CAGAYAN DE ORO CITY WATER DISTRICT
ENGINEERING DEPARTMENTCOWD PROJECTS as of December 2012
SOURCE OF FUNDS: CAPEX- BUILDING CONSTRUCTION
AMOUNT DATE PROJECT TITLE LOCATION STATUS
Cagayan de Oro City
WORK ORDER
Five Key Result Areas(EO # 43,s 2011)
20,518.00 12-012-B 2012-02-22 COMPLETED
422,751.00 12-016-D 2012-03-01 COMPLETED
64,922.00 12-026-D 2012-04-18 Window Grills COMPLETED
33,217.36 12-030-D 2012-04-24 Temporary Fence COMPLETED
83,483.00 12-044-C 2012-06-21 COMPLETED
43,141.00 12-046-D 2012-06-21 Locker & Storage COMPLETED
152,891.00 12-047-D 2012-06-25 Guard House in progress
269,129.02 12-050-D 2012-06-25 COMPLETED
284,697.00 12-052-D 2012-07-20 in progress
230,019.00 12-053-F 2012-07-25 COMPLETED
Pressure Monitoring Chamber
Macapagal-Masterson Ave., Upper Bal.
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Drainage Line Connection
Booster Pump Station, Sumpm#2
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Rapid, inclusive and sustained economic growth
Property Division, Kauswagan
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
COWD Vacant Lot, Carmen
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Just and Lasting Peace and the Rule of Law
COWD Sub-office Rectification
Obando Building, Puerto
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigationRapid, inclusive and sustained economic growth
Groundfloor, Admin Bldg.
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
PW # 24, Balulang
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Just and Lasting Peace and the Rule of Law
Installation of Window Glass @ 3rd Floor
Admin. Bldg., Corrales Ave.
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Perimeter Fence Extension
PW #2, Macasandig
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Just and Lasting Peace and the Rule of Law
Realignment of 300mmØ Steel Pipeline
CM Recto cor Corrales Ave. (beside Caltex)
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
CAGAYAN DE ORO CITY WATER DISTRICT
ENGINEERING DEPARTMENTCOWD PROJECTS as of December 2012
SOURCE OF FUNDS: CAPEX- BUILDING CONSTRUCTION
AMOUNT DATE PROJECT TITLE LOCATION STATUS
Cagayan de Oro City
WORK ORDER
Five Key Result Areas(EO # 43,s 2011)
33,347.00 12-064-D 2012-08-22 2nd FLR Fire Exit Ladder COMPLETED
102,985.00 12-067-C 2012-09-03 COMPLETED
126,439.00 12-072-B 2012-09-27 COWD Admin COMPLETED
196,273.00 12-076-F 2012-10-08 in progress
160,749.30 12-079-D 2012-10-08 not started
441,060.00 12-083-D 2012-10-30 in progress
14,900.00 12-087-D 2012-11-09 not started
88,787.00 12-089-F 2012-11-13 in progress
94,122.13 12-091-D 2012-11-19 in progress
Admin. Bldg., Corrales Ave.
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Just and Lasting Peace and the Rule of Law
Replacement of Service Pedestal
PW # 9, Biasong
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Just and Lasting Peace and the Rule of Law
1.5 cu.m. Stainless Steel Water Tank Installation
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Temporary GI Sheet Perimeter Fence
Tin-ao, Agusan, CDO
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Just and Lasting Peace and the Rule of Law
Renovation of Ground Floor Men & Women's
CRCOWD Admin Ofc.
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Renovation of 2nd Flr CR (Men & Women)
Admin. Bldg., Corrales Ave.
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Refilling Station Modification
BPS, Macasandig
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Demolition & Restoration of Road
PavementLumbia Rd. CDO
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Just and Lasting Peace and the Rule of Law
Low Partition w/ Glass & Fabrication of Cabinet
Finance Dept., Admin Bldg.
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
CAGAYAN DE ORO CITY WATER DISTRICT
ENGINEERING DEPARTMENTCOWD PROJECTS as of December 2012
SOURCE OF FUNDS: CAPEX- BUILDING CONSTRUCTION
AMOUNT DATE PROJECT TITLE LOCATION STATUS
Cagayan de Oro City
WORK ORDER
Five Key Result Areas(EO # 43,s 2011)
122,348.00 13-003-D 2013-01-03 Ramp & Handrail not started
147,241.00 13-005-D 2013-01-16 not started
618,947.00 13-006-D 2013-01-16 Mini Shop not started
81,777.63 13-010-D 2013-02-07 not started
Five Key Result Areas(EO # 43,s 2011)
a Transparent, accountable and participatory governanceb Poverty reduction and empowerment of the poor and vulnerablec Rapid, inclusive and sustained economic growthd Just and Lasting Peace and the Rule of Lawe Integrity of the environment and climate change adaptation and mitigation
Macasandig Booster Station
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Just and Lasting Peace and the Rule of Law
Barbed Wire Perimeter Fence Extension
PW #11, Bantiles Bugo
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Macasandig Booster Station
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
New Pedestal Electrical Wiring from Service
Entrance Cap to Panel Board
PW# 9, Biasong Mac.
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
CAGAYAN DE ORO CITY WATER DISTRICT
ENGINEERING DEPARTMENTCOWD PROJECTS as of December 2012
SOURCE OF FUNDS: LGU (6M)
PROJECT COST DATE PROJECT TITLE LOCATION STATUS No. of Beneficiaries
Cagayan de Oro City
WORK ORDER
Five Key Result Areas (EO # 43,s 2011)
82,139.56 12-015-F 2012-02-29 COMPLETED
192,975.00 12-018-F 2012-03-21 COMPLETED
203,495.00 12-027-F 2012-04-20 COMPLETED
207,152.70 12-031-F 2012-04-30 COMPLETED
225,723.00 12-032-F 2012-05-03 suspended
145,833.00 12-040-F 2012-05-30 COMPLETED
2-units Water Meter Stub-outs & 3 units Service
Connection
PNP & Covered Court Rel. Site
Calaanan
All Typhoon Sendong relocated beneficiaries at Calaanan, Barangay
Canitoan
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
Integrity of the environment and climate change adaptation and mitigation
2-50mm PE Pipe Distribution Line w/ 1 meter stub-out &
50mm Mother meter
Relocation Site Calaanan
All Typhoon Sendong relocated beneficiaries at Calaanan, Barangay
Canitoan
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
Integrity of the environment and climate change adaptation and mitigation
150mmØ Commercial fire Hydrant
Toribio Chavez cor. Pabayo St.
Entire Cagayan de Oro community
Transparent, accountable and participatory governance
Rapid, inclusive and sustained economic growth
Integrity of the environment and climate change adaptation and mitigation
50mm Ø Distribution Line w/ 5 units Meter Stub-outs
B40-50, Phase 3, Calaanan
Relocation
All Typhoon Sendong relocated beneficiaries at Calaanan, Barangay
Canitoan
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerableRapid, inclusive and sustained economic growth
Integrity of the environment and climate change adaptation and mitigation
50mmØ Distribution Line w/ 2-units Meter Stub-outs
Mindanawan, Purok 13 Tablon
CDO
Suspended due to pipeline right of way
within private owned lot and expected to serve
280 beneficiaries.
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Just and Lasting Peace and the Rule of Law
50mm PE Pipe Distribution Line w/ 3 units Meter Stub-
outs
P2, Calaanan Relocation Site
All Typhoon Sendong relocated beneficiaries at Calaanan, Barangay
Canitoan
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerableRapid, inclusive and sustained economic growth
Integrity of the environment and climate change adaptation and mitigation
CAGAYAN DE ORO CITY WATER DISTRICT
ENGINEERING DEPARTMENTCOWD PROJECTS as of December 2012
SOURCE OF FUNDS: LGU (6M)
PROJECT COST DATE PROJECT TITLE LOCATION STATUS No. of Beneficiaries
Cagayan de Oro City
WORK ORDER
Five Key Result Areas (EO # 43,s 2011)
71,582.55 12-041-F 2012-05-30 COMPLETED 420
2,564,279.00 12-058-A 2012-08-07 in progress 700
137,587.00 12-060-F 2012-08-09 COMPLETED 140
688,121.00 12-062-A 2012-08-09 in progress
435,749.00 12-063-F 2012-08-16 COMPLETED
295,555.00 12-093-f 2012-12-06 not started 280
Five Key Result Areas(EO # 43,s 2011)a Transparent, accountable and participatory governanceb Poverty reduction and empowerment of the poor and vulnerablec Rapid, inclusive and sustained economic growthd Just and Lasting Peace and the Rule of Lawe Integrity of the environment and climate change adaptation and mitigation
50mm PE Pipe Distribution Line w/ 3 units Meter Stub-
outs
Habitat - P2, Calaanan
Relocation Site
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerableRapid, inclusive and sustained economic growth
Integrity of the environment and climate change adaptation and mitigation
6"Øpipeline Extn. w/ 5 units 2"Ø Meter Stub-outs
Purok 7, Sitio Sapong Tablon
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerableRapid, inclusive and sustained economic growth
50mmØ Service Line w/ 1 unit Meter Stub-out
Zone 11, Tejero St. Patag
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerableRapid, inclusive and sustained economic growth
Calaanan Phase 2 Water System
Calaanan, Canitoan
All Typhoon Sendong relocated beneficiaries at Calaanan, Barangay
Canitoan
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerableRapid, inclusive and sustained economic growth
Water Supply System w/ 4 units Meter Stub-outs
North City Central Schl., Puntod
All enrolled students in North cioty Central
School, Barangay Puntod
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerableRapid, inclusive and sustained economic growth
2" Service Line w/ 2 units MSO
P-2C Gusa, CDO
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
CAGAYAN DE ORO CITY WATER DISTRICT
ENGINEERING DEPARTMENTCOWD PROJECTS as of December 2012
SOURCE OF FUNDS: CAPEX- PIPELINE EXTENSION
PROJECT COST DATE PROJECT TITLE LOCATION STATUS
Cagayan de Oro City
WORK ORDER
No. of Beneficiaries
Five Key Result Areas (EO # 43,s 2011)
132,368.56 12-002-A 2012-01-16 400mmØ Pipe Realignment COMPLETED
438,638.43 12-022-A 2012-03-30 COMPLETED
85,034.00 12-028-A 2012-04-23 COMPLETED
81,948.00 12-029-A 2012-04-23 COMPLETED
294,046.00 12-034-A 2012-05-10 COMPLETED
46,392.00 12-035-A 2012-05-15 COMPLETED
1,212,099.00 12-049 2012-06-25 in progress
91,259.00 12-054-C 2012-07-25 COMPLETED
100,658.46 12-056-F 2012-08-02 COMPLETED
Adelfa St. Carmen
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
300mmØ Steel Pipe Realignment
Bitan-ag Box Culvert, Lapasan
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
200mmØ Line Meter w/ Vault (DMA)
RER Subd. Agoho entrance
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
150mmØ Line Meter w/ vault (DMA)
San Lazaro, Lapasan
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
300mmØ PIPELINE Realignment
Corrales-Recto Ave. CDO
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
150mmØ Line Meter w/ vault (DMA)
LKK Center, Lapasan, CDO
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
Inline Booster Installation & Shedhouse
TOP, Taguanao-Lumbia
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerableRapid, inclusive and sustained economic growth
200mmØ Check Valve Modification
PW#23, Tina-ao, Agusan
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
Realignment of 300mmØ Steel Pipeline
CM Recto cor Julio Pacana
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerableRapid, inclusive and sustained economic growth
CAGAYAN DE ORO CITY WATER DISTRICT
ENGINEERING DEPARTMENTCOWD PROJECTS as of December 2012
SOURCE OF FUNDS: CAPEX- PIPELINE EXTENSION
PROJECT COST DATE PROJECT TITLE LOCATION STATUS
Cagayan de Oro City
WORK ORDER
No. of Beneficiaries
Five Key Result Areas (EO # 43,s 2011)
357,571.48 12-057-F 2012-08-02 COMPLETED 280
190,053.00 12-059-F 2012-08-08 COMPLETED
283,521.00 12-065-F 2012-08-22 COMPLETED
112,681.00 12-068 2012-09-10 not started
304,401.64 12-070-A 2012-09-27 not started
306,080.71 12-071-A 2012-09-27 COMPLETED
696,802.47 12-075-A 2012-10-04 in progress 280
1,089,502.62 12-094-B 2012-12-06 3 Units Ultrasonic Chamber not started
1,016,093.00 13-002-A 2013-01-03 not started 3220
Realignment of 150mmØ uPVC Pipeline W/ 4 units
2"Ø Stub-outs
Abellanosa-Magsaysay -Burgos Sts.
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
Realignment of 300mmØ Steel Pipeline
Corrales-Recto Ave.(Gaisano City) CDO
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
Realignment of 300mmØ Steel Pipeline
Abellanosa Rd. fronting UCCP
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
Relocation of PPA Mother Meter
Corrales Extn.
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
12"Ø Pipeline Realignment Capt. V. Roa St.
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
12" Ø Pipeline Realignment Osmena St. CDO
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerableRapid, inclusive and sustained economic growth
100mmØ and 2-50mm Distribution Line w/ w units
50mmØ Meter Stub-out
Lower Zone 6, Upper Zone 8, Bulua
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
Masterson Avenue, Upper Balulang
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerableRapid, inclusive and sustained economic growth
Pipe Rehabilitation & Installation of 23 units-
Meter Stub-outsSan Lazaro, Lapasan
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
CAGAYAN DE ORO CITY WATER DISTRICT
ENGINEERING DEPARTMENTCOWD PROJECTS as of December 2012
SOURCE OF FUNDS: CAPEX- PIPELINE EXTENSION
PROJECT COST DATE PROJECT TITLE LOCATION STATUS
Cagayan de Oro City
WORK ORDER
No. of Beneficiaries
Five Key Result Areas (EO # 43,s 2011)
158,018.00 12-007-B 2013-01-25 300mm Ø Isolation Valve not started
Five Key Result Areas(EO # 43,s 2011)a Transparent, accountable and participatory governanceb Poverty reduction and empowerment of the poor and vulnerablec Rapid, inclusive and sustained economic growthd Just and Lasting Peace and the Rule of Lawe Integrity of the environment and climate change adaptation and mitigation
Calaanan, Canitoan
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
CAGAYAN DE ORO CITY WATER DISTRICT
ENGINEERING DEPARTMENTCOWD PROJECTS as of December 2012
SOURCE OF FUNDS: CAPEX-STUB-OUT
DATE PROJECT TITLE LOCATION STATUS
Cagayan de Oro City
PROJECT COST
WORK ORDER
No. of Beneficiaries
Five Key Result Areas (EO # 43,s 2011)
61,091.00 12-008-F 2012-02-22 COMPLETED 140
85,254.00 12-019-F 2012-03-20 Z-6, Carmen COMPLETED 140
110,912.00 12-025-F 2012-04-19 COMPLETED 140
42,957.00 12-045-F 2012-06-21 COMPLETED 140
69,133.94 12-048-F 2012-06-25 COMPLETED 140
200,022.00 12-061-F 2012-08-09 UMNAI, Carmen COMPLETED 140
61,857.85 12-074-F 2012-10-04 COMPLETED 140
One (1) unit Meter Stub-out
San Lazaro, Zone 2, Lapasan
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
1-Unit 50mmØ Meter Stub-out
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
1-Unit Meter Stub-out
GSIS District 7, Calaanan
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
Relocation of 1 unit 50mm Ø
Meter Stub-out & Fire Hydrant
Abellanosa St., CDO
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
50mm Ø Distribution Line w/ 1 unit 50mmMeter
Stub-out
Sacred Heart Phase 4 Zone 8 Carmen
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
50mmØ Pipe Interconnection
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerableRapid, inclusive and sustained economic growth
2" Service Line w/ 1 unit MSO
Magic 18 Homeowners Asso., Woodland Heights
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
CAGAYAN DE ORO CITY WATER DISTRICT
ENGINEERING DEPARTMENTCOWD PROJECTS as of December 2012
SOURCE OF FUNDS: CAPEX-STUB-OUT
DATE PROJECT TITLE LOCATION STATUS
Cagayan de Oro City
PROJECT COST
WORK ORDER
No. of Beneficiaries
Five Key Result Areas (EO # 43,s 2011)
332,454.19 12-088-F 2012-11-09 Xavier Eco-ville in progress 560
144,742.00 12-096-F 2012-12-21 not started 420
178,202.00 12-097-F 2012-12-02 not started 560
393,349.00 12-098-F 2012-12-21 not started 420
235,902.00 12-099-F 2013-01-04 not started 280
547,339.03 13-001-A 2013-01-03 not started 840
611,032.57 13-011-A 2013-02-08 not started 280
4 units-50mmØ Meter Stub-outs
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerableRapid, inclusive and sustained economic growth
3-50mmØ Service Lines w/ 3 units Meter Stub-outs
Camp Evang, Patag
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerableRapid, inclusive and sustained economic growth
4-units 50mmØ Service Lines w/
stub-outsZ-3, Patag, CDO
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
100mmØ Distribution Line w/ 3 units MSO
Camp Evang, Patag
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerableRapid, inclusive and sustained economic growth
2-50mm PE Pipe Distribution Line
w/ individual meter stub-outs
Camp Evang, Patag
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
4"Ø Distribution Line w/ 6-units
Meter Stub-outsCamp Alagar, Lapasan
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerableRapid, inclusive and sustained economic growth
4"Ø Distribution Line w/ 2-units
Meter Stub-outsSaarenas Village, Patag
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerableRapid, inclusive and sustained economic growth
CAGAYAN DE ORO CITY WATER DISTRICT
ENGINEERING DEPARTMENTCOWD PROJECTS as of December 2012
SOURCE OF FUNDS: CAPEX-STUB-OUT
DATE PROJECT TITLE LOCATION STATUS
Cagayan de Oro City
PROJECT COST
WORK ORDER
No. of Beneficiaries
Five Key Result Areas (EO # 43,s 2011)
141,080.52 13-012-F 2013-02-12 completed 280
Five Key Result Areas(EO # 43,s 2011)a Transparent, accountable and participatory governanceb Poverty reduction and empowerment of the poor and vulnerablec Rapid, inclusive and sustained economic growthd Just and Lasting Peace and the Rule of Lawe Integrity of the environment and climate change adaptation and mitigation
Installation of 2"Ø Mother Meter
San Vicente, Casinglot Tagoloan, Mis. Or.
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerableRapid, inclusive and sustained economic growth
CAGAYAN DE ORO CITY WATER DISTRICT
ENGINEERING DEPARTMENTCOWD PROJECTS as of December 2012
SOURCE OF FUNDS: CAPEX- BUILDING CONSTRUCTION
AMOUNT DATE PROJECT TITLE LOCATION STATUS
20,518.00 12-012-B 2012-02-22 COMPLETED
422,751.00 12-016-D 2012-03-01 COMPLETED
64,922.00 12-026-D 2012-04-18 Window Grills COMPLETED
33,217.36 12-030-D 2012-04-24 Temporary Fence COMPLETED
83,483.00 12-044-C 2012-06-21 COMPLETED
43,141.00 12-046-D 2012-06-21 Locker & Storage COMPLETED
152,891.00 12-047-D 2012-06-25 Guard House in progress
269,129.02 12-050-D 2012-06-25 COMPLETED
284,697.00 12-052-D 2012-07-20 in progress
230,019.00 12-053-F 2012-07-25 COMPLETED
33,347.00 12-064-D 2012-08-22 2nd FLR Fire Exit Ladder COMPLETED
Cagayan de Oro City
WORK ORDER
Five Key Result Areas(EO # 43,s 2011)
Pressure Monitoring Chamber
Macapagal-Masterson Ave., Upper Bal.
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Drainage Line Connection
Booster Pump Station, Sumpm#2
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Rapid, inclusive and sustained economic growth
Property Division, Kauswagan
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
COWD Vacant Lot, Carmen
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Just and Lasting Peace and the Rule of Law
COWD Sub-office Rectification
Obando Building, Puerto
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigationRapid, inclusive and sustained economic growth
Groundfloor, Admin Bldg.
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
PW # 24, Balulang
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Just and Lasting Peace and the Rule of Law
Installation of Window Glass @ 3rd Floor
Admin. Bldg., Corrales Ave.
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Perimeter Fence Extension
PW #2, Macasandig
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Just and Lasting Peace and the Rule of Law
Realignment of 300mmØ Steel Pipeline
CM Recto cor Corrales Ave. (beside Caltex)
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Admin. Bldg., Corrales Ave.
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Just and Lasting Peace and the Rule of Law
102,985.00 12-067-C 2012-09-03 COMPLETED
126,439.00 12-072-B 2012-09-27 COWD Admin COMPLETED
196,273.00 12-076-F 2012-10-08 in progress
160,749.30 12-079-D 2012-10-08 not started
441,060.00 12-083-D 2012-10-30 in progress
14,900.00 12-087-D 2012-11-09 not started
88,787.00 12-089-F 2012-11-13 in progress
94,122.13 12-091-D 2012-11-19 in progress
122,348.00 13-003-D 2013-01-03 Ramp & Handrail not started
147,241.00 13-005-D 2013-01-16 not started
618,947.00 13-006-D 2013-01-16 Mini Shop not started
81,777.63 13-010-D 2013-02-07 not started
Five Key Result Areas(EO # 43,s 2011)
Replacement of Service Pedestal
PW # 9, Biasong
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Just and Lasting Peace and the Rule of Law
1.5 cu.m. Stainless Steel Water Tank Installation
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Temporary GI Sheet Perimeter Fence
Tin-ao, Agusan, CDO
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Just and Lasting Peace and the Rule of Law
Renovation of Ground Floor Men & Women's
CRCOWD Admin Ofc.
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Renovation of 2nd Flr CR (Men & Women)
Admin. Bldg., Corrales Ave.
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Refilling Station Modification
BPS, Macasandig
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Demolition & Restoration of Road
PavementLumbia Rd. CDO
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Just and Lasting Peace and the Rule of Law
Low Partition w/ Glass & Fabrication of Cabinet
Finance Dept., Admin Bldg.
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Macasandig Booster Station
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Just and Lasting Peace and the Rule of Law
Barbed Wire Perimeter Fence Extension
PW #11, Bantiles Bugo
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
Macasandig Booster Station
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
New Pedestal Electrical Wiring from Service
Entrance Cap to Panel Board
PW# 9, Biasong Mac.
Transparent, accountable and participatory governance
Integrity of the environment and climate change adaptation and mitigation
a Transparent, accountable and participatory governanceb Poverty reduction and empowerment of the poor and vulnerablec Rapid, inclusive and sustained economic growthd Just and Lasting Peace and the Rule of Lawe Integrity of the environment and climate change adaptation and mitigation
CAGAYAN DE ORO CITY WATER DISTRICT
ENGINEERING DEPARTMENTCOWD PROJECTS as of December 2012
SOURCE OF FUNDS: LGU (6M)
PROJECT COST DATE PROJECT TITLE LOCATION STATUS No. of Beneficiaries
82,139.56 12-015-F 2012-02-29 COMPLETED
192,975.00 12-018-F 2012-03-21 COMPLETED
203,495.00 12-027-F 2012-04-20 COMPLETED
Cagayan de Oro City
WORK ORDER
Five Key Result
Areas (EO # 43,s 2011)
2-units Water Meter Stub-outs & 3 units Service Connection
PNP & Covered Court Rel. Site Calaanan
All Typhoon Sendong relocated beneficiaries at Calaanan, Barangay
Canitoan
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
Integrity of the environment and climate change adaptation and mitigation
2-50mm PE Pipe Distribution Line w/ 1
meter stub-out & 50mm Mother meter
Relocation Site CalaananAll Typhoon Sendong relocated
beneficiaries at Calaanan, Barangay Canitoan
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
Integrity of the environment and climate change adaptation and mitigation
150mmØ Commercial fire Hydrant
Toribio Chavez cor. Pabayo St.
Entire Cagayan de Oro community
Transparent, accountable and participatory governance
Rapid, inclusive and sustained economic growth
203,495.00 12-027-F 2012-04-20 COMPLETED
207,152.70 12-031-F 2012-04-30 COMPLETED
225,723.00 12-032-F 2012-05-03 suspended
145,833.00 12-040-F 2012-05-30 COMPLETED
71,582.55 12-041-F 2012-05-30 COMPLETED 420
150mmØ Commercial fire Hydrant
Toribio Chavez cor. Pabayo St.
Entire Cagayan de Oro communityIntegrity of the environment and climate change adaptation and mitigation
50mm Ø Distribution Line w/ 5 units Meter
Stub-outs
B40-50, Phase 3, Calaanan Relocation
All Typhoon Sendong relocated beneficiaries at Calaanan, Barangay
Canitoan
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
Integrity of the environment and climate change adaptation and mitigation
50mmØ Distribution Line w/ 2-units Meter Stub-outs
Mindanawan, Purok 13 Tablon CDO
Suspended due to pipeline right of way within private owned lot and expected
to serve 280 beneficiaries.
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Just and Lasting Peace and the Rule of Law
50mm PE Pipe Distribution Line w/ 3 units Meter Stub-outs
P2, Calaanan Relocation Site
All Typhoon Sendong relocated beneficiaries at Calaanan, Barangay
Canitoan
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
Integrity of the environment and climate change adaptation and mitigation
50mm PE Pipe Distribution Line w/ 3 units Meter Stub-outs
Habitat - P2, Calaanan Relocation Site
Transparent, accountable and participatory governance
71,582.55 12-041-F 2012-05-30 COMPLETED 420
2,564,279.00 12-058-A 2012-08-07 in progress 700
137,587.00 12-060-F 2012-08-09 COMPLETED 140
688,121.00 12-062-A 2012-08-09 in progress
435,749.00 12-063-F 2012-08-16 COMPLETED
50mm PE Pipe Distribution Line w/ 3 units Meter Stub-outs
Habitat - P2, Calaanan Relocation Site
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
Integrity of the environment and climate change adaptation and mitigation
6"Øpipeline Extn. w/ 5 units 2"Ø Meter Stub-outs
Purok 7, Sitio Sapong Tablon
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
50mmØ Service Line w/ 1 unit Meter Stub-out
Zone 11, Tejero St. Patag
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
Calaanan Phase 2 Water System
Calaanan, CanitoanAll Typhoon Sendong relocated
beneficiaries at Calaanan, Barangay Canitoan
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
Water Supply System w/ 4 units Meter Stub-outs
North City Central Schl., Puntod
All enrolled students in North cioty Central School, Barangay Puntod
Transparent, accountable and participatory governance
435,749.00 12-063-F 2012-08-16 COMPLETED
295,555.00 12-093-f 2012-12-06 not started 280
Five Key Result Areas(EO # 43,s 2011)a Transparent, accountable and participatory governanceb Poverty reduction and empowerment of the poor and vulnerablec Rapid, inclusive and sustained economic growthd Just and Lasting Peace and the Rule of Lawe Integrity of the environment and climate change adaptation and mitigation
CAGAYAN DE ORO CITY WATER DISTRICT
ENGINEERING DEPARTMENTCOWD PROJECTS as of December 2012
SOURCE OF FUNDS: CAPEX- PIPELINE EXTENSION
PROJECT COST DATE PROJECT TITLE LOCATION STATUS No. of Beneficiaries
132,368.56 12-002-A 2012-01-16 COMPLETED
438,638.43 12-022-A 2012-03-30 COMPLETED
85,034.00 12-028-A 2012-04-23 COMPLETED
Water Supply System w/ 4 units Meter Stub-outs
North City Central Schl., Puntod
All enrolled students in North cioty Central School, Barangay Puntod
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
2" Service Line w/ 2 units MSO
P-2C Gusa, CDO
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
Cagayan de Oro City
WORK ORDER
Five Key Result
Areas (EO # 43,s 2011)
400mmØ Pipe Realignment
Adelfa St. Carmen
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
300mmØ Steel Pipe Realignment
Bitan-ag Box Culvert, Lapasan
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
200mmØ Line Meter w/ Vault (DMA)
RER Subd. Agoho entrance
Transparent, accountable and participatory governance
85,034.00 12-028-A 2012-04-23 COMPLETED
81,948.00 12-029-A 2012-04-23 COMPLETED
294,046.00 12-034-A 2012-05-10 COMPLETED
46,392.00 12-035-A 2012-05-15 COMPLETED
1,212,099.00 12-049 2012-06-25 in progress
91,259.00 12-054-C 2012-07-25 COMPLETED
100,658.46 12-056-F 2012-08-02 COMPLETED
200mmØ Line Meter w/ Vault (DMA)
RER Subd. Agoho entrance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
150mmØ Line Meter w/ vault (DMA)
San Lazaro, Lapasan
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
300mmØ PIPELINE Realignment
Corrales-Recto Ave. CDO
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
150mmØ Line Meter w/ vault (DMA)
LKK Center, Lapasan, CDO
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
Inline Booster Installation & Shedhouse
TOP, Taguanao-Lumbia
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
200mmØ Check Valve Modification
PW#23, Tina-ao, Agusan
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
Realignment of 300mmØ Steel Pipeline
CM Recto cor Julio Pacana
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
100,658.46 12-056-F 2012-08-02 COMPLETED
357,571.48 12-057-F 2012-08-02 COMPLETED 280
190,053.00 12-059-F 2012-08-08 COMPLETED
283,521.00 12-065-F 2012-08-22 COMPLETED
112,681.00 12-068 2012-09-10 not started
304,401.64 12-070-A 2012-09-27 not started
306,080.71 12-071-A 2012-09-27 COMPLETED
696,802.47 12-075-A 2012-10-04 in progress 280
Realignment of 300mmØ Steel Pipeline
CM Recto cor Julio Pacana
Rapid, inclusive and sustained economic growth
Realignment of 150mmØ uPVC Pipeline W/ 4 units
2"Ø Stub-outs
Abellanosa-Magsaysay -Burgos Sts.
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
Realignment of 300mmØ Steel Pipeline
Corrales-Recto Ave.(Gaisano City) CDO
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
Realignment of 300mmØ Steel Pipeline
Abellanosa Rd. fronting UCCP
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
Relocation of PPA Mother Meter
Corrales Extn.
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
12"Ø Pipeline Realignment Capt. V. Roa St.
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
12" Ø Pipeline Realignment Osmena St. CDO
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
100mmØ and 2-50mm Distribution Line w/ w units
50mmØ Meter Stub-out
Lower Zone 6, Upper Zone 8, Bulua
Transparent, accountable and participatory governance
696,802.47 12-075-A 2012-10-04 in progress 280
1,089,502.62 12-094-B 2012-12-06 not started
1,016,093.00 13-002-A 2013-01-03 not started 3220
158,018.00 12-007-B 2013-01-25 300mm Ø Isolation Valve not started
Five Key Result Areas(EO # 43,s 2011)a Transparent, accountable and participatory governanceb Poverty reduction and empowerment of the poor and vulnerablec Rapid, inclusive and sustained economic growthd Just and Lasting Peace and the Rule of Lawe Integrity of the environment and climate change adaptation and mitigation
CAGAYAN DE ORO CITY WATER DISTRICT
ENGINEERING DEPARTMENTCOWD PROJECTS as of December 2012
SOURCE OF FUNDS: CAPEX-STUB-OUT
PROJECT COST DATE PROJECT TITLE LOCATION STATUS No. of Beneficiaries
61,091.00 12-008-F 2012-02-22 COMPLETED 140
100mmØ and 2-50mm Distribution Line w/ w units
50mmØ Meter Stub-out
Lower Zone 6, Upper Zone 8, Bulua
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
3 Units Ultrasonic Chamber
Masterson Avenue, Upper Balulang
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
Pipe Rehabilitation & Installation of 23 units-
Meter Stub-outsSan Lazaro, Lapasan
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
Calaanan, Canitoan
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
Cagayan de Oro City
WORK ORDER
Five Key Result
Areas (EO # 43,s 2011)
One (1) unit Meter Stub-out
San Lazaro, Zone 2, Lapasan
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
61,091.00 12-008-F 2012-02-22 COMPLETED 140
85,254.00 12-019-F 2012-03-20 Z-6, Carmen COMPLETED 140
110,912.00 12-025-F 2012-04-19 1-Unit Meter Stub-out COMPLETED 140
42,957.00 12-045-F 2012-06-21 COMPLETED 140
69,133.94 12-048-F 2012-06-25 COMPLETED 140
200,022.00 12-061-F 2012-08-09 UMNAI, Carmen COMPLETED 140
61,857.85 12-074-F 2012-10-04 COMPLETED 140
332,454.19 12-088-F 2012-11-09 Xavier Eco-ville in progress 560
One (1) unit Meter Stub-out
San Lazaro, Zone 2, Lapasan
Rapid, inclusive and sustained economic growth
1-Unit 50mmØ Meter Stub-out
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
GSIS District 7, Calaanan
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
Relocation of 1 unit 50mm Ø Meter Stub-out
& Fire HydrantAbellanosa St., CDO
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
50mm Ø Distribution Line w/ 1 unit 50mmMeter
Stub-out
Sacred Heart Phase 4 Zone 8 Carmen
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
50mmØ Pipe Interconnection
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
2" Service Line w/ 1 unit MSO
Magic 18 Homeowners Asso., Woodland
Heoghts
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
4 units-50mmØ Meter Stub-outs
Transparent, accountable and participatory governance
332,454.19 12-088-F 2012-11-09 Xavier Eco-ville in progress 560
144,742.00 12-096-F 2012-12-21 not started 420
178,202.00 12-097-F 2012-12-02 not started 560
393,349.00 12-098-F 2012-12-21 not started 420
235,902.00 12-099-F 2013-01-04 not started 280
547,339.03 13-001-A 2013-01-03 not started 840
611,032.57 13-011-A 2013-02-08 not started 280
4 units-50mmØ Meter Stub-outs
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
3-50mmØ Service Lines w/ 3 units Meter Stub-
outsCamp Evang, Patag
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
4-units 50mmØ Service Lines w/ stub-outs
Z-3, Patag, CDO
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
100mmØ Distribution Line w/ 3 units MSO
Camp Evang, Patag
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
2-50mm PE Pipe Distribution Line w/
individual meter stub-outs
Camp Evang, Patag
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
4"Ø Distribution Line w/ 6-units Meter Stub-outs
Camp Alagar, Lapasan
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth
4"Ø Distribution Line w/ 2-units Meter Stub-outs
Saarenas Village, Patag
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
611,032.57 13-011-A 2013-02-08 not started 280
141,080.52 13-012-F 2013-02-12 completed 280
Five Key Result Areas(EO # 43,s 2011)a Transparent, accountable and participatory governanceb Poverty reduction and empowerment of the poor and vulnerablec Rapid, inclusive and sustained economic growthd Just and Lasting Peace and the Rule of Lawe Integrity of the environment and climate change adaptation and mitigation
4"Ø Distribution Line w/ 2-units Meter Stub-outs
Saarenas Village, Patag
Rapid, inclusive and sustained economic growth
Installation of 2"Ø Mother Meter
San Vicente, Casinglot Tagoloan, Mis. Or.
Transparent, accountable and participatory governance
Poverty reduction and empowerment of the poor and vulnerable
Rapid, inclusive and sustained economic growth