SOLAR PARK – ROMANIA Photovoltaic Project Stage : Ready to Build 6,174 MWp November 2013 EXPERT GROUP CONSULTING

SOLAR PARK – ROMANIA Photovoltaic Project Stage : Ready to Build 6,174 MWp

  • Upload
    dixon

  • View
    34

  • Download
    0

Embed Size (px)

DESCRIPTION

EXPERT GROUP CONSULTING. SOLAR PARK – ROMANIA Photovoltaic Project Stage : Ready to Build 6,174 MWp. November 2013. STATUS. Ready to build project Term Sheet signed and Contract negotiation on-going with EPC co. for plant construction Contract signed for underground medium voltage line - PowerPoint PPT Presentation

Citation preview

Page 1: SOLAR PARK – ROMANIA Photovoltaic Project Stage : Ready to Build 6,174 MWp

SOLAR PARK – ROMANIA

Photovoltaic Project

Stage : Ready to Build6,174 MWp

November 2013

EXPERT GROUP CONSULTING

Page 2: SOLAR PARK – ROMANIA Photovoltaic Project Stage : Ready to Build 6,174 MWp

Ready to build project Term Sheet signed and Contract negotiation

on-going with EPC co. for plant construction Contract signed for underground medium

voltage line Contract for Grid Connection signed in 2013 Surveillance (“Dispecerizare”) required by

Transelectrica: calendar and very low cost secure

Page 3: SOLAR PARK – ROMANIA Photovoltaic Project Stage : Ready to Build 6,174 MWp

The project is located in the south part of Romania, in an area with a high solar irradiation potential, 70 km North from Bucharest, near Targoviste City (2 km from the City), in an industrial area, near a large modernized Transelectrica station (aprox. 1,5 Km);

Excellent road infrastructure for construction and general access to the Park.

The area is not crowded and suitable for solar PV developments not having influence by wind parks, with a very good stability of the grid;

The land was removed from the agricultural circuit, and is now located in intra muros area - according to the new requirements of the legislation.

The total surface of the land is 12 ha and is owned by the company.

Page 4: SOLAR PARK – ROMANIA Photovoltaic Project Stage : Ready to Build 6,174 MWp
Page 5: SOLAR PARK – ROMANIA Photovoltaic Project Stage : Ready to Build 6,174 MWp
Page 6: SOLAR PARK – ROMANIA Photovoltaic Project Stage : Ready to Build 6,174 MWp

ATR obtained from Transelectrica on April 25th 2013 Building Authorizations:

◦ For Park construction obtained on May 31st 2013 ◦ For Transelectrica Station and Underground Medium voltage Line obtained on June

6th 2013

ANRE: ◦ Set-up Authorization: Approved by ANRE on May 31st 2013

Legal Due Diligence Report issued by a very reputable law firm: available.

Transelectrica – Grid Connection Contract– signed

Page 7: SOLAR PARK – ROMANIA Photovoltaic Project Stage : Ready to Build 6,174 MWp

The connection to the Grid made directly to Station 20kV Electrica Targoviste owned by Transelectrica.

To execute the Grid Connection was necessary: ◦ To install one cell (20kV) in Station Electrica Targoviste ◦ To construct the underground medium voltage cables approx. 1,5 km in

length * ◦ To construct underground optic fiber for Transelectrica surveillance

(dispecerizare) *

Page 8: SOLAR PARK – ROMANIA Photovoltaic Project Stage : Ready to Build 6,174 MWp

Installed capacity: 6,174 MWp Total energy production: 8,390 MWh/a Energy Yield: 1360 kWh/kWp Capacity factor: 15,5% Technical Project and Detailed Design in

compliance with Romanian legislation : finalized.

Page 9: SOLAR PARK – ROMANIA Photovoltaic Project Stage : Ready to Build 6,174 MWp

Negotiations for taking over all the company shares for a very attractive price : 120,000 €/Mwp;

Legal asistance during negociation process and up to the completed transaction status;

Legal due diligence report on Solar Park Project;

Briefing on the legal framework governing the development of photovoltaic projects in ROMANIA, including authorization process;

Legal assistance regarding EU legislation on green energy production and its benefits;

Page 10: SOLAR PARK – ROMANIA Photovoltaic Project Stage : Ready to Build 6,174 MWp

Liliana TodirasProject Manager

P: +4 0722 378 457F : +4 0233 220 402

84 Traian Blvd. Neamt CountyPiatra Neamt 610142 [email protected]@tanasasiasociatii.ro