SOLAR AND WIND
BUSINESS MODELS FOR RENEWABLE ENERGY IN EIP
Timon Herzog, Grips Energy AG
UNIDO Workshop, Friday, 9th November 2018 - Ho Chi Minh City, Vietnam
© Grips Energy AG – www.grips-energy.com
BUSINESS MODEL & FOCUS
CAPEX-FREE | RENEWABLE | ENERGY & KNOWLEGE
Geographical focus:
• Sub-Saharan Africa
(so far branches in Zambia and Ghana)
• Southeast Asia
(key focus: Cambodia, Laos and Vietnam)
Renewable energy as a service:
• GRIPS supplies energy on a “pay-
per-use” basis
• For larger commercial and industrial
off-takers
• GRIPS finances, owns & operates
all required assets (CAPEX-free for
GRIPS customers)
Customer
$$$ $$$
Financing Financing Returns Returns
TYPICAL CONTRACTING STRUCTURE
Key Customer Benefits
• Economic optimization
• Reliable energy supply
• Strong improvement of ecological footprint
>> Contract models: PPA, lease, lease to own and rental
Competitive Renewable Energy Beyond Fossil Fuels and Public Grids
Contractor Off-taker
Global continuously
operating off-grid
diesel generators:
1.250 Mio t CO2 = Japan
2013
> 240 GW (> 5-10% growth p.a.)
investment volume
= 2.4 GW
= USD 3-8 billion
ANNUAL SAVINGS considering 2.4 GW (1%)
1.8 billion liters of diesel
4.8 Mio tonnes of CO2
4,800 tonnes of
particulate matter
1%
Total Size of Segment „Captive Diesel Replacement / Hybridization“1
1 Grips Energy AG market assessment
GLOBAL RELEVANCE
5
Business case: PV Cost Saver
Grid-connected factory
Self consumption of PV generation
Total Consumption 11,614 MWh/a
Initial system sizing: 6 MWp (Rooftop)
Solar coverage: 58% (of total load)
Self-consumption: 66% (5,786 MWh p.a.)
Further Measure: > process heat Inside 1 of 10 halls Total roof area 80,000m²
FACTORY EXAMPLE
Average load vs. PV generation
South East Asia – Fashion Factory - Savings
6
Saving Potential (PPA vs. Grid):
282,000 US$/year
(0.172 US$/kWh vs. PPA @ 0.125 US$/kWh)
CO2 Savings (based on PV electricity)
8,633 tones/year (129,498 at 15 years)
Further huge CO2 Saving potential
Sustainable process heat; Energy Efficiency
FACTORY EXAMPLE
Price Inflation PPA vs. BAU
South East Asia – Fashion Factory - Savings
Renewable Energy Systems (Wind/Solar-PV/Hybrid) for Industries
FINANCING OPTIONS
CONTRACTING
(energy payments / PPA)
RENT / LEASING
(fixed instalments)
Direct Purchase
(EPC/BOOT/...)
Third party owned (TPO)
Self-financed
• High initial CAPEX
• Long term
amortization
• Non-Core Business
Investment
• Technology Risk
• Knowledge required
• Good Investment
• No 3rd Party
• Opportunity for lower
total costs
•
• Suitable Off-Taker
required
• Suitable Project
required
•
• Cash-flow fitting
solution (no upfront
invest)
• Immediate, direct
savings
• Mitigation of
technology risk
• Access to expert
knowledge
•
Business Case / Benefits Matrix
CUSTOMER BUSINESS CASES I.
PV-Saver Diesel-Saver Semi-Hybrid Full-Hybrid Full-Energy
CO2 Saving
CO2 Neutral
If no heat required
Cost Saving benchmark
Grid > 0,12 US$ Diesel > 3h/d & 0,80 US$ / ltr.
Dep. On Mix Dep. On Mix Dep. On Mix
Reliable Supply
Technology PV-System (self-supply)
PV-System or/and ESS with
Diesel/HFO
RE/X-ESS-Diesel-Grid
PV-Wind-RE/X-ESS-Diesel/HFO
& RE Process Heat (e.g. Power to
heat, SHIP, WtE)
Objective Economical benefits through replacement of
grid power
Significant reduction of diesel/HFO
consumption
Reliable electricity supply,
complementary to the main grid
Fully grid-independent system 100%
electricity 24/7
Addition of emission free process heat / steam supply
Illustration of most important Use Cases vs. Load
CUSTOMER BUSINESS CASES II.
Full Hybrid (Island)
PV-Cost Saver (self-supply)
Semi-Hybrid (PV-ESS)
Emissions free. Storage. Power & Heat
OUTLOOK: 100% RE SUPPLY FOR EIP
Wind Turbines
PV System
5 GWh Lumenion Storage
District heat for local community
Refinery
Source: Lumenion GmbH – www.lumenion-energy.com
Thermal Use & Storage of non-required RE-Fluctuations
OUTLOOK: 100% RE SUPPLY FOR EIP
Source: Lumenion, Arbeitsgemeinschaft Energiebilanzen (AGEB), Lumenion estimate, *2011, RP-Energie-Lexikon
Lumenion Power to Heat CHP
• 650°C
• Medium: Steel
• 8hrs charge - 48hrs
dispatch
• Power-2-Heat
• Power-2-Heat&Power
www.lumenion-energy.com
Fluctuating RE System Example: Germany
• 90% renewables Scenario
2050
• Simulated 24 months
generation profile
• 380 GW PV,
• 160 GW onshore Wind
• 20 GW Offshore WIND
PV-Li-ion System for F&B Factory in Sub-Saharan Africa
EXEMPLARY SEMI-HYBRID
• Reliable Supply Focus
• Leasing Contract
• PV-ESS Hybrid System
• 99 kWp PV Generator (Canadian Solar, SMA)
• 130 kWh Li-Ion Battery System (ESS)
• Island system (parallel to grid and diesel
generator)
Loading of ESS in Berlin Li-Ion ESS
Construction Impressions
EXEMPLARY SEMI-HYBRID
Factory Impressions
EXEMPLARY SEMI-HYBRID
APPENDIX
COMPETITIVE ENERGY
BEYOND FOSSIL FUELS AND PUBLIC GRIDS
Management Board - Alexander Voigt (CEO) – Solar industry pioneer and serial entrepreneur (Founder SOLON, Q-Cells, Younicos)
- Timon Herzog (COO) – Renewable energy & development cooperation expert (GIZ, SOLON)1
- Michael Friedel (CTO) – RE Hybrid & storage technology expert (Younicos) 1
Supervisory Board - Jens Christian Gloede (Chairman) – Hardware and software serial entrepreneur (Founder FAST LTA AG)
- Christin Schäfer (Deputy Chairwoman) – Statistician and risk management expert (ERSTE Group Bank) 1
- Michael Schneider (Member) – Financing expert, impact entrepreneur (Head of ESG Deutsche Bank) 1
Grips Energy AG is part of and support by econnext / econnoa group http://econnoa.com/
GRIPS MANAGEMENT TEAM
More Than 500 MW of Renewables in 25 Countries Over the Last 20 Years
1 Previous positions
TEAM PROJECT REFERENCES (SELECTED)
GRIPS Management Team has been involved (among many, many other Projects) in
following ground breaking RE projects in leading roles:
• 1999: First EU roof integrated PV systems: Government buildings in Berlin (e.g. Paul-Löbe Haus), SOLON
• 2003: First 2 digit MW PV power plant of the world: Solarpark Erlasee 12 MW, SOLON (1400 2-axial tracking units),
SOLON
• 2004 to 2010: more than 250 MW EPC PV projects (large rooftops, building integrated, utility scale ground mounted, fixed
1- 2- axial tracked) in many parts of the world, SOLON
• 2008: SunEdison 8 MW 2 axial tracked project Alamosa, Colorado, USA, SOLON
• 2008: Development of Graciosa Island Project, 100% RE-hybrid, 4 MW Li-Ion, 1MW PV, 4,5 MW Wind, Younicos
• 2013: Terna, 2 MW Li-Ion for grid stabilisation, Sardinia Island, Italy, Green Utilty
• 2015: First commercial MW rooftop PPA in India – 3.5 MW PV, Delhi Metro (DMRC), GIZ
• 2015: First large scale PV rooftop system on a Indian Cricket Stadium, Bangalore, GIZ
Pictures: SOLON SE, Younicos AG, GIZ