Plains Elementary School South Hadley, MA Public Presentation South Hadley School Building Committee - ARCADIS U.S., Inc Margo Jones Architects Design Team

South Hadley Plains Elementary School Schematic Design presentation

Embed Size (px)

DESCRIPTION

Schematic Design presentation for a new elementary school to replace the existing 90 year old facility.

Citation preview

Page 1: South Hadley Plains Elementary School Schematic Design presentation

Plains Elementary School South Hadley, MA Public Presentation

South Hadley School Building Committee - ARCADIS U.S., Inc Margo Jones Architects Design Team

Page 2: South Hadley Plains Elementary School Schematic Design presentation

▫ Introduction

▫ Massachusetts School Building Authority & Process

▫ Schematic Design:

Site Plan

Floor Plans

Massing Model

▫ Cost Estimate

▫ Impact On Taxes

▫ Investing In The Community

▫ Next Steps

Presentation Outline

Page 3: South Hadley Plains Elementary School Schematic Design presentation

South Hadley School Building Committee

Thomas Gebhardt Co-Chair

Diane Mulvaney Co-Chair

Ed Boisselle School Committee

Ira Brezinsky Council on Aging

Jeff Cyr Appropriations Committee

Jill Flanders Principal

John Hine Selectboard

Bruce Mailhott Maintenance Director

Ron Michalski Open Space Committee

Raymond Rondeau Board

Carl Weber Board

Dr. Nicholas Young Superintendent

Questions or Comments? Please talk to someone on the SBC

or email:

[email protected]

Owner’s Project Manager: ARCADIS – Nick Macy

Design Team Architects: Margo Jones Architects – Kristian Whitsett

Project Team

Page 4: South Hadley Plains Elementary School Schematic Design presentation

School Building Committee - Process

Elementary School Facilities Study Committee originally formed back in 2004

2004 - 2010 2011 2011-2012 2012

Early 2013 2013 2014-2015 Fall 2015

Page 5: South Hadley Plains Elementary School Schematic Design presentation

• 85 year old sections, infrastructure updates needed • Overcrowding, undersized classrooms • Portable Classrooms used beyond intended lifespan • Antiquated Fire Protection • Inadequate SPED classrooms • Inadequate drop off/pickup • Inadequate exterior program facilities • Inadequate ventilation and fresh air • Accessibility Issues • No clear entrance / security concerns

Existing Conditions

Page 6: South Hadley Plains Elementary School Schematic Design presentation

Existing Plains Site

Page 7: South Hadley Plains Elementary School Schematic Design presentation
Page 8: South Hadley Plains Elementary School Schematic Design presentation

Proposed Plains Site

K-1

Pre-K

Page 9: South Hadley Plains Elementary School Schematic Design presentation

Proposed First Floor Plan

Page 10: South Hadley Plains Elementary School Schematic Design presentation

Proposed Second Floor Plan

Page 11: South Hadley Plains Elementary School Schematic Design presentation

Proposed Massing: Bird’s Eye View Looking North-west

Page 12: South Hadley Plains Elementary School Schematic Design presentation

Proposed Massing: Perspective from Parking Area

Page 13: South Hadley Plains Elementary School Schematic Design presentation

Proposed Massing: Perspective from Knoll

Page 14: South Hadley Plains Elementary School Schematic Design presentation

Proposed Massing: Bird’s Eye View Looking North

Page 15: South Hadley Plains Elementary School Schematic Design presentation

Cost Estimate & Budget

• Two independent cost estimates were completed

• Reconciled estimate plugged into a spreadsheet developed by the MSBA

• Schematic Design Cost Estimate:

Building: $ 14,664,281

Demolition: $ 276,000

Hazmat: $ 400,000

Site: $ 2,143,874

• Total Construction Trade Costs: $ 17,484,155

Design & Pricing Contingencies, Bonds, Escalation, etc: $ 4,079,666

• Total Construction Cost Estimate: $ 21,563,821

FF&E, OPM Fees, A/E Fees, Feasibility Costs: $ 4,354,729

• Total Project Budget: $ 25,918,550

Construction Contingency & Owner’s Contingency $ 2,265,250

• Total Project Budget with ALL Contingencies: $ 28,183,800

• Potential MSBA Reimbursement: $ 13.9 – 15.3 million

Page 16: South Hadley Plains Elementary School Schematic Design presentation

Cost Estimate & Budget

• Town of S. Hadley Share

• Total Project Budget with All Contingencies: $ 28.2 million

• MSBA Potential Reimbursement: $ 13.9 – 15.3 million

• Town of S. Hadley Potential Share: $ 12.9 – 14.3 million

(Not known how much of $2.2 million Contingency will be used OR how much the MSBA will

reimburse of the Contingency)

• Anticipated Tax Impact: • Flat principal payment so slight variation over 20 year term:

• $130 - $145 / yr average for “Average homeowner” ($ 234,168)

OR

• $55 - $62 / $100,000 assessed home value / yr

Page 17: South Hadley Plains Elementary School Schematic Design presentation

Investing In The Community

▫ Community Resources Included in Plains School Project:

6,000 SF Gym

Cafeteria and Stage

Kitchen (able to be powered by emergency generator)

Media Center / Library

Access to Black Stevens trails

Preservation of Baseball Field

▫ New School Benefits

Building design and facility conditions have been associated with teacher motivation and student achievement.

The National Association of Realtors reports that the quality of schools is one of the two most important factors people and businesses consider when choosing a location.

Property values increase in neighborhoods with higher-spending schools. Impact of schools can increase property value from 5 - 10%.

Page 18: South Hadley Plains Elementary School Schematic Design presentation

Thank you

• Hear your thoughts concerning the Schematic Design

• Town of South Hadley Vote February 26, 2013

Questions? Please contact the School Building Committee: