Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
Sound Transit 3
Kirkland Public Meeting
January 11, 2016
2023
2021
2016
2016
2023
2023
Regional Link light rail expansion
By 2023, Puget Sound will have 50+ miles of light rail,
with 30+ stations, directly connecting 11 cities
145th
Seattle
28% population
growth
Bellevue
33% population
growth
Tacoma
59% population
growth
Everett
74% population
growth
More people are calling this home
Source: Puget Sound Regional Council
Projected household population
growth by 2040
4
PartnershipPartnership in the Eastside Rail Corridor
• Sound Transit is a member of the
Eastside Rail Corridor Regional
Advisory Committee
• Endorsed multiple-use vision in the
corridor with other partners
Rendering of
East Link light
rail with the
Redmond
Central
Connector
trail.
Eastside Rail Corridor
• Sound Transit holds a high capacity
transit easement on the corridor.
• The easement specifies the process
through which Sound Transit would
coordinate with the City of Kirkland
regarding implementation of high
capacity transit.
• If the trail is affected by high
capacity transit, it would be Sound
Transit’s responsibility to replace it,
per the requirements of the high
capacity transit easement.5
system
Project Lifecycle
6
Early Planning 2-3 years
Environmental 3-5 years
Final Design & Permitting 2-3 years
Construction 5-6 years
In Service
We are here
Public involvement continues throughout the life of the project
Cross-Section View of Trail with Light Rail
7
8
Cross-Section View of Trail with BRT
ST3 Timeline
9
ST Board’s Core Priorities for ST3
10
11
Review of ST3 Candidate ProjectsEast King County
system
E-01: Overlake to Redmond LRT
12
system
I-405 BRT
13
Note: E-04, HOV Direct Access at Renton/N 8th St. is part of the ST2
program ; due to reduced agency revenues experienced during the
recession, implementation has been deferred.
system
E-03: Totem Lake to Issaquah LRT
1
14
system
E-06: Totem Lake to Bellevue BRT
Downtown Kirkland
1
15
system
Potential Light Rail
System in ST3
16
system
• January 21, 2016:
– Responses from jurisdictions requested regarding ST3 candidate project scopes
• March 2016: Draft System Plan
• April 2016: Public and Stakeholder Outreach
– Open houses, website information
• June 2016: Potential adoption of Final System Plan
• November 2016 Ballot Measure
ST3 Schedule
17
Sound Transit 3: The future