    BOX HOLE BORER

    MD320

  • 7/29/2019 SOMP 08 Industry Kogler

    2/36

    Sandvik Mining and Construct ion

    The Need: Safe Connection between Mine Levels

    z Different needs to connect levels

    9 ventilation9 travel ways

    9 ore passes

    9 other supply/connection holes

    z Rescue access in case of emergency

    9 horizontal (with special muckingsystem) and any inclination

  • 7/29/2019 SOMP 08 Industry Kogler

    3/36

    Sandvik Mining and Construct ion

    The Conventional Methods

    z Conventional method: Drill & Blast

    9 Top level is not developed

    hand held overhead drill from scaffoldings

    Drop raising (top down)

    long hole drilling bottom up

    blast in one go

    high risk to loose the hole

    ALIMAK Climber

  • 7/29/2019 SOMP 08 Industry Kogler

    4/36

    Sandvik Mining and Construct ion

    The Mechanical Method: Raise Borer

    z Mechanical cutting

    9 Raise Boring bottom up

    Blind boring (limited diameterand length)

    9 Raise Boring - reaming

    Pilot hole and reaming

    Special pavement for the rigneeded

    Top section developed

    before

  • 7/29/2019 SOMP 08 Industry Kogler

    5/36

    Sandvik Mining and Construct ion

    Our Motivation for the Development

    zCont r ibu t ion t o safe t y9 high percentage of fatalit ies happens at the raising operation -

    therefore

    9 get t he people out o f dangerous areasz Speed up t he Developm ent

    9 box hole boring independent from the reef (upper level)

    development

    9 high advance rates e.g. time for a hole of 15 m:

    conventional about3 weeks with MD320 about 3 days (including mobilisation and de-mobilisation)

  • 7/29/2019 SOMP 08 Industry Kogler

    6/36

    Sandvik Mining and Construct ion

    The advanced solutionBox Hole BorerMD320

  • 7/29/2019 SOMP 08 Industry Kogler

    7/36

    Sandvik Mining and Construct ion

    z High speed of advance

    z Remote Control no workers in hazardous working areasz No special pavement needed

    z No development on top level needed

    z Technical Data

    9 Component Weight, max. 12 t, easy to re-locate

    9 Total installed 280 kW

    9 Cutter motor 180 kW

    9 Available diameter (current) 1.6 m

    9 Inclination of hole 0 90 deg

    9 Hole length, max 100 m

    9 Cutter Discs raise-borer tools

    Box Hole BorerMD320

  • 7/29/2019 SOMP 08 Industry Kogler

    8/36

    Sandvik Mining and Construct ion

    Box Hole Borer Sequence of action

    z Tramming & Start-up - Step 1

  • 7/29/2019 SOMP 08 Industry Kogler

    9/36

    Sandvik Mining and Construct ion

    z Erecting

    Step 2 Step 3

    Box Hole Borer Sequence of action

  • 7/29/2019 SOMP 08 Industry Kogler

    10/36

    Sandvik Mining and Construct ion

    z Collaring & Start BoringStep 8 Step 9

    Box Hole Borer Sequence of action

  • 7/29/2019 SOMP 08 Industry Kogler

    11/36

    Sandvik Mining and Construct ion

    Working Principle

  • 7/29/2019 SOMP 08 Industry Kogler

    12/36

    Sandvik Mining and Construct ion

    BOXHOLE BORING SYSTEMMine installation

    Power supply

    Main power supply 1000V 50HzTransformer capacity 1000 kVA

    Water supply

    Cooling water temperature 10 - 25 CWater flow app. 80l/minWater pressure 6 10barFiltration less than 500 micronpH value 7 8Feed line size 2

    Return line size 2

  • 7/29/2019 SOMP 08 Industry Kogler

    13/36

    Sandvik Mining and Construct ion

    Face to start

  • 7/29/2019 SOMP 08 Industry Kogler

    14/36

    Sandvik Mining and Construct ion

    MD320 - track bound

  • 7/29/2019 SOMP 08 Industry Kogler

    15/36

    Sandvik Mining and Construct ion

    MD320 - track bound

  • 7/29/2019 SOMP 08 Industry Kogler

    16/36

    Sandvik Mining and Construct ion

    MD320 - track bound

  • 7/29/2019 SOMP 08 Industry Kogler

    17/36

    Sandvik Mining and Construct ion

    MD320 - trackless

  • 7/29/2019 SOMP 08 Industry Kogler

    18/36

    Sandvik Mining and Construct ion

    MD320 - trackless

  • 7/29/2019 SOMP 08 Industry Kogler

    19/36

    Sandvik Mining and Construct ion

    MD320 - tracklesssupply car

  • 7/29/2019 SOMP 08 Industry Kogler

    20/36

    Sandvik Mining and Construct ion

    Box Hole Borer in Action

  • 7/29/2019 SOMP 08 Industry Kogler

    21/36

    Sandvik Mining and Construct ion

    Control Display

  • 7/29/2019 SOMP 08 Industry Kogler

    22/36

    Sandvik Mining and Construct ion

    Collaring

  • 7/29/2019 SOMP 08 Industry Kogler

    23/36

    Sandvik Mining and Construct ion

  • 7/29/2019 SOMP 08 Industry Kogler

    24/36

    Sandvik Mining and Construct ion

    Box Hole Borer in Action

  • 7/29/2019 SOMP 08 Industry Kogler

    25/36

    Sandvik Mining and Construct ion

    The hole is finished

  • 7/29/2019 SOMP 08 Industry Kogler

    26/36

    Sandvik Mining and Construct ion

    Waiting for the next hole

  • 7/29/2019 SOMP 08 Industry Kogler

    27/36

    Sandvik Mining and Construct ion

    Achievements

    Box Hole DevelopmentNewman Shaft - Lonmin/RSA

    0

    2

    4

    6

    8

    10

    12

    14

    16

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

    Hole Number

    HoleLength[m]

    0

    0,2

    0,4

    0,6

    0,8

    1

    1,2

    1,4

    1,6

    1,8

    CuttingRate

    incl.Collaring[m/h]

    Hole Length [m]

    Cutting Rate [m/h]

    no

    data

    recorded

  • 7/29/2019 SOMP 08 Industry Kogler

    28/36

    Sandvik Mining and Construct ion

    AchievementsNet Cutting time per Hole

    0

    2

    4

    6

    8

    10

    12

    14

    16

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

    Hole number

    Length

    ofthehole[m]

    0,00

    2,00

    4,00

    6,00

    8,00

    10,00

    12,00

    14,00

    Nettim

    edemand[h]

    Hole Length [m]

    Net cutting time [h]

  • 7/29/2019 SOMP 08 Industry Kogler

    29/36

    Sandvik Mining and Construct ion

    Indicative Time for one Hole

    0 5 10 15 20 25 30 35 40 45

    Time demand

    Transport to workplace

    Power con ection 1000 VWater connection

    Separate powerpack

    Launchtub e off rail

    Turn launchtub e

    Lift up launchtube

    Line up MD320

    Spread launchtub e

    Install Haulage System

    Mobilisation

    collaring

    tot. drilling

    tot regrip

    Drilling

    Regripp MD320 back

    Unspread Launchtube

    Retract launchtub e

    On rail launchtube

    De-install Haulage

    Disconnect power supply

    Transport out

    Demobilisation

    Total Time one Hole

    Working

    Steps

    Average net t ime fo r one Box Hole

    example - indikative

    Basis:

    Hole length [m]

    Advanc e Rate [m/h]

    30

    1,70

  • 7/29/2019 SOMP 08 Industry Kogler

    30/36

    Sandvik Mining and Construct ion

    Indicative performance figures

    z Conventional

    9 advance/day 1 2 m/d (usual one round = 1,2 m)

    9 cost per meter 400,- Euro/m (2002 ! today double ?)

    z Mechanical raise boring

    9 preparation time app. 5 d

    9 advance per hour app. 1 m

    9cost per meter 853,- Euro/m

    z Mechanical box hole boring

    9 preparation time app. 1 shift

    9 advance per hour app. 1,5 m

    9 cost per meter 685,- Euro/m

  • 7/29/2019 SOMP 08 Industry Kogler

    31/36

    Sandvik Mining and Construct ion

    Rock Properties - Portugal

    Rock Properties

    050

    100150

    200250

    300350

    Graywake

    P

    olysulfidic

    ore

    P

    olysulfidic

    ore

    Pegmatite

    high

    quarcitic

    Shist

    Rock Type

    U

    CS(MPa)

    0

    1

    2

    3

    4

    56

    Ce

    rchar(CAI)

    MPa

    CAI

  • 7/29/2019 SOMP 08 Industry Kogler

    32/36

    Sandvik Mining and Construct ion

    Rock properties Portugal

    / 068

    ( 5

    230,14 438,56 MPa 313,48 ( 5

    15,65 26,20 MPa 19,47

    ( 5

    35524 52736 MPa 44241

    Uniaxial compressive strength

    Average:

    Average:

    Results of Rock Test: Page 2

    Date:Hebenstreit

    c

    Young's modulus

    Report issued by:

    Max.:

    Max.:Min.:

    Min.:

    Brazilian tensile strength

    Min.:

    MPa

    Estat

    2007-11-09

    specimen(s) H/D = 1)

    MECHANICAL PROPERTIES AND ABRASIVITY03

    MPa Average:

    Sample No.:Test Report No.: 2007

    MPaspecimen(s) H/D = 0.5)

    MPa

    MPa

    t

    specimen(s) H/D = 1)

    Max.:

    MPa

  • 7/29/2019 SOMP 08 Industry Kogler

    33/36

    Sandvik Mining and Construct ion

    MD320 - trackless - Portugal

  • 7/29/2019 SOMP 08 Industry Kogler

    34/36

    Sandvik Mining and Construct ion

    MD320 - trackless - Portugal

  • 7/29/2019 SOMP 08 Industry Kogler

    35/36

    Sandvik Mining and Construct ion

    The first hole in Portugal

  • 7/29/2019 SOMP 08 Industry Kogler

    36/36

    Questions ?Thank you for listening !