    5.4 Insulation and Heat Tracing

    and instrumentation is required for operation of the package.

    5.5

    Material selection

    Frames has presently considered MOC as per the requisition.

    Material design Vessels

    Shell/ Casing SA516 Gr 70 or equalHeads SA516 Gr 70 or equalNozzles SA516 Gr 70 or equalBolts / Nuts CS + coatingGaskets As per specificationWelded internals SA516 Gr 70 or equal

    Removable internals/Impeller SS316NACE ISO 1516 compliance NoSurface treatment inside Glass Flake Epoxy (Corrothane or equal)Surface treatment outside 3-layer Epoxy CoatingCorrosion allowance mm 3

    5.6 Lifting equipment