© Douglas OHI [email protected] www.douglasohi.com SOHAR REFINERY IMPROVEMENT PROJECT Key Facts Client: Daelim Petrofac SRIP Joint Venture Period: 19 Months Location: Sohar, Sultanate of Oman Completion Date: October 2015 EPC works for plant & general buildings (26 no) with a total floor area of 12,790 m2 comprising 13 no. blast resistant building (integrated control building, TA substation, MI substation, substation, SIH buildings & operator shelters) and 13 no. non-blast resistant buildings (TL building, fire station, SWI substation, MR substation, guard house, canopy for truck loading, TLS office, maintenance workshop & extension of existing lab building).

SOHAR REFINERY IMPROVEMENT PROJECT · IMPROVEMENT PROJECT Key Facts Client: Daelim Petrofac SRIP Joint Venture Period: 19 Months Location: Sohar, Sultanate of Oman Completion Date:

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

© Douglas OHI [email protected] www.douglasohi.com

SOHAR REFINERYIMPROVEMENT PROJECT

Key Facts

Client:Daelim Petrofac SRIP Joint Venture

Period:19 Months

Location:Sohar, Sultanate of Oman

Completion Date:October 2015

EPC works for plant & general buildings (26 no) with a total floor area of 12,790 m2 comprising 13 no. blast resistant building (integrated control building, TA substation, MI substation, substation, SIH buildings & operator shelters) and 13 no. non-blast resistant buildings (TL building, fire station, SWI substation, MR substation, guard house, canopy for truck loading, TLS office, maintenance workshop & extension of existing lab building).