79
Electronic Bids for the contracts listed herein will be publicly opened. All bid totals will be printed and posted on the SCDOT web site, Bid Express, and the Construction Extranet. Visitors are welcome and should sign in at the Park Street entrance. Please contact the Contract Administration Office at (803)737-1750 with all Letting related questions. The following items will be made available on February 13, 2018 unless otherwise noted: • EBS (Electronic Bidding System) files via Bid Express website • Hardcopy plans & proposals will be printed upon request only via Engineering Publications o Located in room G23 SCDOT Headquarters o Phone (803)737-4533/ Fax (803)737-4530 Call ahead for pickup orders o Cash, check, money order, VISA/MC accepted (Payable to SCDOT. No refunds) Access the Construction Extranet for the following items: • Plans • Announcements • Bids as Received • CPM Schedule Templates Contractors are encouraged to utilize the Extranet Discussion Board to make contact with other Prime and Subcontractors to request/offer quotes. There is no charge to access this site, but you must register for a user name and password. See link for details http://www.scdot.org/doing/constructionletting_extranet.aspx. Certain projects will require bidders to have a minimum quarterly CPS (Contractor Performance Score) issued by SCDOT. These projects will be noted accordingly to include the minimum score and quarter issued. Contractors wishing to verify their CPS may call SCDOT Construction Data Support at (803)737-1656. The SCDOT Standard Drawings are available for download at http://www.scdot.org/doing/road.aspx Quantities shown herein are approximate for information only and should not be used for bidding purposes. The Department reserves the right to change these quantities without notice. SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING March 13, 2018 Letting Location: SCDOT Headquarters Building Conference Room 331 955 Park Street Columbia, SC

SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/03132018 Notice to... · PCN: P032512 Project No.: P032512 PCN: P032530 Project No.: P032530 Description

Embed Size (px)

Citation preview

Electronic Bids for the contracts listed herein will be publicly opened. All bid totals will be printed and postedon the SCDOT web site, Bid Express, and the Construction Extranet. Visitors are welcome and should signin at the Park Street entrance. Please contact the Contract Administration Office at (803)737-1750 with allLetting related questions.

The following items will be made available on February 13, 2018 unless otherwise noted:• EBS (Electronic Bidding System) files via Bid Express website• Hardcopy plans & proposals will be printed upon request only via Engineering Publications

o Located in room G23 SCDOT Headquarterso Phone (803)737-4533/ Fax (803)737-4530 Call ahead for pickup orderso Cash, check, money order, VISA/MC accepted (Payable to SCDOT. No refunds)

Access the Construction Extranet for the following items:• Plans• Announcements• Bids as Received• CPM Schedule Templates

Contractors are encouraged to utilize the Extranet Discussion Board to make contact with other Prime andSubcontractors to request/offer quotes. There is no charge to access this site, but you must register for auser name and password. See link for details http://www.scdot.org/doing/constructionletting_extranet.aspx.

Certain projects will require bidders to have a minimum quarterly CPS (Contractor Performance Score)issued by SCDOT. These projects will be noted accordingly to include the minimum score and quarterissued. Contractors wishing to verify their CPS may call SCDOT Construction Data Support at(803)737-1656.

The SCDOT Standard Drawings are available for download at http://www.scdot.org/doing/road.aspx

Quantities shown herein are approximate for information only and should not be used for bidding purposes.The Department reserves the right to change these quantities without notice.

SOUTH CAROLINADEPARTMENT OF TRANSPORTATION

NOTICE TO CONTRACTORSFOR

REGULAR HIGHWAY LETTINGMarch 13, 2018

Letting Location: SCDOT Headquarters Building

Conference Room 331 955 Park Street Columbia, SC

Call No.: 010 1Page:

South Carolina Department of Transportation 2/2/2018

0246140SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Aiken DBE Goal Percent: 0.00%

Completion Date:

Description: SHLD PAVING, FDP, MILL RESURFACING

11/30/2018

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

23.6200

P032512P032512PCN: Project No.:

P032530P032530PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSREMOVAL & DISPOSAL OF EXISTING PAVEMENT 950.000 SYREMOVAL & DISPOSAL OF EXISTING CURB 10.000 LFBORROW EXCAVATION 3,963.000 CYEXCAVATION FOR SHOULDER PAVING 702.048 STAHAULING OF EXCAVATED SHOULDER MATERIAL 702.048 STAMAINTENANCE STONE 70.050 TONHMA SHOULDER WIDENING COURSE 3,116.375 TONLIQUID ASPHALT BINDER PG64-22 2,580.644 TONFULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1,979.000 SYFULL DEPTH ASPH. PAV. PATCHING 8" UNIF 1,026.000 SYMILLING EXISTING ASPHALT PAVEMENT 1.25" 1,810.000 SYMILLING EXISTING ASPHALT PAVEMENT 1.5" 25,450.000 SYMILLING EXISTING ASPHALT PAVEMENT 1.75" 5,900.000 SYMILLING EXISTING ASPHALT PAVEMENT 2.0" 43,800.000 SYMILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 43,371.000 SYMILLED-IN RUMBLE STRIP 20.108 MIHOT MIX ASPHALT SURFACE COURSE TYPE B 33,717.923 TONHOT MIX ASPHALT SURFACE COURSE TYPE C 3,401.457 TONHOT MIX ASPHALT SURFACE COURSE TYPE D 6,963.953 TONPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 8,924.000 SF4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 17,774.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 138,027.000 LF8" WHITE SOLID LINES PERM.PVMT.MARKINGS 2,877.000 LF12" WHITE SOLID LINES - PERM.PVMT.MARKINGS 520.000 LF12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)PERM.PVMT.MARK 102.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 3,273.000 LF

Call No.: 010 2Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 74.000 EAWHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 48.000 EAWHITE COMBINATION ARROWS(STR&RT.OR STR&LT)PERM.PVMT.MARKING 21.000 EARAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING 5.000 EAHANDICAP SYMBOL - PERM.PVMT MARKING 1.000 EA4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 7,484.000 LF4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 145,126.000 LF4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 26,456.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 161,572.000 LF8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 4,774.000 LF12" WHITE SOLID LINES - FAST DRY PAINT 520.000 LF24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 4,801.000 LFWHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 111.000 EAWHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 56.000 EAWHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 29.000 EARAILROAD CROSSING SYMBOLS - FAST DRY PAINT 5.000 EAHANDICAP SYMBOL - FAST DRY PAINT 1.000 EA4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 9,768.000 LF4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 202,016.000 LF6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 8,803.000 LFPERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 895.000 EAPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 942.000 EAFURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 1,250.000 LFFURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 20,940.000 LFSAWCUT FOR LOOP DETECTOR 7,700.000 LFCONCRETE CURB AND GUTTER (3'-0") VERTICAL FACE 10.000 LFDETECTABLE WARNING MATERIAL 487.500 SFPEDESTRIAN RAMP CONSTRUCTION 950.000 SYSURFACE APPLIED DETECTABLE WARNING 680.000 SFPERMANENT GRASSING FOR SMALL PROJECTS 19.101 ACRE

Call No.: 020 3Page:

South Carolina Department of Transportation 2/2/2018

0247540SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Aiken DBE Goal Percent: 0.00%

Completion Date:

Description: SAFETY IMPROVEMENT FROM MP 19.0 TOMP 30.0

11/30/2018

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$16.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

9.6000

P037068P037068PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSREMOVAL & DISPOSAL OF EXISTING PAVEMENT 1,820.000 SYUNCLASSIFIED EXCAVATION 200.000 CYBORROW EXCAVATION 4,300.000 CYEXCAVATION FOR SHOULDER PAVING 887.000 STAHAULING OF EXCAVATED SHOULDER MATERIAL 887.000 STAMAINTENANCE STONE 100.000 TONHMA SHOULDER WIDENING COURSE 9,997.000 TONLIQUID ASPHALT BINDER PG64-22 1,314.600 TONMILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 1,933.330 SYMILLED-IN RUMBLE STRIP 25.200 MIHOT MIX ASPHALT SURFACE COURSE TYPE D 12,933.000 TONPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,136.000 SFPAVEMENT MARKINGS(TEMP-PAINT) 6" WHITE BROKEN LINES 24,000.000 LFPAVEMENT MARKINGS(TEMP-PAINT) 6" YELLOW BROKEN LINES 90,000.000 LFPAVEMENT MARKINGS(TEMPORARY-PAINT)-6" WHITE SOLID LINES 154,000.000 LFPAVEMENT MARKINGS(TEMPORARY-PAINT)-6" YELLOW SOLID LINES 90,000.000 LFPAVEMENT MARKINGS(TEMPORARY-PAINT)-24"WHITE SOLID LINES 750.000 LF6" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 14,000.000 LF6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 78,000.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 750.000 LF6" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 46,000.000 LF6" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 46,000.000 LFPERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 350.000 EAPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 800.000 EAFLAT SHEET,TYPE-VIII,IX, OR XI, FLUOR FIXED SIZE & MSG. 670.000 SFREFLECTIVE SIGN POST PANELS 352.000 LFGUARDRAIL DELINEATOR - WHITE 60.000 EA

Call No.: 020 4Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

15" SMOOTH WALL PIPE 80.000 LF18" SMOOTH WALL PIPE 500.000 LF24" SMOOTH WALL PIPE 500.000 LF30" SMOOTH WALL PIPE 80.000 LF36" SMOOTH WALL PIPE 40.000 LFCLEANING EXISTING PIPE 400.000 LFCONCRETE COLLAR FOR UP TO 36" PIPE 300.000 EABEVELING OF PIPE END 300.000 EACONCRETE DRIVEWAY(6" UNIFORM) 200.000 SYSTEEL BEAM GUARDRAIL STEEL BEAM GR. 2,550.000 LFSTEEL BEAM GUARDRAIL (THRIE) 125.000 LFEND ANCHOR-TYPE B 2.000 EAEND TERMINAL - TYPE T 15.000 EATHRIE BEAM G.R.BRIDGE CONN. 8.000 EAADDITIONAL LENGTH GUARDRAIL POST 300.000 LFPERMANENT GRASSING FOR SMALL PROJECTS 6.100 ACRESEDIMENT TUBES FOR DITCH CHECKS 200.000 LFSILT FENCE 4,000.000 LFREPLACE/REPAIR SILT FENCE 400.000 LF

Call No.: 030 5Page:

South Carolina Department of Transportation 2/2/2018

0426060SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Anderson DBE Goal Percent: 0.00%

Completion Date:

Description: SHLD PAVING, FDP, MILLING,RESURFACING

5/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

4.7300

P032566P032566PCN: Project No.:

P034707P034707PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSREMOVAL & DISPOSAL OF EXISTING PAVEMENT 222.000 SYREMOVAL OF EXIST. GUARDRAIL 675.000 LFBORROW EXCAVATION 1,192.000 CYEXCAVATION FOR SHOULDER PAVING 409.000 STAHAULING OF EXCAVATED SHOULDER MATERIAL 409.000 STAMAINTENANCE STONE 239.000 TONHMA SHOULDER WIDENING COURSE 2,010.213 TONLIQUID ASPHALT BINDER PG64-22 984.926 TONFULL DEPTH ASPH. PAV. PATCHING 8" UNIF 3,700.000 SYFULL DEPTH ASPH. PAV. PATCHING 10"UNIF 20,200.000 SYMILLING EXISTING ASPHALT PAVEMENT 2.0" 150,693.000 SYMILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 5,850.000 SYMILLED-IN RUMBLE STRIP 7.690 MIHOT MIX ASPHALT SURFACE COURSE TYPE B 16,702.026 TONPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 2,256.000 SF4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 39,276.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 81,765.000 LF24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 2,466.000 LFWHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 120.000 EAWHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 12.000 EAWHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 18.000 EA4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 12,870.000 LF4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 213,235.000 LF4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 13,092.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 27,255.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 822.000 LF

Call No.: 030 6Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 40.000 EAWHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 4.000 EAWHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL 6.000 EA4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4,290.000 LF4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 71,080.000 LFPERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 799.000 EAPERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 350.000 EAPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 896.000 EAFURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 5,000.000 LFFURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 15,000.000 LFSAWCUT FOR LOOP DETECTOR 4,040.000 LF13"X24"X12"D.ELEC.FLUSH UNDGRD.ENCLOSURE-(STR.POLY.CONC.)HD 9.000 EACONCRETE CURB AND GUTTER(1'-6") VERTICAL FACE 100.000 LFCONCRETE SIDEWALK(4" UNIFORM) 15.000 SYCONCRETE DRIVEWAY(6" UNIFORM) 23.000 SYSTEEL BEAM GUARDRAIL STEEL BEAM GR. 575.000 LFEND ANCHOR-TYPE B 2.000 EAEND TERMINAL - TYPE T 4.000 EAPERMANENT GRASSING FOR SMALL PROJECTS 5.138 ACRESILT FENCE 850.000 LFREPLACE/REPAIR SILT FENCE 85.000 LFREMOVAL OF SILT RETAINED BY SILT FENCE 215.000 LF

Call No.: 040 7Page:

South Carolina Department of Transportation 2/2/2018

0446640SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Anderson DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 FA PRESERVATION

5/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

7.4400

P036822P036822PCN: Project No.:

P036885P036885PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSBORROW EXCAVATION 1,488.000 CYMAINTENANCE STONE 62.000 TONLIQUID ASPHALT BINDER PG64-22 325.924 TONFULL DEPTH ASPH. PAV. PATCHING 4" UNIF. 3,300.000 SYFULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 2,900.000 SYMILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 1,850.000 SYMILLED-IN RUMBLE STRIP 7.340 MIHOT MIX ASPHALT SURFACE COURSE TYPE D 5,173.377 TONPREVENTATIVE MAINTENANCE SURFACE TREATMENT 52,700.000 SYPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,598.000 SF4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 5,400.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 157,490.000 LF24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 2,492.000 LFWHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 34.000 EAWHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 8.000 EARAILROAD CROSSING SYMBOLS - FAST DRY PAINT 4.000 EA4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 173,090.000 LF24" YELLOW DIAGONAL LINES - FAST DRY PAINT 300.000 LF4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 2,700.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 78,745.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 1,246.000 LFWHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 17.000 EAWHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 4.000 EARAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 2.000 EA4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 86,545.000 LF24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 24.000 LF

Call No.: 040 8Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 70.000 EAPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 674.000 EASTEEL BEAM GUARDRAIL STEEL BEAM GR. 275.000 LFEND TERMINAL - TYPE T 4.000 EAPERMANENT GRASSING FOR SMALL PROJECTS 6.865 ACRESILT FENCE 320.000 LFREPLACE/REPAIR SILT FENCE 32.000 LFREMOVAL OF SILT RETAINED BY SILT FENCE 80.000 LF

Call No.: 050 9Page:

South Carolina Department of Transportation 2/2/2018

1014380SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Charleston DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 FDP, MILL, RESURFACING

11/15/2018

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

10.3200

P032295P032295PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSREMOVAL & DISPOSAL OF EXISTING PAVEMENT 2,455.000 SYREMOVAL & DISPOSAL OF EXISTING CURB 273.000 LFBORROW EXCAVATION 1,786.000 CYMAINTENANCE STONE 62.400 TONLIQUID ASPHALT BINDER PG64-22 876.003 TONFULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 4,925.000 SYFULL DEPTH ASPH. PAV. PATCHING 8" UNIF 1,315.000 SYMILLING EXISTING ASPHALT PAVEMENT 1.5" 17,140.000 SYMILLING EXISTING ASPHALT PAVEMENT 1.75" 7,645.000 SYMILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 15,860.000 SYHOT MIX ASPHALT SURFACE COURSE TYPE B 738.213 TONHOT MIX ASPHALT SURFACE COURSE TYPE C 13,029.188 TONHOT MIX ASPHALT SURFACE COURSE TYPE D 875.000 TONPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 2,640.000 SF4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 300.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 24,400.000 LF8" WHITE SOLID LINES PERM.PVMT.MARKINGS 1,204.000 LF12" WHITE SOLID LINES - PERM.PVMT.MARKINGS 70.000 LF12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)PERM.PVMT.MARK 40.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 1,033.000 LFWHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 12.000 EAWHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 2.000 EAWHITE COMBINATION ARROWS(STR&RT.OR STR&LT)PERM.PVMT.MARKING 4.000 EARAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING 3.000 EA4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 150.000 LF4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 53,935.000 LF4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 600.000 LF

Call No.: 050 10Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 48,030.000 LF8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 1,676.000 LF12" WHITE SOLID LINES - FAST DRY PAINT 70.000 LF24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,972.000 LFWHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 22.000 EAWHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 4.000 EAWHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 7.000 EARAILROAD CROSSING SYMBOLS - FAST DRY PAINT 2.000 EA4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 300.000 LF4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 84,195.000 LF6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 110.000 LFPERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 18.000 EAPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 727.000 EAFURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 90.000 LFFURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 5,150.000 LFSAWCUT FOR LOOP DETECTOR 2,550.000 LFF&I-12"X12"X12"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 4.000 EACONCRETE CURB (9" X 15") 300.000 LFCONCRETE CURB AND GUTTER(1'-6") VERTICAL FACE 253.000 LFCONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE 20.000 LFCONCRETE SIDEWALK(4" UNIFORM) 1,360.000 SYDETECTABLE WARNING MATERIAL 440.000 SFCONCRETE DRIVEWAY(6" UNIFORM) 500.000 SYCONCRETE MEDIAN 45.000 SYPEDESTRIAN RAMP CONSTRUCTION 550.000 SYSURFACE APPLIED DETECTABLE WARNING 300.000 SFPERMANENT GRASSING FOR SMALL PROJECTS 8.804 ACREROOT BARRIER 50.000 LF

Call No.: 060 11Page:

South Carolina Department of Transportation 2/2/2018

1083530SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Charleston DBE Goal Percent: 6.50%

Completion Date:

Description: S-28 @ S-53 ROUNDABOUT

9/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$37.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $48.00Letting Time:

0.1440

SA100100041072RD01PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBRIDGE CONSTRUCTION ACCESS 1.000 LSBONDS AND INSURANCE 1.000 LSCONSTRUCTION STAKES, LINES & GRADES 1.000 EAUTILITY RELOCATION NO. ____ 001 1.000 EATRAFFIC CONTROL 1.000 LSEARTH-BORNE VIBRATION MONITORING 1.000 LSCPM PROGRESS SCHEDULE 1.000 LSCLEARING & GRUBBING WITHIN RIGHT OF WAY 1.000 LSREMOVAL & DISPOSAL ITEM NO. 001 1.000 LSREMOVAL & DISPOSAL ITEM NO. 002 1.000 LSREMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 165.000 SYREMOVAL & DISPOSAL OF DESIGNATED PORTIONS OF EXISTING BRIDGE 1.000 LSUNCLASSIFIED EXCAVATION 387.000 CYBORROW EXCAVATION 1,267.000 CYMUCK EXCAVATION 474.000 CY18" DIAMETER PIPE ADDITIONAL FOUNDATION WORK 610.000 LFFLOWABLE FILL 15.000 CYMAINTENANCE STONE 10.000 TONHOT MIX ASPHALT BASE COURSE - TYPE A 300.000 TONLIQUID ASPHALT BINDER PG64-22 60.000 TONMILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 410.000 SYHOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 110.000 TONHOT MIX ASPHALT SURFACE COURSE TYPE B 330.000 TONHOT MIX ASPHALT SURFACE COURSE TYPE C 420.000 TONSTAINED CONCRETE PAVEMENT (8" UNIFORM) 397.000 SYPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 228.000 SFPREF.FLEX.RETRO.PVMT.MARK(T-2)TEMP.REMOVABLE 4"WH.SOLID 200.000 LFPREF.FLEX.RETRO.PVMT.MARK(T-2)TEMP.REMOVABLE4"YEL.SOLID 200.000 LFPORTABLE TERMINAL IMPACT ATTENUATOR-TEST LEVEL 2 2.000 EA

CONTRACTORS ARE ADVISED THAT THERE WILL BE A MANDATORY PRE-BID CONFERENCE FOR THIS PROJECT TO BE HELD AT 10:00 AM ON TUESDAY, FEBRUARY 27, 2018.

LOCATION FOR THIS PRE-BID CONFERENCE WILL BE AT (SCDOT CHARLESTON CONSTRUCTION A OFFICE)

3525 PINEHAVEN DR, NORTH CHARLESTON, SC 29405.CONTRACTORS WHO DO NOT ATTEND THIS PRE-BID CONFERENCE

WILL NOT BE ALLOWED TO SUBMIT A BID PROPOSAL FOR THIS PROJECT.

Call No.: 060 12Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

ANCHOR KIT - PORT. ATTENUATOR(TEST LEVEL 2) 2.000 EATEMPORARY CONCRETE BARRIER 220.000 LF2.0" SCHEDULE 80 PVC CONDUIT 182.000 LFCONSTRUCTION ZONE ELECTRIC CHANGEABLE MESSAGE SIGN (TRAILER 2.000 EAPAVEMENT MARKINGS(TEMP-PAINT) 4" WHITE BROKEN LINES 100.000 LFPAVEMENT MARKINGS(TEMPORARY-PAINT)-4" WHITE SOLID LINES 590.000 LFPAVEMENT MARKINGS(TEMPORARY-PAINT)-4" YELLOW SOLID LINES 2,100.000 LFPAVEMENT MARKINGS(TEMPORARY-PAINT)-8" WHITE SOLID LINES 530.000 LFPAVEMENT MARKINGS(TEMPORARY-PAINT)-24"WHITE SOLID LINES 108.000 LFPAVEMENT MARKINGS (TEMPORARY PAINT) 12"X18" WHITE TRIANGLE YIELDBAR

88.000 LF

6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 474.000 LF8" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 50.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 295.000 LF8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 265.000 LF12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 44.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 54.000 LF4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 1,050.000 LFPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 75.000 EAFLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN 42.500 SFFLAT SHEET,TYPE-VIII,IX, OR XI, FLUOR FIXED SIZE & MSG. 120.000 SFU-SECTION POST FOR SIGN SUPPORTS - 3P 268.000 LFREFLECTIVE SIGN POST PANELS 95.000 LF4.0" SCHEDULE 40 PVC CONDUIT 130.000 LFCONC. FOR STRUCTURES - CLASS 4000 117.400 CYREINF. STEEL FOR STRUCTURES (BRIDGE) 27,657.000 LBCONCRETE BRIDGE RAILING WALL (3'6"HT) 90.100 LFDYNAMIC PILE ANALYZER TEST SET-UP DYNAMIC PILE ANALYZER TEST SETUP 3.000 EAPILE DRIVING SET-UP 8.000 EAPREST. CONC. PILING (20"SQ.) 111.000 LFPILE BUILD-UP PREPARATION (20"SQ) 2.000 EAPRESTRESSED INDEX PILING (20" SQUARE) 37.000 LFPRESTRESSED PILE POINT (HP10X57) 48.000 LFSTEEL H BEARING PILING (HP12 X 53) 95.000 LFSTEEL H BEARING INDEX PILING (HP12 X 53) 95.000 LF10" CORRUGATED POLYETHYLENE (PE) PIPE CULVERT (TYPE S) 54.000 LF18" SMOOTH WALL PIPE 610.000 LFCLEANING EXISTING PIPE 46.000 LFCATCH BASIN -TYPE 1 CB - TYPE 1 2.000 EACATCH BASIN -TYPE 16 7.000 EADROP INLET (24" X 36") 1.000 EA36" X 36" JUNCTION BOX 1.000 EA

Call No.: 060 13Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

BEVELING OF PIPE END 3.000 EACONCRETE CURB (9" X 15") 135.000 LFCONCRETE CURB AND GUTTER(1'-6") OGEE 261.000 LFCONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE 877.000 LFCONCRETE SIDEWALK(4" UNIFORM) 440.000 SYDETECTABLE WARNING MATERIAL 63.000 SFCONCRETE MEDIAN 155.000 SYPEDESTRIAN RAMP CONSTRUCTION 125.000 SYSURFACE APPLIED DETECTABLE WARNING 150.000 SFELASTOMERIC BEARING ASSEMBLY (FLAT SLAB) 4.000 EA6" PERFORATED PIPE UNDERDRAIN WITH GEOTEXTILE 120.000 LFRIP-RAP (CLASS B) 60.000 TONGEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE B 75.000 SYSTEEL BEAM GUARDRAIL STEEL BEAM GR. 137.500 LFEND ANCHOR-TYPE B 1.000 EATHRIE BEAM G.R.BRIDGE CONN. 4.000 EAGUARDRAIL LEADING TYPE T TL3 (50') 3.000 EAGR TRAILING END TREATMENT W-BEAM TYPE B 1.000 EATEMPORARY BARRIER FENCE 485.000 LFMOVING ITEM NO. 001 1.000 LSRIGHT OF WAY MARKER(REBAR AND CAP) 8.000 EARIGHT OF WAY PLAT 1.000 LSPERMANENT COVER 0.222 ACRETEMPORARY COVER 0.222 ACRESTRAW OR HAY MULCH WITH TACKIFIER 0.798 ACREFERTILIZER (NITROGEN) 22.000 LBFERTILIZER (PHOSPHORIC ACID) 22.000 LBFERTILIZER (POTASH) 22.000 LBAGRICULTURAL GRANULAR LIME 444.000 LBMOWING 0.888 ACREARBORIST 20.000 HRDOUBLE-SHREDDED HARDWOOD MULCH 315.000 SFMUHLENBERGIA CAPILLARIS (PINK MUHLY GRASS) #1 CONT. 37.000 EAPOROUS MATERIAL FOR ROOT PROTECTION 25.000 TONHYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 3 0.090 ACREINLET STRUCTURE FILTER - TYPE F (WEIGHTED) 150.000 LFINLET STRUCTURE FILTER- TYPE F (NON-WEIGHTED) 150.000 LFSEDIMENT TUBES FOR DITCH CHECKS 48.000 LFSILT FENCE 1,141.000 LFFLOATING TURBIDITY BARRIER-LIGHT DUTY 475.000 SFCLEANING SILT BASINS 5.000 CYINLET FILTER CLEANING 10.000 EA

Call No.: 060 14Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

STABILIZED CONSTRUCTION ENTRANCE 550.000 SYWOOD FENCING 100.000 LF

Call No.: 070 15Page:

South Carolina Department of Transportation 2/2/2018

1091730SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Charleston DBE Goal Percent: 4.50%

Completion Date:

Description: REPLACE BRIDGE OVER CAW CAW SWAMP

5/31/2020

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$24.00

$39.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $50.00Letting Time:

1.1280

BR100060024011XPCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSMOBILIZATION - SUBCONTRACTOR 1.000 LSBRIDGE CONSTRUCTION ACCESS 1.000 LSBONDS AND INSURANCE 1.000 LSCONSTRUCTION STAKES, LINES & GRADES 1.000 EATRAFFIC CONTROL 1.000 LSCLEARING & GRUBBING WITHIN ROADWAY 1.000 LSREMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 11,961.000 SYREMOVAL & DISPOSAL OF EXISTING BRIDGE 1.000 LSREMOVAL & DISPOSAL OF EXISTING BRIDGE 1.000 LSREMOVAL & DISPOSAL OF EXISTING BRIDGE 1.000 LSUNCLASSIFIED EXCAVATION 13,797.000 CYBORROW EXCAVATION 113,348.000 CYMUCK EXCAVATION 49,500.000 CYGEOTEXTILE FOR SEPARATION OF SUBGRADE&SUBBASE/BASE CR 23,700.000 SYGEOGRID REINFORCEMENT (BIAXIAL) 32,700.000 SYTEMPORARY SHORING WALL 740.000 LFSTONE BRIDGE LIFT MATERIAL 75,900.000 TONGRANULAR BRIDGE LIFT MATERIAL 14,200.000 CYFINE GRADING 13,587.000 SYFLOWABLE FILL 165.000 CYMAINTENANCE STONE 20.000 TONHOT MIX ASPHALT BASE COURSE - TYPE A 6,164.000 TONLIQUID ASPHALT BINDER PG64-22 660.000 TONMILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 534.000 SYHOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 5,186.000 TONHOT MIX ASPHALT SURFACE COURSE TYPE B 2,050.000 TONHOT MIX ASPH. CONC. SURF. CR. FOR DITCH PAVING 10.000 TONHOT MIX ASPHALT CONCRETE PLANT MIX UNDER GUARDRAIL 1,935.000 SYPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 184.000 SF

Call No.: 070 16Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

PORTABLE TERMINAL IMPACT ATTENUATOR-TEST LEVEL 3(60 MPH) 12.000 EATEMPORARY CONCRETE BARRIER 6,000.000 LFTEMP CONC BARRIER WITH ANCHORAGE (INCL SECT OF BARR WALL WITHSLOTS/BOLTS/MISC HARDWARE/ITEMS FOR ATTACHMENT TO BRIDGE)

250.000 LF

THRIE BEAM G.R.BRIDGE CONN.(SUPPLEMENTAL TO TEMPORARY CONCRE 13.000 EAPAVEMENT MARKINGS(TEMP-PAINT) 4" YELLOW BROKEN LINES 1,000.000 LFPAVEMENT MARKINGS(TEMPORARY-PAINT)-4" WHITE SOLID LINES 48,000.000 LFPAVEMENT MARKINGS(TEMPORARY-PAINT)-4" YELLOW SOLID LINES 40,000.000 LFPREF.FLEX.WET RETRO.PVMT.MARK(T-4)TEMP.REMOVABLE 4"WH.SOLID PREF. 600.000 LFPREF.FLEX.WET RETRO.PVMT.MARK(T-4)TEMP.REMOVABLE4"YEL.SOLID PREF. 600.000 LFREMOVAL OF PAVEMENT MARKINGS (LINES) (TRAFFIC CONTROL) 3,000.000 LFTEMPORARY YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 300.000 EA4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 12,100.000 LF4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 1,600.000 LF4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 1,400.000 LFPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 80.000 EAFURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 1,212.000 LFCONC. FOR STRUCTURES - CLASS 4000 1,229.300 CYGROOVED SURFACE FINISH 1,410.000 SYREINF. STEEL FOR STRUCTURES (BRIDGE) 259,575.000 LBCONCRETE BRIDGE BARRIER PARAPET 408.000 LFCONCRETE BRIDGE BARRIER PARAPET TRANSITION 12.000 EADYNAMIC PILE ANALYZER TEST SET-UP DYNAMIC PILE ANALYZER TEST SETUP 12.000 EAPILE DRIVING SET-UP 91.000 EAPREST. CONC. PILING (20"SQ.) 2,742.000 LFPILE BUILD-UP PREPARATION (20"SQ) 13.000 EAPRESTRESSED INDEX PILING (20" SQUARE) 192.000 LFPRESTRESSED PILE POINT (HP10X57) 2,898.000 LF18" SMOOTH WALL PIPE 48.000 LFBEVELING OF PIPE END 4.000 EACONCRETE CURB (9" X 15") 36.000 LFBRIDGE APPROACH CONCRETE CURB AND GUTTER(1'-10") 78.000 LFASPHALT CURB 1,650.000 LF10" PIPE SLOPE DRAIN 100.000 LFRIP-RAP (CLASS B) 1,186.000 TONGEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE C 2,272.000 SYSTEEL BEAM GUARDRAIL STEEL BEAM GR. 825.000 LFEND TERMINAL - TYPE T 12.000 EATHRIE BEAM G.R.BRIDGE CONN. 12.000 EATEMPORARY BARRIER FENCE 11,250.000 LFRIGHT OF WAY MARKER(REBAR AND CAP) 48.000 EARIGHT OF WAY PLAT 1.000 LS

Call No.: 070 17Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

PERMANENT COVER 5.626 ACRETEMPORARY COVER 2.813 ACREFERTILIZER (NITROGEN) 563.000 LBFERTILIZER (PHOSPHORIC ACID) 563.000 LBFERTILIZER (POTASH) 563.020 LBAGRICULTURAL GRANULAR LIME 11,252.000 LBSELECTIVE WATERING 135,750.000 GALMOWING 16.878 ACRETURF REINFORCEMENT MATTING (TRM) TYPE 1 0.707 MSYTEMPORARY EROSION CONTROL BLANKET (CLASS A) 5.459 MSYHYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 3 8.439 ACRESEDIMENT TUBES FOR DITCH CHECKS 210.000 LFSILT FENCE 11,250.000 LFREPLACE/REPAIR SILT FENCE 1,125.000 LFFLOATING TURBIDITY BARRIER-LIGHT DUTY(9'DEPTH) 500.000 LFREMOVAL OF SILT RETAINED BY SILT FENCE 2,813.000 LFSTABILIZED CONSTRUCTION ENTRANCE 550.000 SYON-THE-JOB TRAINEE (ROADWAY) 2,080.000 HR

Call No.: 080 18Page:

South Carolina Department of Transportation 2/2/2018

2346530SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Greenville DBE Goal Percent: 7.50%

Completion Date:

Description: SAFETY IMPROVEMENTS AT S-920/OLDGREER TOWN ROAD

11/30/2018

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$11.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

0.3750

P029001P029001PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSCONSTRUCTION STAKES, LINES & GRADES 1.000 EATRAFFIC CONTROL 1.000 LSCPM PROGRESS SCHEDULE 1.000 LSCLEARING & GRUBBING WITHIN RIGHT OF WAY 1.000 LSREMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 168.000 SYUNCLASSIFIED EXCAVATION 26.000 CYBORROW EXCAVATION 607.000 CYFINE GRADING 289.000 SYMAINTENANCE STONE 100.000 TONHOT MIX ASPHALT BASE COURSE - TYPE A 65.000 TONLIQUID ASPHALT BINDER PG64-22 43.000 TONMILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 688.000 SYHOT MIX ASPHALT INTERMEDIATE COURSE TYPE A 21.000 TONHOT MIX ASPHALT SURFACE COURSE TYPE B 583.000 TONHOT MIX ASPHALT SURFACE COURSE TYPE E 122.000 TONPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 184.000 SFPAVEMENT MARKINGS(TEMPORARY-PAINT)-4" WHITE SOLID LINES 4,800.000 LFPAVEMENT MARKINGS(TEMPORARY-PAINT)-4" YELLOW SOLID LINES 7,680.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 1,200.000 LF4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 1,920.000 LFPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 50.000 EA18" SMOOTH WALL PIPE 512.000 LFCLEANING EXISTING PIPE 21.000 LFCATCH BASIN -TYPE 9 1.000 EACATCH BASIN -TYPE 16 3.000 EAMANHOLE EA36" X 36" JUNCTION BOX 1.000 EARIP-RAP (CLASS B) 18.000 TON

Call No.: 080 19Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE C 22.000 SYRESET FENCE 86.000 LFRIGHT OF WAY MARKER(REBAR AND CAP) 7.000 EARIGHT OF WAY PLAT 1.000 LSPERMANENT COVER 0.234 ACREFERTILIZER (NITROGEN) 24.000 LBFERTILIZER (PHOSPHORIC ACID) 24.000 LBFERTILIZER (POTASH) 24.000 LBAGRICULTURAL GRANULAR LIME 468.000 LBMOWING 0.468 ACREHYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 2 0.468 ACREINLET STRUCTURE FILTER - TYPE F (WEIGHTED) 78.000 LFINLET STRUCTURE FILTER- TYPE F (NON-WEIGHTED) 78.000 LFSILT FENCE 1,000.000 LFCLEANING INLET STRUCTURE FILTERS 8.000 EASTABILIZED CONSTRUCTION ENTRANCE 550.000 SY

Call No.: 090 20Page:

South Carolina Department of Transportation 2/2/2018

2425960SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Greenwood DBE Goal Percent: 0.00%

Completion Date:

Description: SHLD PAVING, FDP, MILLING,RESURFACING

8/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

8.6300

P032508P032508PCN: Project No.:

P032509P032509PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSREMOVAL & DISPOSAL OF EXISTING PAVEMENT 580.000 SYREMOVAL OF EXIST. GUARDRAIL 1,191.000 LFBORROW EXCAVATION 2,162.000 CYEXCAVATION FOR SHOULDER PAVING 554.000 STAHAULING OF EXCAVATED SHOULDER MATERIAL 554.000 STAMAINTENANCE STONE 209.000 TONHMA SHOULDER WIDENING COURSE 2,376.880 TONLIQUID ASPHALT BINDER PG64-22 1,118.430 TONFULL DEPTH ASPH. PAV. PATCHING 4" UNIF. 4,000.000 SYFULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 7,300.000 SYFULL DEPTH ASPH. PAV. PATCHING 8" UNIF 8,500.000 SYMILLING EXISTING ASPHALT PAVEMENT 2.0" 118,848.000 SYMILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 12,357.000 SYMILLED-IN RUMBLE STRIP 10.460 MIHOT MIX ASPHALT SURFACE COURSE TYPE B 16,414.769 TONHOT MIX ASPHALT SURFACE COURSE TYPE C 2,160.035 TONPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 2,522.000 SF4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 27,344.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 150,942.000 LF8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 1,626.000 LF24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 2,725.000 LFWHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 34.000 EAWHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 23.000 EAWHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 12.000 EA4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 15,715.000 LF4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 209,700.000 LF

Call No.: 090 21Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 9,268.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 79,394.000 LF8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 542.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 1,125.000 LFWHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 12.000 EAWHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 8.000 EAWHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL 4.000 EA4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 6,575.000 LF4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 99,480.000 LFPERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 590.000 EAPERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 377.000 EAPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 773.000 EAFURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 4,250.000 LFFURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 12,750.000 LFSAWCUT FOR LOOP DETECTOR 3,434.000 LF13"X24"X12"D.ELEC.FLUSH UNDGRD.ENCLOSURE-(STR.POLY.CONC.)HD 9.000 EACONCRETE CURB AND GUTTER(1'-6") OGEE 2,300.000 LFDETECTABLE WARNING MATERIAL 75.000 SFPEDESTRIAN RAMP CONSTRUCTION 150.000 SYSURFACE APPLIED DETECTABLE WARNING 240.000 SFSTEEL BEAM GUARDRAIL STEEL BEAM GR. 1,700.000 LFGUARDRAIL THRIE-BEAM WITH BASE PLATE 3.125’ POST SPACING 325.000 LFEND ANCHOR-TYPE B 1.000 EAEND TERMINAL - TYPE T 7.000 EATHRIE BEAM G.R.BRIDGE CONN. 4.000 EAPERMANENT GRASSING FOR SMALL PROJECTS 7.314 ACRESILT FENCE 1,780.000 LFREPLACE/REPAIR SILT FENCE 180.000 LFREMOVAL OF SILT RETAINED BY SILT FENCE 450.000 LF

Call No.: 100 22Page:

South Carolina Department of Transportation 2/2/2018

2613161SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Horry DBE Goal Percent: 10.00%

Completion Date:

Description: CONWAY ES SRTS PROJECT

7/31/2018

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$25.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

0.2710

P029065P029065PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSCONSTRUCTION STAKES, LINES & GRADES 1.000 EATRAFFIC CONTROL 1.000 LSREMOVAL & DISPOSAL OF EXISTING DROP INLET 9.000 EAREMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 30.000 SYREMOVAL & DISPOSAL OF EXISTING CONCRETE 15.000 CYSITE EXCAVATION 1.000 LSMAINTENANCE STONE 50.000 TONLIQUID ASPHALT BINDER PG64-22 2.000 TONFULL DEPTH ASPH. PAV. PATCHING 10"UNIF 200.000 SYHOT MIX ASPHALT SURFACE COURSE TYPE C 30.000 TONPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 368.000 SF8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 200.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 180.000 LFFLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN 18.000 SFU-SECTION POST FOR SIGN SUPPORTS - 3P 32.000 LF18" SMOOTH WALL PIPE 104.000 LFDROP INLET (24" X 36") 8.000 EAJUNCTION BOX - CONVERT DROP INLET 24" X 24" 10.000 EACONCRETE SIDEWALK(4" UNIFORM) 650.000 SYDETECTABLE WARNING MATERIAL 100.000 SFCONCRETE DRIVEWAY(6" UNIFORM) 220.000 SYPEDESTRIAN RAMP CONSTRUCTION 90.000 SYRIP-RAP (CLASS A) 25.000 TONGEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE C 42.000 SYSELECT MATERIAL 95.000 CYSODDING 1.000 MSYINLET STRUCTURE FILTER - TYPE F (WEIGHTED) 130.000 LFSEDIMENT TUBES FOR DITCH CHECKS 100.000 LF

Call No.: 100 23Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

SILT FENCE 1,300.000 LFDITCH CHECK 150.000 TONCLEANING INLET STRUCTURE FILTERS 25.000 EASTABILIZED CONSTRUCTION ENTRANCE 550.000 SYBICYCLE PARKING RACK 2.000 EA

Call No.: 110 24Page:

South Carolina Department of Transportation 2/2/2018

3247550SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Lexington DBE Goal Percent: 0.00%

Completion Date:

Description: SAFETY IMPROVEMENTS FROM NEARBATESBURG TO NEAR PELION

8/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$24.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

20.0000

P037069P037069PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSSELECTED CLEARING 21.300 ACREREMOVAL & DISPOSAL OF EXISTING PAVEMENT 4,934.000 SYUNCLASSIFIED EXCAVATION 200.000 CYBORROW EXCAVATION 9,826.000 CYEXCAVATION FOR SHOULDER PAVING 2,112.000 STAHAULING OF EXCAVATED SHOULDER MATERIAL 2,112.000 STAMAINTENANCE STONE 200.000 TONHMA SHOULDER WIDENING COURSE 28,160.000 TONLIQUID ASPHALT BINDER PG64-22 5,943.000 TONFULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 4,000.000 SYMILLING EXISTING ASPHALT PAVEMENT 1.0" 281,600.000 SYMILLING EXISTING ASPHALT PAVEMENT 2.0" 422,400.000 SYMILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 533.000 SYMILLED-IN RUMBLE STRIP 60.000 MIHOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 29,005.000 TONHOT MIX ASPHALT SURFACE COURSE TYPE B 40,244.000 TONPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,344.000 SFPAVEMENT MARKINGS(TEMP-PAINT) 6" WHITE BROKEN LINES 3,400.000 LFPAVEMENT MARKINGS(TEMP-PAINT) 6" YELLOW BROKEN LINES 220,000.000 LFPAVEMENT MARKINGS(TEMPORARY-PAINT)-6" WHITE SOLID LINES 440,000.000 LFPAVEMENT MARKINGS(TEMPORARY-PAINT)-6" YELLOW SOLID LINES 110,000.000 LFPAVEMENT MARKINGS(TEMPORARY-PAINT)-24"WHITE SOLID LINES 1,100.000 LF6" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 1,700.000 LF6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 120,000.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 550.000 LF6" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 26,400.000 LF6" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 158,400.000 LF

Call No.: 110 25Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 900.000 EAFLAT SHEET,TYPE-VIII,IX, OR XI, FLUOR FIXED SIZE & MSG. 842.000 SFREFLECTIVE SIGN POST PANELS 340.000 LFGUARDRAIL DELINEATOR - WHITE 40.000 EA15" SMOOTH WALL PIPE 336.000 LF18" SMOOTH WALL PIPE 1,172.000 LF24" SMOOTH WALL PIPE 1,172.000 LF30" SMOOTH WALL PIPE 336.000 LF36" SMOOTH WALL PIPE 336.000 LFCLEANING EXISTING PIPE 800.000 LFBEVELING OF PIPE END 840.000 EASTEEL BEAM GUARDRAIL STEEL BEAM GR. 2,500.000 LFSTEEL BEAM GUARDRAIL (THRIE) 200.000 LFEND ANCHOR-TYPE B 5.000 EAEND TERMINAL - TYPE T 30.000 EATHRIE BEAM G.R.BRIDGE CONN. 8.000 EAADDITIONAL LENGTH GUARDRAIL POST 480.000 LFPERMANENT GRASSING FOR SMALL PROJECTS 7.600 ACRESEDIMENT TUBES FOR DITCH CHECKS 384.000 LFSILT FENCE 4,000.000 LFREPLACE/REPAIR SILT FENCE 400.000 LF

Call No.: 120 26Page:

South Carolina Department of Transportation 2/2/2018

3247560SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Lexington DBE Goal Percent: 0.00%

Completion Date:

Description: SAFETY IMPROVEMENTS FROM MP 0.0 TOMP 15.0

9/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$21.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

14.9000

P037070P037070PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSSELECTED CLEARING 19.100 ACREREMOVAL & DISPOSAL OF EXISTING PAVEMENT 10,213.000 SYUNCLASSIFIED EXCAVATION 200.000 CYBORROW EXCAVATION 11,446.000 CYEXCAVATION FOR SHOULDER PAVING 1,463.000 STAHAULING OF EXCAVATED SHOULDER MATERIAL 1,463.000 STAMAINTENANCE STONE 100.000 TONHMA SHOULDER WIDENING COURSE 20,747.000 TONLIQUID ASPHALT BINDER PG64-22 1,905.000 TONFULL DEPTH ASPH. PAV. PATCHING 8" UNIF 8,500.000 SYMILLING EXISTING ASPHALT PAVEMENT 1.0" 6,518.000 SYMILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 1,600.000 SYMILLED-IN RUMBLE STRIP 37.800 MIHOT MIX ASPHALT SURFACE COURSE TYPE B 20,883.000 TONHOT MIX ASPHALT SURFACE COURSE TYPE D 835.000 TONPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,208.000 SFPAVEMENT MARKINGS(TEMP-PAINT) 6" WHITE BROKEN LINES 2,100.000 LFPAVEMENT MARKINGS(TEMP-PAINT) 6" YELLOW BROKEN LINES 5,322.000 LFPAVEMENT MARKINGS(TEMPORARY-PAINT)-6" WHITE SOLID LINES 266,112.000 LFPAVEMENT MARKINGS(TEMPORARY-PAINT)-6" YELLOW SOLID LINES 186,278.000 LFPAVEMENT MARKINGS(TEMPORARY-PAINT)-24"WHITE SOLID LINES 600.000 LF6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 600.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 300.000 LF6" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 26,612.000 LF6" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 79,834.000 LFPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,032.000 EAREMOVAL OF PAVEMENT MARKINGS 19,000.000 LF

Call No.: 120 27Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

FLAT SHEET,TYPE-VIII,IX, OR XI, FLUOR FIXED SIZE & MSG. 720.000 SFREFLECTIVE SIGN POST PANELS 376.000 LFGUARDRAIL DELINEATOR - WHITE 40.000 EA15" SMOOTH WALL PIPE 248.000 LF18" SMOOTH WALL PIPE 1,952.000 LF24" SMOOTH WALL PIPE 1,952.000 LF30" SMOOTH WALL PIPE 124.000 LF36" SMOOTH WALL PIPE 124.000 LFCLEANING EXISTING PIPE 600.000 LFBEVELING OF PIPE END 670.000 EASTEEL BEAM GUARDRAIL STEEL BEAM GR. 650.000 LFSTEEL BEAM GUARDRAIL (THRIE) 350.000 LFEND ANCHOR-TYPE B 2.000 EAEND TERMINAL - TYPE T 11.000 EATHRIE BEAM G.R.BRIDGE CONN. 8.000 EAADDITIONAL LENGTH GUARDRAIL POST 300.000 LFGUARDRAIL W-BEAM CURVED SYSTEM 100.000 LFPERMANENT GRASSING FOR SMALL PROJECTS 9.200 ACRESEDIMENT TUBES FOR DITCH CHECKS 260.000 LFSILT FENCE 2,200.000 LFREPLACE/REPAIR SILT FENCE 220.000 LF

Call No.: 130 28Page:

South Carolina Department of Transportation 2/2/2018

3547340SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Marlboro DBE Goal Percent: 7.50%

Completion Date:

Description: PEE DEE COG RESURFACING 2018

11/30/2018

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

6.8200

P030677P030677PCN: Project No.:

P030680P030680PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSREMOVAL & DISPOSAL OF EXISTING CATCH BASIN 2.000 EAREMOVAL & DISPOSAL OF EXISTING PAVEMENT 1,361.000 SYREMOVAL & DISPOSAL OF EXISTING CURB 1,000.000 LFBORROW EXCAVATION 1,058.000 CYEXCAVATION FOR SHOULDER PAVING 101.140 STAHAULING OF EXCAVATED SHOULDER MATERIAL 101.140 STAMAINTENANCE STONE 33.000 TONHMA SHOULDER WIDENING COURSE 668.800 TONLIQUID ASPHALT BINDER PG64-22 1,046.267 TONFULL DEPTH ASPH. PAV. PATCHING 10"UNIF 3,300.000 SYMILLING EXISTING ASPHALT PAVEMENT 2.0" 84,552.000 SYMILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 35,910.000 SYMILLED-IN RUMBLE STRIP 8.940 MIHOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 6,223.361 TONHOT MIX ASPHALT SURFACE COURSE TYPE B 8,322.634 TONHOT MIX ASPHALT SURFACE COURSE TYPE C 3,942.960 TONHOT MIX ASPHALT SURFACE COURSE TYPE D 281.875 TONPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,456.000 SF4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 6,100.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 170,280.000 LF8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 2,040.000 LF24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 429.000 LFWHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 20.000 EAWHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 10.000 EAWHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 14.000 EAWHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT 6.000 EA

Call No.: 130 29Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 15,480.000 LF4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 94,420.000 LF24" YELLOW DIAGONAL LINES - FAST DRY PAINT 450.000 LF4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 2,270.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 57,680.000 LF8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 1,020.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 247.000 LFWHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 8.000 EAWHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 4.000 EAWHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL 6.000 EA4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 5,440.000 LF4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 30,140.000 LF24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 150.000 LFPERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 85.000 EAPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 491.000 EAFURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 100.000 LFFURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 400.000 LFSAWCUT FOR LOOP DETECTOR 400.000 LFCATCH BASIN -TYPE 16 2.000 EACONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE 300.000 LFCONCRETE CURB AND GUTTER (3'-0") VERTICAL FACE 700.000 LFCONCRETE SIDEWALK(4" UNIFORM) 347.000 SYCONCRETE SIDEWALK(6" UNIFORM) 30.000 SYCONCRETE DRIVEWAY(6" UNIFORM) 964.000 SYSURFACE APPLIED DETECTABLE WARNING 240.000 SFPERMANENT GRASSING FOR SMALL PROJECTS 5.129 ACRE

Call No.: 140 30Page:

South Carolina Department of Transportation 2/2/2018

3715190SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Oconee DBE Goal Percent: 0.00%

Completion Date:

Description: SHLD PAVING, FDP, MILLING,RESURFACING

6/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

5.1800

P032308P032308PCN: Project No.:

P032415P032415PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSREMOVAL & DISPOSAL OF EXISTING PAVEMENT 50.000 SYREMOVAL OF EXIST. GUARDRAIL 250.000 LFBORROW EXCAVATION 694.000 CYEXCAVATION FOR SHOULDER PAVING 401.300 STAHAULING OF EXCAVATED SHOULDER MATERIAL 401.300 STAMAINTENANCE STONE 150.240 TONHMA SHOULDER WIDENING COURSE 2,675.200 TONLIQUID ASPHALT BINDER PG64-22 925.841 TONFULL DEPTH ASPH. PAV. PATCHING 8" UNIF 15,024.000 SYMILLING EXISTING ASPHALT PAVEMENT 2.0" 131,880.000 SYMILLED-IN RUMBLE STRIP 6.940 MIHOT MIX ASPHALT SURFACE COURSE TYPE B 12,830.253 TONHOT MIX ASPHALT SURFACE COURSE TYPE D 1,779.000 TONPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,560.000 SF4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 5,540.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 36,643.000 LF8" WHITE SOLID LINES PERM.PVMT.MARKINGS 2,648.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 1,262.000 LFWHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 9.000 EAWHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 6.000 EAWHITE COMBINATION ARROWS(STR&RT.OR STR&LT)PERM.PVMT.MARKING 2.000 EARAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING 3.000 EA4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 5,630.000 LF4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 33,747.000 LF4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 22,160.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 73,286.000 LF

Call No.: 140 31Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 5,296.000 LF24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 2,524.000 LFWHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 18.000 EAWHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 12.000 EAWHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 4.000 EARAILROAD CROSSING SYMBOLS - FAST DRY PAINT 6.000 EA4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 22,520.000 LF4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 134,988.000 LF6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 400.000 LFPERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 238.000 EAPERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 232.000 EAPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 603.000 EAFURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 1,050.000 LFFURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (GRAY) 1,500.000 LFFURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 24,370.000 LFSAWCUT FOR LOOP DETECTOR 9,010.000 LFF&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 15.000 EAFURNISH & INSTALL VIDEO DETECTION CAMERA W/ HARDWARE & LEAD-IN 13.000 EADETECTABLE WARNING MATERIAL 25.000 SFPEDESTRIAN RAMP CONSTRUCTION 50.000 SYREMOVE AND REPLACE W BEAM GUARDRAIL 1,300.000 LFRESET GUARDRAIL RESET GR. 11,475.000 LFEND TERMINAL - TYPE T 8.000 EARESET END TERMINAL-TYPE T 45.000 EAPERMANENT GRASSING FOR SMALL PROJECTS 3.365 ACRE

Call No.: 150 32Page:

South Carolina Department of Transportation 2/2/2018

3915120SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Pickens DBE Goal Percent: 0.00%

Completion Date:

Description: SHLD PAVING, FDP, MILLINGRESURFACING

5/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

2.0000

P032416P032416PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSREMOVAL OF EXIST. GUARDRAIL 125.000 LFBORROW EXCAVATION 400.000 CYEXCAVATION FOR SHOULDER PAVING 211.000 STAHAULING OF EXCAVATED SHOULDER MATERIAL 211.000 STAMAINTENANCE STONE 129.440 TONHMA SHOULDER WIDENING COURSE 1,056.000 TONLIQUID ASPHALT BINDER PG64-22 843.978 TONFULL DEPTH ASPH. PAV. PATCHING 8" UNIF 12,944.000 SYMILLING EXISTING ASPHALT PAVEMENT 2.0" 76,055.000 SYMILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 3,184.000 SYMILLED-IN RUMBLE STRIP 8.000 MIHOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 6,900.666 TONHOT MIX ASPHALT SURFACE COURSE TYPE B 7,506.666 TONHOT MIX ASPHALT SURFACE COURSE TYPE D 657.000 TONPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 388.000 SF4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 5,850.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 23,970.000 LF12" WHITE SOLID LINES - PERM.PVMT.MARKINGS 750.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 80.000 LF4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 23,970.000 LF4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 35,100.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 71,910.000 LF12" WHITE SOLID LINES - FAST DRY PAINT 2,250.000 LF24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 160.000 LF4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 71,910.000 LFPERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 320.000 EARESET GUARDRAIL RESET GR. 5,435.000 LF

Call No.: 150 33Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

END TERMINAL - TYPE T 4.000 EARESET END TERMINAL-TYPE T 6.000 EAPERMANENT GRASSING FOR SMALL PROJECTS 1.939 ACRE

Call No.: 160 34Page:

South Carolina Department of Transportation 2/2/2018

4046500SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Richland DBE Goal Percent: 0.00%

Completion Date:

Description: FDP, MILL, LEVEL, 125#STD

10/31/2018

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

9.6300

P036769P036769PCN: Project No.:

P036770P036770PCN: Project No.:

P036771P036771PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSCSX RAILROAD INSURANCE AND FLAGGING 1 1.000 LSREMOVAL & DISPOSAL OF EXISTING PAVEMENT 575.000 SYBORROW EXCAVATION 825.000 CYMAINTENANCE STONE 38.850 TONLIQUID ASPHALT BINDER PG64-22 763.858 TONFULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 2,215.000 SYFULL DEPTH ASPH. PAV. PATCHING 8" UNIF 1,670.000 SYMILLING EXISTING ASPHALT PAVEMENT 1.25" 48,665.000 SYMILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 3,895.000 SYMILLED-IN RUMBLE STRIP 16.320 MIHOT MIX ASPHALT SURFACE COURSE TYPE D 12,124.749 TONPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 656.000 SF4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 7,710.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 169,880.000 LF8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 4,130.000 LF24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 2,578.000 LFWHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 107.000 EAWHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 49.000 EAWHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 12.000 EARAILROAD CROSSING SYMBOLS - FAST DRY PAINT 1.000 EA4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 9,500.000 LF4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 186,550.000 LF6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 5,900.000 LF4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 4,060.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 91,140.000 LF

Call No.: 160 35Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 4,130.000 LF12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 27.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 1,553.000 LFWHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 68.000 EAWHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 31.000 EAWHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL 7.000 EARAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 1.000 EA4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4,750.000 LF4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 95,175.000 LFPERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 230.000 EAPERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 135.000 EAPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,105.000 EAFURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 487.000 LFFURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 16,742.000 LFSAWCUT FOR LOOP DETECTOR 5,079.000 LFDETECTABLE WARNING MATERIAL 287.500 SFPEDESTRIAN RAMP CONSTRUCTION 575.000 SYSURFACE APPLIED DETECTABLE WARNING 30.000 SFPERMANENT GRASSING FOR SMALL PROJECTS 6.150 ACRE

Call No.: 170 36Page:

South Carolina Department of Transportation 2/2/2018

4048090SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Richland DBE Goal Percent: 1.00%

Completion Date:

Description: THREE BRIDGE REHABILITATIONS ONS-1036 OVER SC 277, US 21 OVER I-20, & US321 OVER I-20

11/30/2020

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $123.00Letting Time:

0.2900

P026813P026813PCN: Project No.:

P026815P026815PCN: Project No.:

P026818P026818PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSSELECTED CLEARING 1.000 LSREMOVAL & DISPOSAL OF EXISTING PAVEMENT 608.000 SYREMOVAL & DISPOSAL OF EXISTING CURB 200.000 LFREMOVAL & DISPOSAL OF EXISTING CONCRETE 72.800 CYREMOVAL & DISPOSAL OF CONCRETE MEDIAN BARRIER 645.000 LFSITE EXCAVATION 1.000 LSFLOWABLE FILL 125.000 CYLIQUID ASPHALT BINDER PG64-22 204.000 TONMILLING EXISTING ASPHALT PAVEMENT 1.5" 18,726.000 SYMILLING EXISTING ASPHALT PAVEMENT 2.0" 4,152.000 SYMILLING EXISTING ASPHALT PAVEMENT 2.5" 14,143.000 SYMILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 1,056.000 SYHOT MIX ASPHALT SURFACE COURSE TYPE B 3,823.000 TONPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 888.000 SFTRUCK MOUNTED ATTENUATOR 4.000 EAPORTABLE TERMINAL IMPACT ATTENUATOR-TEST LEVEL 2 6.000 EAANCHOR KIT - PORT. ATTENUATOR(TEST LEVEL 2) 6.000 EATEMPORARY CONCRETE BARRIER 2,270.000 LFPAVEMENT MARKINGS(TEMP-PAINT) 4" WHITE BROKEN LINES 4,950.000 LFPAVEMENT MARKINGS(TEMP-PAINT) 4" YELLOW BROKEN LINES 450.000 LFPREF.FLEX.WET RETRO.PVMT.MARK(T-4)TEMP.REMOVABLE 4"WH.BROKENPREF.

600.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" WHITE SOLID LINES 12,100.000 LFPAVEMENT MARKINGS(TEMPORARY-PAINT)-4" YELLOW SOLID LINES 16,780.000 LFPREF.FLEX.WET RETRO.PVMT.MARK(T-4)TEMP.REMOVABLE 4"WH.SOLID PREF. 1,400.000 LF

CONTRACTORS ARE ADVISED THAT THERE WILL BE A MANDATORY PRE-BID CONFERENCE FOR THIS PROJECT TO BE HELD AT 10:00 AM ON WEDNESDAY, FEBRUARY 21, 2018.

LOCATION FOR THIS PRE-BID CONFERENCE WILL BE AT (SCDOT RICHLAND MAINTENANCE CONFERENCE RM)

7201 FAIRFIELD RD, COLUMBIA, SC 29203.CONTRACTORS WHO DO NOT ATTEND THIS PRE-BID CONFERENCE

WILL NOT BE ALLOWED TO SUBMIT A BID PROPOSAL FOR THIS PROJECT.

Call No.: 170 37Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

PREF.FLEX.WET RETRO.PVMT.MARK(T-4)TEMP.REMOVABLE4"YEL.SOLID PREF. 4,900.000 LFPAVEMENT MARKINGS(TEMPORARY-PAINT)-6" WHITE SOLID LINES 5,140.000 LFPAVEMENT MARKINGS(TEMPORARY-PAINT)-24"WHITE SOLID LINES 1,780.000 LFPAVEMENT MARKINGS (TEMPORARY PAINT) 24"X36" WHITE TRIANGLE YIELDBAR

390.000 LF

REMOVAL OF PAVEMENT MARKINGS (LINES) (TRAFFIC CONTROL) 12,030.000 LFPAVEMENT MARKINGS(TEMPORARY-PAINT)-WHITE SINGLE ARROW 12.000 EAPREF.FLEX.WET RETRO.PVMT.MARK(T-4)TEMP-REMOVABLE WH.SING.ARROW 4.000 EAPAVEMENT MARKINGS(TEMPORARY-PAINT)-WHITE WORD 'ONLY 4.000 EAPREF.FLEX.WET RETRO.PVMT.MARK(T-4)TEMP-REMOV.WH.WORD MESS."ONLY" 4.000 EATEMPORARY CLEAR PAVEMENT MARKERS MONO-DIR.- 4"X4" 212.000 EATEMPORARY YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 137.000 EAWHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 3.000 EAWHITE SINGLE BIKE LANE ARROW (LT, STRAIGHT, RT)-FAST DRY PAINT 17.000 EABIKE LANE SYMBOL - FAST DRY PAINT 8.000 EA4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 1,800.000 LF6" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 300.000 LF6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 1,700.000 LF8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 3,701.000 LF24IN X 36IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 320.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 774.000 LFWHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 13.000 EAWHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 10.000 EA4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 200.000 LF4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 1,200.000 LFBIKE LANE SYMBOL -PREFORMED THERMO - 90MIL 5.000 EABIKE LANE ARROW - PREFORMED THERMO - 90MIL 13.000 EAPERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 150.000 EAPERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 20.000 EAPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 30.000 EAREMOVAL OF PAVEMENT MARKINGS 264.000 LFPREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.60MIL4"WH.BROKEN 400.000 LFPREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.60MIL6"WH.BROKEN 300.000 LFPREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)6"WH.SOLID 800.000 LFFLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN 5.000 SFFlat Sheet, Type XI, Size Determined by MSG, Overhead 46.000 SFMOUNTING ASSEMBLY FOR F.S. SIGN ERCTD ON SPAN WIRE 6.000 EAU-SECTION POST FOR SIGN SUPPORTS - 3P 14.000 LFFURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 2,414.000 LFFURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 2,250.000 LFFURNISH & INSTALL 3.0" SCHEDULE 80 PVC CONDUIT 190.000 LFFURNISH ADDITIONAL CONDUIT WITHIN DIRECTIONAL BORE 363.000 LF

Call No.: 170 38Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

FURNISH & INSTALL 2" SCHEDULE 80 HDPE CONDUIT (DIRECTIONAL BORED) 958.000 LFFURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - BLACK 2,340.000 LFFURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - GRAY 7,505.000 LFFURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (BLACK) 3,435.000 LFFURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (GRAY) 1,620.000 LFFURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 10,564.000 LFFURNISH & INSTALL FIBER OPTIC CABLE-SINGLE MODE 1,480.000 LFFURNISH & INSTALL FIBER OPTIC INTERCONNECT CENTER 2.000 EASAWCUT FOR LOOP DETECTOR 3,618.000 LFFURNISH & INSTALL ELECTRICAL SERVICE FOR TRAFFIC SIGNAL 4.000 EAF&I-12"X12"X12"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 34.000 EAF&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 16.000 EAF&I-17"X30"X26"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 4.000 EAFURNISH & INSTALL 13" X 28' STEEL STRAIN POLE AND FOUNDATION 8.000 EAFURNISH & INSTALL 13" X 32' STEEL STRAIN POLE AND FOUNDATION 8.000 EAFURNISH & INSTALL 1/4" GALVANIZED STEEL CABLE 1,080.000 LFFURNISH & INSTALL 3/8" GALVANIZED STEEL CABLE 1,510.000 LFFURNISH & INSTALL 4' BREAK-AWAY ALUMINUM PEDESTAL POLE 5.000 EAFURNISH & INSTALL 10' BREAK-AWAY ALUM PEDESTAL POLE AND BASE 11.000 EAF&I - CONTR 332/336 CABINET ASSEMBLY - BASE MOUNTED 001 4.000 EAFURNISH & INSTALL - 12" 5 SECTION SIGNAL HEAD 1.000 EAFURNISH & INSTALL -12" 4 SECTION SIGNAL HEAD 3.000 EAFURNISH & INSTALL - 12" 3 SECTION SIGNAL HEAD 001 6.000 EAFURNISH & INSTALL - 12" 3 SECTION SIGNAL HEAD 002 32.000 EAF&I - 1-WAY-1SECT.HAND/MAN EMBLEM PEDESTRIAN SIGNAL HEAD 20.000 EAF&I-PED PUSH BUTTON MICRO ASSEMBLY(9"X15")AND SIGN(R-10-3E or R10-4a) 20.000 EABACKPLATE W/ RETROREFL.BORDERS FOR TRAFF. SIG. 42.000 EAREMOVAL,SALVAGE,&DISP.OF EXISTING TRAF. SIGNAL EQUIPMENT 1.000 LSTEMPORARY ADJUSTMENT OF TRAFFIC SIGNAL EQUIPMENT 1.000 LSTEMPORARY TIMING ADJUSTMENTS PER SITE VISIT 1.000 EAFURNISH & INSTALL CONCRETE CABINET FOUNDATION 4.000 EAFURNISH & INSTALL FACTORY TERMINATED PATCH PANEL 2.000 EACONC. FOR STRUCTURES - CLASS 4000 52.100 CYSPALL REPAIR 140.000 SFEPOXY CRACK INJECTION 60.000 LFGROOVED SURFACE FINISH 5,457.000 SYREINF. STEEL FOR STRUCTURES (BRIDGE) 3,158.000 LBSTRUCTURAL STEEL 1.000 LSENVIRONMENTAL AND WORKER PROTECTION 1.000 LSCLEANING AND PAINTING EXISTING STRUCTURAL STEEL 1.000 LSCATCH BASIN -TYPE 1 CB - TYPE 1 1.000 EACATCH BASIN -TYPE 18 1.000 EA

Call No.: 170 39Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE 200.000 LFCONCRETE SIDEWALK(4" UNIFORM) 2.500 SYDETECTABLE WARNING MATERIAL 376.000 SFCONCRETE MEDIAN 677.000 SYPEDESTRIAN RAMP CONSTRUCTION 750.000 SYSURFACE APPLIED DETECTABLE WARNING 30.000 SFELASTOMERIC BEARING 163.000 EAHYDRO-DEMOLITION OF EXISTING SURFACE 5,582.000 SYPARTIAL DEPTH REMOVAL OF SOUND CONCRETE 1,675.000 SYVERY EARLY STRENGTH CONCRETE OVERLAY (LATEX) 302.300 CYREHABILITATE EXISTING EXPANSION JOINT 8.000 EAJACKING BRIDGE 1.000 LSSTEEL BEAM GUARDRAIL STEEL BEAM GR. 150.000 LFRESET GUARDRAIL RESET GR. 50.000 LFEND TERMINAL - TYPE T 1.000 EATHRIE BEAM G.R.BRIDGE CONN. 1.000 EARESET THRIE BEAM G.R.BRIDGE CONN. 1.000 EAPAINT CONCRETE MEDIAN BARRIER 287.000 SYPERMANENT GRASSING FOR SMALL PROJECTS 0.780 ACREINLET STRUCTURE FILTER - TYPE F (WEIGHTED) 40.000 LFINLET STRUCTURE FILTER- TYPE F (NON-WEIGHTED) 40.000 LFSEDIMENT TUBES FOR DITCH CHECKS 290.000 LFSILT FENCE 2,200.000 LFSURFACE MILLING 002 2,282.000 SYSURFACE MILLING 003 3,300.000 SYBRIDGE DECK PATCHING, FULL DEPTH 003 230.000 SYBRIDGE DECK PATCHING, FULL DEPTH 004 330.000 SYANCHOR BOLT REPLACEMENT WITH CONCRETE CORING 12.000 EACHON-THE-JOB TRAINEE (BRIDGE) 1,040.000 HR

Call No.: 180 40Page:

South Carolina Department of Transportation 2/2/2018

4215170SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Spartanburg DBE Goal Percent: 0.00%

Completion Date:

Description: SHLD PAVING, FDP, MILLING,RESURFACING

11/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

6.7000

P032353P032353PCN: Project No.:

P032356P032356PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSREMOVAL & DISPOSAL OF EXISTING PAVEMENT 350.000 SYREMOVAL OF EXIST. GUARDRAIL 175.000 LFBORROW EXCAVATION 142.000 CYEXCAVATION FOR SHOULDER PAVING 51.210 STAHAULING OF EXCAVATED SHOULDER MATERIAL 51.210 STAMAINTENANCE STONE 549.960 TONHMA SHOULDER WIDENING COURSE 341.440 TONLIQUID ASPHALT BINDER PG64-22 1,574.866 TONFULL DEPTH ASPH. PAV. PATCHING 8" UNIF 54,996.000 SYMILLING EXISTING ASPHALT PAVEMENT 2.0" 262,878.000 SYMILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 1,420.000 SYHOT MIX ASPHALT SURFACE COURSE TYPE B 26,275.326 TONHOT MIX ASPHALT SURFACE COURSE TYPE D 2,622.250 TONPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 3,228.000 SF4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 19,584.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 3,064.000 LF8" WHITE SOLID LINES PERM.PVMT.MARKINGS 3,633.000 LF12" WHITE SOLID LINES - PERM.PVMT.MARKINGS 1,195.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 2,992.000 LFWHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 53.000 EAWHITE WORD MESSAGE "SCHOOL" -PERM.PVMT.MARKING 4.000 EAWHITE COMBINATION ARROWS(STR&RT.OR STR&LT)PERM.PVMT.MARKING 6.000 EA4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 8,918.000 LF4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 90,741.000 LF4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 78,336.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 6,128.000 LF

Call No.: 180 41Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 7,266.000 LF12" WHITE SOLID LINES - FAST DRY PAINT 2,390.000 LF24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 5,984.000 LFWHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 106.000 EAWHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 12.000 EA4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 35,672.000 LF4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 362,964.000 LFPERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 1,227.000 EAPERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 902.000 EAPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,899.000 EAFURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 3,150.000 LFFURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (GRAY) 4,940.000 LFFURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 67,930.000 LFFURNISH & INSTALL FLUSH MOUNTED WIRELESS SENSOR 10.000 EASAWCUT FOR LOOP DETECTOR 25,250.000 LFF&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 45.000 EAFURNISH & INSTALL VIDEO DETECTION CAMERA W/ HARDWARE & LEAD-IN 44.000 EAADJUST DROP INLET ADJUST D. I. 3.000 EADETECTABLE WARNING MATERIAL 195.000 SFPEDESTRIAN RAMP CONSTRUCTION 350.000 SYRESET GUARDRAIL RESET GR. 1,365.000 LFEND TERMINAL - TYPE T 7.000 EAPERMANENT GRASSING FOR SMALL PROJECTS 0.688 ACRE

Call No.: 190 42Page:

South Carolina Department of Transportation 2/2/2018

4447230SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Union DBE Goal Percent: 3.00%

Completion Date:

Description: CATAWBA REGIONAL COG RESURFACING

10/31/2018

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

3.6300

P036919P036919PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSREMOVAL & DISPOSAL OF EXISTING CONCRETE 4.000 CYBORROW EXCAVATION 650.000 CYMAINTENANCE STONE 300.000 TONLIQUID ASPHALT BINDER PG64-22 1,298.105 TONFULL DEPTH ASPH. PAV. PATCHING 8" UNIF 11,200.000 SYMILLING EXISTING ASPHALT PAVEMENT 1.75" 131,000.000 SYMILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,000.000 SYMILLED-IN RUMBLE STRIP 6.500 MIHOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 11,500.334 TONHOT MIX ASPHALT SURFACE COURSE TYPE B 13,323.160 TONHOT MIX ASPHALT SURFACE COURSE TYPE C 91.000 TONASPHALT SURFACE TREATMENT(SINGLE TREATMENT) 131,000.000 SYPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 632.000 SF4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 34,000.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 103,180.000 LF8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 1,440.000 LF24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 612.000 LFWHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 80.000 EAWHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 54.000 EAWHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT 4.000 EA4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 1,768.000 LF4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 114,400.000 LF4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 11,850.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 34,430.000 LF8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 770.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 231.000 LFWHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 30.000 EA

Call No.: 190 43Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 20.000 EAWHITE LANE DROP ARROW(LT.OR RT.)THERMO-125MIL 2.000 EA4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 644.000 LF4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 40,040.000 LFPERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 650.000 EAPERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 16.000 EAPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 84.000 EAFURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 700.000 LFFURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 1,000.000 LFSAWCUT FOR LOOP DETECTOR 800.000 LFF&I-12"X12"X12"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 3.000 EAPERMANENT GRASSING FOR SMALL PROJECTS 3.500 ACRE

Call No.: 200 44Page:

South Carolina Department of Transportation 2/2/2018

4646320SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: York DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 FEDERAL AID FDP, PMST

11/30/2018

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

10.7800

P032476P032476PCN: Project No.:

P032481P032481PCN: Project No.:

P032488P032488PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSREMOVAL & DISPOSAL OF EXISTING PAVEMENT 150.000 SYFULL DEPTH ASPH. PAV. PATCHING 8" UNIF 5,055.000 SYFULL DEPTH ASPH. PAV. PATCHING 10"UNIF 16,057.000 SYMILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 6,125.000 SYMILLED-IN RUMBLE STRIP 5.660 MIPREVENTATIVE MAINTENANCE SURFACE TREATMENT 315,816.000 SYPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 946.000 SF4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 42,810.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 71,660.000 LF8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 1,354.000 LF24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,174.000 LFWHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 120.000 EAWHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 62.000 EA4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 36,400.000 LF4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 254,820.000 LF4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 21,405.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 36,160.000 LF8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 704.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 654.000 LFWHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 60.000 EAWHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 31.000 EA4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 18,200.000 LF4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 127,740.000 LFPERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 1,018.000 EAPERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 1,781.000 EA

Call No.: 200 45Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 2,385.000 EAFURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 400.000 LFSAWCUT FOR LOOP DETECTOR 200.000 LFDETECTABLE WARNING MATERIAL 75.000 SFPEDESTRIAN RAMP CONSTRUCTION 150.000 SY

Call No.: 210 46Page:

South Carolina Department of Transportation 2/2/2018

4647570SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: York DBE Goal Percent: 0.00%

Completion Date:

Description: YCPFP RESURFACING

6/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

10.5000

P036785P036785PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSCPM PROGRESS SCHEDULE 1.000 LSCLEARING & GRUBBING WITHIN ROADWAY 1.000 LSSELECTED CLEARING & GRUBBING 0.550 ACREREMOVAL & DISPOSAL OF EXISTING CONCRETE 7.000 CYREMOVAL OF EXIST. GUARDRAIL 300.000 LFUNCLASSIFIED EXCAVATION 1,200.000 CYSITE EXCAVATION 1.000 LSROCK EXCAVATION 500.000 CYBORROW EXCAVATION 3,850.000 CYSTATION GRADING 40.656 STACEMENT MODIFIED RECYCLED BASE (12" UNIFORM) CURING METHOD 2 152,408.000 SYPORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 6,858.360 TONMAINTENANCE STONE 880.000 TONLIQUID ASPHALT BINDER PG64-22 940.656 TONMILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 1,775.000 SYMILLED-IN RUMBLE STRIP 7.700 MIHOT MIX ASPHALT SURFACE COURSE TYPE C 2,764.580 TONHOT MIX ASPHALT SURFACE COURSE TYPE E 11,919.698 TONPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,392.000 SF4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 1,560.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 332,760.000 LF24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,500.000 LF4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 11,400.000 LF4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 272,160.000 LF4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 520.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 110,920.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 500.000 LF

Call No.: 210 47Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 3,800.000 LF4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 90,720.000 LFPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 716.000 EAREMOVAL OF PAVEMENT MARKINGS 100.000 LF15" SMOOTH WALL PIPE 544.000 LF18" SMOOTH WALL PIPE 100.000 LF24" SMOOTH WALL PIPE 16.000 LF48" SMOOTH WALL PIPE 4.000 LFCLEANING EXISTING PIPE 732.000 LFCONCRETE COLLAR FOR UP TO 24" PIPE 19.000 EARIP-RAP (CLASS B) 500.000 TONGEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE B 2,500.000 SYSTEEL BEAM GUARDRAIL STEEL BEAM GR. 4,137.500 LFSTEEL BEAM GUARDRAIL (THRIE-DOUBLE LAYERED) 120.000 LFEND TERMINAL - TYPE T 60.000 EAADDITIONAL LENGTH GUARDRAIL POST 550.000 LFPERMANENT GRASSING FOR SMALL PROJECTS 25.040 ACRETURF REINFORCEMENT MATTING (TRM) TYPE 2 10.000 MSYTEMPORARY EROSION CONTROL BLANKET (CLASS A) 2.500 MSYHYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 3 5.000 ACRESEDIMENT TUBES FOR DITCH CHECKS 2,000.000 LFSILT FENCE 13,300.000 LFREPLACE/REPAIR SILT FENCE 2,400.000 LFREMOVAL OF SILT RETAINED BY SILT FENCE 2,400.000 LFDITCH CHECK 300.000 TON

Call No.: 220 48Page:

South Carolina Department of Transportation 2/2/2018

5125760SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Kershaw Lee DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 FA REHAB KERSHAW SUMTER LEE

5/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

10.0300

P033677P033677PCN: Project No.:

P033678P033678PCN: Project No.:

P033682P033682PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSREMOVAL & DISPOSAL OF EXISTING PAVEMENT 75.000 SYBORROW EXCAVATION 1,828.000 CYEXCAVATION FOR SHOULDER PAVING 965.880 STAHAULING OF EXCAVATED SHOULDER MATERIAL 965.880 STAMAINTENANCE STONE 94.000 TONHMA SHOULDER WIDENING COURSE 4,825.920 TONLIQUID ASPHALT BINDER PG64-22 1,500.430 TONFULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 900.000 SYFULL DEPTH ASPH. PAV. PATCHING 8" UNIF 8,500.000 SYMILLING EXISTING ASPHALT PAVEMENT 1.5" 39,900.000 SYMILLING EXISTING ASPHALT PAVEMENT 2.0" 87,082.000 SYMILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 855.000 SYMILLED-IN RUMBLE STRIP 18.280 MIHOT MIX ASPHALT INTERMEDIATE COURSE TYPE C 9,105.067 TONHOT MIX ASPHALT SURFACE COURSE TYPE C 13,701.513 TONPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,524.000 SF4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 672.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 236,630.000 LF8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 490.000 LF24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 648.000 LFWHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 2.000 EAWHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 2.000 EA4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 13,540.000 LF4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 161,303.000 LF4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 536.000 LF

Call No.: 220 49Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 100,339.000 LF8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 245.000 LF12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 25.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 288.000 LFWHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL 4.000 EA4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 8,670.000 LF4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 53,557.000 LFPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 679.000 EACONCRETE SIDEWALK(4" UNIFORM) 50.000 SYDETECTABLE WARNING MATERIAL 37.500 SFPEDESTRIAN RAMP CONSTRUCTION 75.000 SYSURFACE APPLIED DETECTABLE WARNING 6.000 SFSTEEL BEAM GUARDRAIL STEEL BEAM GR. 600.000 LFEND TERMINAL - TYPE T 12.000 EARESET THRIE BEAM G.R.BRIDGE CONN. 6.000 EAPERMANENT GRASSING FOR SMALL PROJECTS 7.901 ACRE

Call No.: 230 50Page:

South Carolina Department of Transportation 2/2/2018

5146400SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Lee Sumter DBE Goal Percent: 0.00%

Completion Date:

Description: FDP, MILL, LEVEL 125# STD

9/30/2018

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

6.1900

P036779P036779PCN: Project No.:

P036780P036780PCN: Project No.:

P036781P036781PCN: Project No.:

P036782P036782PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSREMOVAL & DISPOSAL OF EXISTING PAVEMENT 150.000 SYBORROW EXCAVATION 694.000 CYMAINTENANCE STONE 2.500 TONLIQUID ASPHALT BINDER PG64-22 499.065 TONFULL DEPTH ASPH. PAV. PATCHING 8" UNIF 250.000 SYMILLING EXISTING ASPHALT PAVEMENT 1.0" 1,625.000 SYMILLING EXISTING ASPHALT PAVEMENT 1.25" 10,500.000 SYMILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,525.000 SYMILLED-IN RUMBLE STRIP 9.080 MIHOT MIX ASPHALT SURFACE COURSE TYPE D 7,921.651 TONPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,638.000 SF4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 4,510.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 50,000.000 LF8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 520.000 LF24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 747.000 LFWHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 19.000 EAWHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 6.000 EAWHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 4.000 EARAILROAD CROSSING SYMBOLS - FAST DRY PAINT 2.000 EA4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4,570.000 LF4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 35,660.000 LF6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 325.000 LF4" WHITE BROKEN LINES -(GAPS EXCLUDED) - EPOXY PAINT 170.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT 700.000 LF

Call No.: 230 51Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

4"YELLOW SOLID LINES-PVT.EDGE&NO PASSING ZONE - EPOXY PAINT 700.000 LF4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 4,510.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 49,800.000 LF8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 380.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 622.300 LFWHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 15.000 EAWHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 6.000 EAWHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL 2.000 EARAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 2.000 EA4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4,510.000 LF4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 35,240.000 LFPERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 280.000 EAPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 725.000 EAFURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 160.000 LFFURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 3,200.000 LFSAWCUT FOR LOOP DETECTOR 1,441.000 LFDETECTABLE WARNING MATERIAL 75.000 SFPEDESTRIAN RAMP CONSTRUCTION 150.000 SY

Call No.: 240 52Page:

South Carolina Department of Transportation 2/2/2018

5246620SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Abbeville AndersonGreenwood LaurensNewberry

DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 FA PRESERVATION (CRACK SEAL)

5/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

31.2700

P036787P036787PCN: Project No.:

P036798P036798PCN: Project No.:

P036799P036799PCN: Project No.:

P036808P036808PCN: Project No.:

P036813P036813PCN: Project No.:

P036825P036825PCN: Project No.:

P036826P036826PCN: Project No.:

P036831P036831PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSCLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT 85.450 LaMi4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 7,000.000 LF4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 11,000.000 LF4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 56,740.000 LF4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 11,100.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 32,000.000 LF4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 7,000.000 LF4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 70,450.000 LF

Call No.: 250 53Page:

South Carolina Department of Transportation 2/2/2018

5246630SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Abbeville EdgefieldGreenwood LaurensMcCormick

DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 FA PRESERVATION (MICROSURFACE)

7/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

26.5500

P036766P036766PCN: Project No.:

P036789P036789PCN: Project No.:

P036792P036792PCN: Project No.:

P036793P036793PCN: Project No.:

P036800P036800PCN: Project No.:

P036881P036881PCN: Project No.:

P036902P036902PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSREMOVAL & DISPOSAL OF EXISTING PAVEMENT 67.000 SYBORROW EXCAVATION 2,112.000 CYMAINTENANCE STONE 233.230 TONLIQUID ASPHALT BINDER PG64-22 19.400 TONFULL DEPTH ASPH. PAV. PATCHING 4" UNIF. 19,683.000 SYFULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 3,600.000 SYHOT MIX ASPHALT SURFACE COURSE TYPE D 50.000 TONHOT MIX ASPHALT SURFACE COURSE TYPE E 250.000 TONMICRO SURFACING SURFACE COURSE 534,350.000 SYMICRO SURFACING LEVELING 1,702.000 TONPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 3,608.000 SF4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 17,324.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 396,888.000 LF8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 1,410.000 LF24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 592.000 LFWHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 2.000 EA4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 25,384.000 LF4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 332,185.000 LF24" YELLOW DIAGONAL LINES - FAST DRY PAINT 395.000 LF4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 10,682.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 274,204.000 LF

Call No.: 250 54Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 1,410.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 456.000 LFWHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 2.000 EA4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 16,742.000 LF4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 235,310.000 LF24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 395.000 LFPERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 1,474.000 EAPERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 900.000 EAPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 2,113.000 EASURFACE APPLIED DETECTABLE WARNING 20.000 SFSTEEL BEAM GUARDRAIL STEEL BEAM GR. 340.000 LFEND TERMINAL - TYPE T 4.000 EAPERMANENT GRASSING FOR SMALL PROJECTS 10.240 ACRESILT FENCE 580.000 LFREPLACE/REPAIR SILT FENCE 58.000 LFREMOVAL OF SILT RETAINED BY SILT FENCE 145.000 LF

Call No.: 260 55Page:

South Carolina Department of Transportation 2/2/2018

5246650SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: GreenwoodNewberry Saluda

DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 FA PRESERVATION (125#)

5/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

6.5300

P036823P036823PCN: Project No.:

P036824P036824PCN: Project No.:

P036830P036830PCN: Project No.:

P036835P036835PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSBORROW EXCAVATION 882.000 CYMAINTENANCE STONE 1,067.670 TONLIQUID ASPHALT BINDER PG64-22 299.830 TONFULL DEPTH ASPH. PAV. PATCHING 4" UNIF. 2,397.000 SYFULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 4,370.000 SYMILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,500.000 SYMILLED-IN RUMBLE STRIP 2.260 MIHOT MIX ASPHALT SURFACE COURSE TYPE D 4,759.166 TONPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,166.000 SF4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 4,220.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 111,660.000 LF8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 720.000 LF24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 860.000 LFWHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 14.000 EA4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 1,680.000 LF4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 118,560.000 LF4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 1,210.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 55,180.000 LF8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 360.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 430.000 LFWHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 7.000 EAWHITE WORD MESSAGE "STOP AHEAD" -THERMOPLASTIC - 125 MIL. 1.000 EA4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 840.000 LF4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 57,980.000 LF

Call No.: 260 56Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 20.000 EAPERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 19.000 EAPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 493.000 EAFURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 3,250.000 LFFURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 9,750.000 LFSAWCUT FOR LOOP DETECTOR 2,626.000 LF13"X24"X12"D.ELEC.FLUSH UNDGRD.ENCLOSURE-(STR.POLY.CONC.)HD 6.000 EAADJUST DROP INLET ADJUST D. I. 1.000 EASURFACE APPLIED DETECTABLE WARNING 120.000 SFPERMANENT GRASSING FOR SMALL PROJECTS 4.276 ACRE

Call No.: 270 57Page:

South Carolina Department of Transportation 2/2/2018

5246660SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Abbeville EdgefieldMcCormickNewberry

DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 FA PRESERVATION (CHIP SEAL)

11/30/2018

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

6.7800

P036796P036796PCN: Project No.:

P036827P036827PCN: Project No.:

P036882P036882PCN: Project No.:

P036883P036883PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSREMOVAL OF EXIST. GUARDRAIL 100.000 LFBORROW EXCAVATION 1,356.000 CYMAINTENANCE STONE 35.896 TONFULL DEPTH ASPH. PAV. PATCHING 4" UNIF. 250.000 SYFULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 4,250.000 SYASPHALT SURFACE TREATMENT(SINGLE TREATMENT) 82,560.000 SYPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 856.000 SF4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 520.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 134,608.000 LF24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 231.000 LF4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 2,380.000 LF4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 119,638.000 LF4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 260.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 71,654.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 121.000 LF4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 1,190.000 LF4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 64,169.000 LFPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 449.000 EASTEEL BEAM GUARDRAIL STEEL BEAM GR. 275.000 LFGUARDRAIL THRIE-BEAM WITH BASE PLATE 3.125’ POST SPACING 50.000 LFSTEEL BEAM GUARDRAIL (THRIE) 75.000 LFEND TERMINAL - TYPE T 6.000 EAPERMANENT GRASSING FOR SMALL PROJECTS 6.574 ACRESILT FENCE 395.000 LF

Call No.: 270 58Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

REPLACE/REPAIR SILT FENCE 50.000 LFREMOVAL OF SILT RETAINED BY SILT FENCE 100.000 LF

Call No.: 280 59Page:

South Carolina Department of Transportation 2/2/2018

5446310SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: ChesterfieldLancaster

DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 FEDERAL AID FDP CHIP SEALING

9/30/2018

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

3.6600

P032484P032484PCN: Project No.:

P032486P032486PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSFULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1,050.000 SYASPHALT SURFACE TREATMENT(SINGLE TREATMENT) 41,770.666 SYPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 82.000 SF4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 84.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 37,600.000 LF24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 104.000 LF4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 2,150.000 LF4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 26,080.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 104.000 LFPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 240.000 EA

Call No.: 290 60Page:

South Carolina Department of Transportation 2/2/2018

5526110SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Darlington Marlboro DBE Goal Percent: 0.00%

Completion Date:

Description: SHLD PAVING, FDP, MILL , PAVING

11/30/2018

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

9.6300

P032400P032400PCN: Project No.:

P032406P032406PCN: Project No.:

P033579P033579PCN: Project No.:

P033585P033585PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSREMOVAL & DISPOSAL OF EXISTING PAVEMENT 45.000 SYBORROW EXCAVATION 1,926.000 CYEXCAVATION FOR SHOULDER PAVING 555.000 STAHAULING OF EXCAVATED SHOULDER MATERIAL 555.000 STAMAINTENANCE STONE 138.350 TONHMA SHOULDER WIDENING COURSE 2,777.280 TONLIQUID ASPHALT BINDER PG64-22 1,999.771 TONFULL DEPTH ASPH. PAV. PATCHING 8" UNIF 6,135.000 SYFULL DEPTH ASPH. PAV. PATCHING 10"UNIF 7,700.000 SYMILLING EXISTING ASPHALT PAVEMENT 2.0" 88,850.000 SYMILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 4,000.000 SYMILLED-IN RUMBLE STRIP 20.300 MIHOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 5,694.773 TONHOT MIX ASPHALT SURFACE COURSE TYPE B 23,474.360 TONHOT MIX ASPHALT SURFACE COURSE TYPE D 5,179.875 TONPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,266.000 SF4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 37,800.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 290,145.000 LF24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 4,840.000 LFWHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 24.000 EAWHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 12.000 EAWHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 18.000 EA4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 44,250.000 LF4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 209,100.000 LF

Call No.: 290 61Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 12,600.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 96,715.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 1,280.000 LFWHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 8.000 EAWHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 6.000 EAWHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL 6.000 EA4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 14,750.000 LF4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 69,700.000 LFPERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 720.000 EAPERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 890.000 EAPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,245.000 EAFURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 100.000 LFFURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 2,600.000 LFSAWCUT FOR LOOP DETECTOR 1,000.000 LFRESET GUARDRAIL RESET GR. 850.000 LFPERMANENT GRASSING FOR SMALL PROJECTS 8.686 ACRE

Call No.: 300 62Page:

South Carolina Department of Transportation 2/2/2018

5526120SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Dillon Marion DBE Goal Percent: 0.00%

Completion Date:

Description: FDP, MILLING, RESURFACING IN DISTRICT5 (17,34)

11/30/2018

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

8.2900

P032401P032401PCN: Project No.:

P032405P032405PCN: Project No.:

P033580P033580PCN: Project No.:

P033584P033584PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSREMOVAL & DISPOSAL OF EXISTING PAVEMENT 50.000 SYBORROW EXCAVATION 1,658.000 CYEXCAVATION FOR SHOULDER PAVING 289.000 STAHAULING OF EXCAVATED SHOULDER MATERIAL 289.000 STAMAINTENANCE STONE 111.500 TONHMA SHOULDER WIDENING COURSE 1,446.720 TONLIQUID ASPHALT BINDER PG64-22 1,845.160 TONFULL DEPTH ASPH. PAV. PATCHING 8" UNIF 2,850.000 SYFULL DEPTH ASPH. PAV. PATCHING 10"UNIF 8,300.000 SYMILLING EXISTING ASPHALT PAVEMENT 2.0" 111,483.000 SYMILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,100.000 SYMILLED-IN RUMBLE STRIP 15.160 MIHOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 11,626.241 TONHOT MIX ASPHALT SURFACE COURSE TYPE B 13,598.673 TONHOT MIX ASPHALT SURFACE COURSE TYPE C 4,648.300 TONHOT MIX ASPHALT SURFACE COURSE TYPE D 2,861.250 TONPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 3,200.000 SF4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 31,600.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 233,100.000 LF24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 7,250.000 LFWHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 18.000 EARAILROAD CROSSING SYMBOLS - FAST DRY PAINT 2.000 EA4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 14,100.000 LF4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 213,100.000 LF

Call No.: 300 63Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 11,300.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 95,550.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 2,610.000 LFWHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 6.000 EARAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 1.000 EA4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 5,550.000 LF4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 83,550.000 LFPERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 450.000 EAPERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 330.000 EAPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 650.000 EAFURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 300.000 LFFURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 300.000 LFSAWCUT FOR LOOP DETECTOR 300.000 LFDETECTABLE WARNING MATERIAL 25.000 SFPEDESTRIAN RAMP CONSTRUCTION 50.000 SYSURFACE APPLIED DETECTABLE WARNING 160.000 SFSTEEL BEAM GUARDRAIL STEEL BEAM GR. 100.000 LFSTEEL BEAM GUARDRAIL (THRIE) 100.000 LFRESET GUARDRAIL RESET GR. 1,850.000 LFEND TERMINAL - TYPE T 6.000 EAPERMANENT GRASSING FOR SMALL PROJECTS 7.292 ACRE

Call No.: 310 64Page:

South Carolina Department of Transportation 2/2/2018

5547010SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Dillon Marion DBE Goal Percent: 0.00%

Completion Date:

Description: FDP, MILL, LEVEL, 125# STD

10/31/2018

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

11.9200

P033623P033623PCN: Project No.:

P033627P033627PCN: Project No.:

P033631P033631PCN: Project No.:

P033635P033635PCN: Project No.:

P033639P033639PCN: Project No.:

P033643P033643PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSBORROW EXCAVATION 2,384.000 CYMAINTENANCE STONE 6.300 TONLIQUID ASPHALT BINDER PG64-22 960.478 TONFULL DEPTH ASPH. PAV. PATCHING 8" UNIF 540.000 SYSURFACE PLANE ASPHALT PAVEMENT - VARIABLE 3,500.000 SYMILLED-IN RUMBLE STRIP 25.720 MIHOT MIX ASPHALT SURFACE COURSE TYPE D 15,245.617 TONPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 2,596.000 SF4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 15,490.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 192,800.000 LF6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 1,250.000 LF8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 3,000.000 LF24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 356.000 LFWHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 1.000 EA4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 20,850.000 LF4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 122,600.000 LF6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 4,000.000 LF4" WHITE BROKEN LINES -(GAPS EXCLUDED) - EPOXY PAINT 450.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT 2,800.000 LF4" YELLOW BROKEN LINES(GAPS EXC) EPOXY PAINT 150.000 LF4"YELLOW SOLID LINES-PVT.EDGE&NO PASSING ZONE - EPOXY PAINT 1,600.000 LF4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 9,330.000 LF

Call No.: 310 65Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 128,900.000 LF6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 1,250.000 LF8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 1,500.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 356.000 LFWHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 1.000 EA4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 13,350.000 LF4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 79,900.000 LFPERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 400.000 EAPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 645.000 EAREMOVAL OF PAVEMENT MARKINGS 253,100.000 LFPERMANENT GRASSING FOR SMALL PROJECTS 11.559 ACRE

Call No.: 320 66Page:

South Carolina Department of Transportation 2/2/2018

5610011SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Beaufort CharlestonColleton Jasper

DBE Goal Percent: 0.00%

Completion Date:

Description: 2017 FA MICRO SURFACING

10/31/2018

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

18.0300

P030576P030576PCN: Project No.:

P030581P030581PCN: Project No.:

P030583P030583PCN: Project No.:

P030691P030691PCN: Project No.:

P030697P030697PCN: Project No.:

P030698P030698PCN: Project No.:

P030699P030699PCN: Project No.:

P030713P030713PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSREMOVAL & DISPOSAL OF EXISTING PAVEMENT 240.000 SYMAINTENANCE STONE 30.650 TONFULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 3,065.000 SYSURFACE PLANE ASPHALT PAVEMENT - VARIABLE 700.000 SYMILLED-IN RUMBLE STRIP 8.340 MIMICRO SURFACING SURFACE COURSE 619,739.607 SYMICRO SURFACING LEVELING 1,382.420 TONPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4,986.000 SF4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 38,585.000 LF6" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 700.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 106,092.000 LF6" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 44,420.000 LF8" WHITE SOLID LINES PERM.PVMT.MARKINGS 5,839.000 LF12" WHITE SOLID LINES - PERM.PVMT.MARKINGS 390.000 LF12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)PERM.PVMT.MARK 45.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 3,940.000 LFWHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 158.000 EAWHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 186.000 EAWHITE COMBINATION ARROWS(STR&RT.OR STR&LT)PERM.PVMT.MARKING 46.000 EAWHITE LANE DROP ARROW(LT.OR RT.)PERM.PVMT.MARKING 6.000 EA

Call No.: 320 67Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 14,880.000 LF4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 178,637.000 LF12" YELLOW SOLID LINES - PERM.PVMT.MARKING 445.000 LF24" YELLOW SOLID LINES - PERM.PVMT.MARKING 230.000 LF4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 85,730.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 381,464.000 LF8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 12,888.000 LF12" WHITE SOLID LINES - FAST DRY PAINT 780.000 LF24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 8,880.000 LFWHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 365.000 EAWHITE SINGLE BIKE LANE ARROW (LT, STRAIGHT, RT)-FAST DRY PAINT 45.000 EAWHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 361.000 EAWHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 92.000 EAWHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT 72.000 EABIKE LANE SYMBOL - FAST DRY PAINT 38.000 EA4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 31,660.000 LF4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 390,584.000 LF6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 3,695.000 LF24" YELLOW DIAGONAL LINES - FAST DRY PAINT 450.000 LF12" YELLOW SOLID LINES - FAST DRY PAINT 785.000 LFBIKE LANE SYMBOL -PREFORMED THERMO - 90MIL 60.000 EABIKE LANE ARROW - PREFORMED THERMO - 90MIL 67.000 EAPERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 3,094.000 EAPERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 1,638.000 EAPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 3,166.000 EADELINEATORS, SINGLE, BI., INCL. SUPPORTS 10.000 EA

Call No.: 330 68Page:

South Carolina Department of Transportation 2/2/2018

5646520SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Berkeley Charleston DBE Goal Percent: 0.00%

Completion Date:

Description: SHLD PAVING, FDP, INTERMEDIATE,SURFACE

11/30/2018

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

6.6600

P033668P033668PCN: Project No.:

P034706P034706PCN: Project No.:

P034724P034724PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSCONSTRUCTION STAKES, LINES & GRADES 3.000 EATRAFFIC CONTROL 1.000 LSCSX RAILROAD INSURANCE AND FLAGGING 001 1.000 LSREMOVAL & DISPOSAL OF EXISTING PAVEMENT 875.000 SYREMOVAL & DISPOSAL OF EXISTING CURB 200.000 LFREMOVAL OF EXIST. GUARDRAIL 326.000 LFUNCLASSIFIED EXCAVATION 301.000 CYBORROW EXCAVATION 1,412.000 CYEXCAVATION FOR SHOULDER PAVING 486.000 STAHAULING OF EXCAVATED SHOULDER MATERIAL 486.000 STAMAINTENANCE STONE 162.000 TONHOT MIX ASPHALT BASE COURSE - TYPE A 4,961.440 TONLIQUID ASPHALT BINDER PG64-22 1,393.292 TONFULL DEPTH ASPH. PAV. PATCHING 8" UNIF 9,390.000 SYMILLING EXISTING ASPHALT PAVEMENT 1.75" 67,840.000 SYMILLING EXISTING ASPHALT PAVEMENT 2.0" 57,835.000 SYMILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 7,000.000 SYMILLED-IN RUMBLE STRIP 9.760 MIHOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 7,135.896 TONHOT MIX ASPHALT SURFACE COURSE TYPE B 15,209.332 TONPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,104.000 SF4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 5,100.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 51,990.000 LF8" WHITE SOLID LINES PERM.PVMT.MARKINGS 1,630.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 518.000 LFWHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 15.000 EA

Call No.: 330 69Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 23.000 EAWHITE COMBINATION ARROWS(STR&RT.OR STR&LT)PERM.PVMT.MARKING 11.000 EAWHITE LANE DROP ARROW(LT.OR RT.)PERM.PVMT.MARKING 10.000 EARAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING 6.000 EA4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 7,770.000 LF4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 33,140.000 LF6" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 650.000 LF24" YELLOW SOLID LINES - PERM.PVMT.MARKING 32.000 LF4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 5,100.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 173,480.000 LF8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 1,630.000 LF24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 640.000 LFWHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 15.000 EAWHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 23.000 EAWHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 11.000 EAWHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT 10.000 EARAILROAD CROSSING SYMBOLS - FAST DRY PAINT 8.000 EA4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 7,770.000 LF4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 124,590.000 LF6"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 650.000 LF6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 3,680.000 LF24" YELLOW DIAGONAL LINES - FAST DRY PAINT 32.000 LFPERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 74.000 EAPERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 28.000 EAPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 655.000 EAFURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 8,300.000 LFSAWCUT FOR LOOP DETECTOR 3,375.000 LFF&I-12"X12"X12"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 9.000 EACONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE 200.000 LFCONCRETE SIDEWALK(4" UNIFORM) 500.000 SYDETECTABLE WARNING MATERIAL 130.000 SFPEDESTRIAN RAMP CONSTRUCTION 325.000 SYSURFACE APPLIED DETECTABLE WARNING 110.000 SFSTEEL BEAM GUARDRAIL STEEL BEAM GR. 1,369.000 LFGUARDRAIL THRIE-BEAM WITH BASE PLATE 6.25’ POST SPACING 66.000 LFSTEEL BEAM GUARDRAIL (THRIE) 50.000 LFEND TERMINAL - TYPE T 8.000 EAADDITIONAL LENGTH GUARDRAIL POST 40.000 LFPERMANENT GRASSING FOR SMALL PROJECTS 4.723 ACRESILT FENCE 2,300.000 LF

Call No.: 340 70Page:

South Carolina Department of Transportation 2/2/2018

5746920SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Calhoun ClarendonOrangeburg

DBE Goal Percent: 0.00%

Completion Date:

Description: SHLD PAVING, FDP, MILL INTERMEDIATE,SURFACE COURSES

10/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

37.4000

P031747P031747PCN: Project No.:

P036815P036815PCN: Project No.:

P036816P036816PCN: Project No.:

P036828P036828PCN: Project No.:

P036892P036892PCN: Project No.:

P036897P036897PCN: Project No.:

P036908P036908PCN: Project No.:

P036910P036910PCN: Project No.:

P036911P036911PCN: Project No.:

P036929P036929PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSCSX RAILROAD INSURANCE AND FLAGGING 001 1.000 LSREMOVAL & DISPOSAL OF EXISTING PAVEMENT 1,350.000 SYREMOVAL OF EXIST. GUARDRAIL 1,440.000 LFBORROW EXCAVATION 4,954.000 CYEXCAVATION FOR SHOULDER PAVING 3,133.152 STAHAULING OF EXCAVATED SHOULDER MATERIAL 3,133.152 STAMAINTENANCE STONE 103.860 TONHMA SHOULDER WIDENING COURSE 21,880.615 TONLIQUID ASPHALT BINDER PG64-22 5,577.930 TONFULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 9,087.000 SYFULL DEPTH ASPH. PAV. PATCHING 8" UNIF 1,299.000 SYMILLING EXISTING ASPHALT PAVEMENT 1.75" 20,350.000 SYMILLING EXISTING ASPHALT PAVEMENT 2.0" 34,300.000 SYMILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 48,419.000 SYMILLED-IN RUMBLE STRIP 55.380 MIHOT MIX ASPHALT SURFACE COURSE TYPE B 36,123.948 TONHOT MIX ASPHALT SURFACE COURSE TYPE C 33,286.902 TONHOT MIX ASPHALT SURFACE COURSE TYPE D 9,081.300 TON

Call No.: 340 71Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 6,044.000 SF4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 5,952.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 190,870.000 LF6" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 700.000 LF8" WHITE SOLID LINES PERM.PVMT.MARKINGS 1,215.000 LF12" WHITE SOLID LINES - PERM.PVMT.MARKINGS 150.000 LF12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)PERM.PVMT.MARK 85.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 2,037.000 LFWHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 21.000 EAWHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 9.000 EAWHITE COMBINATION ARROWS(STR&RT.OR STR&LT)PERM.PVMT.MARKING 1.000 EARAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING 2.000 EA4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 16,780.000 LF4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 124,535.000 LF6" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 170.000 LF4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 38,606.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 571,580.000 LF6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 3,650.000 LF8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 2,960.000 LF12" WHITE SOLID LINES - FAST DRY PAINT 1,800.000 LF24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 4,867.000 LFWHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 26.000 EAWHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 11.000 EAWHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 1.000 EARAILROAD CROSSING SYMBOLS - FAST DRY PAINT 2.000 EA4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 45,140.000 LF4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 390,600.000 LF6"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 340.000 LF6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 990.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT 620.000 LF4"YELLOW SOLID LINES-PVT.EDGE&NO PASSING ZONE - EPOXY PAINT 620.000 LF4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 14,450.000 LF6" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 776.000 LF6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 169,340.000 LF8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 430.000 LF12" WHITE SOLID LINES - THERMO. - 125 MIL. 820.000 LF12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 35.000 LF24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 961.000 LFWHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 5.000 EAWHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 2.000 EA4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 10,335.000 LF6" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 1,510.000 LF

Call No.: 340 72Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 67,210.000 LF6" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 38,850.000 LFPERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 1,108.000 EAPERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 114.000 EAPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 2,774.000 EAPERM.RED/CLEAR PAVEMENT MARKERS BI-DIR. - 4"X 4" 2.000 EAREMOVAL OF PAVEMENT MARKINGS 1,240.000 LFFURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 500.000 LFFURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 21,800.000 LFSAWCUT FOR LOOP DETECTOR 3,750.000 LFADJUST DROP INLET ADJUST D. I. 7.000 EADETECTABLE WARNING MATERIAL 675.000 SFPEDESTRIAN RAMP CONSTRUCTION 1,350.000 SYSURFACE APPLIED DETECTABLE WARNING 300.000 SFSTEEL BEAM GUARDRAIL STEEL BEAM GR. 2,640.000 LFSTEEL BEAM GUARDRAIL (THRIE) 635.000 LFEND ANCHOR-TYPE B 2.000 EATHRIE BEAM G.R.BRIDGE CONN. 8.000 EAADDITIONAL LENGTH GUARDRAIL POST 360.000 LFGUARDRAIL THRIE-BEAM WITH BASE PLATE 6.25’ POST SPACING 1,385.000 LFGUARDRAIL LEADING TYPE T TL3 (50') 31.000 EAPERMANENT GRASSING FOR SMALL PROJECTS 24.021 ACRE

Call No.: 350 73Page:

South Carolina Department of Transportation 2/2/2018

8814200SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: Fairfield Newberry DBE Goal Percent: 0.00%

Completion Date:

Description: SC 213 OVER BROAD RIVER BRIDGEREHAB

6/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $29.00Letting Time:

0.2870

P026821P026821PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSREMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 100.000 SYSITE EXCAVATION 1.000 LSFLOWABLE FILL 50.000 CYLIQUID ASPHALT BINDER PG64-22 13.000 TONFULL DEPTH ASPH. PAV. PATCHING 8" UNIF 100.000 SYMILLING EXISTING ASPHALT PAVEMENT 1.5" 1,121.000 SYMILLING EXISTING ASPHALT PAVEMENT 2.5" 1,121.000 SYMILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 50.000 SYHOT MIX ASPHALT SURFACE COURSE TYPE B 244.000 TONPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 312.000 SFPERMANENT CONSTRUCTION SIGNS (BARRICADE MOUNTED) 70.000 SFBARRICADE - TYPE 3 84.000 LFTYPE B - FLASHING LIGHT 16.000 EAPAVEMENT MARKINGS(TEMP-PAINT) 4" YELLOW BROKEN LINES 400.000 LFPAVEMENT MARKINGS(TEMPORARY-PAINT)-4" WHITE SOLID LINES 3,200.000 LFPAVEMENT MARKINGS(TEMPORARY-PAINT)-4" YELLOW SOLID LINES 500.000 LFTEMPORARY YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 25.000 EA4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 3,957.000 LF4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 60.000 LF4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 3,957.000 LF4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 3,957.000 LF4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 60.000 LF4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 3,957.000 LFPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 25.000 EAPREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"WH.SOLID 3,200.000 LFPREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"YEL.BROKEN 400.000 LFCONC. FOR STRUCTURES - CLASS 4000 3.600 CY

CONTRACTORS ARE ADVISED THAT THERE WILL BE A MANDATORY PRE-BID CONFERENCE FOR THIS PROJECT TO BE HELD AT 1:30 PM ON TUESDAY, FEBRUARY 13, 2018.

LOCATION FOR THIS PRE-BID CONFERENCE WILL BE AT (SCDOT - ITS BUILDING - NEW CONFERENCE ROOM OUTSIDE DISTRICT 1 LAB)

1408 SHOP RD, COLUMBIA, SC 29201.CONTRACTORS WHO DO NOT ATTEND THIS PRE-BID CONFERENCE

WILL NOT BE ALLOWED TO SUBMIT A BID PROPOSAL FOR THIS PROJECT.

Call No.: 350 74Page:

South Carolina Department of Transportation 2/2/2018

Description Quantity Units

SPALL REPAIR 290.000 SFEPOXY CRACK INJECTION 50.000 LFGROOVED SURFACE FINISH 4,032.000 SYREINF. STEEL FOR STRUCTURES (BRIDGE) 774.000 LBSTRUCTURAL STEEL 1.000 LSCLEANING AND PAINTING EXISTING STRUCTURAL STEEL 1.000 LSBRIDGE APPROACH CONCRETE CURB AND GUTTER(1'-10") 42.000 LFELASTOMERIC BEARING 180.000 EAHYDRO-DEMOLITION OF EXISTING SURFACE 4,222.000 SYPARTIAL DEPTH REMOVAL OF SOUND CONCRETE 1,270.000 SYVERY EARLY STRENGTH CONCRETE OVERLAY (LATEX) 229.000 CYREHABILITATE EXISTING EXPANSION JOINT 18.000 EAJACKING BRIDGE 1.000 LSRESET GUARDRAIL RESET GR. 100.000 LFEND TERMINAL - TYPE T 2.000 EATHRIE BEAM G.R.BRIDGE CONN. 2.000 EAGUARDRAIL THRIE-BEAM WITH BASE PLATE 3.125’ POST SPACING 1,218.750 LFGR TRAILING END TREATMENT THRIE-BEAM TYPE B 2.000 EAPERMANENT GRASSING FOR SMALL PROJECTS 0.400 ACRESEDIMENT TUBES FOR DITCH CHECKS 50.000 LFSILT FENCE 1,000.000 LFSURFACE MILLING 001 4,222.000 SYBRIDGE DECK PATCHING, FULL DEPTH 002 422.000 SY

Call No.: 360 75Page:

South Carolina Department of Transportation 2/2/2018

8847610SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: STATEWIDE DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 UPPER STATE INTERSTATE RPMS

8/31/2018

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

348.5000

P037098P037098PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSCLEAR MONODIRECTION REPLACEMENT REFLECTOR 3,700.000 EAPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 530.000 EAPERM.RED/CLEAR PAVEMENT MARKERS BI-DIR. - 4"X 4" 93,050.000 EA

Call No.: 370 76Page:

South Carolina Department of Transportation 2/2/2018

8847620SC File NO(S).:

March 13, 201802:00 PM

Letting Date: CO(S).: STATEWIDE DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 LOWER STATE INTERSTATE RPMS

8/31/2018

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00Letting Time:

501.5000

P037099P037099PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LSBONDS AND INSURANCE 1.000 LSTRAFFIC CONTROL 1.000 LSPERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 4,625.000 EAPERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 100.000 EAPERM.RED/CLEAR PAVEMENT MARKERS BI-DIR. - 4"X 4" 101,500.000 EA

BID BONDS FOR SCDOT WORK. Unless otherwise indicated in the advertisement, no proposal will beconsidered unless accompanied by a bid bond in the amount of 5% of the APPROXIMATE BID AMOUNT,written by a SURETY satisfactory to the Department, properly executed in South Carolina Department ofTransportation Form 674 (furnished by the Department in each proposal). If an electronic bond is utilized,the Bond ID number must be provided on the Surety 2000 or SurePath Network electronic bond form. NOOTHER FORM OF PROPOSAL GUARANTY WILL BE ACCEPTED.

IRREGULAR ELECTRONIC BIDS. Electronic bids may be declared irregular for any of the followingreasons: 1. In the schedule of Prices, (a) alteration of a part of bid item except for the unit price; or (b) failure to enter a bid item unit price; or (c) a bid item unit price is not in the proper form or is incomplete. 2. In the DBE Folder, when a project has a DBE goal, in the DBE's subcontractors information, work items, unit prices, or the other required information has not been entered in the proper form fields or is incomplete. 3. In the PROPOSAL FORM, (a) the box at the end of the form indicating acknowledgement and acceptance of the conditions set forth in the form is not checked. 4. In the Bid Bond section of the PROPOSAL FORM, the required information for appropriate form fields is not furnished. 5. A properly executed Bid Bond is not furnished in accordance with the selected manner of submission.

SUBMISSION OF BID BONDS. Bid Bonds may be submitted electronically, by US mail, express deliveryservice or hand-delivered. Bid Bonds not submitted electronically must be submitted in advance of the bidopening.

1. BID BONDS SUBMITTED BY US MAIL OR EXPRESS DELIVERY SERVICE. Sealed bid bondssubmitted by US mail or express delivery service shall be enclosed in sealed envelope or containerwith Contractor Name and "Bid Bond for SC File No._______", and enclosed in an outer, sealedenvelope or container addressed to Contract Administrator, SCDOT, PO Box 365, Columbia, SC29202-0365, or 955 Park Street, Columbia, South Carolina, 29201. Bid bonds submitted by USmail or express delivery service must be received by the Contract Administrator, or designee, priorto the time and date for opening of proposals indicated in the beginning of this Notice. Thedepartment will not be responsible for delays in the US mail or express delivery service.

2. BID BONDS HAND DELIVERED. Bid bonds that are hand delivered shall be enclosed in a sealedenvelope marked with Contractor Name and "Bid Bond for SC File No._______", and must bedelivered directly to the Contract Administrator or designee prior to the time and date for opening ofproposals indicated in the beginning of this Notice.

PREQUALIFICATION. The Contractor's attention is called to the requirements of the SC Department ofTransportation for Prequalification. ONLY CONTRACTORS WHO HAVE BEEN ISSUED APREQUALIFICATION CERTIFICATE BY THE SC DEPARTMENT OF TRANSPORTATION WILL BEALLOWED TO SUBMIT BIDS. Information concerning prequalification can be obtained at the ContractsAdministration office, Room 334 in the Headquarters building, 955 Park Street, Columbia, SC, or by callingJeff Elliott at (803)737-1253.

STATUTES, CODES, AND REGULATIONS. The Federal-Aid Projects embraced in this advertisementcontemplates the expenditure of funds pursuant to Title 23, United States Code, "Highways.The Contractor's attention is called to the fact that the SC Department of Transportation, in accordance withthe provisions of Title VI of the Civil Rights Act of 1964 (78) Sta. 252 and the Regulations of the FederalHighway Administration (15 C.F.R., Part 8), issued pursuant to such act, hereby notifies all bidders that itwill affirmatively insure that in any contract entered into pursuant to this advertisement minority businessenterprises will be afforded full opportunity to submit bids in response to this invitation and will not bediscriminated against on the grounds of race, color, sex, religion or national origin in consideration foraward. All bidders on Federal Aid Projects must comply with the Instructions to Bidders and SpecialProvision covering Disadvantaged and Women Business Enterprise (DBE/WBE) included as a part of theproposal.Attention is directed to the Fair Labor Standards Act of 1938, as amended. Contractors will be responsiblefor carrying out all of the provisions of this Act, which may affect these contracts. Attention is also called tothe fact that any Federal Aid Project or Projects included in this notice will be subject to the Work Hours andSafety Act of 1962 as amended, PL 87-581, PL 91-54 and implementing regulations.

MINIMUM WAGE RATES FOR FAP CONTRACTS HAVE BEEN PREDETERMINED BY THE SECRETARYOF LABOR IN ACCORDANCE WITH THE TERMS OF THE DAVIS BACON ACT AS AMENDED AND THEFEDERAL HIGHWAY ACT OF 1956, AND LATER ACTS, AND THESE RATES WILL BE SET FORTH INTHE PROPOSAL FORM. THIS CONTRACT IS ALSO SUBJECT TO THE WORK HOURS AND SAFETYACT OF 1962 AS AMENDED, PL 87-581, PL 91-54, AND IMPLEMENTING REGULATIONS.CONTRACTORS ATTENTION IS ALSO CALLED TO THE FEDERAL REQUIREMENTS GOVERNINGSPECIFIC EQUAL EMPLOYMENT OPPORTUNITY RESPONSIBILITIES, WHICH WILL BE INCLUDED INTHIS CONTRACT.

In addition to the Standard Specifications for Highway Construction, Edition of 2007, the "SupplementalSpecifications", and the "Project Special Provisions", the following govern SCDOT Highway Lettings:

TIME OF THE LETTING. The Contract Administrator, or designee, at the site of the letting shall be the solejudge of determining the local time and the arrival of the designated time for the opening and reading of thebids.

Information in this notice is the latest available at the time of its publication. The information contained inthe proposals, plans, and any addenda issued shall govern over this notice. Cost of plans may change, andthe bidder should check with the SCDOT Engineering Publications office for the cost of plans when theplans are indicated to be available.

THE SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION RESERVES THE RIGHT TO REJECTANY OR ALL PROPOSALS AND WAIVE ANY TECHNICALITIES.

IRREGULAR ELECTRONIC BIDS. Electronic bids may be declared irregular for any of the followingreasons:

1. In the schedule of Prices,(a) alteration of a part of bid item except for the unit price; or(b) failure to enter a bid item unit price; or(c) a bid item unit price is not in the proper form or is incomplete.

2. In the DBE Folder, when a project has a DBE goal, in the DBE's subcontractors information, workitems, unit prices, or the other required information has not been entered in the proper form fields or

is incomplete.3. In the PROPOSAL FORM,

(a) the box at the end of the form indicating acknowledgement and acceptance of the conditions setforth in the form is not checked.

4. In the Bid Bond section of the PROPOSAL FORM, the required information for appropriate form fieldsis not furnished.

5. A properly executed Bid Bond is not furnished in accordance with the selected manner ofsubmission.

Prepared by L. Stuckey

Issued by:

J.Brian ParnellContract Administrator