7
217 217 217 200 200 200 255 255 255 0 0 0 163 163 163 131 132 122 237 237 237 PRESENTATION TITLE SOUTH FLORIDA ECOSYSTEM RESTORATION (SFER) PROGRAM Integrated Delivery Schedule (IDS) 2019 Update ‐ Working Version Public Workshop Hosted by SFER Task Force Eva B. Vélez 19 September 2019

SOUTH FLORIDA ECOSYSTEM RESTORATION (SFER) PROGRAM … · 2019. 9. 19. · PRESENTATION TITLE SOUTH FLORIDA ECOSYSTEM RESTORATION (SFER) PROGRAM Integrated Delivery Schedule (IDS)

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SOUTH FLORIDA ECOSYSTEM RESTORATION (SFER) PROGRAM … · 2019. 9. 19. · PRESENTATION TITLE SOUTH FLORIDA ECOSYSTEM RESTORATION (SFER) PROGRAM Integrated Delivery Schedule (IDS)

217217217

200200200

255255255

000

163163163

131132122

2396553

110135120

1129256

62102130

1025648

130120111

237237237

8011927

252174.59

PRESENTATION TITLESOUTH FLORIDA ECOSYSTEM RESTORATION (SFER) PROGRAM

Integrated Delivery Schedule (IDS)2019 Update ‐ Working VersionPublic Workshop Hosted by SFER Task Force 

Eva B. Vélez19 September 2019

Page 2: SOUTH FLORIDA ECOSYSTEM RESTORATION (SFER) PROGRAM … · 2019. 9. 19. · PRESENTATION TITLE SOUTH FLORIDA ECOSYSTEM RESTORATION (SFER) PROGRAM Integrated Delivery Schedule (IDS)

OVERVIEW -- IDS 2019 UPDATE

• IDS Purpose and Background

• Review of July 2018 IDS (see handout)

• Highlights of FY2019 Activities

• IDS 2019 Update – Working Version (see handouts)

2

Page 3: SOUTH FLORIDA ECOSYSTEM RESTORATION (SFER) PROGRAM … · 2019. 9. 19. · PRESENTATION TITLE SOUTH FLORIDA ECOSYSTEM RESTORATION (SFER) PROGRAM Integrated Delivery Schedule (IDS)

PURPOSE OF TODAY’S WORKSHOP

Educate the public on the process to update to the Integrated Delivery Schedule for the SFER

Increase transparency with stakeholders and the public on how projects fit together

Receive comments on the Working Version of the 2019 IDS update

3

Page 4: SOUTH FLORIDA ECOSYSTEM RESTORATION (SFER) PROGRAM … · 2019. 9. 19. · PRESENTATION TITLE SOUTH FLORIDA ECOSYSTEM RESTORATION (SFER) PROGRAM Integrated Delivery Schedule (IDS)

WRDA 2000CERPAuthorized

Extensive Agricultural Development of

Muck Lands

Settlement ContinuesPre-development“River of Grass” Catastrophic

Hurricanes

Muck Fires

Extensive Floods

mid 1800s early 1900s1926 & 1928

1930s1947

1948

HOW & WHYSOUTH FLORIDA EVERGLADES RESTORATION PROGRAM

C&SF Authorized

Everglades National Park Designated

Page 5: SOUTH FLORIDA ECOSYSTEM RESTORATION (SFER) PROGRAM … · 2019. 9. 19. · PRESENTATION TITLE SOUTH FLORIDA ECOSYSTEM RESTORATION (SFER) PROGRAM Integrated Delivery Schedule (IDS)

On December 11, 2000, the President signed the Water Resources Development Act of 2000 approving:

COMPREHENSIVE EVERGLADES RESTORATION PLAN (CERP)

A program providing for the restoration, preservation, and protection of the south Florida ecosystem while providing for other water-related needs of the region.

Page 6: SOUTH FLORIDA ECOSYSTEM RESTORATION (SFER) PROGRAM … · 2019. 9. 19. · PRESENTATION TITLE SOUTH FLORIDA ECOSYSTEM RESTORATION (SFER) PROGRAM Integrated Delivery Schedule (IDS)

THE GOAL OF CERP

Page 7: SOUTH FLORIDA ECOSYSTEM RESTORATION (SFER) PROGRAM … · 2019. 9. 19. · PRESENTATION TITLE SOUTH FLORIDA ECOSYSTEM RESTORATION (SFER) PROGRAM Integrated Delivery Schedule (IDS)

Yellow Book (1999)• Contained implementation plan with GANTT chart

showing sequencing of CERP projects• 35+ Year implementation period• Coordinated with stakeholders prior to inclusion in

Yellow Book• Based on annual funding level of $200M Federal

and $200M non-Federal

Master Implementation Sequencing Plan (MISP)

• Required by Programmatic Regulations• To maximize the achievement of the goals and

purposes of the plan at earliest possible time and in the most cost-effective way

• Completed in 2005, projects sequenced within 5-year bands

• Integrated foundation projects and other projects CERP depends upon to create an “Integrated Delivery Schedule” in 2008

7HISTORY OF THE INTEGRATED DELIVERY SCHEDULE