Connecting downtown Seattle, Mercer Island, Bellevue and Redmond via I-90

Sound Transit: East Link Project UpdateJoint Transportation Committee

June 18th, 2008

Page 2: Sound Transit: East Link Project Update - Washingtonleg.wa.gov/JTC/Meetings/Documents/ST_Briefing_I90_061808.pdfConnecting downtown Seattle, Mercer Island, Bellevue and Redmond via

2

ST Participation with the I-90 Independent Review Team

• Regular Coordination– Weekly conference calls– Three meetings in Seattle

• ST/WSDOT responded to requests in IRT letter of April 24, 2008

• ST advanced engineering/analysis as necessary to support the IRT review

Page 3: Sound Transit: East Link Project Update - Washingtonleg.wa.gov/JTC/Meetings/Documents/ST_Briefing_I90_061808.pdfConnecting downtown Seattle, Mercer Island, Bellevue and Redmond via

3

Expansion Joint

• Rail expansion joint/track bridge must accommodate same movements as traffic expansion joint– longitudinal expansion – vertical rotation – horizontal rotation

I-90 Traffic Expansion Joint

Page 4: Sound Transit: East Link Project Update - Washingtonleg.wa.gov/JTC/Meetings/Documents/ST_Briefing_I90_061808.pdfConnecting downtown Seattle, Mercer Island, Bellevue and Redmond via

4

Trackwork Examples from VancouverLongitudinal Expansion

Vertical Rotation

Page 5: Sound Transit: East Link Project Update - Washingtonleg.wa.gov/JTC/Meetings/Documents/ST_Briefing_I90_061808.pdfConnecting downtown Seattle, Mercer Island, Bellevue and Redmond via

5

I-90 Track Bridge

Page 6: Sound Transit: East Link Project Update - Washingtonleg.wa.gov/JTC/Meetings/Documents/ST_Briefing_I90_061808.pdfConnecting downtown Seattle, Mercer Island, Bellevue and Redmond via

6

Work Advanced for the IRT• Passenger Comfort Analysis

– Verified passenger experience will be within accepted criteria

• Next Steps– IRT confirms ST2 Expert Review panel

recommendation for developing a prototype– Staff will further develop plans for early final design

and prototyping and be ready to implement upon funding availability

Page 7: Sound Transit: East Link Project Update - Washingtonleg.wa.gov/JTC/Meetings/Documents/ST_Briefing_I90_061808.pdfConnecting downtown Seattle, Mercer Island, Bellevue and Redmond via

7

Stray Current Control

• Power to light rail supplied via overhead catenary and returns to substation via running rail

• Modern rail systems include track isolation measures • Enhanced protection recommended for floating bridge

Page 8: Sound Transit: East Link Project Update - Washingtonleg.wa.gov/JTC/Meetings/Documents/ST_Briefing_I90_061808.pdfConnecting downtown Seattle, Mercer Island, Bellevue and Redmond via

8

Floating Bridge Stray Current Control• Three layers of protection

– High insulating rail fasteners– Stray current collector mesh– Upgrade anchor cable cathodic

protection system to protect the pontoons

Page 9: Sound Transit: East Link Project Update - Washingtonleg.wa.gov/JTC/Meetings/Documents/ST_Briefing_I90_061808.pdfConnecting downtown Seattle, Mercer Island, Bellevue and Redmond via

9

Stray Current Monitoring• Continuous remote monitoring

– Will automatically detect failures in the isolation systems and alert maintenance personnel

– ST Operations and Maintenance will respond and repair

Page 10: Sound Transit: East Link Project Update - Washingtonleg.wa.gov/JTC/Meetings/Documents/ST_Briefing_I90_061808.pdfConnecting downtown Seattle, Mercer Island, Bellevue and Redmond via

10

Stray Current Analysis• Work Advanced for the IRT

– Analyzed isolation techniques – Built test section to confirm electrical insulation

results during wet conditions

Page 11: Sound Transit: East Link Project Update - Washingtonleg.wa.gov/JTC/Meetings/Documents/ST_Briefing_I90_061808.pdfConnecting downtown Seattle, Mercer Island, Bellevue and Redmond via

11

Light Rail Installation• Direct fixation rail on plinth

blocks• Plinth blocks attached to bridge

deck with dowel rods

Page 12: Sound Transit: East Link Project Update - Washingtonleg.wa.gov/JTC/Meetings/Documents/ST_Briefing_I90_061808.pdfConnecting downtown Seattle, Mercer Island, Bellevue and Redmond via

12

Light Rail Installation• Bridge deck has a dense fabric of reinforcing

steel and post-tensioning cable

Page 13: Sound Transit: East Link Project Update - Washingtonleg.wa.gov/JTC/Meetings/Documents/ST_Briefing_I90_061808.pdfConnecting downtown Seattle, Mercer Island, Bellevue and Redmond via

13

Light Rail Installation• Locating Steel in the Bridge

– Ground penetrating radar– Pachometer– X-ray

Page 14: Sound Transit: East Link Project Update - Washingtonleg.wa.gov/JTC/Meetings/Documents/ST_Briefing_I90_061808.pdfConnecting downtown Seattle, Mercer Island, Bellevue and Redmond via

14

Next Steps

• Complete review process with the IRT• Develop plans to implement IRT

recommendations

Thanks to the IRT for their Efforts, Expertise and Professionalism