    This is a sample specification for a leak location survey on soil-covered geomembrane over aconductive material. It should be used as a guide and not verbatim. TRI Environmental willreview your specific application and recommend changes to the specification as needed.Contact TRI Environmental personnel at (!!" !-TE#T or abeck$tri-env.com.

    GEOMEMBRANE LINER INTEGRITY TESTING EARTH COVERED GEOMEMBRANE

    PART 1 GENERAL

    1.1 SECTION INCLUDES

    A. This section includes a description of the leak location testing using the dipoleethod on the geoe!rane after placeent of the co"er soil aterial.

    1.# $ELATED SECTIONS

    A. Section %%%%% & ''''''''''''''

    (. Section %%%%% & ''''''''''''''

    C. Section %%%%% & ''''''''''''''

    D. Section %%%%% & ''''''''''''''

    1.) $E*E$ENCES

    A. AST+ D,-- & Standard /uide for Selection of Techni0ues for ElectricalDetection of otential Leak aths in /eoe!ranes

    (. AST+ D-22- & Standard ractices for Locating Leak in /eoe!ranesCo"ered 3ith 4ater or Earth +aterials

    1. SU(+ITTALS

    A. rior to coenceent of the liner integrit5 sur"e56 the liner integrit5 consultantshall su!it a 4ork lan to the CONT$ACTO$. The Liner Integrit5 Sur"e54ork lan shall include7

    1. 8ualifications of the proposed liner integrit5 consultant including thes0uare footage and nu!er of pro9ects of successful ethod applicationthe liner integrit5 consultant has perfored of the proposed sur"e5ethod.

    #. Description of the proposed sur"e5 ethod6 procedures6 sitepreparations6 estiated duration of sur"e56 and 0ualit5 control and fieldsensiti"it5 testing procedures.

    ). A Stateent of 8ualifications eeting the re0uireents of Section #.16aragraph A.

    . A list of nu!er and t5pes of defects located for the three 0ualif5ingpro9ects of the super"ising leak location technician or docuentation of

    Technical Specifications Soil:Co"ered /eoe!rane +ethods$e"ision # & +a5 #21) /eoe!rane Liner Integrit5 Testing

  • 8/10/2019 Soil Covered Geomembrane

    2/4

    the ELIS operator certification for said technician.

    (. If necessar56 the leak detection consultant shall pro"ide an5 peranentelectrodes6 3ires6 and installation instructions to the CONT$ACTO$ prior to theinstallation of the geoe!rane.

    C. The leak detection consultant shall report the general results of the sur"e5 tothe CONT$ACTO$ and O4NE$ during the dail5 progress of the field 3ork.

    D. rior to the deo!ili;ation of the sur"e5 personnel fro the site6 the leakdetection consultant shall su!it a list of locations of the leaks detected to theO4NE$6 CONT$ACTO$6 and INSTALLE$.

    E. The leak detection consultant shall su!it a letter report docuenting the field3ork and results of the sur"e5s to the O4NE$ 3ithin fourteen CONSULTANT AND SUE$?ISO$ 8UALI*ICATIONS

    A. The liner integrit5 consultant shall ha"e e@perience in conducting liner integrit5sur"e5s of the proposed ethod including ha"ing tested a iniu of62226222 s0uare feet of the proposed sur"e5 ethods on at least fi"e pro9ects.In addition6 the leak location sur"e5 shall !e super"ised !5 a professional ortechnician 3ith a iniu of #62226222 s0uare feet of liner integrit5 testinge@perience using the proposed ethod on at least three pro9ects. Alternati"el56the field professional or technician a5 aintain current Le"el ) ELIS operatorcertification in lieu of the iniu pro9ect and s0uare footage re0uireent.

    PART 3 EXECUTION

    ).1 IN*O$+ATION $E8UI$ED

    A. The leak detection consultant shall !e pro"ided 3ith dra3ings sho3ing7

    1. All la5ers constituting the lining s5ste and details of all linerpenetrations.

    #. lan of the sur"e5 area.

    ). eripheral details6 including 3elds to ad9acent lining s5stes.

    . Structures and o!structions a!o"e the liner.

    . Electrical e0uipent a!o"e the geoe!rane.

    Technical Specifications Soil:Co"ered /eoe!rane +ethods$e"ision # & +a5 #21) /eoe!rane Liner Integrit5 Testing

  • 8/10/2019 Soil Covered Geomembrane

    3/4

    ).# $EA$ATION AND SUO$T

    A. The CONT$ACTO$ is responsi!le for preparing the sur"e5 area for the leakdetection sur"e5. The preparation consists of6 !ut is not liited to6 the follo3ing7

    1. Install an5 necessar5 electrodes.

    #. Coordinate 3ith the leak detection consultant to pro"ide a sur"e5 area3ithin the liner e@pansion area that is electricall5 isolated fro thesurrounding ground

    A. The dipole leak detection sur"e5 shall !e perfored after the placeent of theprotecti"e co"er la5er.

    Technical Specifications Soil:Co"ered /eoe!rane +ethods$e"ision # & +a5 #21) /eoe!rane Liner Integrit5 Testing

  • 8/10/2019 Soil Covered Geomembrane

    4/4

    (. The leak detection consultant is responsi!le for cali!rating all e0uipent utili;edto achie"e optiu data 0ualit5 and sensiti"it5 for the site conditions.

    C. All 3ork shall !e perfored in accordance 3ith current industr5 and AST+standards.

    D. Data ac0uisition shall !e /S:!ased and a "oltage ap of the recorded dipoleeasureents shall !e generated in three diensions 3ith appropriate contourinter"als and colored "oltage ranges. The sensiti"it5 test shall include a "oltageap of the area including the artificial leak location.

    D. +anual easureents shall !e ade to "erif5 leak signals after data anal5sisand to pinpoint the leak positions on top of the protecti"e co"er la5er fore@ca"ation 3hile the sur"e5 personnel are on site. 4ithin one foot of the liner6the CONT$ACTO$s la!orers shall hand e@ca"ate possi!le leak locations toe@pose the liner.

    E. Additional anual easureents should !e ade to guide the

    CONT$ACTO$s personnel 3hile the5 e@ca"ate the leak6 if re0uired.

    *. After the identification and e@ca"ation of a leak6 the soil around the leak locationshall !e tested 3hile the leak is unco"ered and cleaned to check for ad9acentleaks.

    /. Leak locations shall !e logged6 "isi!l5 arked6 and reported for repair.

    . The leak detection consultant shall report the general results of the sur"e5 tothe Lead C8A +onitor and CONT$ACTO$ during the dail5 progress of the field3ork.

    I. rior to the deo!ili;ation of the sur"e5 personnel fro the site6 the leak

    detection consultant shall su!it a list of locations of the leaks detected to theLead C8A +onitor and CONT$ACTO$.

    . The leak detection consultant shall su!it a letter report docuenting the field3ork and results of the sur"e5s to the CONT$ACTO$ 3ithin fourteen