6
Badulla City Badulla City Badulla; the capital of the Uva Province is Badulla; the capital of the Uva Province is about 230 km away from Colombo towards the Eastern slopes of the Central hills of Sri the Eastern slopes of the Central hills of Sri Lanka. Badulla is encircled by the Badulu OyaBadulla is encircled by the Badulu Oya which enriches Mahawali River PROVINCE Uva DISTRICT Badulla AREA 1036 Hectare CITY BOUNDARY 10.0km 2 INSTITUTION Municipal Council, Badulla FULL POPULATION IN THE MC BOUNDARY 45,096 No. of Estimated Family Units 9105 Rate of population 1.07 Main Schools 17 Private Educational institutes 22 Private Educational institutes 22 Business 1930 Building Applications approved annually 258

Solid Waste Managment Project - Badulla City.pptAnnual amount for the SWM Rs.37247000.00 Approved laborers for the SWM 84 Laborers engaged in the project 80 Amount to move one ton

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Solid Waste Managment Project - Badulla City.pptAnnual amount for the SWM Rs.37247000.00 Approved laborers for the SWM 84 Laborers engaged in the project 80 Amount to move one ton

Badulla CityBadulla City

• Badulla; the capital of the Uva Province isBadulla; the capital of the Uva Province is about 230 km away from Colombo towards the Eastern slopes of the Central hills of Srithe Eastern slopes of the Central hills of Sri Lanka.

• Badulla is encircled by the “Badulu Oya”• Badulla is encircled by the  Badulu Oya  which enriches Mahawali River

PROVINCE Uva

DISTRICT Badulla

AREA 1036 Hectare

CITY BOUNDARY 10.0km2

INSTITUTION Municipal Council, Badullap ,

FULL POPULATION IN THE MC BOUNDARY 45,096

No. of Estimated Family Units 9105

Rate of population  1.07

Main Schools 17

Private Educational institutes 22Private Educational institutes 22

Business 1930

Building Applications approved annually 258

Page 2: Solid Waste Managment Project - Badulla City.pptAnnual amount for the SWM Rs.37247000.00 Approved laborers for the SWM 84 Laborers engaged in the project 80 Amount to move one ton

Annual amount for the SWM Rs.37247000.00

Approved laborers for the SWM 84

Laborers engaged in the project 80

Amount to move one ton of solid Rs.2459.00Amount to move one ton of solid waste

Rs.2459.00

Details regarding the SWM

The ways of collecting  Collecting garbage by Solid Waste visiting each and every

buildingSolid Waste collected per day

20‐25 tons.

Amount of laborers in the project.

80the project.Method of the collection

Collecting garbage  by tractors withoutcollection tractors without classifying.

REDUCE

REUSE

RECYCLE

Introducing Compost Bins.

Page 3: Solid Waste Managment Project - Badulla City.pptAnnual amount for the SWM Rs.37247000.00 Approved laborers for the SWM 84 Laborers engaged in the project 80 Amount to move one ton

P tl l ll ti S lid W t i thPresently we are only collecting Solid Waste in theUrban area.

For the Non Urban Area we have introduced homeC tiComposting.  

W h d S lid W t M t P liWe have prepared Solid Waste Management PolicyBut not yet implemented. 

Page 4: Solid Waste Managment Project - Badulla City.pptAnnual amount for the SWM Rs.37247000.00 Approved laborers for the SWM 84 Laborers engaged in the project 80 Amount to move one ton
Page 5: Solid Waste Managment Project - Badulla City.pptAnnual amount for the SWM Rs.37247000.00 Approved laborers for the SWM 84 Laborers engaged in the project 80 Amount to move one ton
Page 6: Solid Waste Managment Project - Badulla City.pptAnnual amount for the SWM Rs.37247000.00 Approved laborers for the SWM 84 Laborers engaged in the project 80 Amount to move one ton

Composting Programme completely changed the Former situation of the Badulla City.

Earning Money for the Council Fund.

Creating new employments for the city workers.

Existing site is going to develop as playground .

Surrounding Area is covered by Schools, Playgrounds, and Houses.

Bad Odour .

T h i l A iTechnical Assistance.More Training for the staff and workers.