6
Sound Transit Construction Contracting 2013 DES Training Conference & Trade Show Tina Davis October 29, 2013 1

Sound Transit Construction Contracting

Embed Size (px)

DESCRIPTION

Sound Transit Construction Contracting. 2013 DES Training Conference & Trade Show Tina Davis October 29, 2013. Construction Contracting Tools. Invitation for Bid (Design-Bid-Build) General Contractor/Construction Manager (GC/CM) Design-Build (DB) Job Order Contracting (JOC) - PowerPoint PPT Presentation

Citation preview

Page 1: Sound Transit Construction Contracting

1

Sound Transit Construction Contracting

2013 DES Training Conference & Trade Show

Tina Davis

October 29, 2013

Page 2: Sound Transit Construction Contracting

2

Construction Contracting Tools

1. Invitation for Bid (Design-Bid-Build)

2. General Contractor/Construction Manager (GC/CM)

3. Design-Build (DB)

4. Job Order Contracting (JOC)

5. Small Works Roster (SWR)

Page 3: Sound Transit Construction Contracting

3

Advertising Contracting Opportunities

Daily Journal of Commerce• www.djc.com

eBid • www.ebidexchange.com/soundtransit

Weekly Snapshot• www.soundtransit.org

Page 4: Sound Transit Construction Contracting

4

Construction Contracting Tools

• 1 LR station• Park and Ride GarageE320 DBB• TunnelE330 DBB• 4 LR stationsE335 GCCM• 1 LR station• Park and Ride LotE340 DBB• 2 LR stations• Park and Ride GarageE360 DB

Page 5: Sound Transit Construction Contracting

5

Reaching out to Contractors

Design-Build Industry Review • Comment period on General Conditions

East Link and Northgate Link Outreach Event • Contract Packaging strategies

N125 TBM Tunnel Industry Review• Comment period on draft IFB

Page 6: Sound Transit Construction Contracting

6

• Tina Davis, Design & Construction Contracts Supervisor

• Sound Transit• [email protected]• Speaker Phone (206) 689-3372

Questions