Solarsan-NRT [email protected]: 9890035993/9663905993

NANO ROOFTOP PLANT

BESCOM

Page 2: Solarsan-PVarchrev4-BESCOM

Solarsan-NRT [email protected]: 9890035993/9663905993

CONTENTS MY PROFILE

PROJECT OBJECTIVE

ELECTRICITY – CUSTOEMR NEEDS

LONG TERM VISION

PV – INDIA SCENARIO- National Solar Mission

24X7 ELECTRIC SUPPLY – PV ARCHITECTURE

NANO ROOF TOP- DEMO DESIGN

NANO ROOF TOP- INSTRUMENTATION & CONNECTIVITY NANO ROOF TOP – KEY DIFFERENTIATORS

NANO ROOF TOP – SAFETY REQUIREMENTS

NANO ROOF TOP – SAFETY COMPLIANCE

NANO ROOF TOP- PERFORMANCE SO FAR

FINANCIALS

WAY FORWARD...?

Page 3: Solarsan-PVarchrev4-BESCOM

Solarsan-NRT [email protected]: 9890035993/9663905993

SOLARSAN– PROMOTER PROFILE

POST GRAD - IIT BOMBAY

2.5 DECADES OF DIVERSE , MULTI DIMENSIONAL KNOWLEDGE BASE IN MULTINATYIONAL , LOCAL CORPORATIONS. TOSHIBA, ABB, GE MED SAYSTEMS, WHIRLPOOL, JABIL, ONIDA

MULTI CULTURAL BACKGROUND

CAREER GRAPH FROM SOFT WARE, HARDWARE, SYSTEM INTGN, ENGG MGMT,GENERAL MANAGEMENT, ENGG DIRECTOR, CTO.

STARTING UP NEW VENTURE IN RENEWABLE “ OUT OF PASSION”

SCALED CREDITABLE PERFORMANCE IN DIVERSE INDUSTRIESMEDICAL IMAGING, INDUSTRIAL AUTOMATION, EMS,WHITEGOODS, CONSUMER ELECTRONICS

SELF CONTAINED PACKAGE IN ELECTRONIC INDUSTRY – TECHNOLOGY, DESIGN, PROD DEVELOPMENT , SUPPLY CHAIN, PRODCUT& PEOPLE MANAGEMENT, MFG,SUSTAIN ENGG

RAVI SHANKAR SATYAN

Page 4: Solarsan-PVarchrev4-BESCOM

Solarsan-NRT [email protected]: 9890035993/9663905993

PROJECT OBJECTIVEEVERY ROOF- SOURCE OF UNTAPPED SOLAR ENERGY- NEVER HARVESTED.

BEING GREEN FAST CATCHING UP- MOST IN THING , “FASHIONABLE”

GOI SET UP MNRE- POLICY GUIDLEINES FRAMED – VISION IN PUBLIC DOMAIN

STATE GOVT FOLLOWING SUIT- STATE LEVEL POLICIES FALLING IN PLACE

ELECTRICITY GEN,T&D - TREND MIGRATION FROM CENTRALIZED TO DISTRIBUTED.( MAIN FRAME TO PC)

UTILITY GRID UNSTABLE, SURGY, NOISY- FR OF ELECTRONIC DEVICE MAINLY ATTRIBUTABLE TO GRID INSTABILITY.

GRID INSTABILITY POINTS TO ENERGY SHORTFALL.

CONCEPT OF THIS PROJECT - ROOF TOP NANO PLANTS

EVERY ROOF – SELF SUFFICIENT TO ITS ELECTRIC NEEDS. 24X7.VIABLE,RELIABLE,RENEWABLE _ EXCESS ENERGY PUMP BACK TO UTILITY ,WHILE GRID IS ON _ WHILE GRID IS OFF, SERVE INTERNAL NEEDS THRO' SOLAR ; EXCESS TO NEIGHBORHOOD THRO' MICRO GRID, BATTERY CHARGE, HEATING_ IN NIGHT, SERVE THRO' SOLAR ENERGY CHARGED BATTERY INVERTERS

Page 5: Solarsan-PVarchrev4-BESCOM

Solarsan-NRT [email protected]: 9890035993/9663905993

Customer Wishes

UNINTERRUPED 24X7 ELECTRICITY

NO FLUCTUATIONS

EXPENSIVE DEVICES LIKE APPLIANCES, TV , MULTI MEDIA GADGETS TO BE PROTECTED AGAINST GRID SURGE

GREEN SAVVY

INCREASINGLY ITCHY ,INTOLERANT WITH UNRELIABLE, UNSTABLE UTILITY GRID.

INITIAL INVESTMENT LOW- SCALABLE

Page 6: Solarsan-PVarchrev4-BESCOM

Solarsan-NRT [email protected]: 9890035993/9663905993

SOLARSAN– NRT CORPORATE ROADMAP

ROOF TOP NANO PLANTDEMO CENTRE

ROOF TOP IB SET UPESTABLISH ECO SYSTEM

COE – SOLAR

PV FEASIBILITY ( FINACIALS , ARCHITECTURE) PROCESS & PROCEDURES ESTABLISH SUPPLY CHAIN LOCAL , IMPORT IDENTIFY CTQ TECHNOLOGY, COST, SUPPLY CHAIN

PV AWARENESS, EDUCATION COMMUNITY, MEDIA, SOCIAL

IDENTIFY CRITICAL TECH COMPONENT UTILITY SIDE INSTRUMENTATION MONITOR INSTRUMENTATION INVERTER TECHNOLOGY TOPOLOGY

ESTABLISH ENGG , R&D CENTRES

DRIVE VALUE ENGG , FEATURE CONSOLIDATE , GROW IB

ESTABLISH ROOFTOP IB ASSESS IT, INSTRUMENTATION NEED ESTABLISH SUPPLY CHAIN LOCAL , IMPORT IDENTIFY CTQ TECHNOLOGY, COST, SUPPLY CHAIN

PV AWARENESS, EDUCATION COMMUNITY, MEDIA, SOCIAL

PHASE 1 PHASE 2 PHASE 3

CAP OUTLAY > 0.1Cr(REQD FUND)NANO PLANT 0.05CrINSTRUMNTN 0.05Cr

CAP OUTLAY > 10Cr(REQD FUND)

CAP OUTLAY > 100Cr(REQD FUND)

Page 7: Solarsan-PVarchrev4-BESCOM

Solarsan-NRT [email protected]: 9890035993/9663905993

Application Segment

Phase 1 (2010-2013)

Phase 2 (2013-2017)

Phase 3 (2017-2022)

Solar Collectors

7 million sq. meters

15 million sq. meters

20 million sq. meters

Off-grid solar applications

200 MW 1,000 MW 2,000 MW

Utility grid power, including rooftop

1,000-2,000 MW 4,000-10,000 MW

20,000 MW

PV SYSTEM – INDIA POTENTIAL

Page 8: Solarsan-PVarchrev4-BESCOM

Solarsan-NRT [email protected]: 9890035993/9663905993

PV SYSTEM ARCHITECTURE- ADDRESS CUSTOMER NEEDS

PV PANEL

PV PANEL

PV PANEL

PV PANEL

MICRO INV

MICRO INV

MICRO INV

MICRO INV

AC COUPLED INVERTER

BAT- BANKS

BAT -MGMT SYSTEM

MICRO GRID( 230V , 50 Hz,4KW)

~ ~ ~ ~

ESSENTIAL LOAD

DISTBN PANEL

UTILITY DISTBN PANEL

ESSENTIAL

LOAD

UTILITY

LOAD

ACW2

BDACW1

ACW3

ACW1

DCW4

GRID

BDACW- Bidirectional AC WattsACW* - AC Watts measurementDCW* - DC Watts Measurement

DCW3

DCW2

DCW1

30V15A

30V15A

30V15A

30V15A

30V15A

Page 9: Solarsan-PVarchrev4-BESCOM

Solarsan-NRT [email protected]: 9890035993/9663905993

SOLARSAN–NRT- DEMO DESIGN

2 MODULEs in Parallel

2 MODULEs in Parallel

PV

COMBINER

WITH DC BKR

PV

COMBINER

WITH DC BKR

Overall 18,157Wp PV modules

GTI 11.5KW,2

30

GTI 21.5KW,2

30

ACB1

ACB2

AC COUPLED INVERTER4KW

SUB PANEL FOR ESSENTIAL LOAD WITH CB

TWO

PO

LE

AC D

ISC

ON

NE

CT

3 #s

BATTERYBANK

DIVERSION CONTROLR

(DVCT)

BDIRW

1

BDIRW

2

SOLAR THERMAL HEATER

MAIN PANEL

WITH CB

TO UTILITYGRID

TO ESSENTIAL LOAD

TO NON ESSENTIALLOADTHREE

MODULES IN SERIES

3 A,350 DC2.5mm2 Double insulated

15A,350 DC4mm2

15A,350V DC4mm2

230VAC,50Hz,10A

230VAC,50Hz,10A

230VAC,50Hz,15A

230VAC,50Hz,15A

UTILITYDISCONN

ECT

AC B3

CHANGEOVER SWITCH

PV GRID

(EXISTING) (EXISTING)

FRO

NT

SID

E M

OD

ULE

S16

#sR

EAR

SID

E M

OD

ULE

S16

#s

ACINV1

TO BE LOCATED NEAR METER BOX

230VAC,50Hz,30A

6mm2

6mm2

6mm2

6mm2

3 A,350 DC2.5mm2 Double insulated

Page 10: Solarsan-PVarchrev4-BESCOM

Solarsan-NRT [email protected]: 9890035993/9663905993

PV SYSTEM – NETWORK ARCHITECTURE

BDACW- Bidirectional AC Watts MeasurementACW* - AC Watts measurementDCW* - DC Watts MeasurementAP*: - Access Points

RS485/RS422 LINK

DCW1

DCW3

DCW3

DCW2 ACW

3

BDACW1

ACW2

ACW1

DCW4

SERIAL TO ETHERNET ADAPTER

LOCATED PHYSICALLY ON ROOFTOP

LOCATED PHYSICALLY IN GROUND FLOOR

AP1

AP2 ( OPTIONAL)

Entire Network powered by 24X7 Microgrid

INVESTMENT =0.05Cr

Page 11: Solarsan-PVarchrev4-BESCOM

Solarsan-NRT [email protected]: 9890035993/9663905993

ARCHITECTURE - DIFFERENTIATORS HARNESS SOLAR ENERGY INDEPENDENT OF GRID

AVAILABILITY.

PROVIDE 24X7 POWER SUPPLY TO ROOF.

CONVENTIONAL UTILITY CHARGED INVERTERS BE REPLACED BY SOLAR CHARGED BATTERY INVERTERS.

SCALABLE ARCHITECTURE TO MEET DIFFERENT CUSTOMER AFFORDABILITY POINTS

LOW COST REMOTE MONITORING. GOOGLE POWER METER

NON ABRASIVE CYLINDRICAL SOLAR PANELS. HORIZANTAL MOUNT.DOES NOT IMPACT ARCHITECTURE.

COMPONENT SELECTION PER INTERNATIONAL SAFETY NORM. UL, IEC, AS4777

Page 12: Solarsan-PVarchrev4-BESCOM

04

PV system

Applicable standards.

PV CELLS PV Modules Testing and Certification UL 1703 IEC 61215 IEC 61646 IEC / UL 61730 (UL 790 - fire test) Junction box UL 1703 UL 746C IEC / UL 61730

Polymeric materials UL 746A, B, C, D

Fire test (roof mounted modules) UL 790

Batteries UL 1989 UL 2054

PV MODULES (with junction box)

BATTERIES

COMBINER BOX

CHARGE CONTROLLER

INVERTER

Note: Many of these components or functions can be built into one product like the inverter.

Cable for PV UL 4703 outline UL 854 (USE-2)

Combiner Box UL 1741 Connector UL 1703 UL 486A/486B GFDI UL 1741

Inverter UL 1741 (future IEC / UL 62109)

Output wiring system NFPA70 NEC

AC LOADS Grid tied or stand alone

NANO ROOF TOP – DEMO- SAFETY REQUIREMENTS

Page 13: Solarsan-PVarchrev4-BESCOM

Solarsan-NRT [email protected]: 9890035993/9663905993

05

Photovoltaic modules and panels

Roofing materials

Inverters, converters, controllers and interconnection system equipment for use with distributed energy resources

Combiner boxes

Photovoltaic wire

Fuses

Photovoltaic connector

Polymeric materials

Procedures for temperature and irradiance corrections to measured I-V characteristics of crystalline siliconPhotovoltaic

Photovoltaic devices

Characteristic parameters of stand-alone photovoltaic (PV) systems

UV test for photovoltaic (PV) modules

Rating of direct coupled photovoltaic (PV) pumping systems

Crystalline silicon photovoltaic (PV) array -on-site measurement of I-V characteristics

Concentrator photovoltaic (CPV) modules and assemblies - design qualification and type approval

Portable solar photovoltaic (PV) lanterns - blank detail specification. Approval under the IEC system for conformity testing and certification of electrical equipment (IECEE)

Portable solar photovoltaic (PV) lanterns - design qualification and type approval. Amendment 1,extension to include lanterns with nickel-metal hydride batteries

Used as facades or building glass

Mounting and wiring methods are evaluated with the PV modules for impact resistance

PERFORMANCE SAFETY QUALITY

IEC 61215 (crystalline) IEC 61646 (thin film)

IEC 61730 UL 61730(harmonized with UL 1703) (previously UL 1703)

UL 790 (fire test)

IEC 62109 (end 2009) UL 1741 (future IEC / UL 62109)

UL 1741

Subject 4703(outline of investigation)UL 854 Service Entrance Cables USE-2

UL 248

UL 1703UL 486A / 486B

UL 746 A, B, C, D Subject 5703

IEC 60891 (ed.1)**Devices Amendment 1: 06-1992

IEC 60904 Series

IEC 61194 (ed.1)Referenced by IEC 61215

IEC 61345 (ed.1)Referenced by IEC 61215

IEC 61702 (ed.1)Referenced by IEC 61215

IEC 61829 (ed.1)Referenced by IEC 61215

IEC 62108 (ed.1) Subject 8703(outline of investigation)

IEC PVRS11

IEC PVRS11A

ANSIZ97, 1-1984

National Electric Code (NEC) Chapter 6, Article 690

OK

NA- CONCRETE ROOF

OK

OKOK

OKOK MC3/ MC4

OK MC3/ MC4

NA

OK

OKNA

NA

NA

NA

NA

NA

NANO ROOF TOP – DEMO- SAFETY COMPLIANCE MAP

IP65/67 ,LIGHNING PROTECTION ON DC SIDE

Page 14: Solarsan-PVarchrev4-BESCOM

Solarsan-NRT [email protected]: 9890035993/9663905993

NANO ROOF TOP - PERFORMANCE SO FAR...

SUMMARY - HSR345 NANO ROOF TOP

DURATION JAN 15 ~ FEB 12 2011

SOLAR ENERGY GENERATED 186.0

ENERGY FED FROM GRID 90.5

SOLAR ENERGY FED TO GRID( EXPORT) 114.6

TOTAL ENERGY CONSUMPTION 161.9

SOLAR ENERGY FED TO LOAD( ESSENTIAL, HEATER,BATTERY) 71.4

ESSENTIAL LOAD SOLAR ENERGY UNITS 35.6

BATTERY , HEATER SOLAR ENERGY 35.8

AVERAGE INSOLATION HRS/ DAY 10.2

Page 15: Solarsan-PVarchrev4-BESCOM

Solarsan-NRT [email protected]: 9890035993/9663905993

SOLARSAN–NRT- INTERCONNECTION COMPATIBILTY DIAGRAM

CB1

CB7

CB2 CB3

CB5A W

CB4

AC

I IN

ACI O

UT

KEBIN

GAC

IN

GTI2

GTI1C

B6PVA C

BIDIR

LOAD

KEBMETRCHANGE OVER SW

LOCATED IN FIRST FLOOR

BIDIR

Page 16: Solarsan-PVarchrev4-BESCOM

Solarsan-NRT [email protected]: 9890035993/9663905993

ROOFTOP NANO PLANT– BOM COST

BILL OF MATERIALS – ROOF TOP NANO PLANT ( in $)

KW CAPACITY 1.0 2.0 3.0 4.0

PANEL COST- $ 2555.6 5111.1 7666.7 10222.2

PV COMBINER BOX, MC4, ADAPTERS 850.0 1100.0 1350.0 1850.0

INVERTER COST($) 618.0 1236.0 1854.0 2112.0

AC COUPLED INVERTER($) 1714.0 1714.0 1840.0 1840.0

INSTALLATION COST($) 611.1 833.6 833.0 833.0

BATTERY 3 YRS VRLA,200Ah 183.3 366.7 550.0 733.3

MISCELLANEOUS LIKE BATTERY CABLES,DIVERSION CONTROLLER) 361.1

722.2 1083.3 1444.4

CIF - GTI 300.0 300.0 300.0 300.0

CIF+ Duty AC Coupled inv 1111.1 1111.0 1111.1 1111.1

CIF PV COMBINER BOX 81.5 163.0 244.4 325.9

TOTAL- ( $) 8385.7 12657.6 16832.6 20772.0

Estimate /Watt Peak-Rs 377.4 284.8 252.5 233.7

CAPITAL OUTLAY-ROOFTOP NANO PLANT- (Rs)

377356.7 569590.1 757465.0 934741.7

In Rs L 3.8 5.7 7.6 9.3

Page 17: Solarsan-PVarchrev4-BESCOM

Solarsan-NRT [email protected]: 9890035993/9663905993

SOLARSAN–NRT- NANO ROOF TOP – HSR345- 1.8KW -FINANCIALS

-1500000

-1000000

-500000

0

500000

1000000

1500000

2000000

2500000

2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

HSR345 FINANCIALS- PROTO NANO ROOF TOP

CUM-CASH FLOW-1KW- Rs

CUM-CASH FLOW-2KW- Rs

CUM-CASH FLOW-3KW- Rs

CUM-CASH FLOW-4KW- Rs

CU

MU

LATI

VE

CA

SH

FLO

W -

Rs

FINANCIAL METRIC 1 KW 2KW 3 KW 4 KW

IRR 1.42% 2.39% 2.84% 3.17%

PAYBACK PERIOD 13.00 9.00 8.00 7.00

ROI( 5 YRS) 0.40 0.56 0.64 0.70

ROI (25 YRS) 2.10 2.79 3.14 3.39

Page 18: Solarsan-PVarchrev4-BESCOM

Solarsan-NRT [email protected]: 9890035993/9663905993

SOLARSAN–NRT- NANO ROOF TOP – VOLUME- 10MW -FINANCIALS

FINANCIAL METRIC 1 KW 2KW 3 KW 4 KW

IRR 2.21% 3.19% 3.67% 4.08%

PAYBACK PERIOD(YRS) 10.00 7.50 6.50 5.50

ROI( 5 YRS) 0.53 0.70 0.80 0.88

ROI (25 YRS) 2.76 3.49 3.90 4.25

-1000000

-500000

0

500000

1000000

1500000

2000000

2500000

2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

NANO ROOF TOP- VOLUME 1 MW - FINANCIALS

CUM-CASH FLOW-1KW-RsCUM-CASH FLOW-2KW-RsCUM-CASH FLOW-3KW-RsCUM-CASH FLOW-4KW-Rs

CU

MU

LATI

VE

CA

SH

FLO

W -

Rs

Page 19: Solarsan-PVarchrev4-BESCOM

Solarsan-NRT [email protected]: 9890035993/9663905993

SOLARSAN–NRT- NANO ROOF TOP – VOLUME OF SCALE - FINANCIALS

NANO ROOF TOP - PROTO

NANO ROOF TOP - 10 MW VOLUME

FINANCIAL METRIC 1 KW 2KW 3 KW 4 KW

IRR 1.4% 2.4% 2.8% 3.2% PAYBACK PERIOD 13.0 9.0 8.0 7.0 ROI( 5 YRS) 0.4 0.6 0.6 0.7 ROI (25 YRS) 2.1 2.8 3.1 3.4 Ruppes/ Watt 377.4 284.8 252.5 233.7

FINANCIAL METRIC 1 KW 2KW 3 KW 4 KW IRR 2.2% 3.2% 3.7% 4.1% PAYBACK PERIOD 9.5 8.0 7.0 5.5 ROI( 5 YRS) 0.5 0.7 0.8 0.9 ROI (25 YRS) 2.8 3.5 3.9 4.3 Rs/ Watt 287.0 227.0 203.4 186.5

Page 20: Solarsan-PVarchrev4-BESCOM

Solarsan-NRT [email protected]: 9890035993/9663905993

SOLARSAN–NRT- NANO ROOF TOP – WAY FORWARD

RENEWABLE ENERGY POLICIES ARE IN PLACE. GOOD STARTING POINT.

NANO ROOF TOP LENDS ITSELF FOR QUICK MASS IMPLEMENTATION.

- ALL ASPECTS TECHNICAL, FUNDING, ...NEED TO DRAW UP PROCEDURES TO KEEP PACE. NO NEED FOR LAND APPROVAL,FOREST DEPT etc... ONLY OWNER, BESCOM PPA .

NEED FOR AGENCY LEVEL COMMON UNDERSTANDING. BESCOM, KERC, KREDL,MNRE ESPESCIALLY FOR CATEGORY 2 GRID CONNECTIVITY., FUNDING TYPES

HOW DO WE UPSCALE TO MASS IMPLEMENTATION?

BESCOM ONE POINT WINDOW . RENEWABLE ENERGY DEPARTMENT?

PPA PROCESS - IN PUBLIC DOMAIN.

ENERGY MONITORING POINTS, SAFETY AUDIT,CODE COMPLIANCE etc..

PPA PROCESS- CENTRAL FUNDING/ STATE FUNDING/ PRIVATE FUNDING

NEED FOR SEPARATE PPA PROCESS FOR EACH ROUTE TO ACCELERATE IMPLEMENTATION