CE POWER SOLUTIONS FAMILY OF COMPANIES CE Power - Kentucky CE Power - Florida CE Power - Tennessee Hope Engineering - Michigan 3 rd Party NETA Independent Testing Companies CE Power - Ohio CE Power - Minnesota Client Type: Electric Utility Challenge/Issue: Provide client with modern technology and interrupting capability replacing existing, within the confines of existing conditions Equipment Involved: 15kV, 1200A and 2000A vacuum circuit breakers Solutions: Design, build and install new units Scope/Deliverables: Provide design engineering for retrofill circuit breakers to match existing switchgear with limited modification to bus work and breaker cradles Solution Profile Switchgear Upgrade

Solution Profile - CE Powercepower.net/assets/Switchgear-Upgrade-Utility.docx · Web viewParty NETA Independent Testing Companies CE Power - Ohio CE Power - Minnesota 800.434.0415

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Solution Profile - CE Powercepower.net/assets/Switchgear-Upgrade-Utility.docx · Web viewParty NETA Independent Testing Companies CE Power - Ohio CE Power - Minnesota 800.434.0415

CE POWER SOLUTIONS FAMILY OF COMPANIES

CE Power - Kentucky

CE Power - Florida

CE Power - Tennessee

Hope Engineering - Michigan

3rd Party NETA Independent Testing Companies

CE Power - Ohio

CE Power - Minnesota

www.cepower.net

800.434.0415

Client Type: Electric Utility

Challenge/Issue: Provide client with modern technology and interrupting capability replacing existing, within the confines of existing conditions

Equipment Involved: 15kV, 1200A and 2000A vacuum circuit breakers

Solutions: Design, build and install new units

Scope/Deliverables: Provide design engineering for retrofill circuit breakers to match existing switchgear with limited modification to bus work and breaker cradles

Timeframe: Approximately 6 weeks, including 2 week outage for installation

Solution ProfileSwitchgear Upgrade