and service is really half of what it should be and the student population is only l=getting larger -only one lunch period --now primarily a closed campus, thus more students stay on campus for food F. Gymnasium -no AC and inadequate ventilation -one fan brings in hot air
MEETING NOTES | KING CITY HIGH SCHOOL COMMUNITY WORKSHOP
PMSM March 8 2018 Page 4 -bathrooms are terrible and don’t meet code -‘really cool’ building G. STADIUM -track needs work and resurfacing -restrooms currently being remodeled H. RESTROOMS -teachers restroom at administration looks horrible -girls don’t have proper dispensers in bathroom for tampons -theatre restrooms have only two women’s toilets I. MAINTENANCE and OPERATIONS -KCHS is better than Greenfield VI Site/General Needs A Front Door/Entry -concrete sign is drab -front door not clear to high school -formal diagonal walks away from parking B. Security -Campus security for after hours classrooms is needed -teacher cameras for student behavior on campus core when instructor is on break C. Public Spaces -not enough gathering spaces and difficult to pass through large groups gathered. -classrooms are opened for lunch due to inadequate eating areas -trees…we have lost our trees -trees removed and not replace -grossly inadequate shade D. Sustainability -problems with trash/recycling containers -sorting and handling is questionable -cafeteria food items not recyclable and food -need compost that aligns with AG program -need separate bins for Trash/Recycling/Compost -missed opportunity for education E. Vehicle circulation and Drop-off -needs separate teacher and student parking. All co-mingled -need more student parking -drop-off happens at a 4 way stop and the 7-11 store F. Parking -newly re-done parking lot is not visible to visitors and parents cruising Broadway
101P M S M A R C H I T E C T S + S O U T H M O N T E R E Y C O U N T Y J O I N T U N I O N H I G H S C H O O L D I S T R I C T | 2 0 1 8 F A C I L I T I E S M A S T E R P L A N
PMSM March 8 2018 Page 5 -parents don’t know of parking lot and use added drop-off lane to park -in the past student’s parked in front and teacher parked in rear. -problems need to be identified and solved -not solved for peak periods at this point -could enforce a parking pass -need free parking sticker for everyone -shaded parking and solar? VII. Closing -parent of 2 daughters at meeting open and honest about issues -INCREASE in school pride associated with pride in facility -teachers have great support for kids -AG teachers set up students for success and are dedicated and committed, even with limitations -KCHS is overlooked -GHS is new and fun needs -mustang pride -congestion is crappy -daughters excelling due to great parent, excellent teachers and they need the facility to match this enthusiasm -SOLAR!! Work on solar plan for next board meeting. Public hearings to come
MEETING NOTES | KING CITY HIGH SCHOOL COMMUNITY WORKSHOP